메뉴 건너뛰기




Volumn 24, Issue 4, 2006, Pages 330-336

Non-delay scheduling as a managerial approach for managing projects

Author keywords

Branch and bound; Managing projects; Non delay scheduling; Resource constraints; Theory of constraints; Time

Indexed keywords

ALGORITHMS; CONSTRAINT THEORY; MATHEMATICAL MODELS; PLANNING; SCHEDULING;

EID: 33645966496     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2005.11.002     Document Type: Article
Times cited : (21)

References (32)
  • 1
    • 33646014218 scopus 로고
    • Optimum seeking with branch and bound
    • Agin N. Optimum seeking with branch and bound. Manage Sci 13 4 (1966) 176-185
    • (1966) Manage Sci , vol.13 , Issue.4 , pp. 176-185
    • Agin, N.1
  • 2
    • 0344466654 scopus 로고    scopus 로고
    • A heuristic search algorithm for solving resource-constrained project scheduling problems
    • Ahsan M.K., and Tsao D. A heuristic search algorithm for solving resource-constrained project scheduling problems. Asia-Pacific J Oper Res 20 2 (2003) 143-160
    • (2003) Asia-Pacific J Oper Res , vol.20 , Issue.2 , pp. 143-160
    • Ahsan, M.K.1    Tsao, D.2
  • 3
    • 0001849846 scopus 로고
    • Heuristic algorithms for a resource-constrained project scheduling: A review and an empirical analysis
    • Slowinski R., and Weglarz J. (Eds), Elsevier, Amsterdam
    • Alvarez-Valdes R., and Tamarit J.M. Heuristic algorithms for a resource-constrained project scheduling: A review and an empirical analysis. In: Slowinski R., and Weglarz J. (Eds). Advances in project scheduling (1989), Elsevier, Amsterdam 113-134
    • (1989) Advances in project scheduling , pp. 113-134
    • Alvarez-Valdes, R.1    Tamarit, J.M.2
  • 5
    • 32644440855 scopus 로고    scopus 로고
    • Multi-project scheduling and control: a process-based comparative study of the critical chain methodology and some alternatives
    • Cohen I., Mandelbaum A., and Shtub A. Multi-project scheduling and control: a process-based comparative study of the critical chain methodology and some alternatives. Project Manage J 35 2 (2004) 39-50
    • (2004) Project Manage J , vol.35 , Issue.2 , pp. 39-50
    • Cohen, I.1    Mandelbaum, A.2    Shtub, A.3
  • 7
    • 0034311599 scopus 로고    scopus 로고
    • The discrete time/resource trade-off problem in project networks: a branch and bound approach
    • Demeulemeester E., De-Reyck B., and Herroelen W. The discrete time/resource trade-off problem in project networks: a branch and bound approach. IIE Trans 32 (2000) 1059-1069
    • (2000) IIE Trans , vol.32 , pp. 1059-1069
    • Demeulemeester, E.1    De-Reyck, B.2    Herroelen, W.3
  • 8
    • 0031272722 scopus 로고    scopus 로고
    • New benchmark results for the resource-constrained project scheduling problem
    • Demeulemeester E.L., and Herroelen W.S. New benchmark results for the resource-constrained project scheduling problem. Manage Sci 43 11 (1997) 1485-1492
    • (1997) Manage Sci , vol.43 , Issue.11 , pp. 1485-1492
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 9
    • 33645958022 scopus 로고    scopus 로고
    • Demeulemeester E. Optimal algorithms for various classes of multiple resource-constrained project scheduling problems, unpublished Ph.D. Dissertation, Katholieke Universiteit Leuven, Belgium, 1992.
  • 10
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester E., and Herroelen W. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Manage Sci 38 (1992) 1803-1818
    • (1992) Manage Sci , vol.38 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 11
    • 33646008335 scopus 로고    scopus 로고
    • Globerson S, Shtub A. Project management - planning, executing and control, Dyunon, Tel-Aviv, Israel (in Hebrew). 2004.
  • 12
    • 0004244246 scopus 로고
    • The North River Press, Great Barrington, MA
    • Goldratt E.M. The goal (1984), The North River Press, Great Barrington, MA
    • (1984) The goal
    • Goldratt, E.M.1
  • 13
    • 0003926816 scopus 로고    scopus 로고
    • The North River Press, Great Barrington, MA
    • Goldratt E.M. Critical Chain (1997), The North River Press, Great Barrington, MA
    • (1997) Critical Chain
    • Goldratt, E.M.1
  • 15
    • 33646011307 scopus 로고    scopus 로고
    • PERT scheduling with resource-constraints using qualitative simulation graphs
    • Ingalls R.G., and Morrice D.J. PERT scheduling with resource-constraints using qualitative simulation graphs. Project Manage J 35 3 (2004) 5-14
    • (2004) Project Manage J , vol.35 , Issue.3 , pp. 5-14
    • Ingalls, R.G.1    Morrice, D.J.2
  • 16
    • 33645999439 scopus 로고    scopus 로고
    • Kaplan LA. Resource-constrained project scheduling with preemption of jobs, Unpublished PhD Thesis, University of Michigan. 1988.
  • 18
    • 0030231487 scopus 로고    scopus 로고
    • Efficient priority rules for the resource-constrained project scheduling problem
    • Kolisch R. Efficient priority rules for the resource-constrained project scheduling problem. J Oper Manage 14 3 (1996) 179-192
    • (1996) J Oper Manage , vol.14 , Issue.3 , pp. 179-192
    • Kolisch, R.1
  • 19
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for solving the resource-constrained project scheduling problem: classification and computational analysis
    • Weglarz J. (Ed), Kluwer Academic Publishers [Chapter 7]
    • Kolisch R., and Hartman S. Heuristic algorithms for solving the resource-constrained project scheduling problem: classification and computational analysis. In: Weglarz J. (Ed). Handbook of recent advances in project scheduling (1999), Kluwer Academic Publishers 147-178 [Chapter 7]
    • (1999) Handbook of recent advances in project scheduling , pp. 147-178
    • Kolisch, R.1    Hartman, S.2
  • 21
    • 33645966274 scopus 로고    scopus 로고
    • Management by projects achieving success in a changing world
    • Kidlington: 3 pgs
    • Lichtenberg S. Management by projects achieving success in a changing world. Int J Project Manage 17 4 (1999) 266 Kidlington: 3 pgs
    • (1999) Int J Project Manage , vol.17 , Issue.4 , pp. 266
    • Lichtenberg, S.1
  • 22
    • 0032070635 scopus 로고    scopus 로고
    • An exact algorithm for project scheduling with resource-constraints based on a new mathematical formulation
    • Mingozzi A., Maniezzo V., Ricciardelli S., and Bianco L. An exact algorithm for project scheduling with resource-constraints based on a new mathematical formulation. Manage Sci 44 5 (1998) 714-729
    • (1998) Manage Sci , vol.44 , Issue.5 , pp. 714-729
    • Mingozzi, A.1    Maniezzo, V.2    Ricciardelli, S.3    Bianco, L.4
  • 23
    • 0016028677 scopus 로고
    • A horizon-varying, zero-one approach to project scheduling
    • Patterson J.H., and Huber W.D. A horizon-varying, zero-one approach to project scheduling. Manage Sci 20 6 (1974) 990-998
    • (1974) Manage Sci , vol.20 , Issue.6 , pp. 990-998
    • Patterson, J.H.1    Huber, W.D.2
  • 24
    • 0014574409 scopus 로고
    • Multi project scheduling with limited resources: a zero-one programming approach
    • Pritsker A.A.B., Watters L.J., and Wolfe P.M. Multi project scheduling with limited resources: a zero-one programming approach. Manage Sci 16 (1969) 93-108
    • (1969) Manage Sci , vol.16 , pp. 93-108
    • Pritsker, A.A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 25
    • 18144388787 scopus 로고    scopus 로고
    • A critical look at critical chain project management
    • Raz T., Barnes R., and Dvir D. A critical look at critical chain project management. Project Manage J 34 4 (2003) 24-32
    • (2003) Project Manage J , vol.34 , Issue.4 , pp. 24-32
    • Raz, T.1    Barnes, R.2    Dvir, D.3
  • 26
    • 0029636114 scopus 로고
    • Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
    • Sprecher A., Kolish R., and Drexl A. Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem. Eur J Oper Res 80 (1995) 94-102
    • (1995) Eur J Oper Res , vol.80 , pp. 94-102
    • Sprecher, A.1    Kolish, R.2    Drexl, A.3
  • 27
    • 0018011301 scopus 로고
    • Multiple resource-constrained scheduling using branch-and-bound
    • Stinson J.P., Davis E.W., and Khumawala B.M. Multiple resource-constrained scheduling using branch-and-bound. AIIE Trans 10 3 (1978) 252-259
    • (1978) AIIE Trans , vol.10 , Issue.3 , pp. 252-259
    • Stinson, J.P.1    Davis, E.W.2    Khumawala, B.M.3
  • 28
    • 0347410241 scopus 로고    scopus 로고
    • Sunde L, Lichtenberg S. Net-present-value cost/time tradeoff. Int J Project Manage 1995;13(1):45, 5p.
  • 29
    • 0017997005 scopus 로고
    • An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems
    • Talbot B., and Patterson J. An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems. Manage Sci 24 (1978) 1163-1174
    • (1978) Manage Sci , vol.24 , pp. 1163-1174
    • Talbot, B.1    Patterson, J.2
  • 30
    • 0035617605 scopus 로고    scopus 로고
    • A competitive heuristic solution technique for resource-constrained project scheduling
    • Tormos P., and Lova A. A competitive heuristic solution technique for resource-constrained project scheduling. Ann Oper Res 102 1 (2001) 65
    • (2001) Ann Oper Res , vol.102 , Issue.1 , pp. 65
    • Tormos, P.1    Lova, A.2
  • 31
    • 1542790563 scopus 로고    scopus 로고
    • Evaluating the quality of project planning: a model and field results
    • Zwikael O., and Globerson S. Evaluating the quality of project planning: a model and field results. Int J Prod Res 42 8 (2004) 1545-1556
    • (2004) Int J Prod Res , vol.42 , Issue.8 , pp. 1545-1556
    • Zwikael, O.1    Globerson, S.2
  • 32
    • 24344494424 scopus 로고    scopus 로고
    • Cultural differences in project management processes: a field study
    • Zwikael O., Shimizu K., and Globerson S. Cultural differences in project management processes: a field study. Int J Project Manage 23 6 (2005) 454-462
    • (2005) Int J Project Manage , vol.23 , Issue.6 , pp. 454-462
    • Zwikael, O.1    Shimizu, K.2    Globerson, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.