메뉴 건너뛰기




Volumn 57, Issue 4, 2006, Pages 261-271

Project schedule management using a fuzzy activity network considering resource and environmental factors

Author keywords

Fuzzy activity network; Project schedule management; Resource and environment factors

Indexed keywords

COMPUTATION THEORY; DISTRIBUTION OF GOODS; FUZZY CONTROL; QUALITY CONTROL; SCHEDULING;

EID: 33846382794     PISSN: 13422618     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (5)

References (24)
  • 1
    • 0001501655 scopus 로고
    • Applications of a Technique for Research and Development Program Evaluation
    • Malcolm. D, Roseboom, Clark, and W. Fazar. 1959. "Applications of a Technique for Research and Development Program Evaluation", Operations Research, Vol.7, 646-669.
    • (1959) Operations Research , vol.7 , pp. 646-669
    • Malcolm1    Roseboom, D.2    Clark3    Fazar, W.4
  • 2
    • 0002641538 scopus 로고
    • An analystical study of PERT assumptions
    • MacCrimmon K.R and Ryavec C.A (1964) "An analystical study of PERT assumptions" Operation Research, Vol.12, 16-37.
    • (1964) Operation Research , vol.12 , pp. 16-37
    • MacCrimmon, K.R.1    Ryavec, C.A.2
  • 5
    • 0033891504 scopus 로고    scopus 로고
    • Project duration in stochastic networks by PERT-path technique
    • Pierpaolo (2000) "Project duration in stochastic networks by PERT-path technique" Int. Journal of Project Management, Vol.18, 215-222.
    • (2000) Int. Journal of Project Management , vol.18 , pp. 215-222
    • Pierpaolo1
  • 6
    • 33846382436 scopus 로고    scopus 로고
    • New Method for Calculating Path Float in PERT
    • Deng H. Z, and Jian S. Z (2003) "New Method for Calculating Path Float in PERT", Journal of Constr. Engrg and Mgmt, Vol.129, 501-506.
    • (2003) Journal of Constr. Engrg and Mgmt , vol.129 , pp. 501-506
    • Deng, H.Z.1    Jian, S.Z.2
  • 7
    • 0002146440 scopus 로고
    • The use of fuzzy variables in PERT
    • Stefan Ghanas and Kamburowski (1981) "The use of fuzzy variables in PERT" Fuzzy Sets and Systems, Vol 5, 11-19.
    • (1981) Fuzzy Sets and Systems , vol.5 , pp. 11-19
    • Ghanas, S.1    Kamburowski2
  • 8
    • 0020798185 scopus 로고
    • Fuzzy Network Planning-FNET
    • August
    • Igor Gazdik (1983) "Fuzzy Network Planning-FNET", IEEE Transactions on Reliability, Vol R32,No3, August 1983.
    • (1983) IEEE Transactions on Reliability , vol.R32 , Issue.NO3
    • Gazdik, I.1
  • 9
    • 0035885517 scopus 로고    scopus 로고
    • Critical path analysis in the network with fuzzy activity times
    • Stefan Ghanas and Pawel Zielinski (2001) "Critical path analysis in the network with fuzzy activity times" Fuzzy Sets and Systems, Vol.122, 195-204.
    • (2001) Fuzzy Sets and Systems , vol.122 , pp. 195-204
    • Ghanas, S.1    Zielinski, P.2
  • 10
    • 0035670765 scopus 로고    scopus 로고
    • Shy-Ming Chen and Tao Hsing Chang Finding Multiple possible Critical Paths Using Fuzzy PERT IEEE Transactions on Systems, Man and Crybernetics- Part B, 31, No 6, 2001.
    • Shy-Ming Chen and Tao Hsing Chang "Finding Multiple possible Critical Paths Using Fuzzy PERT" IEEE Transactions on Systems, Man and Crybernetics- Part B, Vol.31, No 6, 2001.
  • 11
    • 0024770103 scopus 로고
    • Stochastic and fiizzy PERT
    • Lootsma F.A. (1989)"Stochastic and fiizzy PERT" European J. Op.Rer, Vol.43, 174-183.
    • (1989) European J. Op.Rer , vol.43 , pp. 174-183
    • Lootsma, F.A.1
  • 12
    • 0021441936 scopus 로고
    • Project scheduling using fuzzy set concepts"
    • Ayyub and Haldar (1983) "Project scheduling using fuzzy set concepts" Journal of Constr. Engrg and Mgmt, ASCE, Vol.110(2), 189-436.
    • (1983) Journal of Constr. Engrg and Mgmt, ASCE , vol.110 , Issue.2 , pp. 189-436
    • Ayyub1    Haldar2
  • 13
    • 0027592830 scopus 로고
    • Using PERT as an Approximation of Fuzzy Project-Network Analysis
    • McCahon C S (1993) "Using PERT as an Approximation of Fuzzy Project-Network Analysis" IEEE Transactions on Engineering Management, Vol.40(2), 146-153.
    • (1993) IEEE Transactions on Engineering Management , vol.40 , Issue.2 , pp. 146-153
    • McCahon, C.S.1
  • 14
    • 0000732919 scopus 로고    scopus 로고
    • Project Network Analysis using fuzzy sets theory
    • Pasit and Osama (1996)"Project Network Analysis using fuzzy sets theory" Journal of Constr. Engrg and Mgmt, Vol. 122(4), 308-317.
    • (1996) Journal of Constr. Engrg and Mgmt , vol.122 , Issue.4 , pp. 308-317
    • Pasit1    Osama2
  • 15
    • 33846386870 scopus 로고    scopus 로고
    • Project schedule uncertainty analysis using fuzzy logic
    • Liberatore (2002) "Project schedule uncertainty analysis using fuzzy logic" Project Management Journal, Vol.33, 15-22.
    • (2002) Project Management Journal , vol.33 , pp. 15-22
    • Liberatore1
  • 16
    • 0018478270 scopus 로고    scopus 로고
    • Carr, R (1979) Simulation of project duration J. Constr. Div, ASCE, l05(2),117-128.
    • Carr, R (1979) "Simulation of project duration" J. Constr. Div, ASCE, Vol.l05(2),117-128.
  • 17
    • 0034322763 scopus 로고    scopus 로고
    • Model for evaluating networks under correlated uncertainty- NETCOR"
    • Wang, W-C and Demsetz, L.A (2000) " Model for evaluating networks under correlated uncertainty- NETCOR" Journal of Constr. Engrg and Mgmt, ASCE, Vol. 126(6), 458-466.
    • (2000) Journal of Constr. Engrg and Mgmt, ASCE , vol.126 , Issue.6 , pp. 458-466
    • Wang, W.-C.1    Demsetz, L.A.2
  • 18
    • 0034324513 scopus 로고    scopus 로고
    • Application Example for Evaluating Networks Considering Correlation
    • Wang, W-C and Demsetz, L.A (2000) "Application Example for Evaluating Networks Considering Correlation" Journal of Constr. Engrg and Mgmt, Vol.126, 467-474.
    • (2000) Journal of Constr. Engrg and Mgmt , vol.126 , pp. 467-474
    • Wang, W.-C.1    Demsetz, L.A.2
  • 19
    • 12444300210 scopus 로고    scopus 로고
    • Factor-based path analysis to support subcontractor management
    • Wei-Chih Wang and Jang-Jeng Lii (2005) "Factor-based path analysis to support subcontractor management", International Journal of Project Management, Vol.23, 109-120.
    • (2005) International Journal of Project Management , vol.23 , pp. 109-120
    • Wang, W.1    Lii, J.2
  • 20
    • 33846346658 scopus 로고    scopus 로고
    • Zadeh L.A (1965) Fuzzy Sets in Selected Papers by L.A. Zadeh.
    • Zadeh L.A (1965) "Fuzzy Sets" in Selected Papers by L.A. Zadeh.
  • 21
    • 33846341875 scopus 로고    scopus 로고
    • Zadeh, L.A (1978) Fuzzy sets as a basis for a theory of possibility in Selected Papers by L.A. Zadeh.
    • Zadeh, L.A (1978) "Fuzzy sets as a basis for a theory of possibility" in Selected Papers by L.A. Zadeh.
  • 23
    • 0001130859 scopus 로고
    • Comparison of fuzzy numbers based on the probability measure of fuzzy events
    • Lee E.S and Li R.L (1988) "Comparison of fuzzy numbers based on the probability measure of fuzzy events" Computer and Mathematics with Application, Vol 15, 887-896.
    • (1988) Computer and Mathematics with Application , vol.15 , pp. 887-896
    • Lee, E.S.1    Li, R.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.