메뉴 건너뛰기




Volumn 44, Issue 11, 2006, Pages 2183-2203

A fuzzy logic modelling of dynamic scheduling in FMS

Author keywords

FMS scheduling; Fuzzy scheduling; Multicriteria scheduling

Indexed keywords

FUZZY SETS; JOB ANALYSIS; OPERATIONS RESEARCH; PROCESS CONTROL; PRODUCTION CONTROL; SCHEDULING;

EID: 33646394085     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540500465493     Document Type: Article
Times cited : (26)

References (32)
  • 1
    • 0033207947 scopus 로고    scopus 로고
    • Towards the integration of flexible manufacturing system scheduling
    • Balogun, O.O. and Popplewell, K., Towards the integration of flexible manufacturing system scheduling. Int. J. Prod. Rex., 1999, 37, 3399-3428.
    • (1999) Int. J. Prod. Rex. , vol.37 , pp. 3399-3428
    • Balogun, O.O.1    Popplewell, K.2
  • 4
  • 7
    • 0037328890 scopus 로고    scopus 로고
    • A modelling technique for loading and scheduling problems in FMS
    • Gamila, M.A. and Motavalli, S., A modelling technique for loading and scheduling problems in FMS. Robot. & Comp. Integ. Manuf., 2003, 19, 45-54.
    • (2003) Robot. & Comp. Integ. Manuf. , vol.19 , pp. 45-54
    • Gamila, M.A.1    Motavalli, S.2
  • 8
    • 0028408966 scopus 로고
    • Dispatching rules in scheduling: A fuzzy approach
    • Grabot, B. and Geneste, E.L., Dispatching rules in scheduling: a fuzzy approach. Int. J. Prod. Res., 1994, 32, 903-915.
    • (1994) Int. J. Prod. Res. , vol.32 , pp. 903-915
    • Grabot, B.1    Geneste, E.L.2
  • 9
    • 0001326653 scopus 로고    scopus 로고
    • Scheduling a two-stage hybrid flow-shop with separable setup and removal times
    • Gupta, J.N.D. and Tune, E.A., Scheduling a two-stage hybrid flow-shop with separable setup and removal times. Euro. J. Op. Res., 1997, 77, 415-428.
    • (1997) Euro. J. Op. Res. , vol.77 , pp. 415-428
    • Gupta, J.N.D.1    Tune, E.A.2
  • 10
    • 0024715944 scopus 로고
    • A method to control flexible manufacturing systems
    • Hintz, G.W. and Zimmermann, H.J., A method to control flexible manufacturing systems. Euro. J. Op. Res., 1989, 41, 421-434.
    • (1989) Euro. J. Op. Res. , vol.41 , pp. 421-434
    • Hintz, G.W.1    Zimmermann, H.J.2
  • 11
    • 0031365101 scopus 로고    scopus 로고
    • Real-time operation selection in an FMS using simulation - A fuzzy approach
    • Kazerooni, A., Chan, F.T.S. and Abhary, K., Real-time operation selection in an FMS using simulation - a fuzzy approach. Prod. Planning & Control, 1997, 8, 771-779.
    • (1997) Prod. Planning & Control , vol.8 , pp. 771-779
    • Kazerooni, A.1    Chan, F.T.S.2    Abhary, K.3
  • 14
    • 0030106944 scopus 로고    scopus 로고
    • The classification of FMS scheduling problems
    • Liu, J. and MacCarthy, B.L., The classification of FMS scheduling problems. Int. J. Prod. Res., 1996, 34, 647-656.
    • (1996) Int. J. Prod. Res. , vol.34 , pp. 647-656
    • Liu, J.1    MacCarthy, B.L.2
  • 15
    • 0027625736 scopus 로고
    • Scheduling of manufacturing systems using the Lagrangian relaxation technique
    • Luh, P.B. and Hoitomt, D.J., Scheduling of manufacturing systems using the Lagrangian relaxation technique. IEEE Trans. on Auto. Control, 1993, 38, 1066-1079.
    • (1993) IEEE Trans. on Auto. Control , vol.38 , pp. 1066-1079
    • Luh, P.B.1    Hoitomt, D.J.2
  • 16
    • 0016451032 scopus 로고    scopus 로고
    • An experiment in linguistic synthesis with a fuzzy logic controller
    • Mamadani, E.H. and Assilian S., An experiment in linguistic synthesis with a fuzzy logic controller, Int. J. Man-Mach. St., 7(1), 1-13.
    • Int. J. Man-Mach. St. , vol.7 , Issue.1 , pp. 1-13
    • Mamadani, E.H.1    Assilian, S.2
  • 19
    • 0028585426 scopus 로고
    • Exploiting shop floor status information to scheduling complex job shops
    • Ovacik, I.M. and Uzsoy, R., Exploiting shop floor status information to scheduling complex job shops. J. Manuf. Syst., 1994, 13, 73-84.
    • (1994) J. Manuf. Syst. , vol.13 , pp. 73-84
    • Ovacik, I.M.1    Uzsoy, R.2
  • 21
    • 0024943441 scopus 로고
    • Integrating scheduling and control functions in computer integrated manufacturing using artificial intelligence
    • Rabelo, L.C. and Alptekin, S., Integrating scheduling and control functions in computer integrated manufacturing using artificial intelligence. Int. J. Comp. & Indust. Eng., 1989, 17, 101-106.
    • (1989) Int. J. Comp. & Indust. Eng. , vol.17 , pp. 101-106
    • Rabelo, L.C.1    Alptekin, S.2
  • 22
    • 0025262878 scopus 로고
    • Multi-criteria operational control rules in flexible manufacturing systems
    • Ro, I. and Kim, J., Multi-criteria operational control rules in flexible manufacturing systems. Int. J. Prod. Res., 1990, 28, 47-63.
    • (1990) Int. J. Prod. Res. , vol.28 , pp. 47-63
    • Ro, I.1    Kim, J.2
  • 24
    • 0031275801 scopus 로고    scopus 로고
    • Due date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporters
    • Roh, H.K. and Kim, Y.D., Due date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporters. Int. J. Prod. Res., 1997, 35, 2989-3003.
    • (1997) Int. J. Prod. Res. , vol.35 , pp. 2989-3003
    • Roh, H.K.1    Kim, Y.D.2
  • 25
    • 0025419819 scopus 로고
    • Modelling and scheduling of a flexible manufacturing system
    • Sawik, T., Modelling and scheduling of a flexible manufacturing system. Euro. J. Op. Res., 1990, 45, 177-190.
    • (1990) Euro. J. Op. Res. , vol.45 , pp. 177-190
    • Sawik, T.1
  • 26
    • 0032656054 scopus 로고    scopus 로고
    • A new approach to finite scheduling
    • Shayan, E. and Fallah, H., A new approach to finite scheduling. Int. J. Prod. Res., 1999, 37, 1903-1915.
    • (1999) Int. J. Prod. Res. , vol.37 , pp. 1903-1915
    • Shayan, E.1    Fallah, H.2
  • 27
    • 0030398342 scopus 로고    scopus 로고
    • Parallel machine scheduling with release dates, due dates and family setup times
    • Schutten, J.M.J. and Leussink, R.A.M., Parallel machine scheduling with release dates, due dates and family setup times. Int. J. Prod. Econ., 1996, 46-47, 119-125.
    • (1996) Int. J. Prod. Econ. , vol.46-47 , pp. 119-125
    • Schutten, J.M.J.1    Leussink, R.A.M.2
  • 29
    • 0032686543 scopus 로고    scopus 로고
    • Fuzzy inference-based multiple criteria FMS scheduling
    • Yu, L., Shih, H.M. and Sekiguchi, T., Fuzzy inference-based multiple criteria FMS scheduling. Int. J. Prod. Res., 1999, 37, 2315-2333.
    • (1999) Int. J. Prod. Res. , vol.37 , pp. 2315-2333
    • Yu, L.1    Shih, H.M.2    Sekiguchi, T.3
  • 30
    • 0028766747 scopus 로고
    • Preemptive scheduling with releases dates, delivery times and sequence independent setup times
    • Zdrzalka, S., Preemptive scheduling with releases dates, delivery times and sequence independent setup times. Euro. J. Op. Res., 1994, 76, 60-71.
    • (1994) Euro. J. Op. Res. , vol.76 , pp. 60-71
    • Zdrzalka, S.1
  • 31
    • 0010771889 scopus 로고    scopus 로고
    • A sequencing problem with family setup times
    • Zdrzalka, S., A sequencing problem with family setup times. Discrete Appl. Math., 1996, 66, 161-183.
    • (1996) Discrete Appl. Math. , vol.66 , pp. 161-183
    • Zdrzalka, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.