메뉴 건너뛰기




Volumn 36, Issue 9, 1998, Pages 2609-2626

A real-time scheduling mechanism for a flexible manufacturing system: Using simulation and dispatching rules

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL METHODS; COMPUTER SIMULATION; MATHEMATICAL MODELS; PROCESS CONTROL; PRODUCTION CONTROL; REAL TIME SYSTEMS; SCHEDULING; STRATEGIC PLANNING;

EID: 0032163477     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075498192733     Document Type: Article
Times cited : (110)

References (32)
  • 1
    • 0028374762 scopus 로고
    • A simulation-based scheduler for flexible flowlines
    • Bengu, G., 1994, A simulation-based scheduler for flexible flowlines. International Journal of Production Research, 32, 321-344.
    • (1994) International Journal of Production Research , vol.32 , pp. 321-344
    • Bengu, G.1
  • 3
    • 0039986700 scopus 로고
    • The use of neural networks in determining operational policies for manufacturing systems
    • Chryssolouris, G., Lee, M. and Domroese, M., 1991, The use of neural networks in determining operational policies for manufacturing systems. Journal of Manufacturing Systems, 10, 166-175.
    • (1991) Journal of Manufacturing Systems , vol.10 , pp. 166-175
    • Chryssolouris, G.1    Lee, M.2    Domroese, M.3
  • 7
    • 0028590749 scopus 로고
    • Real-time distributed scheduling of heterarchical manufacturing systems
    • Duffie, N. A. and Prabhu, V. V., 1994, Real-time distributed scheduling of heterarchical manufacturing systems. Journal of Manufacturing Systems, 13, 94-107.
    • (1994) Journal of Manufacturing Systems , vol.13 , pp. 94-107
    • Duffie, N.A.1    Prabhu, V.V.2
  • 9
    • 0010848666 scopus 로고    scopus 로고
    • An extended dispatching rule approach in an on-line scheduling framework for batch process management
    • Ishii, N. and Muraki, M., 1996, An extended dispatching rule approach in an on-line scheduling framework for batch process management. International Journal of Production Research, 34, 329-348.
    • (1996) International Journal of Production Research , vol.34 , pp. 329-348
    • Ishii, N.1    Muraki, M.2
  • 10
    • 0028594405 scopus 로고
    • Simulation-based real-time scheduling mechanism in a flexible manufacturing system
    • Kim, M.-H. and Kim, Y.-D., 1994, Simulation-based real-time scheduling mechanism in a flexible manufacturing system. Journal of Manufacturing Systems, 13, 85-93.
    • (1994) Journal of Manufacturing Systems , vol.13 , pp. 85-93
    • Kim, M.-H.1    Kim, Y.-D.2
  • 11
    • 0025430088 scopus 로고
    • A comparison of dispatching rules for job shops with multiple identical jobs and alternative routings
    • Kim, Y.-D., 1990, A comparison of dispatching rules for job shops with multiple identical jobs and alternative routings. International Journal of Production Research, 28, 953-962.
    • (1990) International Journal of Production Research , vol.28 , pp. 953-962
    • Kim, Y.-D.1
  • 12
    • 0020915621 scopus 로고
    • An algorithm for the computer control of a flexible manufacturing system
    • Kimemia, J. and Gershwin, S. B., 1983, An algorithm for the computer control of a flexible manufacturing system. IIE Transactions, 15, 353-362.
    • (1983) IIE Transactions , vol.15 , pp. 353-362
    • Kimemia, J.1    Gershwin, S.B.2
  • 13
    • 78649742351 scopus 로고
    • Integrating neural networks and semi-Markov process for automated knowledge acquisition: An application to real-time scheduling
    • Liang, T.-P., Moskowitz, H. and Yih, Y., 1992, Integrating neural networks and semi-Markov process for automated knowledge acquisition: an application to real-time scheduling. Decision Sciences, 23, 1297-1314.
    • (1992) Decision Sciences , vol.23 , pp. 1297-1314
    • Liang, T.-P.1    Moskowitz, H.2    Yih, Y.3
  • 14
    • 0023247002 scopus 로고
    • Real-time operational control of flexible manufacturing systems
    • Maimon, O. Z., 1987, Real-time operational control of flexible manufacturing systems. Journal of Manufacturing Systems, 6, 125-136.
    • (1987) Journal of Manufacturing Systems , vol.6 , pp. 125-136
    • Maimon, O.Z.1
  • 15
    • 0023978351 scopus 로고
    • Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines
    • Maimon, O. Z. and Gershwin, S. B., 1988, Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines. Operations Research, 36, 279-292.
    • (1988) Operations Research , vol.36 , pp. 279-292
    • Maimon, O.Z.1    Gershwin, S.B.2
  • 17
    • 0001377662 scopus 로고
    • Part input into a flexible flow system: An evaluation of look-ahead simulation and a fuzzy rule base
    • O’ Keefe, R. M. and Rao, R., 1992, Part input into a flexible flow system: an evaluation of look-ahead simulation and a fuzzy rule base. International Journal of Flexible Manufacturing Systems, 4, 113-127.
    • (1992) International Journal of Flexible Manufacturing Systems , vol.4 , pp. 113-127
    • O’ Keefe, R.M.1    Rao, R.2
  • 19
    • 0024664313 scopus 로고
    • Real-time scheduling of an automated manufacturing center. European
    • Raman, N., Rachamadugu, R. V. and Talbot, F. B., 1989, Real-time scheduling of an automated manufacturing center. European Journal of Operational Research, 40, 222-242.
    • (1989) Journal of Operational Research , vol.40 , pp. 222-242
    • Raman, N.1    Rachamadugu, R.V.2    Talbot, F.B.3
  • 20
    • 29444438437 scopus 로고
    • Dynamic job shop scheduling: A survey of simulation studies. OMEGA: The
    • Ramasesh, R., 1990, Dynamic job shop scheduling: a survey of simulation studies. OMEGA: The International Journal of Management Science, 18, 43-57.
    • (1990) International Journal of Management Science , vol.18 , pp. 43-57
    • Ramasesh, R.1
  • 21
    • 0023437076 scopus 로고
    • A comparative analysis of the COVERT job sequencing rule using various shop performance measures
    • Russel, R. S., Dar-El, E. M. and Taylor, B. W., III. 1987, A comparative analysis of the COVERT job sequencing rule using various shop performance measures. International Journal of Production Research, 25, 1523-1540.
    • (1987) International Journal of Production Research , vol.25 , pp. 1523-1540
    • Russel, R.S.1    Dar-El, E.M.2    Taylor, B.W.3
  • 23
    • 0023362310 scopus 로고
    • On-line scheduling of a robotic manufacturing cell with stochastic sequence-dependent processing rates
    • Seidmann, A., 1987, On-line scheduling of a robotic manufacturing cell with stochastic sequence-dependent processing rates. International Journal of Production Research, 25, 907-924.
    • (1987) International Journal of Production Research , vol.25 , pp. 907-924
    • Seidmann, A.1
  • 24
    • 0242687748 scopus 로고
    • A pattern-directed approach to flexible manufacturing: A framework for intelligent scheduling, learning, and control
    • Shaw, M. J., 1989, A pattern-directed approach to flexible manufacturing: a framework for intelligent scheduling, learning, and control. International Journal of Flexible Manufacturing Systems, 2, 121-144.
    • (1989) International Journal of Flexible Manufacturing Systems , vol.2 , pp. 121-144
    • Shaw, M.J.1
  • 25
    • 34250111322 scopus 로고
    • Design, planning, scheduling, and control problems of flexible manufacturing systems
    • Stecke, K. E., 1985, Design, planning, scheduling, and control problems of flexible manufacturing systems. Annals of Operations Research, 3, 3-12.
    • (1985) Annals of Operations Research , vol.3 , pp. 3-12
    • Stecke, K.E.1
  • 27
    • 0002102362 scopus 로고
    • Dynamic load control policies for a flexible manufacturing system with stochastic processing rates
    • Tenenbaum, A. and Seidmann, A., 1989, Dynamic load control policies for a flexible manufacturing system with stochastic processing rates. International Journal of Flexible Manufacturing Systems, 2, 93-120.
    • (1989) International Journal of Flexible Manufacturing Systems , vol.2 , pp. 93-120
    • Tenenbaum, A.1    Seidmann, A.2
  • 28
    • 0000168684 scopus 로고
    • An expert scheduling system for material handling hoists
    • Thesen, A. and Lei, L., 1990, An expert scheduling system for material handling hoists. Journal of Manufacturing Systems, 9, 247-252.
    • (1990) Journal of Manufacturing Systems , vol.9 , pp. 247-252
    • Thesen, A.1    Lei, L.2
  • 29
    • 0023399009 scopus 로고
    • Priority rules for job shops with weighted tardiness costs
    • Vepsalainen, A. P. J. and Morton, T. E., 1987, Priority rules for job shops with weighted tardiness costs. Management Science, 33, 1035-1047.
    • (1987) Management Science , vol.33 , pp. 1035-1047
    • Vepsalainen, A.P.J.1    Morton, T.E.2
  • 30
    • 0024731596 scopus 로고
    • An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing
    • Wu, S.-Y. D. and Wysk, R. A., 1989, An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing. International Journal of Production Research, 27, 1603-1623.
    • (1989) International Journal of Production Research , vol.27 , pp. 1603-1623
    • Wu, S.-Y.D.1    Wysk, R.A.2
  • 31
    • 0022097890 scopus 로고
    • Scheduling/rescheduling in the manufacturing operating system environment
    • Yamamoto, M. and Nof, S. Y., 1985, Scheduling/rescheduling in the manufacturing operating system environment. International Journal of Production Research, 23, 705-722.
    • (1985) International Journal of Production Research , vol.23 , pp. 705-722
    • Yamamoto, M.1    Nof, S.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.