-
1
-
-
0028374762
-
A simulation-based scheduler for flexible flowlines
-
Bengu, G., 1994, A simulation-based scheduler for flexible flowlines. International Journal of Production Research, 32, 321-344.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 321-344
-
-
Bengu, G.1
-
2
-
-
0020013653
-
A state-of-the-art survey of dispatching rules for manufacturing job shop operations
-
Blackstone, Jr., J. H., Phillips, D. T. and Hogg, G. L., 1982, A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research, 20, 27-45.
-
(1982)
International Journal of Production Research
, vol.20
, pp. 27-45
-
-
Blackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
3
-
-
0039986700
-
The use of neural networks in determining operational policies for manufacturing systems
-
Chryssolouris, G., Lee, M. and Domroese, M., 1991, The use of neural networks in determining operational policies for manufacturing systems. Journal of Manufacturing Systems, 10, 166-175.
-
(1991)
Journal of Manufacturing Systems
, vol.10
, pp. 166-175
-
-
Chryssolouris, G.1
Lee, M.2
Domroese, M.3
-
4
-
-
0000522889
-
Analysis of periodic and event-driven rescheduling policies in dynamic shops
-
Church, L. K. and Uzsoy, R., 1992, Analysis of periodic and event-driven rescheduling policies in dynamic shops. International Journal of Computer Integrated Manufacturing, 5, 153-163.
-
(1992)
International Journal of Computer Integrated Manufacturing
, vol.5
, pp. 153-163
-
-
Church, L.K.1
Uzsoy, R.2
-
5
-
-
0000312362
-
Scheduling and control of flexible manufacturing systems: A critical review
-
Chuda, B. and Mize, J. H., 1994, Scheduling and control of flexible manufacturing systems: a critical review. International Journal of Computer Integrated Manufacturing, 7, 340-355.
-
(1994)
International Journal of Computer Integrated Manufacturing
, vol.7
, pp. 340-355
-
-
Chuda, B.1
Mize, J.H.2
-
6
-
-
0040165204
-
A real-time production scheduler for a stochastic manufacturing environment
-
Davis, W. J. and Jones, A. T., 1988, A real-time production scheduler for a stochastic manufacturing environment. International Journal of Computer Integrated Manufacturing, 4, 531-544.
-
(1988)
International Journal of Computer Integrated Manufacturing
, vol.4
, pp. 531-544
-
-
Davis, W.J.1
Jones, A.T.2
-
7
-
-
0028590749
-
Real-time distributed scheduling of heterarchical manufacturing systems
-
Duffie, N. A. and Prabhu, V. V., 1994, Real-time distributed scheduling of heterarchical manufacturing systems. Journal of Manufacturing Systems, 13, 94-107.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, pp. 94-107
-
-
Duffie, N.A.1
Prabhu, V.V.2
-
8
-
-
0001982473
-
Real-time scheduling in computer integrated manufacturing: A review of recent research
-
Harmonosky, C. M. and Robohn, S. F., 1991, Real-time scheduling in computer integrated manufacturing: a review of recent research. International Journal of Computer Integrated Manufacturing, 4, 331-340.
-
(1991)
International Journal of Computer Integrated Manufacturing
, vol.4
, pp. 331-340
-
-
Harmonosky, C.M.1
Robohn, S.F.2
-
9
-
-
0010848666
-
An extended dispatching rule approach in an on-line scheduling framework for batch process management
-
Ishii, N. and Muraki, M., 1996, An extended dispatching rule approach in an on-line scheduling framework for batch process management. International Journal of Production Research, 34, 329-348.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 329-348
-
-
Ishii, N.1
Muraki, M.2
-
10
-
-
0028594405
-
Simulation-based real-time scheduling mechanism in a flexible manufacturing system
-
Kim, M.-H. and Kim, Y.-D., 1994, Simulation-based real-time scheduling mechanism in a flexible manufacturing system. Journal of Manufacturing Systems, 13, 85-93.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, pp. 85-93
-
-
Kim, M.-H.1
Kim, Y.-D.2
-
11
-
-
0025430088
-
A comparison of dispatching rules for job shops with multiple identical jobs and alternative routings
-
Kim, Y.-D., 1990, A comparison of dispatching rules for job shops with multiple identical jobs and alternative routings. International Journal of Production Research, 28, 953-962.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 953-962
-
-
Kim, Y.-D.1
-
12
-
-
0020915621
-
An algorithm for the computer control of a flexible manufacturing system
-
Kimemia, J. and Gershwin, S. B., 1983, An algorithm for the computer control of a flexible manufacturing system. IIE Transactions, 15, 353-362.
-
(1983)
IIE Transactions
, vol.15
, pp. 353-362
-
-
Kimemia, J.1
Gershwin, S.B.2
-
13
-
-
78649742351
-
Integrating neural networks and semi-Markov process for automated knowledge acquisition: An application to real-time scheduling
-
Liang, T.-P., Moskowitz, H. and Yih, Y., 1992, Integrating neural networks and semi-Markov process for automated knowledge acquisition: an application to real-time scheduling. Decision Sciences, 23, 1297-1314.
-
(1992)
Decision Sciences
, vol.23
, pp. 1297-1314
-
-
Liang, T.-P.1
Moskowitz, H.2
Yih, Y.3
-
14
-
-
0023247002
-
Real-time operational control of flexible manufacturing systems
-
Maimon, O. Z., 1987, Real-time operational control of flexible manufacturing systems. Journal of Manufacturing Systems, 6, 125-136.
-
(1987)
Journal of Manufacturing Systems
, vol.6
, pp. 125-136
-
-
Maimon, O.Z.1
-
15
-
-
0023978351
-
Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines
-
Maimon, O. Z. and Gershwin, S. B., 1988, Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines. Operations Research, 36, 279-292.
-
(1988)
Operations Research
, vol.36
, pp. 279-292
-
-
Maimon, O.Z.1
Gershwin, S.B.2
-
16
-
-
0024105641
-
Dynamic control in automated manufacturing: A knowledge-integrated approach
-
Maley, J. G., Ruiz-Meir, S. and Solberg, J. J., 1988, Dynamic control in automated manufacturing: a knowledge-integrated approach. International Journal of Production Research, 26, 1739-1748.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 1739-1748
-
-
Maley, J.G.1
Ruiz-Meir, S.2
Solberg, J.J.3
-
17
-
-
0001377662
-
Part input into a flexible flow system: An evaluation of look-ahead simulation and a fuzzy rule base
-
O’ Keefe, R. M. and Rao, R., 1992, Part input into a flexible flow system: an evaluation of look-ahead simulation and a fuzzy rule base. International Journal of Flexible Manufacturing Systems, 4, 113-127.
-
(1992)
International Journal of Flexible Manufacturing Systems
, vol.4
, pp. 113-127
-
-
O’ Keefe, R.M.1
Rao, R.2
-
18
-
-
0003054955
-
A survey of scheduling rules
-
Panwalkar, S. S. and Iskander, W., 1977, A survey of scheduling rules. Operations Research, 25, 45-61.
-
(1977)
Operations Research
, vol.25
, pp. 45-61
-
-
Panwalkar, S.S.1
Iskander, W.2
-
19
-
-
0024664313
-
Real-time scheduling of an automated manufacturing center. European
-
Raman, N., Rachamadugu, R. V. and Talbot, F. B., 1989, Real-time scheduling of an automated manufacturing center. European Journal of Operational Research, 40, 222-242.
-
(1989)
Journal of Operational Research
, vol.40
, pp. 222-242
-
-
Raman, N.1
Rachamadugu, R.V.2
Talbot, F.B.3
-
20
-
-
29444438437
-
Dynamic job shop scheduling: A survey of simulation studies. OMEGA: The
-
Ramasesh, R., 1990, Dynamic job shop scheduling: a survey of simulation studies. OMEGA: The International Journal of Management Science, 18, 43-57.
-
(1990)
International Journal of Management Science
, vol.18
, pp. 43-57
-
-
Ramasesh, R.1
-
21
-
-
0023437076
-
A comparative analysis of the COVERT job sequencing rule using various shop performance measures
-
Russel, R. S., Dar-El, E. M. and Taylor, B. W., III. 1987, A comparative analysis of the COVERT job sequencing rule using various shop performance measures. International Journal of Production Research, 25, 1523-1540.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 1523-1540
-
-
Russel, R.S.1
Dar-El, E.M.2
Taylor, B.W.3
-
22
-
-
0025476281
-
Development of a knowledge-based system for dynamic scheduling
-
Sarin, S. C. and Salgame, R. R., 1990, Development of a knowledge-based system for dynamic scheduling. International Journal of Production Research, 28, 1499-1512.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 1499-1512
-
-
Sarin, S.C.1
Salgame, R.R.2
-
23
-
-
0023362310
-
On-line scheduling of a robotic manufacturing cell with stochastic sequence-dependent processing rates
-
Seidmann, A., 1987, On-line scheduling of a robotic manufacturing cell with stochastic sequence-dependent processing rates. International Journal of Production Research, 25, 907-924.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 907-924
-
-
Seidmann, A.1
-
24
-
-
0242687748
-
A pattern-directed approach to flexible manufacturing: A framework for intelligent scheduling, learning, and control
-
Shaw, M. J., 1989, A pattern-directed approach to flexible manufacturing: a framework for intelligent scheduling, learning, and control. International Journal of Flexible Manufacturing Systems, 2, 121-144.
-
(1989)
International Journal of Flexible Manufacturing Systems
, vol.2
, pp. 121-144
-
-
Shaw, M.J.1
-
25
-
-
34250111322
-
Design, planning, scheduling, and control problems of flexible manufacturing systems
-
Stecke, K. E., 1985, Design, planning, scheduling, and control problems of flexible manufacturing systems. Annals of Operations Research, 3, 3-12.
-
(1985)
Annals of Operations Research
, vol.3
, pp. 3-12
-
-
Stecke, K.E.1
-
26
-
-
0042558922
-
Automated development of design and control strategy for FMS
-
Talavage, J. J. and Shodhan, R., 1992, Automated development of design and control strategy for FMS. International Journal of Computer Integrated Manufacturing, 5, 335-348.
-
(1992)
International Journal of Computer Integrated Manufacturing
, vol.5
, pp. 335-348
-
-
Talavage, J.J.1
Shodhan, R.2
-
27
-
-
0002102362
-
Dynamic load control policies for a flexible manufacturing system with stochastic processing rates
-
Tenenbaum, A. and Seidmann, A., 1989, Dynamic load control policies for a flexible manufacturing system with stochastic processing rates. International Journal of Flexible Manufacturing Systems, 2, 93-120.
-
(1989)
International Journal of Flexible Manufacturing Systems
, vol.2
, pp. 93-120
-
-
Tenenbaum, A.1
Seidmann, A.2
-
28
-
-
0000168684
-
An expert scheduling system for material handling hoists
-
Thesen, A. and Lei, L., 1990, An expert scheduling system for material handling hoists. Journal of Manufacturing Systems, 9, 247-252.
-
(1990)
Journal of Manufacturing Systems
, vol.9
, pp. 247-252
-
-
Thesen, A.1
Lei, L.2
-
29
-
-
0023399009
-
Priority rules for job shops with weighted tardiness costs
-
Vepsalainen, A. P. J. and Morton, T. E., 1987, Priority rules for job shops with weighted tardiness costs. Management Science, 33, 1035-1047.
-
(1987)
Management Science
, vol.33
, pp. 1035-1047
-
-
Vepsalainen, A.P.J.1
Morton, T.E.2
-
30
-
-
0024731596
-
An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing
-
Wu, S.-Y. D. and Wysk, R. A., 1989, An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing. International Journal of Production Research, 27, 1603-1623.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1603-1623
-
-
Wu, S.-Y.D.1
Wysk, R.A.2
-
31
-
-
0022097890
-
Scheduling/rescheduling in the manufacturing operating system environment
-
Yamamoto, M. and Nof, S. Y., 1985, Scheduling/rescheduling in the manufacturing operating system environment. International Journal of Production Research, 23, 705-722.
-
(1985)
International Journal of Production Research
, vol.23
, pp. 705-722
-
-
Yamamoto, M.1
Nof, S.Y.2
-
32
-
-
0026254010
-
Semi-Markov decision models for real-time scheduling
-
Yih, Y. and Thesen, A., 1991, Semi-Markov decision models for real-time scheduling. International Journal of Production Research, 29, 2331-2346.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 2331-2346
-
-
Yih, Y.1
Thesen, A.2
|