메뉴 건너뛰기




Volumn 37, Issue 15, 1999, Pages 3399-3428

Towards the integration of flexible manufacturing system scheduling

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL COMPLEXITY; COMPUTER SIMULATION; KNOWLEDGE BASED SYSTEMS; PROBLEM SOLVING; SCHEDULING;

EID: 0033207947     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075499190112     Document Type: Article
Times cited : (30)

References (243)
  • 4
    • 0030142353 scopus 로고    scopus 로고
    • Tool handling and scheduling in a 2-machine flexible manufacturing cell
    • Agnetis, A., Dror, M., Vakharia, A. J. and Rossi, F., 1996, Tool handling and scheduling in a 2-machine flexible manufacturing cell. IIE Transactions, 28, 425-437.
    • (1996) IIE Transactions , vol.28 , pp. 425-437
    • Agnetis, A.1    Dror, M.2    Vakharia, A.J.3    Rossi, F.4
  • 7
    • 3743105739 scopus 로고
    • A tool and part flow simulator for optimal FMS management
    • V. C. Venkatesh and J. C. McGeough, New York: Elsevier
    • Alberti, N., La Commare, V., Noto La Diega, S. and Perrone, G., 1991, A tool and part flow simulator for optimal FMS management. In V. C. Venkatesh and J. C. McGeough (eds), Computer Aided Production Engineering (New York: Elsevier).
    • (1991) Computer Aided Production Engineering
    • Alberti, N.1    La Commare, V.2    Noto La Diega, S.3    Perrone, G.4
  • 12
    • 0041536086 scopus 로고
    • An expert system approach to scheduling in flexible manufacturing systems
    • A. Kusiak (ed.), New York: Elsevier
    • Askin, R. G. and Subramanyam, S., 1986, An expert system approach to scheduling in flexible manufacturing systems. In A. Kusiak (ed.), Flexible Manufacturing Systems: Methods and Studies (New York: Elsevier), pp. 243-256.
    • (1986) Flexible Manufacturing Systems: Methods and Studies , pp. 243-256
    • Askin, R.G.1    Subramanyam, S.2
  • 13
    • 0030110029 scopus 로고    scopus 로고
    • Auxiliary tool allocation in flexible manufacturing systems
    • Atan, T S. and Pandit, R., 1996, Auxiliary tool allocation in flexible manufacturing systems. European Journal of Operational Research, 89, 642-659.
    • (1996) European Journal of Operational Research , vol.89 , pp. 642-659
    • Atan, T.S.1    Pandit, R.2
  • 14
    • 0025624142 scopus 로고
    • Deadlock avoidance in flexible manufacturing systems with concurrently competing process flows
    • Banaszak, Z. A. and Krogh, B. H., 1990, Deadlock avoidance in flexible manufacturing systems with concurrently competing process flows. IEEE Transactions on Robotics and Automation, 6, 724-734.
    • (1990) IEEE Transactions on Robotics and Automation , vol.6 , pp. 724-734
    • Banaszak, Z.A.1    Krogh, B.H.2
  • 15
    • 0024140442 scopus 로고
    • A heuristic for minimizing the number of tool switches on a flexible machine
    • Bard, J. F., 1988, A heuristic for minimizing the number of tool switches on a flexible machine. IIE Transactions, 20, 382-391.
    • (1988) IIE Transactions , vol.20 , pp. 382-391
    • Bard, J.F.1
  • 17
    • 0031189149 scopus 로고    scopus 로고
    • An algorithm for the cell formation and the machine selection problems in the design of a cellular manufacturing system
    • Beaulieu, A., Ait-Kadi, D. and Gharbi, A., 1997, An algorithm for the cell formation and the machine selection problems in the design of a cellular manufacturing system. International Journal of Production Research, 35, 1857-1874.
    • (1997) International Journal of Production Research , vol.35 , pp. 1857-1874
    • Beaulieu, A.1    Ait-Kadi, D.2    Gharbi, A.3
  • 19
  • 20
    • 0342304214 scopus 로고
    • A branch and bound approach for machine loading in FMS
    • Berrada, M. and Stecke, K. E., 1986, A branch and bound approach for machine loading in FMS. Management Science, 32, 1317-1335.
    • (1986) Management Science , vol.32 , pp. 1317-1335
    • Berrada, M.1    Stecke, K.E.2
  • 24
    • 34250084648 scopus 로고
    • Routing and scheduling in flexible job shop by tabu search
    • Brandimarte, P., 1993, Routing and scheduling in flexible job shop by tabu search. Annals of Operations Research, 41, 157-183.
    • (1993) Annals of Operations Research , vol.41 , pp. 157-183
    • Brandimarte, P.1
  • 31
    • 0020388157 scopus 로고
    • Direct clustering algorithm for group formation in cellular manufacturing
    • Chan, H. M. and Milner, D. A., 1982, Direct clustering algorithm for group formation in cellular manufacturing. Journal of Manufacturing Systems, 1, 65-74.
    • (1982) Journal of Manufacturing Systems , vol.1 , pp. 65-74
    • Chan, H.M.1    Milner, D.A.2
  • 32
    • 0022663529 scopus 로고
    • Heuristical job allocation in a flexible manufacturing system
    • Chan, T. S. and Pak, H. A., 1986, Heuristical job allocation in a flexible manufacturing system. Journal of Manufacturing Systems, 1, 69-90.
    • (1986) Journal of Manufacturing Systems , vol.1 , pp. 69-90
    • Chan, T.S.1    Pak, H.A.2
  • 38
    • 0027626981 scopus 로고
    • FMS scheduling and control: Learning to achieve multiple goals
    • Chaturvedi, A. R., 1993, FMS scheduling and control: learning to achieve multiple goals. Expert Systems with Applications, 6, 267-286.
    • (1993) Expert Systems with Applications , vol.6 , pp. 267-286
    • Chaturvedi, A.R.1
  • 41
    • 0026254174 scopus 로고
    • Effects of loading and routing decisions on performance of flexible manufacturing systems
    • Chen, I. J. and Chung, C.-H., 1991, Effects of loading and routing decisions on performance of flexible manufacturing systems. International Journal of Production Research, 29, 2209-2225.
    • (1991) International Journal of Production Research , vol.29 , pp. 2209-2225
    • Chen, I.J.1    Chung, C.-H.2
  • 43
    • 0028425193 scopus 로고
    • Simulated annealing procedures for forming cells in group technology
    • Chen, W.-H. and Srivastava, B., 1994, Simulated annealing procedures for forming cells in group technology. European Journal of Operational Research, 75, 100-111.
    • (1994) European Journal of Operational Research , vol.75 , pp. 100-111
    • Chen, W.-H.1    Srivastava, B.2
  • 45
    • 0027576654 scopus 로고
    • A robust adaptive scheduler for an intelligent workstation controller
    • Cho, H. and Wysk, R. A., 1993, A robust adaptive scheduler for an intelligent workstation controller. International Journal of Production Research, 31, 771-789.
    • (1993) International Journal of Production Research , vol.31 , pp. 771-789
    • Cho, H.1    Wysk, R.A.2
  • 46
    • 0023824587 scopus 로고
    • Evaluation of traditional work scheduling rules in a FMS with a physical simulator
    • Choi, R. H. and Malstrom E. M., 1988, Evaluation of traditional work scheduling rules in a FMS with a physical simulator. Journal of Manufacturing Systems, 7, 33-45.
    • (1988) Journal of Manufacturing Systems , vol.7 , pp. 33-45
    • Choi, R.H.1    Malstrom, E.M.2
  • 48
    • 0026190510 scopus 로고
    • A fuzzy clustering approach to manufacturing cell formation
    • Chu, C. H. and Hayya, J. C., 1991, A fuzzy clustering approach to manufacturing cell formation. International Journal of Production Research, 29, 1475-1487.
    • (1991) International Journal of Production Research , vol.29 , pp. 1475-1487
    • Chu, C.H.1    Hayya, J.C.2
  • 49
    • 0008235709 scopus 로고
    • Planning tool requirements for flexible manufacturing systems
    • Chung, C., 1991, Planning tool requirements for flexible manufacturing systems. Journal of Manufacturing Systems, 10, 476-483.
    • (1991) Journal of Manufacturing Systems , vol.10 , pp. 476-483
    • Chung, C.1
  • 51
    • 0023868981 scopus 로고
    • Sequencing in flexible manufacturing systems and other short queue-length systems
    • Co, H. C., Jaw, T J. and Chen, S. K., 1988, Sequencing in flexible manufacturing systems and other short queue-length systems. Journal of Manufacturing Systems, 7, 18.
    • (1988) Journal of Manufacturing Systems , vol.7 , pp. 18
    • Co, H.C.1    Jaw, T.J.2    Chen, S.K.3
  • 52
    • 0025595213 scopus 로고
    • Methodical approach to the flexible manufacturing system batching, loading and tool configuration problems
    • Co, H. C., Biermann, J. S. and Chen, S. K., 1990, Methodical approach to the flexible manufacturing system batching, loading and tool configuration problems. International Journal of Production Research, 28, 2171-2186.
    • (1990) International Journal of Production Research , vol.28 , pp. 2171-2186
    • Co, H.C.1    Biermann, J.S.2    Chen, S.K.3
  • 56
    • 0031281696 scopus 로고    scopus 로고
    • Exact solution procedures for certain planning problems in flexible manufacturing systems
    • Denizel, M. and Erenguc, S. S., 1997, Exact solution procedures for certain planning problems in flexible manufacturing systems. Computers and Operations Research, 24, 1043-1055.
    • (1997) Computers and Operations Research , vol.24 , pp. 1043-1055
    • Denizel, M.1    Erenguc, S.S.2
  • 59
    • 0027702306 scopus 로고
    • Positioning of AGVs in a loop layout to improve response time
    • Egbelu, P.J., 1993, Positioning of AGVs in a loop layout to improve response time. European Journal of Operational Research, 7, 32-44.
    • (1993) European Journal of Operational Research , vol.7 , pp. 32-44
    • Egbelu, P.J.1
  • 60
    • 0009441818 scopus 로고
    • Component flow analysis—an effective approach to production systems’ design
    • El-Essawy, I. G. K. and Torrance, J., 1972, Component flow analysis—an effective approach to production systems’ design. The Production Engineer, 165-170.
    • (1972) The Production Engineer , pp. 165-170
    • El-Essawy, I.G.K.1    Torrance, J.2
  • 61
    • 0001590283 scopus 로고
    • An inexact algorithm for part input sequencing with side constraints in FMS
    • Escudero, L. F., 1989, An inexact algorithm for part input sequencing with side constraints in FMS. International Journal of Flexible Manufacturing Systems, 1, 143-174.
    • (1989) International Journal of Flexible Manufacturing Systems , vol.1 , pp. 143-174
    • Escudero, L.F.1
  • 65
    • 0024122470 scopus 로고
    • Integer LP neural networks for job shop-scheduling
    • Foo, Y. P. S. and Takefuji, Y., 1988, Integer LP neural networks for job shop-scheduling. Proceedings of the iCNn, 2, 341-348.
    • (1988) Proceedings of the Icnn , vol.2 , pp. 341-348
    • Foo, Y.P.S.1    Takefuji, Y.2
  • 66
    • 84982522109 scopus 로고
    • ISIS—a knowledge-based system for factory scheduling
    • Fox, M. S. and Smith, S. F., 1984, ISIS—a knowledge-based system for factory scheduling. Experts Systems, 1, 25-48.
    • (1984) Experts Systems , vol.1 , pp. 25-48
    • Fox, M.S.1    Smith, S.F.2
  • 67
    • 0020247332 scopus 로고
    • Job shop scheduling: An investigation in constraint-directed reasoning
    • American Association for AI, Cambridge, MA
    • Fox, M. S., Allen, B. and Strohm, G., 1982, Job shop scheduling: an investigation in constraint-directed reasoning. Proceedings of the National Conference on AI, American Association for AI, Cambridge, MA, pp. 155-158.
    • (1982) Proceedings of the National Conference on AI , pp. 155-158
    • Fox, M.S.1    Allen, B.2    Strohm, G.3
  • 69
    • 0023563395 scopus 로고
    • A simple simulation for scheduling in a flexible manufacturing system
    • San Diego, CA
    • Frese, S. D., 1987, A simple simulation for scheduling in a flexible manufacturing system. Proceedings of the 1987 Winter Simulation Conference, San Diego, CA, pp. 654-658.
    • (1987) Proceedings of the 1987 Winter Simulation Conference , pp. 654-658
    • Frese, S.D.1
  • 71
    • 0027681460 scopus 로고
    • Integrated fixture planning and analysis system for machining processes
    • Fuh, J. Y. H., Chang, C. H. and Melkanoff, M. A., 1993, Integrated fixture planning and analysis system for machining processes. Robotics and CIM, 10, 339-353.
    • (1993) Robotics and CIM , vol.10 , pp. 339-353
    • Fuh, J.Y.H.1    Chang, C.H.2    Melkanoff, M.A.3
  • 74
    • 0025431933 scopus 로고
    • Guide path design and location of load pick-up/drop-off points for an AGV system
    • Goetz, W. G. and Egbelu, P. J., 1990, Guide path design and location of load pick-up/drop-off points for an AGV system. International Journal of Production Research, 28, 927-941.
    • (1990) International Journal of Production Research , vol.28 , pp. 927-941
    • Goetz, W.G.1    Egbelu, P.J.2
  • 76
    • 0342739277 scopus 로고
    • Making production scheduling more efficient helps control manufacturing costs and improve productivity
    • Grant, H. and Clapp, C., 1988, Making production scheduling more efficient helps control manufacturing costs and improve productivity. IIE Transactions, 20, 54-62.
    • (1988) IIE Transactions , vol.20 , pp. 54-62
    • Grant, H.1    Clapp, C.2
  • 77
    • 0023541064 scopus 로고
    • Nonlinear networks for deterministic scheduling
    • Gulati, S. and Iyengar, S. S., 1987, Nonlinear networks for deterministic scheduling. Proceedings of the CNN, 4, 745-752.
    • (1987) Proceedings of the CNN , vol.4 , pp. 745-752
    • Gulati, S.1    Iyengar, S.S.2
  • 78
    • 0024732499 scopus 로고
    • Machine grouping problem in cellular manufacturing systems: An integer programming approach
    • Gunasingh, K. R. and Lashkari, R. S., 1989, Machine grouping problem in cellular manufacturing systems: an integer programming approach. International Journal of Production Research, 27, 1465-1473.
    • (1989) International Journal of Production Research , vol.27 , pp. 1465-1473
    • Gunasingh, K.R.1    Lashkari, R.S.2
  • 80
  • 82
    • 0030190465 scopus 로고    scopus 로고
    • Finding part-machine families using graph partitioning techniques
    • Hadley, S. W., 1996, Finding part-machine families using graph partitioning techniques. International Journal of Production Research, 34, 1821-1839.
    • (1996) International Journal of Production Research , vol.34 , pp. 1821-1839
    • Hadley, S.W.1
  • 84
    • 0026102908 scopus 로고
    • Modeling and on-line scheduling of flexible manufacturing systems using stochastic petri nets
    • Hatono, I., Yamagata, K. and Tamura, H., 1991, Modeling and on-line scheduling of flexible manufacturing systems using stochastic petri nets. IEEE Transactions on Software Engineering, 17.
    • (1991) IEEE Transactions on Software Engineering , pp. 17
    • Hatono, I.1    Yamagata, K.2    Tamura, H.3
  • 85
    • 38149148466 scopus 로고
    • A graph theory approach to subcontracting machine duplication and intercell moves in cellular manufacturing
    • Hertz, A., Jaumard, B. and Riberio, C. C., 1994, A graph theory approach to subcontracting machine duplication and intercell moves in cellular manufacturing. Discrete Applied Mathematics, 50, 255-265.
    • (1994) Discrete Applied Mathematics , vol.50 , pp. 255-265
    • Hertz, A.1    Jaumard, B.2    Riberio, C.C.3
  • 88
    • 0001899198 scopus 로고
    • Mathematical programming for the scheduling problem with alternate process plans in FMS
    • Jiang, J. and Hsiao, W., 1994, Mathematical programming for the scheduling problem with alternate process plans in FMS. Computers and Industrial Engineering, 27, 15-18.
    • (1994) Computers and Industrial Engineering , vol.27 , pp. 15-18
    • Jiang, J.1    Hsiao, W.2
  • 92
    • 0029504717 scopus 로고
    • Integrated approach for loading, routing and scheduling in flexible manufacturing systems
    • Kato, K., 1995, Integrated approach for loading, routing and scheduling in flexible manufacturing systems. IEEE Symposium on Emerging Technologies and Factory Automation, Vol. 1, pp. 299-310.
    • (1995) IEEE Symposium on Emerging Technologies and Factory Automation , vol.1 , pp. 299-310
    • Kato, K.1
  • 93
    • 0027680123 scopus 로고
    • GT-based heuristic approach for machine loading and batch formation in flexible manufacturing systems
    • Kato, K., Oba, F. and Hashimoto, F., 1993, GT-based heuristic approach for machine loading and batch formation in flexible manufacturing systems. Control Engineering Practice, 1, 845-850.
    • (1993) Control Engineering Practice , vol.1 , pp. 845-850
    • Kato, K.1    Oba, F.2    Hashimoto, F.3
  • 94
    • 0343609249 scopus 로고
    • Multi objective decision making model for a flexible manufacturing system
    • A. Kusiak (ed.), New York: North Holland
    • Kim, S.-R., 1986, Multi objective decision making model for a flexible manufacturing system. In A. Kusiak (ed.) Flexible Manufacturing Systems: Methods and Studies (New York: North Holland).
    • (1986) Flexible Manufacturing Systems: Methods and Studies
    • Kim, S.-R.1
  • 95
    • 0027851665 scopus 로고
    • Enhancement of a job sequencing rule using an artificial neural network
    • Los Angeles, CA
    • Kim, S. and Lee, Y., 1993, Enhancement of a job sequencing rule using an artificial neural network. Second Industrial Engineering Research Conference Proceedings, Los Angeles, CA, pp. 842-846.
    • (1993) Second Industrial Engineering Research Conference Proceedings , pp. 842-846
    • Kim, S.1    Lee, Y.2
  • 99
    • 0029419084 scopus 로고
    • Optimal operation grouping and sequencing technique for multistage machining systems
    • Minneapolis, MN
    • Kim, I. T, Suh, H. and Kim, H. R., 1995, Optimal operation grouping and sequencing technique for multistage machining systems. ASME Database Symposium, Minneapolis, MN, pp. 633-645.
    • (1995) ASME Database Symposium , pp. 633-645
    • Kim, I.T.1    Suh, H.2    Kim, H.R.3
  • 100
    • 0020915621 scopus 로고
    • An algorithm for the computer control of a flexible manufacturing system
    • Kimemia, J. and Gershwin, S. B., 1983, An algorithm for the computer control of a flexible manufacturing system. IIE Transactions, 15, 353-362.
    • (1983) IIE Transactions , vol.15 , pp. 353-362
    • Kimemia, J.1    Gershwin, S.B.2
  • 101
    • 0342739274 scopus 로고
    • Machine-component grouping in production flow analysis: An approach
    • King, J. R., 1980, Machine-component grouping in production flow analysis: an approach. International Journal of Production Research, 18, 231-237.
    • (1980) International Journal of Production Research , vol.18 , pp. 231-237
    • King, J.R.1
  • 103
    • 0022895879 scopus 로고
    • Scheduling jobs in flexible manufacturing systems. Real-Time Optimization in Automated Manufacturing Facilities
    • Gaithersburg, MD
    • Kiran, A. S. and Alptekin, S., 1986, Scheduling jobs in flexible manufacturing systems. Real-Time Optimization in Automated Manufacturing Facilities, Proceedings of a Symposium held at the National Bureau of Standards, Gaithersburg, MD, pp. 393-399.
    • (1986) Proceedings of a Symposium Held at the National Bureau of Standards , pp. 393-399
    • Kiran, A.S.1    Alptekin, S.2
  • 104
    • 0031104005 scopus 로고    scopus 로고
    • Knowledge-based system for selection of an AGV and a workcentre for transport of a part in on-line scheduling of FMS
    • Kodali, R., 1997, Knowledge-based system for selection of an AGV and a workcentre for transport of a part in on-line scheduling of FMS. Production Planning and Control, 8, 114-122.
    • (1997) Production Planning and Control , vol.8 , pp. 114-122
    • Kodali, R.1
  • 107
    • 0027073047 scopus 로고
    • A CAPP system for non-linear process plans
    • Kruth, J. P. and Detand, J., 1992, A CAPP system for non-linear process plans. Annals of CIRP, 41, 489-492.
    • (1992) Annals of CIRP , vol.41 , pp. 489-492
    • Kruth, J.P.1    Detand, J.2
  • 109
    • 0023384110 scopus 로고
    • Entropy measures of measuring manufacturing flexibility
    • Kumar, V., 1987, Entropy measures of measuring manufacturing flexibility. International Journal of Production Research, 25, 957-966.
    • (1987) International Journal of Production Research , vol.25 , pp. 957-966
    • Kumar, V.1
  • 112
    • 34250115624 scopus 로고
    • The part families problem in flexible manufacturing systems
    • Kusiak, A., 1985, The part families problem in flexible manufacturing systems. Annals of Operations Research, 3, 279-300.
    • (1985) Annals of Operations Research , vol.3 , pp. 279-300
    • Kusiak, A.1
  • 114
    • 0022604478 scopus 로고
    • FMS scheduling: A crucial element in an expert system control structure
    • Kusiak, A., 1986b, FMS scheduling: a crucial element in an expert system control structure. IEEE Transactions, 653-658.
    • (1986) IEEE Transactions , pp. 653-658
    • Kusiak, A.1
  • 117
    • 0023206153 scopus 로고
    • Efficient solving of the group technology problem
    • Kusiak, A. and Chow, W. S., 1987, Efficient solving of the group technology problem. Journal of Manufacturing Systems, 6, 117-124.
    • (1987) Journal of Manufacturing Systems , vol.6 , pp. 117-124
    • Kusiak, A.1    Chow, W.S.2
  • 119
    • 0023416625 scopus 로고
    • A new formulation of operation allocation problem in flexible manufacturing systems: Mathematical modeling and computational experience
    • Lashkari, R. S., Dutta, S. P. and Padhye, A. M., 1987, A new formulation of operation allocation problem in flexible manufacturing systems: mathematical modeling and computational experience. International Journal of Production Research, 25, 1267-1283.
    • (1987) International Journal of Production Research , vol.25 , pp. 1267-1283
    • Lashkari, R.S.1    Dutta, S.P.2    Padhye, A.M.3
  • 120
    • 0022866453 scopus 로고
    • PATRIARCH: Hierarchical production scheduling. Real-Time Optimization in Automated Manufacturing Facilities
    • Gaithersburg, MD
    • Lawrence, S. R. and Morton, T E., 1986, PATRIARCH: hierarchical production scheduling. Real-Time Optimization in Automated Manufacturing Facilities, Proceedings of a Symposium held at the National Bureau of Standards, Gaithersburg, MD.
    • (1986) Proceedings of a Symposium Held at the National Bureau of Standards
    • Lawrence, S.R.1    Morton, T.E.2
  • 122
    • 0032187951 scopus 로고    scopus 로고
    • Iterative procedures for multi-period order selection and loading problems in flexible manufacturing systems
    • Lee, D.-H. and Kim, Y.-D., 1998, Iterative procedures for multi-period order selection and loading problems in flexible manufacturing systems. International Journal of Production Research, 36, 2653-2668.
    • (1998) International Journal of Production Research , vol.36 , pp. 2653-2668
    • Lee, D.-H.1    Kim, Y.-D.2
  • 124
    • 0001057408 scopus 로고
    • Flowshop sequencing problems with limited buffer storage
    • Leisten, R., 1990, Flowshop sequencing problems with limited buffer storage. International Journal of Production Research, 28, 2085-2100.
    • (1990) International Journal of Production Research , vol.28 , pp. 2085-2100
    • Leisten, R.1
  • 125
    • 0031246898 scopus 로고    scopus 로고
    • Using an unsupervised neural network and decision tree as knowledge acquisition tools for FMS scheduling
    • Li, D. C., Wu, C. and Torng, K. Y., 1997, Using an unsupervised neural network and decision tree as knowledge acquisition tools for FMS scheduling. International Journal of Systems Science, 28, 977-985.
    • (1997) International Journal of Systems Science , vol.28 , pp. 977-985
    • Li, D.C.1    Wu, C.2    Torng, K.Y.3
  • 126
    • 0026938172 scopus 로고
    • Combined part selection, load sharing and machine loading problem in hybrid manufacturing systems
    • Liang, M. and Dutta, S. P., 1992, Combined part selection, load sharing and machine loading problem in hybrid manufacturing systems. International Journal of Production Research, 30, 2335-2349.
    • (1992) International Journal of Production Research , vol.30 , pp. 2335-2349
    • Liang, M.1    Dutta, S.P.2
  • 127
    • 0027608954 scopus 로고
    • Integrated approach to the part selection and machine loading problem in a class of flexible manufacturing systems
    • Liang, M. and Dutta, S. P., 1993, Integrated approach to the part selection and machine loading problem in a class of flexible manufacturing systems. European Journal of Operational Research, 67, 387-404.
    • (1993) European Journal of Operational Research , vol.67 , pp. 387-404
    • Liang, M.1    Dutta, S.P.2
  • 128
    • 78649742351 scopus 로고
    • Integrating neural networks and semi-Markov process for automated knowledge acquisition: An application to real time scheduling
    • Liang, T, Moskowitz, H. and Yih, Y., 1992, Integrating neural networks and semi-Markov process for automated knowledge acquisition: an application to real time scheduling. Decision Sciences, 23, 1297-1313.
    • (1992) Decision Sciences , vol.23 , pp. 1297-1313
    • Liang, T.1    Moskowitz, H.2    Yih, Y.3
  • 130
    • 0026206377 scopus 로고
    • Effective heuristics for the single machine sequencing problem with ready times
    • Liu, J. and McCarthy, B. L., 1991, Effective heuristics for the single machine sequencing problem with ready times. International Journal of Production Research, 29, 1521-1533.
    • (1991) International Journal of Production Research , vol.29 , pp. 1521-1533
    • Liu, J.1    Mc Carthy, B.L.2
  • 133
    • 0002436396 scopus 로고
    • Machine grouping for efficient production
    • McAuley, J., 1972, Machine grouping for efficient production. Production Engineering, 2, 5357.
    • (1972) Production Engineering , vol.2 , pp. 5357
    • Mc Auley, J.1
  • 134
    • 0015397231 scopus 로고
    • Problem decomposition and data reorganization by clustering technique
    • McCormick, W. T, Schweitzer, P. J. and White, T. W., 1972, Problem decomposition and data reorganization by clustering technique. Operations Research, 20, 992-1009.
    • (1972) Operations Research , vol.20 , pp. 992-1009
    • Mc Cormick, W.T.1    Schweitzer, P.J.2    White, T.W.3
  • 135
    • 0024770469 scopus 로고
    • Sequencing in an assembly line with blocking to minimize cycle time
    • McCormick, S. T, Pinedo, M. L. and Wolf, B., 1988, Sequencing in an assembly line with blocking to minimize cycle time. Operations Research, 36, 925-935.
    • (1988) Operations Research , vol.36 , pp. 925-935
    • Mc Cormick, S.T.1    Pinedo, M.L.2    Wolf, B.3
  • 136
    • 0001360372 scopus 로고
    • Level schedules for mixed-model assembly lines in just-in-time production systems
    • Miltenburg, J., 1989, Level schedules for mixed-model assembly lines in just-in-time production systems. Management Science, 35, 192-207.
    • (1989) Management Science , vol.35 , pp. 192-207
    • Miltenburg, J.1
  • 137
    • 0032121915 scopus 로고    scopus 로고
    • A competitive neural network approach to multiobjective FMS scheduling
    • Min, H.-S, Yih, Y. and Kim, C.-O., 1998, A competitive neural network approach to multiobjective FMS scheduling. International Journal of Production Research, 36, 1749-1765.
    • (1998) International Journal of Production Research , vol.36 , pp. 1749-1765
    • Min, H.-S.1    Yih, Y.2    Kim, C.-O.3
  • 139
    • 0004729748 scopus 로고
    • Cell design strategies for efficient materials handling
    • J. M. A. Tanchoco (ed.), London: Chapman & Hall
    • Moodie, C. L., Drolet, J., Ho, Y.-C. and Warren, G. M. H., 1994, Cell design strategies for efficient materials handling. In J. M. A. Tanchoco (ed.), Material Flow Systems in Manufacturing (London: Chapman & Hall).
    • (1994) Material Flow Systems in Manufacturing
    • Moodie, C.L.1    Drolet, J.2    Ho, Y.-C.3    Warren, G.M.H.4
  • 140
    • 0001379675 scopus 로고
    • Forming part-machine families for cellular manufacturing: A neural network approach
    • Moon, Y. B., 1990, Forming part-machine families for cellular manufacturing: a neural network approach. International Journal of Advanced Manufacturing Technology, 5, 278-291.
    • (1990) International Journal of Advanced Manufacturing Technology , vol.5 , pp. 278-291
    • Moon, Y.B.1
  • 141
    • 38249014262 scopus 로고
    • Generalized part family formation using neural network techniques
    • Moon, Y. B. and Chi, S. C., 1992, Generalized part family formation using neural network techniques. Journal of Manufacturing Systems, 11, 149-159.
    • (1992) Journal of Manufacturing Systems , vol.11 , pp. 149-159
    • Moon, Y.B.1    Chi, S.C.2
  • 142
    • 0009184781 scopus 로고
    • Automatic generation of group technology families during part classification process
    • Moon, Y. B. and Kao, Y., 1993, Automatic generation of group technology families during part classification process. International Journal of Advanced Manufacturing Technology, 8, 160-166.
    • (1993) International Journal of Advanced Manufacturing Technology , vol.8 , pp. 160-166
    • Moon, Y.B.1    Kao, Y.2
  • 145
    • 0343173750 scopus 로고
    • Dynamic manufacturing scheduling with Petri net modelling and constraint based editing
    • V. C. Venkatesh and J. C. McGeough, New York: Elsevier
    • Mori, K., Tsukiyama, M. and Fukuda, T, 1991, Dynamic manufacturing scheduling with Petri net modelling and constraint based editing. In V. C. Venkatesh and J. C. McGeough (eds), Computer Aided Production Engineering (New York: Elsevier).
    • (1991) Computer Aided Production Engineering
    • Mori, K.1    Tsukiyama, M.2    Fukuda, T.3
  • 146
    • 0042264360 scopus 로고
    • Dynamic scheduling and tool loading
    • V. C. Venkatesh and J. C. McGeough, New York: Elsevier
    • Mottet, Y. and Widmer, M., 1991, Dynamic scheduling and tool loading. In V. C. Venkatesh and J. C. McGeough (eds), Computer Aided Production Engineering (New York: Elsevier).
    • (1991) Computer Aided Production Engineering
    • Mottet, Y.1    Widmer, M.2
  • 147
    • 0026914581 scopus 로고
    • A heuristic procedure for loading problems in flexible manufacturing systems
    • Mukhopadhyay, S. K. and Sahu, S. K., 1992, A heuristic procedure for loading problems in flexible manufacturing systems. International Journal of Production Research, 30, 2213-2228.
    • (1992) International Journal of Production Research , vol.30 , pp. 2213-2228
    • Mukhopadhyay, S.K.1    Sahu, S.K.2
  • 148
  • 151
    • 0031259515 scopus 로고    scopus 로고
    • Real-time part dispatching with manufacturing cells using fuzzy logic
    • Nauman, A. and Gu, P., 1997, Real-time part dispatching with manufacturing cells using fuzzy logic. Production Planning and Control, 8, 662-669.
    • (1997) Production Planning and Control , vol.8 , pp. 662-669
    • Nauman, A.1    Gu, P.2
  • 152
    • 0032121744 scopus 로고    scopus 로고
    • Part type selection, machine loading and part type volume determination problems in FMS planning
    • Nayak, G. K. and Acharya, D., 1998, Part type selection, machine loading and part type volume determination problems in FMS planning. International Journal of Production Research, 36, 1801-1824.
    • (1998) International Journal of Production Research , vol.36 , pp. 1801-1824
    • Nayak, G.K.1    Acharya, D.2
  • 153
    • 0342840859 scopus 로고
    • A multiple criterion approach for production planning of automated manufacturing
    • O’ Grady, P. J. and Menon, U., 1985, A multiple criterion approach for production planning of automated manufacturing. Engineering Optimization, 8, 161-175.
    • (1985) Engineering Optimization , vol.8 , pp. 161-175
    • O’ Grady, P.J.1    Menon, U.2
  • 157
    • 0005869183 scopus 로고
    • Neural network to select dynamic scheduling heuristic
    • Pierreval, H., 1993, Neural network to select dynamic scheduling heuristic. Revue des Systemes de Decision, 2, 173-190.
    • (1993) Revue Des Systemes De Decision , vol.2 , pp. 173-190
    • Pierreval, H.1
  • 161
    • 0031233993 scopus 로고    scopus 로고
    • Simultaneous scheduling of workpieces, fixtures and cutting tools with flexible manufacturing systems
    • Rahimifard, S. and Newman, S. T, 1997, Simultaneous scheduling of workpieces, fixtures and cutting tools with flexible manufacturing systems. International Journal of Production Research, 35, 2379-2396.
    • (1997) International Journal of Production Research , vol.35 , pp. 2379-2396
    • Rahimifard, S.1    Newman, S.T.2
  • 164
    • 0029659077 scopus 로고    scopus 로고
    • Machine loading in the flexible manufacturing systems considering routing flexibility
    • Rajamani, D. and Adil, G. K., 1996, Machine loading in the flexible manufacturing systems considering routing flexibility. International Journal of Advanced Manufacturing Technology, 11, 372-380.
    • (1996) International Journal of Advanced Manufacturing Technology , vol.11 , pp. 372-380
    • Rajamani, D.1    Adil, G.K.2
  • 165
    • 0025418241 scopus 로고
    • Model and a solution approach for the machine loading and tool allocation problem in a flexible manufacturing system
    • Ram, B., Sarin, S. and Chen, C. S., 1990, Model and a solution approach for the machine loading and tool allocation problem in a flexible manufacturing system. International Journal of Production Research, 28, 637-645.
    • (1990) International Journal of Production Research , vol.28 , pp. 637-645
    • Ram, B.1    Sarin, S.2    Chen, C.S.3
  • 167
    • 0030647545 scopus 로고    scopus 로고
    • Quantitative analysis of AGV system in FMS cell layout
    • Ramana, B., Reddy, S. S. and Ramprasad, B., 1997, Quantitative analysis of AGV system in FMS cell layout. Defence Science Journal, 47, 75-81.
    • (1997) Defence Science Journal , vol.47 , pp. 75-81
    • Ramana, B.1    Reddy, S.S.2    Ramprasad, B.3
  • 168
    • 0003592198 scopus 로고
    • Machine scheduling problems: Classification
    • PhD thesis, University of Amsterdam
    • Rinnooy Kan, A. H. G., 1976, Machine scheduling problems: classification, complexity and computations, PhD thesis, University of Amsterdam.
    • (1976) Complexity and Computations
    • Rinnooy Kan, A.H.G.1
  • 169
    • 0026257982 scopus 로고
    • Optimizing the location of material transfer stations within layout analysis
    • Riopel, D. and Langevin, A., 1991, Optimizing the location of material transfer stations within layout analysis. European Journal of Production Economics, 22, 169-176.
    • (1991) European Journal of Production Economics , vol.22 , pp. 169-176
    • Riopel, D.1    Langevin, A.2
  • 170
    • 0031275801 scopus 로고    scopus 로고
    • Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
    • Roh, H.-K. and Kim, Y.-D., 1997, Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter. International Journal of Production Research, 35, 2989-3003.
    • (1997) International Journal of Production Research , vol.35 , pp. 2989-3003
    • Roh, H.-K.1    Kim, Y.-D.2
  • 171
    • 0030151249 scopus 로고    scopus 로고
    • A heuristic approach to n/m job-shop scheduling: Fuzzy dynamic scheduling algorithms
    • Roy, U. and Zhang, X., 1996, A heuristic approach to n/m job-shop scheduling: fuzzy dynamic scheduling algorithms. Production Planning and Control, 7, 299-311.
    • (1996) Production Planning and Control , vol.7 , pp. 299-311
    • Roy, U.1    Zhang, X.2
  • 172
    • 0031197384 scopus 로고    scopus 로고
    • Solutions to a modified tool loading problem for a single FMM
    • Rupe, J. and Kuo, W., 1997, Solutions to a modified tool loading problem for a single FMM. International Journal of Production Research, 35, 2253-2268.
    • (1997) International Journal of Production Research , vol.35 , pp. 2253-2268
    • Rupe, J.1    Kuo, W.2
  • 174
    • 0031627997 scopus 로고    scopus 로고
    • Scheduling with neural networks: A review of the literature and new research directions
    • Sabuncuoglu, I., 1998, Scheduling with neural networks: a review of the literature and new research directions. Production Planning and Control, 9, 2-12.
    • (1998) Production Planning and Control , vol.9 , pp. 2-12
    • Sabuncuoglu, I.1
  • 177
    • 0026866144 scopus 로고
    • Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system
    • Sabuncuoglu, I. and Hommertzheim, D. L., 1992, Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system. International Journal of Production Research, 30, 1059-1079.
    • (1992) International Journal of Production Research , vol.30 , pp. 1059-1079
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 178
    • 0032000573 scopus 로고    scopus 로고
    • Beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems
    • Sabuncuoglu, I. and Karabuk, S., 1998, Beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems. IIE Transactions, 30, 179-191.
    • (1998) IIE Transactions , vol.30 , pp. 179-191
    • Sabuncuoglu, I.1    Karabuk, S.2
  • 179
    • 0025419819 scopus 로고
    • Modeling and scheduling of a flexible manufacturing system
    • Sawik, T., 1990, Modeling and scheduling of a flexible manufacturing system. European Journal of Operational Research, 45, 177-190.
    • (1990) European Journal of Operational Research , vol.45 , pp. 177-190
    • Sawik, T.1
  • 180
    • 0027615366 scopus 로고
    • A scheduling algorithm for flexible flow lines with limited intermediate buffers
    • Sawik, T, 1993, A scheduling algorithm for flexible flow lines with limited intermediate buffers. Applied Stochastic Models and Data Analysis, 9, 127-138.
    • (1993) Applied Stochastic Models and Data Analysis , vol.9 , pp. 127-138
    • Sawik, T.1
  • 181
    • 0030378457 scopus 로고    scopus 로고
    • Two-level heuristic for machine loading and assembly routing in a flexible assembly system
    • Sawik, T, 1996, Two-level heuristic for machine loading and assembly routing in a flexible assembly system. IEEE Symposium on Emerging Technologies and Factory Automation, Vol. 1, 143-149.
    • (1996) IEEE Symposium on Emerging Technologies and Factory Automation , vol.1 , pp. 143-149
    • Sawik, T.1
  • 182
    • 0023384747 scopus 로고
    • The machine loading and tool allocation problem in a flexible manufacturing system
    • Sarin, S. and Chen C. S., 1987, The machine loading and tool allocation problem in a flexible manufacturing system. International Journal of Production Research, 25, 1081-1094.
    • (1987) International Journal of Production Research , vol.25 , pp. 1081-1094
    • Sarin, S.1    Chen, C.S.2
  • 184
    • 0024889373 scopus 로고
    • Duplication process in machine cells formation in group technology
    • Seifoddini, H., 1989, Duplication process in machine cells formation in group technology. IIE Transactions, 21, 382-388.
    • (1989) IIE Transactions , vol.21 , pp. 382-388
    • Seifoddini, H.1
  • 185
    • 84953164255 scopus 로고
    • Application of the similarity coefficient method in group technology
    • Seifoddini, H. K. and Wolfe, P., 1986, Application of the similarity coefficient method in group technology. AIIE Transactions, 18, 271-277.
    • (1986) AIIE Transactions , vol.18 , pp. 271-277
    • Seifoddini, H.K.1    Wolfe, P.2
  • 186
    • 0031076585 scopus 로고    scopus 로고
    • Models and solution methodologies for the generalized grouping problem in cellular manufacturing
    • Shanker, K. and Agrawal, A. K., 1997, Models and solution methodologies for the generalized grouping problem in cellular manufacturing. International Journal of Production Research, 35, 513-538.
    • (1997) International Journal of Production Research , vol.35 , pp. 513-538
    • Shanker, K.1    Agrawal, A.K.2
  • 187
    • 0024673709 scopus 로고
    • Some solution methodologies for loading problems in a flexible manufacturing system
    • Shanker, K. and Srinivasalu, A., 1989, Some solution methodologies for loading problems in a flexible manufacturing system. International Journal of Production Research, 27, 1019-1034.
    • (1989) International Journal of Production Research , vol.27 , pp. 1019-1034
    • Shanker, K.1    Srinivasalu, A.2
  • 189
    • 0030737841 scopus 로고    scopus 로고
    • Formulations and heuristics for scheduling in a buffer-constrained flowshop and flow-line-based manufacturing cell with different buffer-space requirements for jobs: Part 2
    • Sharadapriyadarshini, B. and Rajendran, C., 1997, Formulations and heuristics for scheduling in a buffer-constrained flowshop and flow-line-based manufacturing cell with different buffer-space requirements for jobs: Part 2. International Journal of Production Research, 35, 101-122.
    • (1997) International Journal of Production Research , vol.35 , pp. 101-122
    • Sharadapriyadarshini, B.1    Rajendran, C.2
  • 191
    • 0024016193 scopus 로고
    • A knowledge-based scheduling system for flexible manufacturing
    • Shaw, M. J., 1988, A knowledge-based scheduling system for flexible manufacturing. International Journal of Production Research, 26, 821-844.
    • (1988) International Journal of Production Research , vol.26 , pp. 821-844
    • Shaw, M.J.1
  • 192
    • 0000936343 scopus 로고
    • Intelligent scheduling with machine learning capabilities: The induction of scheduling knowledge
    • Shaw, M. J., Park, S. and Raman, N., 1992, Intelligent scheduling with machine learning capabilities: the induction of scheduling knowledge. IIE Transactions, 24, 156-168.
    • (1992) IIE Transactions , vol.24 , pp. 156-168
    • Shaw, M.J.1    Park, S.2    Raman, N.3
  • 193
    • 0024682175 scopus 로고
    • An AI approach to scheduling in flexible manufacturing systems
    • Shaw, M. J. and Whinston, A., 1989, An AI approach to scheduling in flexible manufacturing systems. IEE Transactions, 21, 170-183.
    • (1989) IEE Transactions , vol.21 , pp. 170-183
    • Shaw, M.J.1    Whinston, A.2
  • 194
    • 0024656202 scopus 로고
    • Modeling group technology cell formation as a generalized assignment problem
    • Shtub, A., 1989, Modeling group technology cell formation as a generalized assignment problem. International Journal of Production Research, 27, 775-782.
    • (1989) International Journal of Production Research , vol.27 , pp. 775-782
    • Shtub, A.1
  • 195
    • 0025243881 scopus 로고
    • Deliberately slowing down output in a family production context
    • Silver, E., 1990, Deliberately slowing down output in a family production context. International Journal of Production Research, 28, 17-27.
    • (1990) International Journal of Production Research , vol.28 , pp. 17-27
    • Silver, E.1
  • 196
    • 84952488322 scopus 로고
    • An expert neural system for dynamic job shop scheduling heuristic
    • Sim, S. K., Yeo, K. Y. and Lee, W. H., 1994, An expert neural system for dynamic job shop scheduling heuristic. Revue des Systèmes de Decision, 32, 1759-1773.
    • (1994) Revue Des Systèmes De Decision , vol.32 , pp. 1759-1773
    • Sim, S.K.1    Yeo, K.Y.2    Lee, W.H.3
  • 198
  • 199
  • 201
    • 0028452748 scopus 로고    scopus 로고
    • 1994, Multiperiod tool and production assignment in flexible manufacturing systems
    • Sodhi, M. S., Askin, R. G. and Sen, S., 1994, Multiperiod tool and production assignment in flexible manufacturing systems. International Journal of Production Research, 32, 1281-1294.
    • International Journal of Production Research , vol.32 , pp. 1281-1294
    • Sodhi, M.S.1    Askin, R.G.2    Sen, S.3
  • 202
    • 0026905656 scopus 로고
    • Simulated annealing applied to the process allocation problem
    • Sofianopoulou, S., 1991, Simulated annealing applied to the process allocation problem. European Journal of Operational Research, 60, 327-334.
    • (1991) European Journal of Operational Research , vol.60 , pp. 327-334
    • Sofianopoulou, S.1
  • 203
    • 0031075272 scopus 로고    scopus 로고
    • Application of simulated annealing to a linear model for the formation of machine cells in group technology
    • Sofianopoulou, S., 1997, Application of simulated annealing to a linear model for the formation of machine cells in group technology. International Journal of Production Research, 35, 501-511.
    • (1997) International Journal of Production Research , vol.35 , pp. 501-511
    • Sofianopoulou, S.1
  • 205
    • 0030192321 scopus 로고    scopus 로고
    • Scheduling in flow-shop and cellular manufacturing systems with multiple objectives—a genetic algorithmic approach
    • Sridhar, J. and Rajendran, C., 1996, Scheduling in flow-shop and cellular manufacturing systems with multiple objectives—a genetic algorithmic approach. Production Planning and Control, 7, 374-382.
    • (1996) Production Planning and Control , vol.7 , pp. 374-382
    • Sridhar, J.1    Rajendran, C.2
  • 208
    • 0020718128 scopus 로고
    • Formulation and solution of nonlinear integer production planning problems for FMSs
    • Stecke, K. E., 1983, Formulation and solution of nonlinear integer production planning problems for FMSs. Management Science, 29, 273-288.
    • (1983) Management Science , vol.29 , pp. 273-288
    • Stecke, K.E.1
  • 209
    • 0022676091 scopus 로고
    • A hierarchical approach to solving machine grouping and loading problems of FMSs
    • Stecke, K. E., 1986, A hierarchical approach to solving machine grouping and loading problems of FMSs. European Journal of Operational Research, 24, 369-378.
    • (1986) European Journal of Operational Research , vol.24 , pp. 369-378
    • Stecke, K.E.1
  • 211
    • 0001357568 scopus 로고
    • Variation in FMSs according to the relevant types of automated materials handling
    • Stecke, K. E. and Browne, J., 1985, Variation in FMSs according to the relevant types of automated materials handling. Material Flow, 2, 179-185.
    • (1985) Material Flow , vol.2 , pp. 179-185
    • Stecke, K.E.1    Browne, J.2
  • 212
    • 0025894458 scopus 로고
    • A flexible approach to part type selection in flexible flow systems using part mix ratios
    • Stecke, K. E. and Kim, I., 1991, A flexible approach to part type selection in flexible flow systems using part mix ratios. International Journal of Production Research, 29, 53-75.
    • (1991) International Journal of Production Research , vol.29 , pp. 53-75
    • Stecke, K.E.1    Kim, I.2
  • 215
    • 0030790585 scopus 로고    scopus 로고
    • Scheduling a 2-machine flowshop with travel times to minimize maximum lateness
    • Stevens, J. W. and Gemmill, D. D., 1997, Scheduling a 2-machine flowshop with travel times to minimize maximum lateness. International Journal of Production Research, 35, 115.
    • (1997) International Journal of Production Research , vol.35 , pp. 115
    • Stevens, J.W.1    Gemmill, D.D.2
  • 216
    • 0030269845 scopus 로고    scopus 로고
    • Impact of empty vehicle flow on optimal flow path design for unidirectional AGV systems
    • Sun, X.-C. and Tchernev, N., 1996, Impact of empty vehicle flow on optimal flow path design for unidirectional AGV systems. International Journal of Production Research, 34, 2827-2852.
    • (1996) International Journal of Production Research , vol.34 , pp. 2827-2852
    • Sun, X.-C.1    Tchernev, N.2
  • 217
    • 0021607371 scopus 로고
    • Decision support requirements in flexible manufacturing
    • Suri, R. and Whitney, C. K., 1984, Decision support requirements in flexible manufacturing. Journal of Manufacturing Systems, 3, 61-69.
    • (1984) Journal of Manufacturing Systems , vol.3 , pp. 61-69
    • Suri, R.1    Whitney, C.K.2
  • 220
    • 0027644831 scopus 로고
    • A real time scheduler using neural networks for independent and nonpreemptable tasks with deadlines and resource requirements
    • Thawonmas, R., Shiratori, N. and Noguchi, S., 1993, A real time scheduler using neural networks for independent and nonpreemptable tasks with deadlines and resource requirements. IEICE Transactions Information and Systems, E. 76, 947-955.
    • (1993) IEICE Transactions Information and Systems, E. , vol.76 , pp. 947-955
    • Thawonmas, R.1    Shiratori, N.2    Noguchi, S.3
  • 222
    • 0003348756 scopus 로고
    • Tooling strategies related to FMS management
    • Tomek, P., 1986, Tooling strategies related to FMS management. The FMS Magazine, pp. 102-107.
    • (1986) The FMS Magazine , pp. 102-107
    • Tomek, P.1
  • 224
    • 0027845081 scopus 로고
    • Simultaneous scheduling of machines and automated guided vehicles
    • Ulusoy, G. and Bilge, U., 1993, Simultaneous scheduling of machines and automated guided vehicles. International Journal of Production Research, 31, 2857-2873.
    • (1993) International Journal of Production Research , vol.31 , pp. 2857-2873
    • Ulusoy, G.1    Bilge, U.2
  • 226
    • 0026851407 scopus 로고
    • A stochastic neural network for resource constrained scheduling
    • Vaithianathan, S. and Ignizo, J. P., 1992, A stochastic neural network for resource constrained scheduling. Computing and Operations Research, 19, 241-254.
    • (1992) Computing and Operations Research , vol.19 , pp. 241-254
    • Vaithianathan, S.1    Ignizo, J.P.2
  • 228
    • 0026986146 scopus 로고
    • Cell formation in manufacturing systems through simulated annealing: An experimental evaluation
    • Venugopal, V. and Navendran, T T, 1992, Cell formation in manufacturing systems through simulated annealing: an experimental evaluation. European Journal of Operational Research, 63, 409-422.
    • (1992) European Journal of Operational Research , vol.63 , pp. 409-422
    • Venugopal, V.1    Navendran, T.T.2
  • 229
    • 0031146035 scopus 로고    scopus 로고
    • Formation of machine cells and part families: A modified p-median model and comparative study
    • Wang, J. and Roze, C., 1997, Formation of machine cells and part families: a modified p-median model and comparative study. International Journal of Production Research, 35, 1259-1286.
    • (1997) International Journal of Production Research , vol.35 , pp. 1259-1286
    • Wang, J.1    Roze, C.2
  • 231
    • 0030216417 scopus 로고    scopus 로고
    • Formation and dynamic routing of part families among flexible manufacturing cells
    • Wen, H. J., Smith, C. H. and Minor, E. D., 1996, Formation and dynamic routing of part families among flexible manufacturing cells. International Journal of Production Research, 34, 2229-2245.
    • (1996) International Journal of Production Research , vol.34 , pp. 2229-2245
    • Wen, H.J.1    Smith, C.H.2    Minor, E.D.3
  • 233
    • 0025894230 scopus 로고
    • Job shop scheduling with tooling constraints: A tabu search approach
    • Widmer, M., 1991, Job shop scheduling with tooling constraints: a tabu search approach. Journal of the Operational Society, 42, 75-82.
    • (1991) Journal of the Operational Society , vol.42 , pp. 75-82
    • Widmer, M.1
  • 235
    • 0024016313 scopus 로고
    • An adaptable scheduling algorithm for flexible flow lines
    • Wittrock, R. J., 1988, An adaptable scheduling algorithm for flexible flow lines. Operations Research, 36, 445-453.
    • (1988) Operations Research , vol.36 , pp. 445-453
    • Wittrock, R.J.1
  • 236
  • 237
    • 0023868237 scopus 로고
    • Multi-pass expert control system—a control and scheduling structure for flexible manufacturing systems
    • Wu, S. D. and Wysk, R. A., 1988, Multi-pass expert control system—a control and scheduling structure for flexible manufacturing systems. Journal of Manufacturing Systems, 7, 107-120.
    • (1988) Journal of Manufacturing Systems , vol.7 , pp. 107-120
    • Wu, S.D.1    Wysk, R.A.2
  • 240
    • 0030190733 scopus 로고    scopus 로고
    • The use of dynamic programming in GAs for permutation problems
    • Yagiura, M. and Ibaraki, T, 1996, The use of dynamic programming in GAs for permutation problems. European Journal of Operational Research, 92, 387-401.
    • (1996) European Journal of Operational Research , vol.92 , pp. 387-401
    • Yagiura, M.1    Ibaraki, T.2
  • 241
    • 0000123908 scopus 로고
    • Material and information flows in flexible manufacturing systems
    • Yao, D. D., 1985, Material and information flows in flexible manufacturing systems. Material Flow, 2, 143-149.
    • (1985) Material Flow , vol.2 , pp. 143-149
    • Yao, D.D.1
  • 242
    • 0025398941 scopus 로고
    • Flexible parts routing in manufacturing systems
    • Yao, D. D. and Pei, F. F., 1990, Flexible parts routing in manufacturing systems. IIE Transactions, 22, 48-55.
    • (1990) IIE Transactions , vol.22 , pp. 48-55
    • Yao, D.D.1    Pei, F.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.