-
1
-
-
0027675742
-
A scheduling approach for a flexible manufacturing system
-
Aanen, E., Gaalman, G. J. and Nawijn, W. M., 1993, A scheduling approach for a flexible manufacturing system. International Journal of Production Research, 31, 2369-2385.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2369-2385
-
-
Aanen, E.1
Gaalman, G.J.2
Nawijn, W.M.3
-
2
-
-
0001255490
-
A computational study of local search algorithm for job shop scheduling
-
Aarts, E. H. L., Van Laarhoven, P. J. M., Lenstra, J. K. and Ulder, N. L. J., 1994, A computational study of local search algorithm for job shop scheduling. ORSA Journal of Computing, 6, 118-129.
-
(1994)
ORSA Journal of Computing
, vol.6
, pp. 118-129
-
-
Aarts, E.H.L.1
Van Laarhoven, P.J.M.2
Lenstra, J.K.3
Ulder, N.L.J.4
-
3
-
-
0030576471
-
A fuzzy-linguistic approach to a multi-criteria sequencing problem
-
Adamapoulos, G. I. and Pappis, C. P., 1996, A fuzzy-linguistic approach to a multi-criteria sequencing problem. European Journal of Operational Research, 92, 628-636.
-
(1996)
European Journal of Operational Research
, vol.92
, pp. 628-636
-
-
Adamapoulos, G.I.1
Pappis, C.P.2
-
4
-
-
0030142353
-
Tool handling and scheduling in a 2-machine flexible manufacturing cell
-
Agnetis, A., Dror, M., Vakharia, A. J. and Rossi, F., 1996, Tool handling and scheduling in a 2-machine flexible manufacturing cell. IIE Transactions, 28, 425-437.
-
(1996)
IIE Transactions
, vol.28
, pp. 425-437
-
-
Agnetis, A.1
Dror, M.2
Vakharia, A.J.3
Rossi, F.4
-
5
-
-
0030216322
-
Part-machine grouping using a multi-objective cluster analysis
-
Akturk, M. S. and Balkose, H. O., 1996, Part-machine grouping using a multi-objective cluster analysis. International Journal of Production Research, 34, 2299-2315.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 2299-2315
-
-
Akturk, M.S.1
Balkose, H.O.2
-
6
-
-
0030085521
-
Scheduling of AGVs in a decision making hierarchy
-
Akturk, M. S. and Yilmaz, H., 1996, Scheduling of AGVs in a decision making hierarchy. International Journal of Production Research, 34, 577-591.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 577-591
-
-
Akturk, M.S.1
Yilmaz, H.2
-
7
-
-
3743105739
-
A tool and part flow simulator for optimal FMS management
-
V. C. Venkatesh and J. C. McGeough, New York: Elsevier
-
Alberti, N., La Commare, V., Noto La Diega, S. and Perrone, G., 1991, A tool and part flow simulator for optimal FMS management. In V. C. Venkatesh and J. C. McGeough (eds), Computer Aided Production Engineering (New York: Elsevier).
-
(1991)
Computer Aided Production Engineering
-
-
Alberti, N.1
La Commare, V.2
Noto La Diega, S.3
Perrone, G.4
-
8
-
-
34250114086
-
A large scale loading problem in flexible assembly
-
Ammons, J. C., Lofgren, C. B. and McGinnis, L. F., 1985, A large scale loading problem in flexible assembly. Annals of Operations Research, 3, 319-328.
-
(1985)
Annals of Operations Research
, vol.3
, pp. 319-328
-
-
Ammons, J.C.1
Lofgren, C.B.2
Mc Ginnis, L.F.3
-
9
-
-
85010595003
-
Optimization models for FMSs
-
F. Archetti, M. Lucertini and M. P. Serafini
-
Arbib, C., Lucertini, M. and Nicolo, F., 1989, Optimization models for FMSs. In F. Archetti, M. Lucertini and M. P. Serafini (eds) Operations Research Models in FMSs. International Centre for Mechanical Sciences of Udine (Springer), pp. 75-89.
-
(1989)
Operations Research Models in Fmss. International Centre for Mechanical Sciences of Udine (Springer)
, pp. 75-89
-
-
Arbib, C.1
Lucertini, M.2
Nicolo, F.3
-
10
-
-
0026836078
-
Scheduling for minimizing total actual flow time by neural networks
-
Arizona, I., Yamamato, A. and Ohto, H., 1992, Scheduling for minimizing total actual flow time by neural networks. International Journal of Production Research, 30, 503-511.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 503-511
-
-
Arizona, I.1
Yamamato, A.2
Ohto, H.3
-
11
-
-
0023135130
-
A cost-based heuristic for group technology configuration
-
Askin, R. and Subramanian, S., 1987, A cost-based heuristic for group technology configuration. International Journal of Production Research, 25, 101-114.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 101-114
-
-
Askin, R.1
Subramanian, S.2
-
12
-
-
0041536086
-
An expert system approach to scheduling in flexible manufacturing systems
-
A. Kusiak (ed.), New York: Elsevier
-
Askin, R. G. and Subramanyam, S., 1986, An expert system approach to scheduling in flexible manufacturing systems. In A. Kusiak (ed.), Flexible Manufacturing Systems: Methods and Studies (New York: Elsevier), pp. 243-256.
-
(1986)
Flexible Manufacturing Systems: Methods and Studies
, pp. 243-256
-
-
Askin, R.G.1
Subramanyam, S.2
-
13
-
-
0030110029
-
Auxiliary tool allocation in flexible manufacturing systems
-
Atan, T S. and Pandit, R., 1996, Auxiliary tool allocation in flexible manufacturing systems. European Journal of Operational Research, 89, 642-659.
-
(1996)
European Journal of Operational Research
, vol.89
, pp. 642-659
-
-
Atan, T.S.1
Pandit, R.2
-
14
-
-
0025624142
-
Deadlock avoidance in flexible manufacturing systems with concurrently competing process flows
-
Banaszak, Z. A. and Krogh, B. H., 1990, Deadlock avoidance in flexible manufacturing systems with concurrently competing process flows. IEEE Transactions on Robotics and Automation, 6, 724-734.
-
(1990)
IEEE Transactions on Robotics and Automation
, vol.6
, pp. 724-734
-
-
Banaszak, Z.A.1
Krogh, B.H.2
-
15
-
-
0024140442
-
A heuristic for minimizing the number of tool switches on a flexible machine
-
Bard, J. F., 1988, A heuristic for minimizing the number of tool switches on a flexible machine. IIE Transactions, 20, 382-391.
-
(1988)
IIE Transactions
, vol.20
, pp. 382-391
-
-
Bard, J.F.1
-
16
-
-
0000312362
-
Scheduling and control of flexible manufacturing systems: A critical review
-
Basnet, C. and Mize, J. H., 1994, Scheduling and control of flexible manufacturing systems: a critical review. International Journal of Computer Integrated Manufacturing, 7, 340-355.
-
(1994)
International Journal of Computer Integrated Manufacturing
, vol.7
, pp. 340-355
-
-
Basnet, C.1
Mize, J.H.2
-
17
-
-
0031189149
-
An algorithm for the cell formation and the machine selection problems in the design of a cellular manufacturing system
-
Beaulieu, A., Ait-Kadi, D. and Gharbi, A., 1997, An algorithm for the cell formation and the machine selection problems in the design of a cellular manufacturing system. International Journal of Production Research, 35, 1857-1874.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 1857-1874
-
-
Beaulieu, A.1
Ait-Kadi, D.2
Gharbi, A.3
-
19
-
-
0024017013
-
OPAL: A multi-knowledge-based system for industrial job shop scheduling
-
Bensana, E., Bel, G. and Dubois, D., 1988, OPAL: A multi-knowledge-based system for industrial job shop scheduling. International Journal of Production Research, 26, 795-819.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 795-819
-
-
Bensana, E.1
Bel, G.2
Dubois, D.3
-
20
-
-
0342304214
-
A branch and bound approach for machine loading in FMS
-
Berrada, M. and Stecke, K. E., 1986, A branch and bound approach for machine loading in FMS. Management Science, 32, 1317-1335.
-
(1986)
Management Science
, vol.32
, pp. 1317-1335
-
-
Berrada, M.1
Stecke, K.E.2
-
21
-
-
0020013653
-
A state-of-the-art survey of dispatching rules for manufacturing job shop operations
-
Blackstone, Jr J. H., Phillips, D. T and Hogg, G. L., 1982, A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research, 20, 27-45.
-
(1982)
International Journal of Production Research
, vol.20
, pp. 27-45
-
-
Blackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
22
-
-
34249921014
-
Scheduling tasks and vehicles in a flexible manufacturing system
-
Blazewicz, J., Eiselt, H. A., Finke, G., Laporte, G. and Weglarz, J., 1991, Scheduling tasks and vehicles in a flexible manufacturing system. Internationa l Journal of Flexible Manufacturing Systems, 4, 5-16.
-
(1991)
Internationa L Journal of Flexible Manufacturing Systems
, vol.4
, pp. 5-16
-
-
Blazewicz, J.1
Eiselt, H.A.2
Finke, G.3
Laporte, G.4
Weglarz, J.5
-
23
-
-
0030196437
-
Optimizing SA schedules with genetic programming
-
Bolte, A. and Thonemann, V. W., 1996, Optimizing SA schedules with genetic programming. European Journal of Operational Research, 92, 402-416.
-
(1996)
European Journal of Operational Research
, vol.92
, pp. 402-416
-
-
Bolte, A.1
Thonemann, V.W.2
-
24
-
-
34250084648
-
Routing and scheduling in flexible job shop by tabu search
-
Brandimarte, P., 1993, Routing and scheduling in flexible job shop by tabu search. Annals of Operations Research, 41, 157-183.
-
(1993)
Annals of Operations Research
, vol.41
, pp. 157-183
-
-
Brandimarte, P.1
-
25
-
-
0011798818
-
FMS production scheduling by simulated annealing
-
Turin, Italy
-
Brandimarte, P., Contemo, R. and Laface, P., 1987, FMS production scheduling by simulated annealing. Proceedings of the 3rd Conference on Simulation in Manufacturing, Turin, Italy, pp. 235-245.
-
(1987)
Proceedings of the 3Rd Conference on Simulation in Manufacturing
, pp. 235-245
-
-
Brandimarte, P.1
Contemo, R.2
Laface, P.3
-
26
-
-
0343609255
-
Part families and manufacturing cell formation
-
Dresden, GDR
-
Bruyand, A., Garcia, H., Gateau, D., Molloholli, L. and Mutel, B., 1989, Part families and manufacturing cell formation. Prolamat’s Conference Proceedings, Dresden, GDR.
-
(1989)
Prolamat’s Conference Proceedings
-
-
Bruyand, A.1
Garcia, H.2
Gateau, D.3
Molloholli, L.4
Mutel, B.5
-
29
-
-
0022812077
-
Work scheduling in FMS under tool availability constraints
-
Carrie, A. S. and Perera, D. T. S., 1986, Work scheduling in FMS under tool availability constraints. International Journal of Production Research, 24, 1299-1308.
-
(1986)
International Journal of Production Research
, vol.24
, pp. 1299-1308
-
-
Carrie, A.S.1
Perera, D.T.S.2
-
31
-
-
0020388157
-
Direct clustering algorithm for group formation in cellular manufacturing
-
Chan, H. M. and Milner, D. A., 1982, Direct clustering algorithm for group formation in cellular manufacturing. Journal of Manufacturing Systems, 1, 65-74.
-
(1982)
Journal of Manufacturing Systems
, vol.1
, pp. 65-74
-
-
Chan, H.M.1
Milner, D.A.2
-
32
-
-
0022663529
-
Heuristical job allocation in a flexible manufacturing system
-
Chan, T. S. and Pak, H. A., 1986, Heuristical job allocation in a flexible manufacturing system. Journal of Manufacturing Systems, 1, 69-90.
-
(1986)
Journal of Manufacturing Systems
, vol.1
, pp. 69-90
-
-
Chan, T.S.1
Pak, H.A.2
-
33
-
-
0026253933
-
Intelligent dispatching for flexible manufacturing
-
Chandra, J. and Talavage, J., 1991, Intelligent dispatching for flexible manufacturing. International Journal of Production Research, 29, 2259-2278.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 2259-2278
-
-
Chandra, J.1
Talavage, J.2
-
34
-
-
0022787990
-
MODROC: An extension of rank order clustering for group technology
-
Chandrasekharan, M. P. and Rajagopalan, R., 1986, MODROC: an extension of rank order clustering for group technology. International Journal of Production Research, 24, 1221-1233.
-
(1986)
International Journal of Production Research
, vol.24
, pp. 1221-1233
-
-
Chandrasekharan, M.P.1
Rajagopalan, R.2
-
35
-
-
0023366202
-
ZODIAC: An algorithm for concurrent formation of part families and machine cells
-
Chandrasekharan, M. P. and Rajagopalan, R., 1987, ZODIAC: an algorithm for concurrent formation of part families and machine cells. International Journal of Production Research, 25, 835-850.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 835-850
-
-
Chandrasekharan, M.P.1
Rajagopalan, R.2
-
37
-
-
0012331828
-
Experimental investigation of quasi real time scheduling in FMS
-
K. E. Stecke and R. Suri, Amsterdam: Elsevier Science
-
Chang, Y., Sullivan, R. and Bagghi, U., 1986, Experimental investigation of quasi real time scheduling in FMS. In K. E. Stecke and R. Suri (eds), Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications (Amsterdam: Elsevier Science), pp. 307-312.
-
(1986)
Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications
, pp. 307-312
-
-
Chang, Y.1
Sullivan, R.2
Bagghi, U.3
-
38
-
-
0027626981
-
FMS scheduling and control: Learning to achieve multiple goals
-
Chaturvedi, A. R., 1993, FMS scheduling and control: learning to achieve multiple goals. Expert Systems with Applications, 6, 267-286.
-
(1993)
Expert Systems with Applications
, vol.6
, pp. 267-286
-
-
Chaturvedi, A.R.1
-
39
-
-
0025377030
-
FMS scheduling using goal-directed conceptual aggregation
-
Chaturvedi, A. R., Hutchinson, G. K. and Nazareth, D. L., 1990, FMS scheduling using goal-directed conceptual aggregation. Proceedings of the 7th IEEE Conference on Artificial Intelligence Applications, pp. 315-321.
-
(1990)
Proceedings of the 7Th IEEE Conference on Artificial Intelligence Applications
, pp. 315-321
-
-
Chaturvedi, A.R.1
Hutchinson, G.K.2
Nazareth, D.L.3
-
40
-
-
0029388639
-
An effective part selection model for production planning of FMSs
-
Chen, F. F., Ker, J.-I. and Kleawpatinon, K., 1995, An effective part selection model for production planning of FMSs. International Journal of Production Research, 33, 2671-2683.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 2671-2683
-
-
Chen, F.F.1
Ker, J.-I.2
Kleawpatinon, K.3
-
41
-
-
0026254174
-
Effects of loading and routing decisions on performance of flexible manufacturing systems
-
Chen, I. J. and Chung, C.-H., 1991, Effects of loading and routing decisions on performance of flexible manufacturing systems. International Journal of Production Research, 29, 2209-2225.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 2209-2225
-
-
Chen, I.J.1
Chung, C.-H.2
-
42
-
-
0029505655
-
FMS scheduling using backtracking-free heuristic search based on petri net state equations
-
Vancouver, BC
-
Chen, S. C. and Jeng, M. D., 1995, FMS scheduling using backtracking-free heuristic search based on petri net state equations. 1995 IEEE International Conference on Systems, Man and Cybernetics, Intelligent Systems for the 21st Century, Vancouver, BC, Vol. 3, pp. 2153-2158.
-
(1995)
1995 IEEE International Conference on Systems, Man and Cybernetics, Intelligent Systems for the 21St Century
, vol.3
, pp. 2153-2158
-
-
Chen, S.C.1
Jeng, M.D.2
-
43
-
-
0028425193
-
Simulated annealing procedures for forming cells in group technology
-
Chen, W.-H. and Srivastava, B., 1994, Simulated annealing procedures for forming cells in group technology. European Journal of Operational Research, 75, 100-111.
-
(1994)
European Journal of Operational Research
, vol.75
, pp. 100-111
-
-
Chen, W.-H.1
Srivastava, B.2
-
44
-
-
0030675603
-
GA embedded dynamic search algorithm over a petri net model for a FMS scheduling
-
Chiu, Y. F. and Fu, L. C., 1997, GA embedded dynamic search algorithm over a petri net model for a FMS scheduling. Proceedings of the 1997 IEEE International Conference on Robotics and Automation, Vol. 1, pp. 513-518.
-
(1997)
Proceedings of the 1997 IEEE International Conference on Robotics and Automation
, vol.1
, pp. 513-518
-
-
Chiu, Y.F.1
Fu, L.C.2
-
45
-
-
0027576654
-
A robust adaptive scheduler for an intelligent workstation controller
-
Cho, H. and Wysk, R. A., 1993, A robust adaptive scheduler for an intelligent workstation controller. International Journal of Production Research, 31, 771-789.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 771-789
-
-
Cho, H.1
Wysk, R.A.2
-
46
-
-
0023824587
-
Evaluation of traditional work scheduling rules in a FMS with a physical simulator
-
Choi, R. H. and Malstrom E. M., 1988, Evaluation of traditional work scheduling rules in a FMS with a physical simulator. Journal of Manufacturing Systems, 7, 33-45.
-
(1988)
Journal of Manufacturing Systems
, vol.7
, pp. 33-45
-
-
Choi, R.H.1
Malstrom, E.M.2
-
47
-
-
0024124520
-
Manufacturing systems operations: Dispatch rules vs intelligent control
-
Chryssolouris, G., Wright, K., Pierce, J. and Cobb, W., 1988, Manufacturing systems operations: dispatch rules vs intelligent control. Robotics and Computer Integrated Manufacturing, 4, 531-544.
-
(1988)
Robotics and Computer Integrated Manufacturing
, vol.4
, pp. 531-544
-
-
Chryssolouris, G.1
Wright, K.2
Pierce, J.3
Cobb, W.4
-
48
-
-
0026190510
-
A fuzzy clustering approach to manufacturing cell formation
-
Chu, C. H. and Hayya, J. C., 1991, A fuzzy clustering approach to manufacturing cell formation. International Journal of Production Research, 29, 1475-1487.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1475-1487
-
-
Chu, C.H.1
Hayya, J.C.2
-
49
-
-
0008235709
-
Planning tool requirements for flexible manufacturing systems
-
Chung, C., 1991, Planning tool requirements for flexible manufacturing systems. Journal of Manufacturing Systems, 10, 476-483.
-
(1991)
Journal of Manufacturing Systems
, vol.10
, pp. 476-483
-
-
Chung, C.1
-
50
-
-
0001575225
-
Using genetic algorithms to schedule flow shop releases
-
Arlington, VA
-
Cleveland, G. and Smith, S., 1989, Using genetic algorithms to schedule flow shop releases. Proceedings of the Third International Conference on Genetic Algorithms, Arlington, VA, pp. 160-169.
-
(1989)
Proceedings of the Third International Conference on Genetic Algorithms
, pp. 160-169
-
-
Cleveland, G.1
Smith, S.2
-
51
-
-
0023868981
-
Sequencing in flexible manufacturing systems and other short queue-length systems
-
Co, H. C., Jaw, T J. and Chen, S. K., 1988, Sequencing in flexible manufacturing systems and other short queue-length systems. Journal of Manufacturing Systems, 7, 18.
-
(1988)
Journal of Manufacturing Systems
, vol.7
, pp. 18
-
-
Co, H.C.1
Jaw, T.J.2
Chen, S.K.3
-
52
-
-
0025595213
-
Methodical approach to the flexible manufacturing system batching, loading and tool configuration problems
-
Co, H. C., Biermann, J. S. and Chen, S. K., 1990, Methodical approach to the flexible manufacturing system batching, loading and tool configuration problems. International Journal of Production Research, 28, 2171-2186.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 2171-2186
-
-
Co, H.C.1
Biermann, J.S.2
Chen, S.K.3
-
54
-
-
0028416608
-
Production planning and scheduling using a fuzzy decision system
-
Custodio, L. M. M., Sentieiro, J. J. S. and Bispo, C. F. G., 1994, Production planning and scheduling using a fuzzy decision system. IEEE Transactions on Robotics and Automation, 10, 160-167.
-
(1994)
IEEE Transactions on Robotics and Automation
, vol.10
, pp. 160-167
-
-
Custodio, L.M.M.1
Sentieiro, J.J.S.2
Bispo, C.F.G.3
-
56
-
-
0031281696
-
Exact solution procedures for certain planning problems in flexible manufacturing systems
-
Denizel, M. and Erenguc, S. S., 1997, Exact solution procedures for certain planning problems in flexible manufacturing systems. Computers and Operations Research, 24, 1043-1055.
-
(1997)
Computers and Operations Research
, vol.24
, pp. 1043-1055
-
-
Denizel, M.1
Erenguc, S.S.2
-
57
-
-
0023385665
-
Experimental investigation of FMS scheduling decision rules
-
Denzler, D. R. and Boe, W. J., 1987, Experimental investigation of FMS scheduling decision rules. International Journal of Production Research, 25, 979-994.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 979-994
-
-
Denzler, D.R.1
Boe, W.J.2
-
58
-
-
0038755220
-
A hierarchical knowledge based scheduling and control for FMSs
-
Doulgeri, Z., Dalessandro, G. and Magaletti, N., 1993, A hierarchical knowledge based scheduling and control for FMSs. International Journal of Computer Integrated Manufacturing, 6, 191-200.
-
(1993)
International Journal of Computer Integrated Manufacturing
, vol.6
, pp. 191-200
-
-
Doulgeri, Z.1
Dalessandro, G.2
Magaletti, N.3
-
59
-
-
0027702306
-
Positioning of AGVs in a loop layout to improve response time
-
Egbelu, P.J., 1993, Positioning of AGVs in a loop layout to improve response time. European Journal of Operational Research, 7, 32-44.
-
(1993)
European Journal of Operational Research
, vol.7
, pp. 32-44
-
-
Egbelu, P.J.1
-
60
-
-
0009441818
-
Component flow analysis—an effective approach to production systems’ design
-
El-Essawy, I. G. K. and Torrance, J., 1972, Component flow analysis—an effective approach to production systems’ design. The Production Engineer, 165-170.
-
(1972)
The Production Engineer
, pp. 165-170
-
-
El-Essawy, I.G.K.1
Torrance, J.2
-
61
-
-
0001590283
-
An inexact algorithm for part input sequencing with side constraints in FMS
-
Escudero, L. F., 1989, An inexact algorithm for part input sequencing with side constraints in FMS. International Journal of Flexible Manufacturing Systems, 1, 143-174.
-
(1989)
International Journal of Flexible Manufacturing Systems
, vol.1
, pp. 143-174
-
-
Escudero, L.F.1
-
63
-
-
0342739279
-
Flexible manufacturing modules and cells
-
Finke, G. and Kusiak, A., 1985, Flexible manufacturing modules and cells. Revue Francaise dAutomatique, d’Informatique et de Recherche Operationelle (RAIRO-APII), 19, 359-370.
-
(1985)
Revue Francaise Dautomatique, d’Informatique Et De Recherche Operationelle (RAIRO-APII)
, vol.19
, pp. 359-370
-
-
Finke, G.1
Kusiak, A.2
-
64
-
-
0011715971
-
Genetic algorithms applied to workshop problems
-
Fleury, G. and Gourgand, M., 1998, Genetic algorithms applied to workshop problems. International Journal of Computer Integrated Manufacturing, 11, 183-192.
-
(1998)
International Journal of Computer Integrated Manufacturing
, vol.11
, pp. 183-192
-
-
Fleury, G.1
Gourgand, M.2
-
65
-
-
0024122470
-
Integer LP neural networks for job shop-scheduling
-
Foo, Y. P. S. and Takefuji, Y., 1988, Integer LP neural networks for job shop-scheduling. Proceedings of the iCNn, 2, 341-348.
-
(1988)
Proceedings of the Icnn
, vol.2
, pp. 341-348
-
-
Foo, Y.P.S.1
Takefuji, Y.2
-
66
-
-
84982522109
-
ISIS—a knowledge-based system for factory scheduling
-
Fox, M. S. and Smith, S. F., 1984, ISIS—a knowledge-based system for factory scheduling. Experts Systems, 1, 25-48.
-
(1984)
Experts Systems
, vol.1
, pp. 25-48
-
-
Fox, M.S.1
Smith, S.F.2
-
67
-
-
0020247332
-
Job shop scheduling: An investigation in constraint-directed reasoning
-
American Association for AI, Cambridge, MA
-
Fox, M. S., Allen, B. and Strohm, G., 1982, Job shop scheduling: an investigation in constraint-directed reasoning. Proceedings of the National Conference on AI, American Association for AI, Cambridge, MA, pp. 155-158.
-
(1982)
Proceedings of the National Conference on AI
, pp. 155-158
-
-
Fox, M.S.1
Allen, B.2
Strohm, G.3
-
69
-
-
0023563395
-
A simple simulation for scheduling in a flexible manufacturing system
-
San Diego, CA
-
Frese, S. D., 1987, A simple simulation for scheduling in a flexible manufacturing system. Proceedings of the 1987 Winter Simulation Conference, San Diego, CA, pp. 654-658.
-
(1987)
Proceedings of the 1987 Winter Simulation Conference
, pp. 654-658
-
-
Frese, S.D.1
-
70
-
-
0029200935
-
FMS scheduling by hybrid approaches using genetic algorithm and simulation
-
Sheffield, UK
-
Fujimoto, H., Lianyi, C., Tanigawa, Y. and Iwahashi, K., 1995, FMS scheduling by hybrid approaches using genetic algorithm and simulation. First International Conference on Genetic Algorithms in Engineering Systems: Innovations and Applications, GALESIA, Sheffield, UK, pp. 442-447.
-
(1995)
First International Conference on Genetic Algorithms in Engineering Systems: Innovations and Applications, Galesia
, pp. 442-447
-
-
Fujimoto, H.1
Lianyi, C.2
Tanigawa, Y.3
Iwahashi, K.4
-
71
-
-
0027681460
-
Integrated fixture planning and analysis system for machining processes
-
Fuh, J. Y. H., Chang, C. H. and Melkanoff, M. A., 1993, Integrated fixture planning and analysis system for machining processes. Robotics and CIM, 10, 339-353.
-
(1993)
Robotics and CIM
, vol.10
, pp. 339-353
-
-
Fuh, J.Y.H.1
Chang, C.H.2
Melkanoff, M.A.3
-
72
-
-
0023349893
-
Flow path design of AGVs
-
Gaskins, R. J. and Tanchoco, J. M. A., 1987, Flow path design of AGVs. International Journal of Production Research, 25, 667-676.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 667-676
-
-
Gaskins, R.J.1
Tanchoco, J.M.A.2
-
73
-
-
0024304737
-
Virtual flow paths for free ranging AGVs
-
Gaskins, R. J., Tanchoco, J. M. A. and Taghagboni, F., 1989, Virtual flow paths for free ranging AGVs. International Journal of Production Research, 27, 91-100.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 91-100
-
-
Gaskins, R.J.1
Tanchoco, J.M.A.2
Taghagboni, F.3
-
74
-
-
0025431933
-
Guide path design and location of load pick-up/drop-off points for an AGV system
-
Goetz, W. G. and Egbelu, P. J., 1990, Guide path design and location of load pick-up/drop-off points for an AGV system. International Journal of Production Research, 28, 927-941.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 927-941
-
-
Goetz, W.G.1
Egbelu, P.J.2
-
75
-
-
0028408966
-
Dispatching rules in scheduling: A fuzzy approach
-
Grabot, B. and Geneste, L., 1994, Dispatching rules in scheduling: a fuzzy approach. International Journal of Production Research, 32, 903-915.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 903-915
-
-
Grabot, B.1
Geneste, L.2
-
76
-
-
0342739277
-
Making production scheduling more efficient helps control manufacturing costs and improve productivity
-
Grant, H. and Clapp, C., 1988, Making production scheduling more efficient helps control manufacturing costs and improve productivity. IIE Transactions, 20, 54-62.
-
(1988)
IIE Transactions
, vol.20
, pp. 54-62
-
-
Grant, H.1
Clapp, C.2
-
77
-
-
0023541064
-
Nonlinear networks for deterministic scheduling
-
Gulati, S. and Iyengar, S. S., 1987, Nonlinear networks for deterministic scheduling. Proceedings of the CNN, 4, 745-752.
-
(1987)
Proceedings of the CNN
, vol.4
, pp. 745-752
-
-
Gulati, S.1
Iyengar, S.S.2
-
78
-
-
0024732499
-
Machine grouping problem in cellular manufacturing systems: An integer programming approach
-
Gunasingh, K. R. and Lashkari, R. S., 1989, Machine grouping problem in cellular manufacturing systems: an integer programming approach. International Journal of Production Research, 27, 1465-1473.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1465-1473
-
-
Gunasingh, K.R.1
Lashkari, R.S.2
-
79
-
-
0026219104
-
A review of multi-criterion approaches to FMS scheduling problems
-
Gupta, Y. P., Evans, G. W. and Gupta, M. C., 1991, A review of multi-criterion approaches to FMS scheduling problems. International Journal of Production Economics, 22, 13-31.
-
(1991)
International Journal of Production Economics
, vol.22
, pp. 13-31
-
-
Gupta, Y.P.1
Evans, G.W.2
Gupta, M.C.3
-
80
-
-
0027577264
-
Operations planning and scheduling problems in advanced manufacturing systems
-
Gupta, M. C., Gupta, Y. P. and Evans, G. W., 1993, Operations planning and scheduling problems in advanced manufacturing systems. International Journal of Production Research, 31, 869-900.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 869-900
-
-
Gupta, M.C.1
Gupta, Y.P.2
Evans, G.W.3
-
81
-
-
0027726748
-
Animated AI-based simulation in production scheduling
-
Gusikhin, O. Y. and Kulinitch, A. S., 1994, Animated AI-based simulation in production scheduling. IFIP Transactions B: Computer Applications in Technology, B11, 165-176.
-
(1994)
IFIP Transactions B: Computer Applications in Technology
, vol.B11
, pp. 165-176
-
-
Gusikhin, O.Y.1
Kulinitch, A.S.2
-
82
-
-
0030190465
-
Finding part-machine families using graph partitioning techniques
-
Hadley, S. W., 1996, Finding part-machine families using graph partitioning techniques. International Journal of Production Research, 34, 1821-1839.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 1821-1839
-
-
Hadley, S.W.1
-
83
-
-
0024716540
-
Real-time tool control andjob dispatching in FMS
-
Han, M.-H., Yoon, K. N., and Hogg, G. L., 1989, Real-time tool control andjob dispatching in FMS. International Journal of Production Research, 27, 1257-1267.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1257-1267
-
-
Han, M.-H.1
Yoon, K.N.2
Hogg, G.L.3
-
84
-
-
0026102908
-
Modeling and on-line scheduling of flexible manufacturing systems using stochastic petri nets
-
Hatono, I., Yamagata, K. and Tamura, H., 1991, Modeling and on-line scheduling of flexible manufacturing systems using stochastic petri nets. IEEE Transactions on Software Engineering, 17.
-
(1991)
IEEE Transactions on Software Engineering
, pp. 17
-
-
Hatono, I.1
Yamagata, K.2
Tamura, H.3
-
85
-
-
38149148466
-
A graph theory approach to subcontracting machine duplication and intercell moves in cellular manufacturing
-
Hertz, A., Jaumard, B. and Riberio, C. C., 1994, A graph theory approach to subcontracting machine duplication and intercell moves in cellular manufacturing. Discrete Applied Mathematics, 50, 255-265.
-
(1994)
Discrete Applied Mathematics
, vol.50
, pp. 255-265
-
-
Hertz, A.1
Jaumard, B.2
Riberio, C.C.3
-
88
-
-
0001899198
-
Mathematical programming for the scheduling problem with alternate process plans in FMS
-
Jiang, J. and Hsiao, W., 1994, Mathematical programming for the scheduling problem with alternate process plans in FMS. Computers and Industrial Engineering, 27, 15-18.
-
(1994)
Computers and Industrial Engineering
, vol.27
, pp. 15-18
-
-
Jiang, J.1
Hsiao, W.2
-
89
-
-
0000136405
-
A hybrid approach for real-time sequencing and scheduling
-
Jones, A., Rabelo, L. and Yih, Y., 1995, A hybrid approach for real-time sequencing and scheduling. International Journal of Computer Integrated Manufacturing, 8, 145-154.
-
(1995)
International Journal of Computer Integrated Manufacturing
, vol.8
, pp. 145-154
-
-
Jones, A.1
Rabelo, L.2
Yih, Y.3
-
90
-
-
0023328851
-
Expert system in production scheduling
-
Kanet, J. J. and Adelsberger, H. H., 1987, Expert system in production scheduling. European Journal of Operational Research, 29, 51-57.
-
(1987)
European Journal of Operational Research
, vol.29
, pp. 51-57
-
-
Kanet, J.J.1
Adelsberger, H.H.2
-
91
-
-
0009338739
-
Optimal flow path design for unidirectional AGV systems
-
Kaspi, M. and Tanchoco, J. M. A., 1990, Optimal flow path design for unidirectional AGV systems. International Journal of Production Research, 28, 1023-1030.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 1023-1030
-
-
Kaspi, M.1
Tanchoco, J.M.A.2
-
92
-
-
0029504717
-
Integrated approach for loading, routing and scheduling in flexible manufacturing systems
-
Kato, K., 1995, Integrated approach for loading, routing and scheduling in flexible manufacturing systems. IEEE Symposium on Emerging Technologies and Factory Automation, Vol. 1, pp. 299-310.
-
(1995)
IEEE Symposium on Emerging Technologies and Factory Automation
, vol.1
, pp. 299-310
-
-
Kato, K.1
-
93
-
-
0027680123
-
GT-based heuristic approach for machine loading and batch formation in flexible manufacturing systems
-
Kato, K., Oba, F. and Hashimoto, F., 1993, GT-based heuristic approach for machine loading and batch formation in flexible manufacturing systems. Control Engineering Practice, 1, 845-850.
-
(1993)
Control Engineering Practice
, vol.1
, pp. 845-850
-
-
Kato, K.1
Oba, F.2
Hashimoto, F.3
-
94
-
-
0343609249
-
Multi objective decision making model for a flexible manufacturing system
-
A. Kusiak (ed.), New York: North Holland
-
Kim, S.-R., 1986, Multi objective decision making model for a flexible manufacturing system. In A. Kusiak (ed.) Flexible Manufacturing Systems: Methods and Studies (New York: North Holland).
-
(1986)
Flexible Manufacturing Systems: Methods and Studies
-
-
Kim, S.-R.1
-
95
-
-
0027851665
-
Enhancement of a job sequencing rule using an artificial neural network
-
Los Angeles, CA
-
Kim, S. and Lee, Y., 1993, Enhancement of a job sequencing rule using an artificial neural network. Second Industrial Engineering Research Conference Proceedings, Los Angeles, CA, pp. 842-846.
-
(1993)
Second Industrial Engineering Research Conference Proceedings
, pp. 842-846
-
-
Kim, S.1
Lee, Y.2
-
96
-
-
0026383580
-
Conflict-free shortest-time bi-directional AGV routeing
-
Kim, C. W. and Tanchoco, J. M. A., 1991, Conflict-free shortest-time bi-directional AGV routeing. International Journal of Production Research, 29, 2377-2391.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 2377-2391
-
-
Kim, C.W.1
Tanchoco, J.M.A.2
-
97
-
-
0027606586
-
Economical design of a material flow path
-
Kim, K. K. and Tanchoco, J. M. A., 1993, Economical design of a material flow path. International Journal of Production Research, 31, 1387-1407.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 1387-1407
-
-
Kim, K.K.1
Tanchoco, J.M.A.2
-
98
-
-
0024135517
-
Building an expert system for FMS scheduling
-
Minneapolis, MN
-
Kim, J., Fichter, E. F. and Funk, K. H., 1988, Building an expert system for FMS scheduling. Proceedings of the US-Japan Symposium on Flexible Automation. Crossing Bridges: Advances in Flexible Automation and Robotics, Minneapolis, MN, pp. 845-852.
-
(1988)
Proceedings of the Us-Japan Symposium on Flexible Automation. Crossing Bridges: Advances in Flexible Automation and Robotics
, pp. 845-852
-
-
Kim, J.1
Fichter, E.F.2
Funk, K.H.3
-
99
-
-
0029419084
-
Optimal operation grouping and sequencing technique for multistage machining systems
-
Minneapolis, MN
-
Kim, I. T, Suh, H. and Kim, H. R., 1995, Optimal operation grouping and sequencing technique for multistage machining systems. ASME Database Symposium, Minneapolis, MN, pp. 633-645.
-
(1995)
ASME Database Symposium
, pp. 633-645
-
-
Kim, I.T.1
Suh, H.2
Kim, H.R.3
-
100
-
-
0020915621
-
An algorithm for the computer control of a flexible manufacturing system
-
Kimemia, J. and Gershwin, S. B., 1983, An algorithm for the computer control of a flexible manufacturing system. IIE Transactions, 15, 353-362.
-
(1983)
IIE Transactions
, vol.15
, pp. 353-362
-
-
Kimemia, J.1
Gershwin, S.B.2
-
101
-
-
0342739274
-
Machine-component grouping in production flow analysis: An approach
-
King, J. R., 1980, Machine-component grouping in production flow analysis: an approach. International Journal of Production Research, 18, 231-237.
-
(1980)
International Journal of Production Research
, vol.18
, pp. 231-237
-
-
King, J.R.1
-
102
-
-
84952494480
-
Machine-component formation in GT: Reviews and extensions
-
King, J. R. and Nakornchai, V., 1982, Machine-component formation in GT: reviews and extensions. International Journal of Production Research, 20, 117-133.
-
(1982)
International Journal of Production Research
, vol.20
, pp. 117-133
-
-
King, J.R.1
Nakornchai, V.2
-
103
-
-
0022895879
-
Scheduling jobs in flexible manufacturing systems. Real-Time Optimization in Automated Manufacturing Facilities
-
Gaithersburg, MD
-
Kiran, A. S. and Alptekin, S., 1986, Scheduling jobs in flexible manufacturing systems. Real-Time Optimization in Automated Manufacturing Facilities, Proceedings of a Symposium held at the National Bureau of Standards, Gaithersburg, MD, pp. 393-399.
-
(1986)
Proceedings of a Symposium Held at the National Bureau of Standards
, pp. 393-399
-
-
Kiran, A.S.1
Alptekin, S.2
-
104
-
-
0031104005
-
Knowledge-based system for selection of an AGV and a workcentre for transport of a part in on-line scheduling of FMS
-
Kodali, R., 1997, Knowledge-based system for selection of an AGV and a workcentre for transport of a part in on-line scheduling of FMS. Production Planning and Control, 8, 114-122.
-
(1997)
Production Planning and Control
, vol.8
, pp. 114-122
-
-
Kodali, R.1
-
105
-
-
0026883177
-
Heuristic unidirectional flow path design for an AGV system
-
Kouvelis, P., Gutierrez, G. J. and Chian, W. C., 1992, Heuristic unidirectional flow path design for an AGV system. International Journal of Production Research, 30,1327-1351.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1327-1351
-
-
Kouvelis, P.1
Gutierrez, G.J.2
Chian, W.C.3
-
106
-
-
0027699626
-
Developing conflict-free routes for AGVSs
-
Krishnamurthy, N. N., Batta, R. and Karwan, M. H., 1993, Developing conflict-free routes for AGVSs. Operations Research, 41, 1077-1090.
-
(1993)
Operations Research
, vol.41
, pp. 1077-1090
-
-
Krishnamurthy, N.N.1
Batta, R.2
Karwan, M.H.3
-
107
-
-
0027073047
-
A CAPP system for non-linear process plans
-
Kruth, J. P. and Detand, J., 1992, A CAPP system for non-linear process plans. Annals of CIRP, 41, 489-492.
-
(1992)
Annals of CIRP
, vol.41
, pp. 489-492
-
-
Kruth, J.P.1
Detand, J.2
-
109
-
-
0023384110
-
Entropy measures of measuring manufacturing flexibility
-
Kumar, V., 1987, Entropy measures of measuring manufacturing flexibility. International Journal of Production Research, 25, 957-966.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 957-966
-
-
Kumar, V.1
-
112
-
-
34250115624
-
The part families problem in flexible manufacturing systems
-
Kusiak, A., 1985, The part families problem in flexible manufacturing systems. Annals of Operations Research, 3, 279-300.
-
(1985)
Annals of Operations Research
, vol.3
, pp. 279-300
-
-
Kusiak, A.1
-
114
-
-
0022604478
-
FMS scheduling: A crucial element in an expert system control structure
-
Kusiak, A., 1986b, FMS scheduling: a crucial element in an expert system control structure. IEEE Transactions, 653-658.
-
(1986)
IEEE Transactions
, pp. 653-658
-
-
Kusiak, A.1
-
117
-
-
0023206153
-
Efficient solving of the group technology problem
-
Kusiak, A. and Chow, W. S., 1987, Efficient solving of the group technology problem. Journal of Manufacturing Systems, 6, 117-124.
-
(1987)
Journal of Manufacturing Systems
, vol.6
, pp. 117-124
-
-
Kusiak, A.1
Chow, W.S.2
-
118
-
-
0001472644
-
Clustering Analysis: Models and Algorithms
-
Kusiak, A., Vanelli, A. and Kumar, K. R., 1986, Clustering Analysis: Models and Algorithms. Control and Cybernetics, 15, 139-154.
-
(1986)
Control and Cybernetics
, vol.15
, pp. 139-154
-
-
Kusiak, A.1
Vanelli, A.2
Kumar, K.R.3
-
119
-
-
0023416625
-
A new formulation of operation allocation problem in flexible manufacturing systems: Mathematical modeling and computational experience
-
Lashkari, R. S., Dutta, S. P. and Padhye, A. M., 1987, A new formulation of operation allocation problem in flexible manufacturing systems: mathematical modeling and computational experience. International Journal of Production Research, 25, 1267-1283.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 1267-1283
-
-
Lashkari, R.S.1
Dutta, S.P.2
Padhye, A.M.3
-
120
-
-
0022866453
-
PATRIARCH: Hierarchical production scheduling. Real-Time Optimization in Automated Manufacturing Facilities
-
Gaithersburg, MD
-
Lawrence, S. R. and Morton, T E., 1986, PATRIARCH: hierarchical production scheduling. Real-Time Optimization in Automated Manufacturing Facilities, Proceedings of a Symposium held at the National Bureau of Standards, Gaithersburg, MD.
-
(1986)
Proceedings of a Symposium Held at the National Bureau of Standards
-
-
Lawrence, S.R.1
Morton, T.E.2
-
121
-
-
0026982303
-
FMS scheduling using petri nets and heuristic search
-
Lee, D. Y. and DiCesare, F., 1992, FMS scheduling using petri nets and heuristic search. Proceedings of the 1992 IEEE International Conference on Robotics and Automation, Vol. 2, pp. 1057-1062.
-
(1992)
Proceedings of the 1992 IEEE International Conference on Robotics and Automation
, vol.2
, pp. 1057-1062
-
-
Lee, D.Y.1
Dicesare, F.2
-
122
-
-
0032187951
-
Iterative procedures for multi-period order selection and loading problems in flexible manufacturing systems
-
Lee, D.-H. and Kim, Y.-D., 1998, Iterative procedures for multi-period order selection and loading problems in flexible manufacturing systems. International Journal of Production Research, 36, 2653-2668.
-
(1998)
International Journal of Production Research
, vol.36
, pp. 2653-2668
-
-
Lee, D.-H.1
Kim, Y.-D.2
-
123
-
-
0031121631
-
Job shop scheduling with a genetic algorithm and machine learning
-
Lee, C.-Y., Piramuthu, S. and Tsai, Y.-K., 1997, Job shop scheduling with a genetic algorithm and machine learning. International Journal of Production Research, 35, 1171-1191.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 1171-1191
-
-
Lee Piramuthu, C.-Y.S.1
Tsai, Y.-K.2
-
124
-
-
0001057408
-
Flowshop sequencing problems with limited buffer storage
-
Leisten, R., 1990, Flowshop sequencing problems with limited buffer storage. International Journal of Production Research, 28, 2085-2100.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 2085-2100
-
-
Leisten, R.1
-
125
-
-
0031246898
-
Using an unsupervised neural network and decision tree as knowledge acquisition tools for FMS scheduling
-
Li, D. C., Wu, C. and Torng, K. Y., 1997, Using an unsupervised neural network and decision tree as knowledge acquisition tools for FMS scheduling. International Journal of Systems Science, 28, 977-985.
-
(1997)
International Journal of Systems Science
, vol.28
, pp. 977-985
-
-
Li, D.C.1
Wu, C.2
Torng, K.Y.3
-
126
-
-
0026938172
-
Combined part selection, load sharing and machine loading problem in hybrid manufacturing systems
-
Liang, M. and Dutta, S. P., 1992, Combined part selection, load sharing and machine loading problem in hybrid manufacturing systems. International Journal of Production Research, 30, 2335-2349.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 2335-2349
-
-
Liang, M.1
Dutta, S.P.2
-
127
-
-
0027608954
-
Integrated approach to the part selection and machine loading problem in a class of flexible manufacturing systems
-
Liang, M. and Dutta, S. P., 1993, Integrated approach to the part selection and machine loading problem in a class of flexible manufacturing systems. European Journal of Operational Research, 67, 387-404.
-
(1993)
European Journal of Operational Research
, vol.67
, pp. 387-404
-
-
Liang, M.1
Dutta, S.P.2
-
128
-
-
78649742351
-
Integrating neural networks and semi-Markov process for automated knowledge acquisition: An application to real time scheduling
-
Liang, T, Moskowitz, H. and Yih, Y., 1992, Integrating neural networks and semi-Markov process for automated knowledge acquisition: an application to real time scheduling. Decision Sciences, 23, 1297-1313.
-
(1992)
Decision Sciences
, vol.23
, pp. 1297-1313
-
-
Liang, T.1
Moskowitz, H.2
Yih, Y.3
-
130
-
-
0026206377
-
Effective heuristics for the single machine sequencing problem with ready times
-
Liu, J. and McCarthy, B. L., 1991, Effective heuristics for the single machine sequencing problem with ready times. International Journal of Production Research, 29, 1521-1533.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1521-1533
-
-
Liu, J.1
Mc Carthy, B.L.2
-
131
-
-
0029182871
-
FMS scheduling using petri net modeling and a branch and bound search
-
Pittsburgh, PA
-
Lloyd, S., Yu, H. and Konstas, N., 1995, FMS scheduling using petri net modeling and a branch and bound search. IEEE International Symposium on Assembly and Task Planning: Proceedings, Pittsburgh, PA, pp. 141-146.
-
(1995)
IEEE International Symposium on Assembly and Task Planning: Proceedings
, pp. 141-146
-
-
Lloyd, S.1
Yu, H.2
Konstas, N.3
-
132
-
-
0023253430
-
Dynamic routing in reentrant flexible manufacturing systems
-
Maimon, O. Z. and Choong, Y. F., 1987, Dynamic routing in reentrant flexible manufacturing systems. Robotics and Computer Integrated Manufacturing, 3, 295-300.
-
(1987)
Robotics and Computer Integrated Manufacturing
, vol.3
, pp. 295-300
-
-
Maimon, O.Z.1
Choong, Y.F.2
-
133
-
-
0002436396
-
Machine grouping for efficient production
-
McAuley, J., 1972, Machine grouping for efficient production. Production Engineering, 2, 5357.
-
(1972)
Production Engineering
, vol.2
, pp. 5357
-
-
Mc Auley, J.1
-
134
-
-
0015397231
-
Problem decomposition and data reorganization by clustering technique
-
McCormick, W. T, Schweitzer, P. J. and White, T. W., 1972, Problem decomposition and data reorganization by clustering technique. Operations Research, 20, 992-1009.
-
(1972)
Operations Research
, vol.20
, pp. 992-1009
-
-
Mc Cormick, W.T.1
Schweitzer, P.J.2
White, T.W.3
-
135
-
-
0024770469
-
Sequencing in an assembly line with blocking to minimize cycle time
-
McCormick, S. T, Pinedo, M. L. and Wolf, B., 1988, Sequencing in an assembly line with blocking to minimize cycle time. Operations Research, 36, 925-935.
-
(1988)
Operations Research
, vol.36
, pp. 925-935
-
-
Mc Cormick, S.T.1
Pinedo, M.L.2
Wolf, B.3
-
136
-
-
0001360372
-
Level schedules for mixed-model assembly lines in just-in-time production systems
-
Miltenburg, J., 1989, Level schedules for mixed-model assembly lines in just-in-time production systems. Management Science, 35, 192-207.
-
(1989)
Management Science
, vol.35
, pp. 192-207
-
-
Miltenburg, J.1
-
137
-
-
0032121915
-
A competitive neural network approach to multiobjective FMS scheduling
-
Min, H.-S, Yih, Y. and Kim, C.-O., 1998, A competitive neural network approach to multiobjective FMS scheduling. International Journal of Production Research, 36, 1749-1765.
-
(1998)
International Journal of Production Research
, vol.36
, pp. 1749-1765
-
-
Min, H.-S.1
Yih, Y.2
Kim, C.-O.3
-
138
-
-
0022940712
-
Simulation studies of FMSS
-
Chicago, IL
-
Mishra, P. K., Pandey, P. C. and Singh, C. K., 1986, Simulation studies of FMSS. Proceedings of the Second International Conference on Simulation in Manufacturing, Chicago, IL, pp. 119-128.
-
(1986)
Proceedings of the Second International Conference on Simulation in Manufacturing
, pp. 119-128
-
-
Mishra, P.K.1
Pandey, P.C.2
Singh, C.K.3
-
139
-
-
0004729748
-
Cell design strategies for efficient materials handling
-
J. M. A. Tanchoco (ed.), London: Chapman & Hall
-
Moodie, C. L., Drolet, J., Ho, Y.-C. and Warren, G. M. H., 1994, Cell design strategies for efficient materials handling. In J. M. A. Tanchoco (ed.), Material Flow Systems in Manufacturing (London: Chapman & Hall).
-
(1994)
Material Flow Systems in Manufacturing
-
-
Moodie, C.L.1
Drolet, J.2
Ho, Y.-C.3
Warren, G.M.H.4
-
140
-
-
0001379675
-
Forming part-machine families for cellular manufacturing: A neural network approach
-
Moon, Y. B., 1990, Forming part-machine families for cellular manufacturing: a neural network approach. International Journal of Advanced Manufacturing Technology, 5, 278-291.
-
(1990)
International Journal of Advanced Manufacturing Technology
, vol.5
, pp. 278-291
-
-
Moon, Y.B.1
-
141
-
-
38249014262
-
Generalized part family formation using neural network techniques
-
Moon, Y. B. and Chi, S. C., 1992, Generalized part family formation using neural network techniques. Journal of Manufacturing Systems, 11, 149-159.
-
(1992)
Journal of Manufacturing Systems
, vol.11
, pp. 149-159
-
-
Moon, Y.B.1
Chi, S.C.2
-
142
-
-
0009184781
-
Automatic generation of group technology families during part classification process
-
Moon, Y. B. and Kao, Y., 1993, Automatic generation of group technology families during part classification process. International Journal of Advanced Manufacturing Technology, 8, 160-166.
-
(1993)
International Journal of Advanced Manufacturing Technology
, vol.8
, pp. 160-166
-
-
Moon, Y.B.1
Kao, Y.2
-
143
-
-
0025416939
-
Analysis of scheduling rules for a FMS
-
Montazeri, M. and Van Wassenhove, L. N., 1990, Analysis of scheduling rules for a FMS. International Journal of Production Research, 28, 785-802.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 785-802
-
-
Montazeri, M.1
Van Wassenhove, L.N.2
-
144
-
-
0001187955
-
Heuristics for the FMS loading and part type selection problems
-
Moreno, A. A. and Ding, F.-Y., 1993, Heuristics for the FMS loading and part type selection problems. International Journal of Flexible Manufacturing Systems, 5, 287-300.
-
(1993)
International Journal of Flexible Manufacturing Systems
, vol.5
, pp. 287-300
-
-
Moreno, A.A.1
Ding, F.-Y.2
-
145
-
-
0343173750
-
Dynamic manufacturing scheduling with Petri net modelling and constraint based editing
-
V. C. Venkatesh and J. C. McGeough, New York: Elsevier
-
Mori, K., Tsukiyama, M. and Fukuda, T, 1991, Dynamic manufacturing scheduling with Petri net modelling and constraint based editing. In V. C. Venkatesh and J. C. McGeough (eds), Computer Aided Production Engineering (New York: Elsevier).
-
(1991)
Computer Aided Production Engineering
-
-
Mori, K.1
Tsukiyama, M.2
Fukuda, T.3
-
146
-
-
0042264360
-
Dynamic scheduling and tool loading
-
V. C. Venkatesh and J. C. McGeough, New York: Elsevier
-
Mottet, Y. and Widmer, M., 1991, Dynamic scheduling and tool loading. In V. C. Venkatesh and J. C. McGeough (eds), Computer Aided Production Engineering (New York: Elsevier).
-
(1991)
Computer Aided Production Engineering
-
-
Mottet, Y.1
Widmer, M.2
-
147
-
-
0026914581
-
A heuristic procedure for loading problems in flexible manufacturing systems
-
Mukhopadhyay, S. K. and Sahu, S. K., 1992, A heuristic procedure for loading problems in flexible manufacturing systems. International Journal of Production Research, 30, 2213-2228.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 2213-2228
-
-
Mukhopadhyay, S.K.1
Sahu, S.K.2
-
148
-
-
0026239447
-
Heuristic solution to the scheduling problems in flexible manufacturing systems
-
Mukhopadhyay, S. K., Maiti, B. and Garg, S., 1991, Heuristic solution to the scheduling problems in flexible manufacturing systems. International Journal of Production Research, 29, 2003-2024.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 2003-2024
-
-
Mukhopadhyay, S.K.1
Maiti, B.2
Garg, S.3
-
149
-
-
0030190236
-
Priority-based tool allocation in a flexible manufacturing system
-
Mukhopadhyay, S. K. and Sahu, S. K., 1996, Priority-based tool allocation in a flexible manufacturing system. International Journal of Production Research, 34, 1995-2018.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 1995-2018
-
-
Mukhopadhyay, S.K.1
Sahu, S.K.2
-
150
-
-
0024131062
-
FMS scheduling using timed petri net and rule base
-
Minneapolis, MN
-
Nakamura, Y., Hatono, I., Kohara, Y., Yamagata, K. and Tamura, H., 1988, FMS scheduling using timed petri net and rule base. Proceedings of the US-Japan Symposium on Flexible Automation. Crossing Bridges: Advances in Flexible Automation and Robotics, Minneapolis, MN, pp. 883-890.
-
(1988)
Proceedings of the Us-Japan Symposium on Flexible Automation. Crossing Bridges: Advances in Flexible Automation and Robotics
, pp. 883-890
-
-
Nakamura, Y.1
Hatono, I.2
Kohara, Y.3
Yamagata, K.4
Tamura, H.5
-
151
-
-
0031259515
-
Real-time part dispatching with manufacturing cells using fuzzy logic
-
Nauman, A. and Gu, P., 1997, Real-time part dispatching with manufacturing cells using fuzzy logic. Production Planning and Control, 8, 662-669.
-
(1997)
Production Planning and Control
, vol.8
, pp. 662-669
-
-
Nauman, A.1
Gu, P.2
-
152
-
-
0032121744
-
Part type selection, machine loading and part type volume determination problems in FMS planning
-
Nayak, G. K. and Acharya, D., 1998, Part type selection, machine loading and part type volume determination problems in FMS planning. International Journal of Production Research, 36, 1801-1824.
-
(1998)
International Journal of Production Research
, vol.36
, pp. 1801-1824
-
-
Nayak, G.K.1
Acharya, D.2
-
153
-
-
0342840859
-
A multiple criterion approach for production planning of automated manufacturing
-
O’ Grady, P. J. and Menon, U., 1985, A multiple criterion approach for production planning of automated manufacturing. Engineering Optimization, 8, 161-175.
-
(1985)
Engineering Optimization
, vol.8
, pp. 161-175
-
-
O’ Grady, P.J.1
Menon, U.2
-
154
-
-
0023385664
-
Loading a flexible manufacturing system
-
O’ Grady, P. J. and Menon, U., 1987, Loading a flexible manufacturing system. International Journal of Production Research, 25, 1053-1068.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 1053-1068
-
-
O’ Grady, P.J.1
Menon, U.2
-
156
-
-
0003589075
-
Heuristic learning for pattern-directed scheduling in a flexible manufacturing system
-
K. E. Stecke and R. Suri (eds), (Amsterdam: Elsevier Science)
-
Park, S. C., Raman, N. and Shaw, M. J., 1989, Heuristic learning for pattern-directed scheduling in a flexible manufacturing system. In K. E. Stecke and R. Suri (eds), Proceedings of the Third ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications (Amsterdam: Elsevier Science), pp. 369376.
-
(1989)
Proceedings of the Third ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications
, pp. 369376
-
-
Park, S.C.1
Raman, N.2
Shaw, M.J.3
-
157
-
-
0005869183
-
Neural network to select dynamic scheduling heuristic
-
Pierreval, H., 1993, Neural network to select dynamic scheduling heuristic. Revue des Systemes de Decision, 2, 173-190.
-
(1993)
Revue Des Systemes De Decision
, vol.2
, pp. 173-190
-
-
Pierreval, H.1
-
158
-
-
0025535595
-
Synergy of artificial neural networks and knowledge-based expert systems for intelligent FMS scheduling
-
Rabelo, L. C., Alptekin, S. and Kiran, A. S., 1990, Synergy of artificial neural networks and knowledge-based expert systems for intelligent FMS scheduling. International Joint Conference on Neural Networks (IJCNN), pp. 359-366.
-
(1990)
International Joint Conference on Neural Networks (IJCNN)
, pp. 359-366
-
-
Rabelo, L.C.1
Alptekin, S.2
Kiran, A.S.3
-
159
-
-
0027840035
-
Using hybrid systems for FMS scheduling
-
Los Angeles, CA
-
Rabelo, L., Jones, A. and Tsai, J., 1993, Using hybrid systems for FMS scheduling. Proceedings of the Second Industrial Engineering Research Conference, Los Angeles, CA, pp. 471-475.
-
(1993)
Proceedings of the Second Industrial Engineering Research Conference
, pp. 471-475
-
-
Rabelo, L.1
Jones, A.2
Tsai, J.3
-
161
-
-
0031233993
-
Simultaneous scheduling of workpieces, fixtures and cutting tools with flexible manufacturing systems
-
Rahimifard, S. and Newman, S. T, 1997, Simultaneous scheduling of workpieces, fixtures and cutting tools with flexible manufacturing systems. International Journal of Production Research, 35, 2379-2396.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 2379-2396
-
-
Rahimifard, S.1
Newman, S.T.2
-
163
-
-
0016573570
-
Design of cellular production systems: A graphic theoretic approach
-
Rajagopalan, R. and Batra, J. L., 1975, Design of cellular production systems: a graphic theoretic approach. International Journal of Production Research, 13, 567-579.
-
(1975)
International Journal of Production Research
, vol.13
, pp. 567-579
-
-
Rajagopalan, R.1
Batra, J.L.2
-
164
-
-
0029659077
-
Machine loading in the flexible manufacturing systems considering routing flexibility
-
Rajamani, D. and Adil, G. K., 1996, Machine loading in the flexible manufacturing systems considering routing flexibility. International Journal of Advanced Manufacturing Technology, 11, 372-380.
-
(1996)
International Journal of Advanced Manufacturing Technology
, vol.11
, pp. 372-380
-
-
Rajamani, D.1
Adil, G.K.2
-
165
-
-
0025418241
-
Model and a solution approach for the machine loading and tool allocation problem in a flexible manufacturing system
-
Ram, B., Sarin, S. and Chen, C. S., 1990, Model and a solution approach for the machine loading and tool allocation problem in a flexible manufacturing system. International Journal of Production Research, 28, 637-645.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 637-645
-
-
Ram, B.1
Sarin, S.2
Chen, C.S.3
-
166
-
-
0041587598
-
Simultaneous scheduling of material handling devices in automated manufacturing
-
K. E. Stecke and R. Suri, Amsterdam: Elsevier Science
-
Raman, N., Talbot, B. and Rachamadugu, R., 1986, Simultaneous scheduling of material handling devices in automated manufacturing. In K. E. Stecke and R. Suri (eds), Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications (Amsterdam: Elsevier Science).
-
(1986)
Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications
-
-
Raman, N.1
Talbot, B.2
Rachamadugu, R.3
-
167
-
-
0030647545
-
Quantitative analysis of AGV system in FMS cell layout
-
Ramana, B., Reddy, S. S. and Ramprasad, B., 1997, Quantitative analysis of AGV system in FMS cell layout. Defence Science Journal, 47, 75-81.
-
(1997)
Defence Science Journal
, vol.47
, pp. 75-81
-
-
Ramana, B.1
Reddy, S.S.2
Ramprasad, B.3
-
168
-
-
0003592198
-
Machine scheduling problems: Classification
-
PhD thesis, University of Amsterdam
-
Rinnooy Kan, A. H. G., 1976, Machine scheduling problems: classification, complexity and computations, PhD thesis, University of Amsterdam.
-
(1976)
Complexity and Computations
-
-
Rinnooy Kan, A.H.G.1
-
169
-
-
0026257982
-
Optimizing the location of material transfer stations within layout analysis
-
Riopel, D. and Langevin, A., 1991, Optimizing the location of material transfer stations within layout analysis. European Journal of Production Economics, 22, 169-176.
-
(1991)
European Journal of Production Economics
, vol.22
, pp. 169-176
-
-
Riopel, D.1
Langevin, A.2
-
170
-
-
0031275801
-
Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
-
Roh, H.-K. and Kim, Y.-D., 1997, Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter. International Journal of Production Research, 35, 2989-3003.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 2989-3003
-
-
Roh, H.-K.1
Kim, Y.-D.2
-
171
-
-
0030151249
-
A heuristic approach to n/m job-shop scheduling: Fuzzy dynamic scheduling algorithms
-
Roy, U. and Zhang, X., 1996, A heuristic approach to n/m job-shop scheduling: fuzzy dynamic scheduling algorithms. Production Planning and Control, 7, 299-311.
-
(1996)
Production Planning and Control
, vol.7
, pp. 299-311
-
-
Roy, U.1
Zhang, X.2
-
172
-
-
0031197384
-
Solutions to a modified tool loading problem for a single FMM
-
Rupe, J. and Kuo, W., 1997, Solutions to a modified tool loading problem for a single FMM. International Journal of Production Research, 35, 2253-2268.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 2253-2268
-
-
Rupe, J.1
Kuo, W.2
-
174
-
-
0031627997
-
Scheduling with neural networks: A review of the literature and new research directions
-
Sabuncuoglu, I., 1998, Scheduling with neural networks: a review of the literature and new research directions. Production Planning and Control, 9, 2-12.
-
(1998)
Production Planning and Control
, vol.9
, pp. 2-12
-
-
Sabuncuoglu, I.1
-
175
-
-
0030572648
-
A neural network model for scheduling problems
-
Sabuncuoglu, I. and Gurgun, B., 1996, A neural network model for scheduling problems. European Journal of Operational Research, 93, 288-299.
-
(1996)
European Journal of Operational Research
, vol.93
, pp. 288-299
-
-
Sabuncuoglu, I.1
Gurgun, B.2
-
176
-
-
0043158988
-
An investigation of machine and AGV scheduling rules in a FMS
-
K. E. Stecke and R. Suri, Amsterdam: Elsevier Science
-
Sabuncuoglu, I. and Hommertzheim, D. L., 1989, An investigation of machine and AGV scheduling rules in a FMS. In K. E. Stecke and R. Suri (eds), Proceedings of the Third ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications (Amsterdam: Elsevier Science), pp. 261-266.
-
(1989)
Proceedings of the Third ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications
, pp. 261-266
-
-
Sabuncuoglu, I.1
Hommertzheim, D.L.2
-
177
-
-
0026866144
-
Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system
-
Sabuncuoglu, I. and Hommertzheim, D. L., 1992, Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system. International Journal of Production Research, 30, 1059-1079.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1059-1079
-
-
Sabuncuoglu, I.1
Hommertzheim, D.L.2
-
178
-
-
0032000573
-
Beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems
-
Sabuncuoglu, I. and Karabuk, S., 1998, Beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems. IIE Transactions, 30, 179-191.
-
(1998)
IIE Transactions
, vol.30
, pp. 179-191
-
-
Sabuncuoglu, I.1
Karabuk, S.2
-
179
-
-
0025419819
-
Modeling and scheduling of a flexible manufacturing system
-
Sawik, T., 1990, Modeling and scheduling of a flexible manufacturing system. European Journal of Operational Research, 45, 177-190.
-
(1990)
European Journal of Operational Research
, vol.45
, pp. 177-190
-
-
Sawik, T.1
-
180
-
-
0027615366
-
A scheduling algorithm for flexible flow lines with limited intermediate buffers
-
Sawik, T, 1993, A scheduling algorithm for flexible flow lines with limited intermediate buffers. Applied Stochastic Models and Data Analysis, 9, 127-138.
-
(1993)
Applied Stochastic Models and Data Analysis
, vol.9
, pp. 127-138
-
-
Sawik, T.1
-
181
-
-
0030378457
-
Two-level heuristic for machine loading and assembly routing in a flexible assembly system
-
Sawik, T, 1996, Two-level heuristic for machine loading and assembly routing in a flexible assembly system. IEEE Symposium on Emerging Technologies and Factory Automation, Vol. 1, 143-149.
-
(1996)
IEEE Symposium on Emerging Technologies and Factory Automation
, vol.1
, pp. 143-149
-
-
Sawik, T.1
-
182
-
-
0023384747
-
The machine loading and tool allocation problem in a flexible manufacturing system
-
Sarin, S. and Chen C. S., 1987, The machine loading and tool allocation problem in a flexible manufacturing system. International Journal of Production Research, 25, 1081-1094.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 1081-1094
-
-
Sarin, S.1
Chen, C.S.2
-
183
-
-
0023016120
-
Scheduling parts in a FMS
-
Sarin, S. C. and Dar-El, E. M., 1986, Scheduling parts in a FMS. Large Scale Systems, 11, 83-94.
-
(1986)
Large Scale Systems
, vol.11
, pp. 83-94
-
-
Sarin, S.C.1
Dar-El, E.M.2
-
184
-
-
0024889373
-
Duplication process in machine cells formation in group technology
-
Seifoddini, H., 1989, Duplication process in machine cells formation in group technology. IIE Transactions, 21, 382-388.
-
(1989)
IIE Transactions
, vol.21
, pp. 382-388
-
-
Seifoddini, H.1
-
185
-
-
84953164255
-
Application of the similarity coefficient method in group technology
-
Seifoddini, H. K. and Wolfe, P., 1986, Application of the similarity coefficient method in group technology. AIIE Transactions, 18, 271-277.
-
(1986)
AIIE Transactions
, vol.18
, pp. 271-277
-
-
Seifoddini, H.K.1
Wolfe, P.2
-
186
-
-
0031076585
-
Models and solution methodologies for the generalized grouping problem in cellular manufacturing
-
Shanker, K. and Agrawal, A. K., 1997, Models and solution methodologies for the generalized grouping problem in cellular manufacturing. International Journal of Production Research, 35, 513-538.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 513-538
-
-
Shanker, K.1
Agrawal, A.K.2
-
187
-
-
0024673709
-
Some solution methodologies for loading problems in a flexible manufacturing system
-
Shanker, K. and Srinivasalu, A., 1989, Some solution methodologies for loading problems in a flexible manufacturing system. International Journal of Production Research, 27, 1019-1034.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1019-1034
-
-
Shanker, K.1
Srinivasalu, A.2
-
188
-
-
0022060472
-
A loading and dispatching problem in a random FMS
-
Shanker, K. and Tzen, Y. J., 1985, A loading and dispatching problem in a random FMS. International Journal of Production Research, 23, 579-595.
-
(1985)
International Journal of Production Research
, vol.23
, pp. 579-595
-
-
Shanker, K.1
Tzen, Y.J.2
-
189
-
-
0030737841
-
Formulations and heuristics for scheduling in a buffer-constrained flowshop and flow-line-based manufacturing cell with different buffer-space requirements for jobs: Part 2
-
Sharadapriyadarshini, B. and Rajendran, C., 1997, Formulations and heuristics for scheduling in a buffer-constrained flowshop and flow-line-based manufacturing cell with different buffer-space requirements for jobs: Part 2. International Journal of Production Research, 35, 101-122.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 101-122
-
-
Sharadapriyadarshini, B.1
Rajendran, C.2
-
191
-
-
0024016193
-
A knowledge-based scheduling system for flexible manufacturing
-
Shaw, M. J., 1988, A knowledge-based scheduling system for flexible manufacturing. International Journal of Production Research, 26, 821-844.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 821-844
-
-
Shaw, M.J.1
-
192
-
-
0000936343
-
Intelligent scheduling with machine learning capabilities: The induction of scheduling knowledge
-
Shaw, M. J., Park, S. and Raman, N., 1992, Intelligent scheduling with machine learning capabilities: the induction of scheduling knowledge. IIE Transactions, 24, 156-168.
-
(1992)
IIE Transactions
, vol.24
, pp. 156-168
-
-
Shaw, M.J.1
Park, S.2
Raman, N.3
-
193
-
-
0024682175
-
An AI approach to scheduling in flexible manufacturing systems
-
Shaw, M. J. and Whinston, A., 1989, An AI approach to scheduling in flexible manufacturing systems. IEE Transactions, 21, 170-183.
-
(1989)
IEE Transactions
, vol.21
, pp. 170-183
-
-
Shaw, M.J.1
Whinston, A.2
-
194
-
-
0024656202
-
Modeling group technology cell formation as a generalized assignment problem
-
Shtub, A., 1989, Modeling group technology cell formation as a generalized assignment problem. International Journal of Production Research, 27, 775-782.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 775-782
-
-
Shtub, A.1
-
195
-
-
0025243881
-
Deliberately slowing down output in a family production context
-
Silver, E., 1990, Deliberately slowing down output in a family production context. International Journal of Production Research, 28, 17-27.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 17-27
-
-
Silver, E.1
-
196
-
-
84952488322
-
An expert neural system for dynamic job shop scheduling heuristic
-
Sim, S. K., Yeo, K. Y. and Lee, W. H., 1994, An expert neural system for dynamic job shop scheduling heuristic. Revue des Systèmes de Decision, 32, 1759-1773.
-
(1994)
Revue Des Systèmes De Decision
, vol.32
, pp. 1759-1773
-
-
Sim, S.K.1
Yeo, K.Y.2
Lee, W.H.3
-
197
-
-
0026221826
-
Intersection graph method for AGV flow path design
-
Sinriech, D. and Tanchoco, J. M. A., 1991, Intersection graph method for AGV flow path design. International Journal of Production Research, 29, 1725-1732.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1725-1732
-
-
Sinriech, D.1
Tanchoco, J.M.A.2
-
198
-
-
0026938781
-
Impact of empty vehicle flow on performance of single loop AGV systems
-
Sinriech, D. and Tanchoco, J. M. A., 1992, Impact of empty vehicle flow on performance of single loop AGV systems. International Journal of Production Research, 30, 2237-2252.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 2237-2252
-
-
Sinriech, D.1
Tanchoco, J.M.A.2
-
199
-
-
0027558925
-
Solution methods for the mathematical models of single loop AGV systems
-
Sinriech, D. and Tanchoco, J. M. A., 1993, Solution methods for the mathematical models of single loop AGV systems. International Journal of Production Research, 31, 705-725.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 705-725
-
-
Sinriech, D.1
Tanchoco, J.M.A.2
-
200
-
-
0002225228
-
Characteristics of US flexible manufacturing systems—a survey
-
K. E. Stecke and R. Suri, Amsterdam: Elsevier Science
-
Smith, M. L., Ramesh, R., Dudek, R. A. and Blair, E. L., 1986, Characteristics of US flexible manufacturing systems—a survey. In K. E. Stecke and R. Suri (eds), Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications (Amsterdam: Elsevier Science), pp. 477-486.
-
(1986)
Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications
, pp. 477-486
-
-
Smith, M.L.1
Ramesh, R.2
Dudek, R.A.3
Blair, E.L.4
-
201
-
-
0028452748
-
1994, Multiperiod tool and production assignment in flexible manufacturing systems
-
Sodhi, M. S., Askin, R. G. and Sen, S., 1994, Multiperiod tool and production assignment in flexible manufacturing systems. International Journal of Production Research, 32, 1281-1294.
-
International Journal of Production Research
, vol.32
, pp. 1281-1294
-
-
Sodhi, M.S.1
Askin, R.G.2
Sen, S.3
-
202
-
-
0026905656
-
Simulated annealing applied to the process allocation problem
-
Sofianopoulou, S., 1991, Simulated annealing applied to the process allocation problem. European Journal of Operational Research, 60, 327-334.
-
(1991)
European Journal of Operational Research
, vol.60
, pp. 327-334
-
-
Sofianopoulou, S.1
-
203
-
-
0031075272
-
Application of simulated annealing to a linear model for the formation of machine cells in group technology
-
Sofianopoulou, S., 1997, Application of simulated annealing to a linear model for the formation of machine cells in group technology. International Journal of Production Research, 35, 501-511.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 501-511
-
-
Sofianopoulou, S.1
-
204
-
-
0029546640
-
FMS’s scheduling by colored petri net model and Hopheld neural network algorithm
-
Song, A. H., Ootsuki, J. T, Yoo, W. K., Fujii, Y. and Sekiguchi, T, 1995, FMS’s scheduling by colored petri net model and Hopheld neural network algorithm. Proceedings of the 34th SICE Annual Conference, pp. 1285-1290.
-
(1995)
Proceedings of the 34Th SICE Annual Conference
, pp. 1285-1290
-
-
Song, A.H.1
Ootsuki, J.T.2
Yoo, W.K.3
Fujii, Y.4
Sekiguchi, T.5
-
205
-
-
0030192321
-
Scheduling in flow-shop and cellular manufacturing systems with multiple objectives—a genetic algorithmic approach
-
Sridhar, J. and Rajendran, C., 1996, Scheduling in flow-shop and cellular manufacturing systems with multiple objectives—a genetic algorithmic approach. Production Planning and Control, 7, 374-382.
-
(1996)
Production Planning and Control
, vol.7
, pp. 374-382
-
-
Sridhar, J.1
Rajendran, C.2
-
206
-
-
0026120363
-
GRAFICS—a nonhierarchical clustering algorithm for group technology
-
Srinivasan, G. and Navendran, T T, 1991, GRAFICS—a nonhierarchical clustering algorithm for group technology. International Journal of Production Research, 29, 463-478.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 463-478
-
-
Srinivasan, G.1
Navendran, T.T.2
-
207
-
-
0025211424
-
An assignment model for the part-families problem in GT
-
Srinivasan, G., Navendran, T T and Mahadevan, M., 1990, An assignment model for the part-families problem in GT. International Journal of Production Research, 28, 145-152.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 145-152
-
-
Srinivasan, G.1
Navendran, T.T.2
Mahadevan, M.3
-
208
-
-
0020718128
-
Formulation and solution of nonlinear integer production planning problems for FMSs
-
Stecke, K. E., 1983, Formulation and solution of nonlinear integer production planning problems for FMSs. Management Science, 29, 273-288.
-
(1983)
Management Science
, vol.29
, pp. 273-288
-
-
Stecke, K.E.1
-
209
-
-
0022676091
-
A hierarchical approach to solving machine grouping and loading problems of FMSs
-
Stecke, K. E., 1986, A hierarchical approach to solving machine grouping and loading problems of FMSs. European Journal of Operational Research, 24, 369-378.
-
(1986)
European Journal of Operational Research
, vol.24
, pp. 369-378
-
-
Stecke, K.E.1
-
211
-
-
0001357568
-
Variation in FMSs according to the relevant types of automated materials handling
-
Stecke, K. E. and Browne, J., 1985, Variation in FMSs according to the relevant types of automated materials handling. Material Flow, 2, 179-185.
-
(1985)
Material Flow
, vol.2
, pp. 179-185
-
-
Stecke, K.E.1
Browne, J.2
-
212
-
-
0025894458
-
A flexible approach to part type selection in flexible flow systems using part mix ratios
-
Stecke, K. E. and Kim, I., 1991, A flexible approach to part type selection in flexible flow systems using part mix ratios. International Journal of Production Research, 29, 53-75.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 53-75
-
-
Stecke, K.E.1
Kim, I.2
-
213
-
-
0343609245
-
A knowledge-based approach to part type selection considering due dates in FMS
-
Stecke, K. E., Kim, I. and Min, M., 1988, A knowledge-based approach to part type selection considering due dates in FMS. Proceedings of the 12th IMACS World Congress on Scientific Computation, pp. 18-22.
-
(1988)
Proceedings of the 12Th IMACS World Congress on Scientific Computation
, pp. 18-22
-
-
Stecke, K.E.1
Kim, I.2
Min, M.3
-
214
-
-
84952242943
-
Loading and control problem for a flexible manufacturing system
-
Stecke, K. E. and Solberg, J. J., 1981, Loading and control problem for a flexible manufacturing system. International Journal of Production Research, 19, 481-490.
-
(1981)
International Journal of Production Research
, vol.19
, pp. 481-490
-
-
Stecke, K.E.1
Solberg, J.J.2
-
215
-
-
0030790585
-
Scheduling a 2-machine flowshop with travel times to minimize maximum lateness
-
Stevens, J. W. and Gemmill, D. D., 1997, Scheduling a 2-machine flowshop with travel times to minimize maximum lateness. International Journal of Production Research, 35, 115.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 115
-
-
Stevens, J.W.1
Gemmill, D.D.2
-
216
-
-
0030269845
-
Impact of empty vehicle flow on optimal flow path design for unidirectional AGV systems
-
Sun, X.-C. and Tchernev, N., 1996, Impact of empty vehicle flow on optimal flow path design for unidirectional AGV systems. International Journal of Production Research, 34, 2827-2852.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 2827-2852
-
-
Sun, X.-C.1
Tchernev, N.2
-
217
-
-
0021607371
-
Decision support requirements in flexible manufacturing
-
Suri, R. and Whitney, C. K., 1984, Decision support requirements in flexible manufacturing. Journal of Manufacturing Systems, 3, 61-69.
-
(1984)
Journal of Manufacturing Systems
, vol.3
, pp. 61-69
-
-
Suri, R.1
Whitney, C.K.2
-
218
-
-
0029389278
-
Dynamic routeing techniques for AGV Systems
-
Taghagboni-Dutta, F. and Tanchoco, J. M. A., 1995, Dynamic routeing techniques for AGV Systems. International Journal of Production Research, 33, 2653-2669.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 2653-2669
-
-
Taghagboni-Dutta, F.1
Tanchoco, J.M.A.2
-
219
-
-
0026837787
-
OSL: Optimal single loop guide paths for AGVs
-
Tanchoco, J. M. A. and Sinriech, D., 1992, OSL: optimal single loop guide paths for AGVs. International Journal of Production Research, 30, 665-681.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 665-681
-
-
Tanchoco, J.M.A.1
Sinriech, D.2
-
220
-
-
0027644831
-
A real time scheduler using neural networks for independent and nonpreemptable tasks with deadlines and resource requirements
-
Thawonmas, R., Shiratori, N. and Noguchi, S., 1993, A real time scheduler using neural networks for independent and nonpreemptable tasks with deadlines and resource requirements. IEICE Transactions Information and Systems, E. 76, 947-955.
-
(1993)
IEICE Transactions Information and Systems, E.
, vol.76
, pp. 947-955
-
-
Thawonmas, R.1
Shiratori, N.2
Noguchi, S.3
-
221
-
-
0031197478
-
A heuristic solution to the machine loading problem of a FMS and its petri net model
-
Tiwari, M. K., Hazarika, B., Vidyarthi, N. K., Jaggi, P. and Mukhopadhyay, S. K., 1997, A heuristic solution to the machine loading problem of a FMS and its petri net model. International Journal of Production Research, 35, 2269-2284.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 2269-2284
-
-
Tiwari, M.K.1
Hazarika, B.2
Vidyarthi, N.K.3
Jaggi, P.4
Mukhopadhyay, S.K.5
-
222
-
-
0003348756
-
Tooling strategies related to FMS management
-
Tomek, P., 1986, Tooling strategies related to FMS management. The FMS Magazine, pp. 102-107.
-
(1986)
The FMS Magazine
, pp. 102-107
-
-
Tomek, P.1
-
224
-
-
0027845081
-
Simultaneous scheduling of machines and automated guided vehicles
-
Ulusoy, G. and Bilge, U., 1993, Simultaneous scheduling of machines and automated guided vehicles. International Journal of Production Research, 31, 2857-2873.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2857-2873
-
-
Ulusoy, G.1
Bilge, U.2
-
226
-
-
0026851407
-
A stochastic neural network for resource constrained scheduling
-
Vaithianathan, S. and Ignizo, J. P., 1992, A stochastic neural network for resource constrained scheduling. Computing and Operations Research, 19, 241-254.
-
(1992)
Computing and Operations Research
, vol.19
, pp. 241-254
-
-
Vaithianathan, S.1
Ignizo, J.P.2
-
227
-
-
0026461248
-
Job-shop scheduling by simulated annealing
-
VanLaarhoven, P. J. M., Aarts, E. H. L. and Lenstr, J. K., 1992, Job-shop scheduling by simulated annealing. Operations Research, 40, 113-126.
-
(1992)
Operations Research
, vol.40
, pp. 113-126
-
-
Vanlaarhoven, P.J.M.1
Aarts, E.H.L.2
Lenstr, J.K.3
-
228
-
-
0026986146
-
Cell formation in manufacturing systems through simulated annealing: An experimental evaluation
-
Venugopal, V. and Navendran, T T, 1992, Cell formation in manufacturing systems through simulated annealing: an experimental evaluation. European Journal of Operational Research, 63, 409-422.
-
(1992)
European Journal of Operational Research
, vol.63
, pp. 409-422
-
-
Venugopal, V.1
Navendran, T.T.2
-
229
-
-
0031146035
-
Formation of machine cells and part families: A modified p-median model and comparative study
-
Wang, J. and Roze, C., 1997, Formation of machine cells and part families: a modified p-median model and comparative study. International Journal of Production Research, 35, 1259-1286.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 1259-1286
-
-
Wang, J.1
Roze, C.2
-
230
-
-
0029288001
-
Intelligent scheduling of FMSs with inductive learning capability using neural networks
-
Wang, L. C., Chen, H. M. and Liu, C. M., 1995, Intelligent scheduling of FMSs with inductive learning capability using neural networks. International Journal of Flexible Manufacturing Systems, 7, 147-175.
-
(1995)
International Journal of Flexible Manufacturing Systems
, vol.7
, pp. 147-175
-
-
Wang, L.C.1
Chen, H.M.2
Liu, C.M.3
-
231
-
-
0030216417
-
Formation and dynamic routing of part families among flexible manufacturing cells
-
Wen, H. J., Smith, C. H. and Minor, E. D., 1996, Formation and dynamic routing of part families among flexible manufacturing cells. International Journal of Production Research, 34, 2229-2245.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 2229-2245
-
-
Wen, H.J.1
Smith, C.H.2
Minor, E.D.3
-
232
-
-
0001868119
-
Scheduling problems and traveling salesman: The genetic edge recombination operators
-
Arlington, VA
-
Whitley, D., Starkweather, T. and Fuguay D., 1989, Scheduling problems and traveling salesman: the genetic edge recombination operators. Proceedings of the Third International Conference on Genetic Algorithms and Their Applications, Arlington, VA, pp. 350-372.
-
(1989)
Proceedings of the Third International Conference on Genetic Algorithms and Their Applications
, pp. 350-372
-
-
Whitley, D.1
Starkweather, T.2
Fuguay, D.3
-
233
-
-
0025894230
-
Job shop scheduling with tooling constraints: A tabu search approach
-
Widmer, M., 1991, Job shop scheduling with tooling constraints: a tabu search approach. Journal of the Operational Society, 42, 75-82.
-
(1991)
Journal of the Operational Society
, vol.42
, pp. 75-82
-
-
Widmer, M.1
-
235
-
-
0024016313
-
An adaptable scheduling algorithm for flexible flow lines
-
Wittrock, R. J., 1988, An adaptable scheduling algorithm for flexible flow lines. Operations Research, 36, 445-453.
-
(1988)
Operations Research
, vol.36
, pp. 445-453
-
-
Wittrock, R.J.1
-
236
-
-
0027088457
-
Combining of expert system and simulator for FMS rescheduling
-
San Francisco, CA
-
Wu, Z., 1992, Combining of expert system and simulator for FMS rescheduling. Proceedings of the 1992 Japan-USA Symposium on Flexible Automation, San Francisco, CA, pp. 1127-1130.
-
(1992)
Proceedings of the 1992 Japan-Usa Symposium on Flexible Automation
, pp. 1127-1130
-
-
Wu, Z.1
-
237
-
-
0023868237
-
Multi-pass expert control system—a control and scheduling structure for flexible manufacturing systems
-
Wu, S. D. and Wysk, R. A., 1988, Multi-pass expert control system—a control and scheduling structure for flexible manufacturing systems. Journal of Manufacturing Systems, 7, 107-120.
-
(1988)
Journal of Manufacturing Systems
, vol.7
, pp. 107-120
-
-
Wu, S.D.1
Wysk, R.A.2
-
238
-
-
0026364564
-
Detection of deadlocks in flexible manufacturing systems
-
Wysk, R. A., Yang, N. S. and Joshi, S., 1991, Detection of deadlocks in flexible manufacturing systems. IEEE Transactions on Robotics and Automation, 7, 853-859.
-
(1991)
IEEE Transactions on Robotics and Automation
, vol.7
, pp. 853-859
-
-
Wysk, R.A.1
Yang, N.S.2
Joshi, S.3
-
239
-
-
0029709086
-
Hybrid heuristic search algorithm for scheduling flexible manufacturing systems
-
Minneapolis, MN
-
Xiong, H. H., Zhou, M. and Caudill, R. J., 1996, Hybrid heuristic search algorithm for scheduling flexible manufacturing systems. Proceedings of the 1996 13th IEEE International Conference on Automation and Robotics, Minneapolis, MN, Vol. 3, pp. 2793-2797.
-
(1996)
Proceedings of the 1996 13Th IEEE International Conference on Automation and Robotics
, vol.3
, pp. 2793-2797
-
-
Xiong, H.H.1
Zhou, M.2
Caudill, R.J.3
-
240
-
-
0030190733
-
The use of dynamic programming in GAs for permutation problems
-
Yagiura, M. and Ibaraki, T, 1996, The use of dynamic programming in GAs for permutation problems. European Journal of Operational Research, 92, 387-401.
-
(1996)
European Journal of Operational Research
, vol.92
, pp. 387-401
-
-
Yagiura, M.1
Ibaraki, T.2
-
241
-
-
0000123908
-
Material and information flows in flexible manufacturing systems
-
Yao, D. D., 1985, Material and information flows in flexible manufacturing systems. Material Flow, 2, 143-149.
-
(1985)
Material Flow
, vol.2
, pp. 143-149
-
-
Yao, D.D.1
-
242
-
-
0025398941
-
Flexible parts routing in manufacturing systems
-
Yao, D. D. and Pei, F. F., 1990, Flexible parts routing in manufacturing systems. IIE Transactions, 22, 48-55.
-
(1990)
IIE Transactions
, vol.22
, pp. 48-55
-
-
Yao, D.D.1
Pei, F.F.2
-
243
-
-
0025750997
-
A neural network approach to job-shop scheduling
-
Zhou, D. N., Cherkassky, V., Baldwin, T R. and Olson, D. E., 1991, A neural network approach to job-shop scheduling. Proceedings of the ICNN, 2, 175-179.
-
(1991)
Proceedings of the ICNN
, vol.2
, pp. 175-179
-
-
Zhou, D.N.1
Cherkassky, V.2
Baldwin, T.R.3
Olson, D.E.4
|