-
3
-
-
0023997981
-
Quasi online scheduling procedures for flexible manufacturing systems
-
Slomp, J., Gaalman, G.J.C. and Nawijn, W.M. (1988) Quasi online scheduling procedures for flexible manufacturing systems. International Journal of Production Research, 26(4), 585-598.
-
(1988)
International Journal of Production Research
, vol.26
, Issue.4
, pp. 585-598
-
-
Slomp, J.1
Gaalman, G.J.C.2
Nawijn, W.M.3
-
4
-
-
0026155862
-
Scheduling approaches for random job shop flexible manufacturing systems
-
Hutchison, J., Leoong, K., Snyder, D. and Ward, P. (1991) Scheduling approaches for random job shop flexible manufacturing systems. International Journal of Production Research, 29(5), 1053-1067.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.5
, pp. 1053-1067
-
-
Hutchison, J.1
Leoong, K.2
Snyder, D.3
Ward, P.4
-
5
-
-
21344489768
-
Dispatching procedures for a flexible manufacturing cell in constant production circumstance
-
Arzi, Y. and Roll, Y. (1993) Dispatching procedures for a flexible manufacturing cell in constant production circumstance. International Journal of Operations and Production Management, 13 (11), 35-51.
-
(1993)
International Journal of Operations and Production Management
, vol.13
, Issue.11
, pp. 35-51
-
-
Arzi, Y.1
Roll, Y.2
-
6
-
-
0025262878
-
Multi-criteria operational control rules in flexible manufacturing system (FMSs)
-
Ro, I.-K. and Kim, J.-I. (1990) Multi-criteria operational control rules in flexible manufacturing system (FMSs). International Journal of Production Research, 28(1), 47-63.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.1
, pp. 47-63
-
-
Ro, I.-K.1
Kim, J.-I.2
-
7
-
-
84950937653
-
Integrated shop floor control using autonomous agents
-
Lin, G.Y. and Solberg, J.J. (1991) Integrated shop floor control using autonomous agents. HE Transactions, 24(3), 57-71.
-
(1991)
HE Transactions
, vol.24
, Issue.3
, pp. 57-71
-
-
Lin, G.Y.1
Solberg, J.J.2
-
8
-
-
0027657053
-
Real time production control of an FMS in produce to order environment
-
Arzi, Y. and Roll, Y. (1993) Real time production control of an FMS in produce to order environment. International Journal of Production Research, 31(9), 2195-2214.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.9
, pp. 2195-2214
-
-
Arzi, Y.1
Roll, Y.2
-
9
-
-
0029490796
-
On-line scheduling in a multi-cell flexible manufacturing system
-
Arzi, Y. (1995) On-line scheduling in a multi-cell flexible manufacturing system. International Journal of Production Research, 33 (12), 3283-3300.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.12
, pp. 3283-3300
-
-
Arzi, Y.1
-
10
-
-
84952242943
-
Loading and control policies for a flexible manufacturing system
-
Stecke, K.E. and Solberg, J.J. (1981) Loading and control policies for a flexible manufacturing system. International Journal of Production Research, 19(5), 481-490.
-
(1981)
International Journal of Production Research
, vol.19
, Issue.5
, pp. 481-490
-
-
Stecke, K.E.1
Solberg, J.J.2
-
11
-
-
0023385665
-
Experimental investigation of flexible manufacturing system scheduling decision rules
-
Denzler, D.R. and Boe, W.J. (1987) Experimental investigation of flexible manufacturing system scheduling decision rules. International Journal of Production Research, 25(7), 979-994.
-
(1987)
International Journal of Production Research
, vol.25
, Issue.7
, pp. 979-994
-
-
Denzler, D.R.1
Boe, W.J.2
-
12
-
-
6244274210
-
A real time, rule based FMS operation control strategy in CIM environment: Part 1
-
Ranky, P.O. (1988) A real time, rule based FMS operation control strategy in CIM environment: part 1. International Journal of Computer Integrated Manufacturing, 1(1), 55-72.
-
(1988)
International Journal of Computer Integrated Manufacturing
, vol.1
, Issue.1
, pp. 55-72
-
-
Ranky, P.O.1
-
13
-
-
33749727600
-
A real time, rule based FMS operation control strategy in CIM environment: Part 2
-
Ranky, P.O. (1988) A real time, rule based FMS operation control strategy in CIM environment: part 2. International Journal of Computer Integrated Manufacturing, 1(3), 185-196.
-
(1988)
International Journal of Computer Integrated Manufacturing
, vol.1
, Issue.3
, pp. 185-196
-
-
Ranky, P.O.1
-
14
-
-
0023824587
-
Evaluation of traditional work scheduling rules in a flexible manufacturing system with a physical simulator
-
Choi, R.H. and Malstrom, E.M. (1988) Evaluation of traditional work scheduling rules in a flexible manufacturing system with a physical simulator. Journal of Manufacturing Systems, 7(1), 33-45.
-
(1988)
Journal of Manufacturing Systems
, vol.7
, Issue.1
, pp. 33-45
-
-
Choi, R.H.1
Malstrom, E.M.2
-
15
-
-
0000423832
-
A review of scheduling rules in flexible manufacturing systems
-
Gupta, J.P., Gupta, M.C. and Bector, C.R. (1989) A review of scheduling rules in flexible manufacturing systems. International Journal of Computer Integrated Manufacturing, 2(6), 356-377.
-
(1989)
International Journal of Computer Integrated Manufacturing
, vol.2
, Issue.6
, pp. 356-377
-
-
Gupta, J.P.1
Gupta, M.C.2
Bector, C.R.3
-
17
-
-
0020290373
-
Production decision support system for computerized manufacturing system
-
Chen, P.M. and Talavage, J. (1982) Production decision support system for computerized manufacturing system. Journal of Manufacturing System, 1(2), 157-168.
-
(1982)
Journal of Manufacturing System
, vol.1
, Issue.2
, pp. 157-168
-
-
Chen, P.M.1
Talavage, J.2
-
18
-
-
0011785324
-
Dynamic material handling for a class of flexible manufacturing systems
-
Cassandras, C.G. (1985) Dynamic material handling for a class of flexible manufacturing systems. Annals of Operations Research, 3, 427-447.
-
(1985)
Annals of Operations Research
, vol.3
, pp. 427-447
-
-
Cassandras, C.G.1
-
19
-
-
0024124520
-
Manufacturing system operation: Dispatch rules vs. intelligence control
-
Chryssolouris, G., Wright, K., Pierce, J. and Cobb, W. (1988) Manufacturing system operation: dispatch rules vs. intelligence control. Robotics and Computer Integrated Manufacturing, 4, 531-544.
-
(1988)
Robotics and Computer Integrated Manufacturing
, vol.4
, pp. 531-544
-
-
Chryssolouris, G.1
Wright, K.2
Pierce, J.3
Cobb, W.4
-
20
-
-
0024731596
-
An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing
-
Wu, S.D. and Wysk, R.A. (1989) An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing. International Journal of Production Research, 27(9), 1603-1623.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.9
, pp. 1603-1623
-
-
Wu, S.D.1
Wysk, R.A.2
-
22
-
-
0011716121
-
Applying simulation and expert systems to the control of advanced manufacturing facilities
-
Chrystall, C.N., Nurse, O.A. and Kaye, M.M. (1990) Applying simulation and expert systems to the control of advanced manufacturing facilities. Computer Integrated Manufacturing Systems, 3(2), 71-78.
-
(1990)
Computer Integrated Manufacturing Systems
, vol.3
, Issue.2
, pp. 71-78
-
-
Chrystall, C.N.1
Nurse, O.A.2
Kaye, M.M.3
-
24
-
-
0000936343
-
Intelligent scheduling with machine learning capabilities: The induction of scheduling knowledge
-
Shaw, M.J., Park, S. and Raman, N. (1992) Intelligent scheduling with machine learning capabilities: the induction of scheduling knowledge. HE Transactions, 24(2), 156-168.
-
(1992)
HE Transactions
, vol.24
, Issue.2
, pp. 156-168
-
-
Shaw, M.J.1
Park, S.2
Raman, N.3
-
25
-
-
0028426236
-
Learning-based scheduling in a flexible manufacturing flow line
-
Piramuthu, S., Raman, N. and Shaw, M.J. (1994) Learning-based scheduling in a flexible manufacturing flow line. IEEE Transactions on Engineering Management, 41(2), 172-182.
-
(1994)
IEEE Transactions on Engineering Management
, vol.41
, Issue.2
, pp. 172-182
-
-
Piramuthu, S.1
Raman, N.2
Shaw, M.J.3
-
26
-
-
0026819312
-
Dynamic scheduling system utilizing matching learning as a knowledge acquisition tool
-
Shinichi, N. and Taketoshi, Y. (1992) Dynamic scheduling system utilizing matching learning as a knowledge acquisition tool. International Journal of Production Research, 30(2), 411-431.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.2
, pp. 411-431
-
-
Shinichi, N.1
Taketoshi, Y.2
-
27
-
-
0001632220
-
Using unsupervised learning technologies to induce scheduling knowledge for FMSs
-
Li, D.C. and She, I.S. (1994) Using unsupervised learning technologies to induce scheduling knowledge for FMSs. International Journal of Production Research, 32(9), 2187-2199.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.9
, pp. 2187-2199
-
-
Li, D.C.1
She, I.S.2
-
28
-
-
0027576654
-
A robust scheduler for an intelligent workstation controller
-
Cho, H. and Wysk, R.A. (1993) A robust scheduler for an intelligent workstation controller. International Journal of Production Research, 31(4), 771-789.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.4
, pp. 771-789
-
-
Cho, H.1
Wysk, R.A.2
-
29
-
-
0030212144
-
-
Sun, Y.L. and Yih, Y. (1996) An intelligent controller for manufacturing cells, International Journal of Production Research, 34(8), 2353-2373.
-
(1996)
An Intelligent Controller for Manufacturing Cells, International Journal of Production Research
, vol.34
, Issue.8
, pp. 2353-2373
-
-
Sun, Y.L.1
Yih, Y.2
-
30
-
-
0030711211
-
Intelligent simulation based scheduling of work cells: An approach
-
Soon, T.H. and De Souza, R. (1997) Intelligent simulation based scheduling of work cells: an approach. Integrated Manufacturing Systems, 8(1), 6-23.
-
(1997)
Integrated Manufacturing Systems
, vol.8
, Issue.1
, pp. 6-23
-
-
Soon, T.H.1
De Souza, R.2
-
31
-
-
0028698620
-
-
Wang, Y.-F., Cruz, J.B. Jr. and Mulligan, J.H. Jr. (1994) Adaptive scheduling utilizing a neural network structure, in Proceedings of the IEEE International Conference on Neural Networks, IEEE, Piscataway, N.J., 6, pp. 3806-3811.
-
(1994)
Adaptive Scheduling Utilizing A Neural Network Structure, in Proceedings of the IEEE International Conference on Neural Networks, IEEE, Piscataway, N.J.
, vol.6
, pp. 3806-3811
-
-
Wang, Y.-F.1
Cruz Jr., J.B.2
Mulligan Jr., J.H.3
-
32
-
-
0030129864
-
Development of manufacturing control strategies using unsupervised learning
-
Bowden, R. and Bullington, S.F. (1996) Development of manufacturing control strategies using unsupervised learning. HE Transactions, 28(4), 319-331.
-
(1996)
HE Transactions
, vol.28
, Issue.4
, pp. 319-331
-
-
Bowden, R.1
Bullington, S.F.2
-
33
-
-
0019243021
-
Artificial intelligence in manufacturing, planning and control
-
Bullers, W.I., Nof, S.Y. and Whinston, A.B. (1980) Artificial intelligence in manufacturing, planning and control. AIIE Transactions, 12, 351-363.
-
(1980)
AIIE Transactions
, vol.12
, pp. 351-363
-
-
Bullers, W.I.1
Nof, S.Y.2
Whinston, A.B.3
-
34
-
-
0019022592
-
Control and decision support in automatic manufacturing systems
-
Nof, S.Y., Whinston, S.B. and Bullers, W.I. (1980) Control and decision support in automatic manufacturing systems. AIIE Transactions, 12(2), 156-169.
-
(1980)
AIIE Transactions
, vol.12
, Issue.2
, pp. 156-169
-
-
Nof, S.Y.1
Whinston, S.B.2
Bullers, W.I.3
-
35
-
-
0022302092
-
-
Ben-Arieh, D., Moodie, C.L. and Nof, S.Y. (1985) Knowledgebased control system for automated production and assembly, in Towards the Factory of the Future, Bullinger, H.J. and Warnecke, HJ. (eds.), Springer-Verlag, Berlin, pp. 285-293.
-
(1985)
Knowledgebased Control System for Automated Production and Assembly, in Towards the Factory of the Future, Bullinger, H.J. and Warnecke, HJ. (Eds.), Springer-Verlag, Berlin
, pp. 285-293
-
-
Ben-Arieh, D.1
Moodie, C.L.2
Nof, S.Y.3
-
36
-
-
0000136405
-
A hybrid approach for real-time sequencing and scheduling
-
Jones, A., Rabelo, L. and Yih, Y. (1995) A hybrid approach for real-time sequencing and scheduling. International Journal of Computer and Integrated Manufacturing, 8(2), 145-154.
-
(1995)
International Journal of Computer and Integrated Manufacturing
, vol.8
, Issue.2
, pp. 145-154
-
-
Jones, A.1
Rabelo, L.2
Yih, Y.3
-
37
-
-
84952488322
-
An expert neural network system for dynamic job shop scheduling
-
Sim, S.K., Yeo, K.T. and Lee, W.H. (1994) An expert neural network system for dynamic job shop scheduling. International Journal of Production Research, 32(8), 1759-1773.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.8
, pp. 1759-1773
-
-
Sim, S.K.1
Yeo, K.T.2
Lee, W.H.3
-
38
-
-
0347076324
-
A model for switching dispatching rules in real time in flexible manufacturing cell
-
Chakravarty, A.K. (1997) A model for switching dispatching rules in real time in flexible manufacturing cell. Production and Operations Management, 6(1), 398-418.
-
(1997)
Production and Operations Management
, vol.6
, Issue.1
, pp. 398-418
-
-
Chakravarty, A.K.1
-
39
-
-
0029288001
-
Intelligent scheduling of FMSs with inductive learning capability using neural networks
-
Wang, L.C., Chen, H.M. and Liu, C.M. (1995) Intelligent scheduling of FMSs with inductive learning capability using neural networks. International Journal of Flexible Manufacturing Systems, 7, 147-145.
-
(1995)
International Journal of Flexible Manufacturing Systems
, vol.7
, pp. 147-1145
-
-
Wang, L.C.1
Chen, H.M.2
Liu, C.M.3
-
40
-
-
33749707348
-
-
Kulikowski, C.A. and Weiss, S.M. (1991) Computer Systems that Learn, Morgan Kaufmann Publishers, San Francisco, CA.
-
(1991)
Computer Systems That Learn, Morgan Kaufmann Publishers, San Francisco, CA.
-
-
Kulikowski, C.A.1
Weiss, S.M.2
-
42
-
-
0003444648
-
-
MIT Press, Cambridge, MA.
-
Rumelhart, D.E., Hinton, G.E. and Williams, R.J. (1986) Learning Internal Representation by Error Propagation, Parallel Distributed Processing: Exploration in the Microcomputers of Cognition, Vol.1, MIT Press, Cambridge, MA.
-
(1986)
Learning Internal Representation by Error Propagation, Parallel Distributed Processing: Exploration in the Microcomputers of Cognition, Vol.
, vol.1
-
-
Rumelhart, D.E.1
Hinton, G.E.2
Williams, R.J.3
-
43
-
-
33744584654
-
Induction of decision trees
-
Quinlan, J.R. (1986) Induction of decision trees. Machine Learning, 1, 81-106.
-
(1986)
Machine Learning
, vol.1
, pp. 81-106
-
-
Quinlan, J.R.1
|