메뉴 건너뛰기




Volumn 8, Issue 1, 1997, Pages 6-23

Intelligent simulation-based scheduling of workcells: An approach

Author keywords

[No Author keywords available]

Indexed keywords

ARTIFICIAL INTELLIGENCE; COMPUTER AIDED MANUFACTURING; COMPUTER SIMULATION; DATA PROCESSING; FLEXIBLE MANUFACTURING SYSTEMS; NEURAL NETWORKS; OPERATIONS RESEARCH; PROCESS CONTROL; PRODUCTION CONTROL; RESOURCE ALLOCATION; SCHEDULING; STRATEGIC PLANNING;

EID: 0030711211     PISSN: 09576061     EISSN: None     Source Type: Journal    
DOI: 10.1108/09576069710158754     Document Type: Article
Times cited : (25)

References (66)
  • 1
    • 21344489768 scopus 로고
    • Despatching procedures for a flexible manufacturing cell in constant production circumstances
    • Arzi, Y. and Roll, Y. (1993), "Despatching procedures for a flexible manufacturing cell in constant production circumstances", International Journal of Operations & Production Management, Vol. 13 No. 11, pp. 35-51.
    • (1993) International Journal of Operations & Production Management , vol.13 , Issue.11 , pp. 35-51
    • Arzi, Y.1    Roll, Y.2
  • 3
    • 8644285988 scopus 로고
    • Scheduling and uncertainty reasoning" an example described
    • Dorn, J. and Froeschl, K. A. (Eds), Ellis Horwood, Chichester
    • Berry, P.M. (1993), "Scheduling and uncertainty reasoning" an example described", in Dorn, J. and Froeschl, K. A. (Eds), Scheduling of Production Processes, Ellis Horwood, Chichester, pp. 31-47.
    • (1993) Scheduling of Production Processes , pp. 31-47
    • Berry, P.M.1
  • 4
    • 3042888076 scopus 로고
    • A case-based approach to scheduling constraints
    • Dorn, Y. and Froeschl, K. A. (Eds), Ellis Horwood, Chichester
    • Bezirgan, A. (1993), "A case-based approach to scheduling constraints", in Dorn, Y. and Froeschl, K. A. (Eds), Scheduling of Production Processes, Ellis Horwood, Chichester, pp. 48-60.
    • (1993) Scheduling of Production Processes , pp. 48-60
    • Bezirgan, A.1
  • 5
    • 8644238656 scopus 로고
    • Current and future scheduling systems
    • Strathclyde Institute, Glasgow
    • Buchanan, Y.T. (1990), "Current and future scheduling systems", Conference Proceedings of CAI)/CAM '90, Strathclyde Institute, Glasgow, pp. 286-94
    • (1990) Conference Proceedings of CAI/CAM '90 , pp. 286-294
    • Buchanan, Y.T.1
  • 6
    • 3342887393 scopus 로고
    • The temporal model of CRONOS-II: A knowledge-based system for production scheduling
    • Dorn, J. and Froeschl, K.A. (Eds), Ellis Horwood, Chichester
    • Canzi, U. and Guida, G. (1993), "The temporal model of CRONOS-II: a knowledge-based system for production scheduling", in Dorn, J. and Froeschl, K.A. (Eds), Scheduling of Production Processes, Ellis Horwood, Chichester, pp. 113-29.
    • (1993) Scheduling of Production Processes , pp. 113-129
    • Canzi, U.1    Guida, G.2
  • 7
    • 0025759602 scopus 로고
    • A review of artificial intelligence-based job-shop scheduling systems
    • Charalambous, O. and Hindi, K.S. (1991), "A review of artificial intelligence-based job-shop scheduling systems", Information and Decision Technologies, Vol. 17 No. 1, pp. 189-201.
    • (1991) Information and Decision Technologies , vol.17 , Issue.1 , pp. 189-201
    • Charalambous, O.1    Hindi, K.S.2
  • 10
    • 0025758099 scopus 로고
    • A neural network architecture for faster dynamic scheduling in manufacturing systems
    • IEEE Computer Society Press, Washington, DC
    • Dagli, C. and Huggahalli, R. (1991), "A neural network architecture for faster dynamic scheduling in manufacturing systems", Proceedings of the IEEE International Conference on Robotics and Automation, Vol. 3, IEEE Computer Society Press, Washington, DC, pp. 2408-13.
    • (1991) Proceedings of the IEEE International Conference on Robotics and Automation , vol.3 , pp. 2408-2413
    • Dagli, C.1    Huggahalli, R.2
  • 11
    • 0342512109 scopus 로고
    • Evolving simulation requirements with the co-ordination of flexible manufacturing system
    • Operations Research Society of Japan, Tokyo
    • Davis, W.Y. (1994), "Evolving simulation requirements with the co-ordination of flexible manufacturing system", Proceedings of Conference on New Directions in Simulation for Manufacturing and Communications, Operations Research Society of Japan, Tokyo, pp. 482-8.
    • (1994) Proceedings of Conference on New Directions in Simulation for Manufacturing and Communications , pp. 482-488
    • Davis, W.Y.1
  • 17
    • 0027805941 scopus 로고
    • Design of simulation experiments with manufacturing applications
    • Institute of Electrical & Electronics Engineers, New York, NY
    • Farrington, P.A. and Swain, Y.Y. (1993), "Design of simulation experiments with manufacturing applications", Proceedings of the Winter Simulation Conference, Institute of Electrical & Electronics Engineers, New York, NY, pp. 69-75.
    • (1993) Proceedings of the Winter Simulation Conference , pp. 69-75
    • Farrington, P.A.1    Swain, Y.Y.2
  • 18
    • 84911263382 scopus 로고
    • Stochastic neural networks for solving job shop scheduling" part 1. Problem formulation and Part 2. Architecture and simulations
    • San Diego, June, Institute of Electrical & Electronics Engineers, New York, NY
    • Foo, Y.P. and Takefuji, Y. (1988), "Stochastic neural networks for solving job shop scheduling" part 1. Problem formulation and Part 2. Architecture and simulations", Proceedings of the IEEE 2nd International Conference on Neural Networks, San Diego, June, Institute of Electrical & Electronics Engineers, New York, NY, pp. 275-83.
    • (1988) Proceedings of the IEEE 2nd International Conference on Neural Networks , pp. 275-283
    • Foo, Y.P.1    Takefuji, Y.2
  • 19
    • 84982522109 scopus 로고
    • ISIS - A knowledge-based system for factory scheduling
    • July
    • Fox, M.S. and Smith, S.E (1984), "ISIS - a knowledge-based system for factory scheduling", Expert Systems, Vol. 1 No. 1, July, pp. 25-49.
    • (1984) Expert Systems , vol.1 , Issue.1 , pp. 25-49
    • Fox, M.S.1    Smith, S.E.2
  • 20
    • 8644288712 scopus 로고
    • Two paradigms of combinatorial production scheduling" operations research and artificial intelligence
    • Dorn, J. and Froeschl, K.A. (Eds), Ellis Horwood, Chichester
    • Froeschl, K.A. (1993), "Two paradigms of combinatorial production scheduling" operations research and artificial intelligence", in Dorn, J. and Froeschl, K.A. (Eds), Scheduling of Production Processes, Ellis Horwood, Chichester, pp. 1-21.
    • (1993) Scheduling of Production Processes , pp. 1-21
    • Froeschl, K.A.1
  • 21
    • 0022520292 scopus 로고
    • Lessons for or from AI a scheduling case study
    • Grant, T.Y. (1986), "Lessons for OR from AI" a scheduling case study", Journal of Operations Research Society, Vol. 37 No. 1, pp. 41-57.
    • (1986) Journal of Operations Research Society , vol.37 , Issue.1 , pp. 41-57
    • Grant, T.Y.1
  • 22
    • 8644288713 scopus 로고
    • Making production scheduling more efficient helps control manufacturing costs and improve productivity
    • Institute of Industrial Engineers, Singapore
    • Grant, H. and Clapp, C. (1988), "Making production scheduling more efficient helps control manufacturing costs and improve productivity", International Conference on Industrial Engineering, Institute of Industrial Engineers, Singapore.
    • (1988) International Conference on Industrial Engineering
    • Grant, H.1    Clapp, C.2
  • 23
    • 0023566098 scopus 로고
    • Kolmogorov's mapping neural network existence theorem
    • Institute of Electrical & Electronics Engineers, New York, NY
    • Hecht-Nielsen, R. (1987), "Kolmogorov's mapping neural network existence theorem", Proceedings of 1st IEEE International Joint Conference of Neural Networks, Institute of Electrical & Electronics Engineers, New York, NY, PP. III-11-III-14.
    • (1987) Proceedings of 1st IEEE International Joint Conference of Neural Networks
    • Hecht-Nielsen, R.1
  • 24
    • 0025802324 scopus 로고
    • AI-based schedulers in manufacturing practice report of a panel discussion
    • January
    • Kempf, K., Russel, B., Sidhu, S. and Barrett, S. (1991), "AI-based schedulers in manufacturing practice" report of a panel discussion", AI Magazine, Vol. 11 No. 5, January, pp. 46-55.
    • (1991) AI Magazine , vol.11 , Issue.5 , pp. 46-55
    • Kempf, K.1    Russel, B.2    Sidhu, S.3    Barrett, S.4
  • 26
    • 0027841040 scopus 로고
    • The philosophy of science and validation in simulation
    • Institute of Electrical & Electronics Engineers, New York, NY
    • Kleindorfer, G.B. and Ganeshan, R. (1993), "The philosophy of science and validation in simulation", Proceedings of the Winter Simulation Conference, Institute of Electrical & Electronics Engineers, New York, NY, pp. 50-7.
    • (1993) Proceedings of the Winter Simulation Conference , pp. 50-57
    • Kleindorfer, G.B.1    Ganeshan, R.2
  • 28
    • 0026381032 scopus 로고
    • Tutorial" scheduling manufacturing systems with FACTOR
    • Institute of Electrical & Electronics Engineers, New York, NY
    • Krahl, D. (1991), "Tutorial" scheduling manufacturing systems with FACTOR", Proceedings of the Winter Simulation Conference, Institute of Electrical & Electronics Engineers, New York, NY, pp. 128-31.
    • (1991) Proceedings of the Winter Simulation Conference , pp. 128-131
    • Krahl, D.1
  • 31
    • 8644240688 scopus 로고
    • Three-step method evaluates neural networks for your application
    • December
    • Lawrence, Y. and Andriola, P. (1992), "Three-step method evaluates neural networks for your application", EDNAsia, December, pp. 47-60.
    • (1992) EDNAsia , pp. 47-60
    • Lawrence, Y.1    Andriola, P.2
  • 33
    • 0027883559 scopus 로고
    • Manufacturing decision making with FACTOR
    • Institute of Electrical & Electronics Engineers, New York, NY
    • Lilegdon, W.R. (1993), "Manufacturing decision making with FACTOR", Proceedings of the Winter Simulation Conference, Institute of Electrical & Electronics Engineers, New York, NY, pp. 159-64.
    • (1993) Proceedings of the Winter Simulation Conference , pp. 159-164
    • Lilegdon, W.R.1
  • 35
    • 0025850145 scopus 로고
    • Scheduling with neural networks for flexible manufacturing systems
    • Computer Society Press, Washington, DC
    • Lo, Z.P. and Bavarian, B. (1991), "Scheduling with neural networks for flexible manufacturing systems", Proceedings of the International Conference on Robotics and Automation, Vol. 1, Computer Society Press, Washington, DC, pp. 818-23.
    • (1991) Proceedings of the International Conference on Robotics and Automation , vol.1 , pp. 818-823
    • Lo, Z.P.1    Bavarian, B.2
  • 36
    • 0027553236 scopus 로고
    • Multiple job scheduling with artificial neural networks
    • Lo, Z.P. and Bavarian, B. (1993), "Multiple job scheduling with artificial neural networks", Computers and Electrical Engineering, Vol. 19 No. 2, pp. 87-101.
    • (1993) Computers and Electrical Engineering , vol.19 , Issue.2 , pp. 87-101
    • Lo, Z.P.1    Bavarian, B.2
  • 38
    • 0345506418 scopus 로고
    • Multilayer feedforward neural networks I: Delta rule learning
    • Maren, A.J., Harsten, C.T. and Pap, R.M. (Eds), Academic Press, New York, NY
    • Maren, A. J. (1990), "Multilayer feedforward neural networks I: delta rule learning", in Maren, A.J., Harsten, C.T. and Pap, R.M. (Eds), Handbook of Neural Computing Applications, Academic Press, New York, NY, pp. 85-105.
    • (1990) Handbook of Neural Computing Applications , pp. 85-105
    • Maren, A.J.1
  • 39
    • 0041830869 scopus 로고
    • Configuring and optimizing the back-propagation network
    • Maren, A. J., Harsten, C.T. and Pap, R.M. (Eds), Academic Press, New York, NY
    • Maren, A.J., Jones, D. and Franklin, S. (1990), "Configuring and optimizing the back-propagation network", in Maren, A. J., Harsten, C.T. and Pap, R.M. (Eds), Handbook of Neural Computing Applications, Academic Press, New York, NY, pp. 233-49.
    • (1990) Handbook of Neural Computing Applications , pp. 233-249
    • Maren, A.J.1    Jones, D.2    Franklin, S.3
  • 42
    • 0027872210 scopus 로고
    • Guidelines for simulation project success
    • Institute of Electrical & Electronics Engineers, New York, NY
    • Musselman, K.J. (1993), "Guidelines for simulation project success", Proceedings of the Winter Simulation Conference, Institute of Electrical & Electronics Engineers, New York, NY, pp. 58-64.
    • (1993) Proceedings of the Winter Simulation Conference , pp. 58-64
    • Musselman, K.J.1
  • 43
    • 0001851622 scopus 로고
    • Verification of computer simulation models
    • Naylor, T.H. and Finger, J.M. (1967), "Verification of computer simulation models", Management Science, Vol. 14, pp. 92-101.
    • (1967) Management Science , vol.14 , pp. 92-101
    • Naylor, T.H.1    Finger, J.M.2
  • 46
    • 0003054955 scopus 로고    scopus 로고
    • A survey of scheduling rules
    • Panwalker, S.S. and lskandar, W. (1997), "A survey of scheduling rules", Operations Research, Vol. 25 No. 1, pp. 45-61
    • (1997) Operations Research , vol.25 , Issue.1 , pp. 45-61
    • Panwalker, S.S.1    Lskandar, W.2
  • 47
    • 0026380611 scopus 로고
    • Total capacity management using simulation
    • Institute of Electrical & Electronics Engineers, New York, NY
    • Pritsker, A.B. and Yancey, D.P. (1991), "Total capacity management using simulation", Proceedings of the Winter Simulation Conference, Institute of Electrical & Electronics Engineers, New York, NY, pp. 348-55.
    • (1991) Proceedings of the Winter Simulation Conference , pp. 348-355
    • Pritsker, A.B.1    Yancey, D.P.2
  • 48
    • 0024943441 scopus 로고
    • Integrating scheduling and control functions in computer integrated manufacturing using artificial intelligence
    • IEEE Computer Society Press, Washington, DC
    • Rabelo, L.C. and Alptekin, S. (1989), "Integrating scheduling and control functions in computer integrated manufacturing using artificial intelligence", Computers and Industrial Engineering, Vol. 17, IEEE Computer Society Press, Washington, DC, pp. 101-06.
    • (1989) Computers and Industrial Engineering , vol.17 , pp. 101-106
    • Rabelo, L.C.1    Alptekin, S.2
  • 49
    • 0242563265 scopus 로고
    • A hybrid neural and symbolic processing approach to flexible manufacturing systems scheduling
    • Kandel, A. and Langholz, G. (Eds), CRC Press, Boca Raton, FL
    • Rabelo, L.C. and Alptekin, S. (1992), "A hybrid neural and symbolic processing approach to flexible manufacturing systems scheduling" in Kandel, A. and Langholz, G. (Eds), Hybrid Architecture for Intelligent System, CRC Press, Boca Raton, FL, pp. 381-405.
    • (1992) Hybrid Architecture for Intelligent System , pp. 381-405
    • Rabelo, L.C.1    Alptekin, S.2
  • 52
    • 0027850346 scopus 로고
    • Simulation-based finite capacity scheduling: A case study
    • Institute of Electrical & Electronics Engineers, New York, NY
    • Rosenwinkel, M.T. and Rogers, P. (1993), "Simulation-based finite capacity scheduling: a case study", Proceedings of the Winter Simulation Conference, Institute of Electrical & Electronics Engineers, New York, NY, pp. 939-46.
    • (1993) Proceedings of the Winter Simulation Conference , pp. 939-946
    • Rosenwinkel, M.T.1    Rogers, P.2
  • 53
    • 0027311805 scopus 로고
    • Intelligent scheduling optimization using a rule-based artificial neural network
    • Institute of Electrical & Electronics Engineers, New York, NY
    • Ruegsegger, S.M. (1993), "Intelligent scheduling optimization using a rule-based artificial neural network", Proceedings of IEEE National Aerospace and Electronics Conference, Vol. 2, Institute of Electrical & Electronics Engineers, New York, NY, pp. 800-6.
    • (1993) Proceedings of IEEE National Aerospace and Electronics Conference , vol.2 , pp. 800-806
    • Ruegsegger, S.M.1
  • 54
    • 84955133316 scopus 로고
    • Validation and verification of simulation models
    • Institute of Electrical & Electronics Engineers, New York, NY
    • Sargent, R.G. (1992), "Validation and verification of simulation models", Proceedings of the Winter Simulation Conference, Institute of Electrical & Electronics Engineers, New York, NY, pp. 104-14.
    • (1992) Proceedings of the Winter Simulation Conference , pp. 104-114
    • Sargent, R.G.1
  • 56
    • 84952488322 scopus 로고
    • An expert neural network system for dynamic job shop scheduling
    • August
    • Sim, S.K., Yeo, K.T. and Lee, WH. (1994), "An expert neural network system for dynamic job shop scheduling", International Journal of Production Research, Vol. 32 No. 8, August, pp. 1759-73.
    • (1994) International Journal of Production Research , vol.32 , Issue.8 , pp. 1759-1773
    • Sim, S.K.1    Yeo, K.T.2    Lee, W.H.3
  • 59
    • 8644292282 scopus 로고
    • Simulation-based production schedule generation
    • Wichmann, K.E. (1990), "Simulation-based production schedule generation", Production Planning and Control, Vol. 1 No. 3, pp. 179-89.
    • (1990) Production Planning and Control , vol.1 , Issue.3 , pp. 179-189
    • Wichmann, K.E.1
  • 60
    • 0026399980 scopus 로고
    • Common features of simulation based scheduling
    • Institute of Electrical & Electronics Engineers, New York, NY
    • Wyman, F.P. (1991), "Common features of simulation based scheduling", Proceedings of the Winter Simulation Conference, Institute of Electrical & Electronics Engineers, New York, NY, pp. 341-7.
    • (1991) Proceedings of the Winter Simulation Conference , pp. 341-347
    • Wyman, F.P.1
  • 61
    • 0027562597 scopus 로고
    • Robot scheduling in a circuit board production line: A hybrid OR/ANN approach
    • Operations Research Society of Japan, Tokyo
    • Yih, Y., Liang, T.P. and Moskowitz, H. (1993), "Robot scheduling in a circuit board production line: a hybrid OR/ANN approach", IIE Transactions, Operations Research Society of Japan, Tokyo, Vol. 25 No. 2, pp. 26-33.
    • (1993) IIE Transactions , vol.25 , Issue.2 , pp. 26-33
    • Yih, Y.1    Liang, T.P.2    Moskowitz, H.3
  • 63
    • 85013571573 scopus 로고
    • Building correct simulation models is difficult
    • Institute of Electrical & Electronics Engineers, New York, NY
    • Yucesan, E. and Jacobson, S.H. (1992), "Building correct simulation models is difficult", Proceedings of the Winter Simulation Conference, Institute of Electrical & Electronics Engineers, New York, NY, pp. 783-9.
    • (1992) Proceedings of the Winter Simulation Conference , pp. 783-789
    • Yucesan, E.1    Jacobson, S.H.2
  • 64
    • 0026274725 scopus 로고
    • Solving job-shop scheduling problem with priority using neural network
    • Institute of Electrical & Electronics Engineers, New York, NY
    • Zhang, C.S., Yan, P.F. and Chang, T. (1991), "Solving job-shop scheduling problem with priority using neural network", Proceedings of the IEEE International Joint Conference on Neural Networks, Institute of Electrical & Electronics Engineers, New York, NY, Vol. 2, pp. 1361-6.
    • (1991) Proceedings of the IEEE International Joint Conference on Neural Networks , vol.2 , pp. 1361-1366
    • Zhang, C.S.1    Yan, P.F.2    Chang, T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.