메뉴 건너뛰기




Volumn 41, Issue 9, 2003, Pages 1927-1951

Adaptive scheduling in random flexible manufacturing systems subject to machine breakdowns

Author keywords

[No Author keywords available]

Indexed keywords

ADAPTIVE CONTROL SYSTEMS; DECISION MAKING; HEURISTIC METHODS; MARKOV PROCESSES; REPAIR; SCHEDULING;

EID: 0242333158     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/0020754031000119016     Document Type: Article
Times cited : (18)

References (31)
  • 1
    • 84989493292 scopus 로고
    • An experiment study of the effectiveness of rolling schedules in production planning
    • BAKER, K. R., 1977, An experiment study of the effectiveness of rolling schedules in production planning. Decision Science, 8, 19-31
    • (1977) Decision Science , vol.8 , pp. 19-31
    • Baker, K.R.1
  • 6
    • 0242360257 scopus 로고
    • Effects of tool loading and replenishing practices on design and operation of flexible manufacturing centers
    • CHEN, F. F., Xu, D. D. and KER, J. I., 1993, Effects of tool loading and replenishing practices on design and operation of flexible manufacturing centers. Transactions of NAMRI/SME, 21, 391-398.
    • (1993) Transactions of NAMRI/SME , vol.21 , pp. 391-398
    • Chen, F.F.1    Xu, D.D.2    Ker, J.I.3
  • 7
    • 85009916807 scopus 로고    scopus 로고
    • Integrating part and tool scheduling in an FMS with multiple setup machine: An optimization based rolling time horizon approach
    • Institute of Industrial Engineers, Atlanta, GA
    • CHEN, J. and CHEN, F. F., 2001, Integrating part and tool scheduling in an FMS with multiple setup machine: an optimization based rolling time horizon approach. Proceedings of the 2001 Industrial Engineering Research Conference, Institute of Industrial Engineers, Atlanta, GA.
    • (2001) Proceedings of the 2001 Industrial Engineering Research Conference
    • Chen, J.1    Chen, F.F.2
  • 10
    • 0026883892 scopus 로고
    • Tooling constraints and shop floor scheduling: Evaluating the impact of sequence dependency
    • GHOSH, S., MELNYK, S. A. and RAGATZ, G. L., 1992, Tooling constraints and shop floor scheduling: evaluating the impact of sequence dependency. International Journal of Production Research, 30(6), 1237-1253.
    • (1992) International Journal of Production Research , vol.30 , Issue.6 , pp. 1237-1253
    • Ghosh, S.1    Melnyk, S.A.2    Ragatz, G.L.3
  • 12
    • 0026374056 scopus 로고
    • A transient-based real-time scheduling algorithm in FMS
    • ISHII, N. and TALAVAGE, J. 1991, A transient-based real-time scheduling algorithm in FMS. International Journal of Production Research, 29(12), 2501-2520.
    • (1991) International Journal of Production Research , vol.29 , Issue.12 , pp. 2501-2520
    • Ishii, N.1    Talavage, J.2
  • 13
    • 0002514818 scopus 로고
    • A posed hierarchical control model for automated manufacturing systems
    • JONES, A. and MCLEAN, C., 1986, A posed hierarchical control model for automated manufacturing systems. Journal of Manufacturing Systems, 5(1), 15-25.
    • (1986) Journal of Manufacturing Systems , vol.5 , Issue.1 , pp. 15-25
    • Jones, A.1    McLean, C.2
  • 14
    • 0029760756 scopus 로고    scopus 로고
    • Analysis of tool sharing in an FMS: A simulation study
    • KASHYAP, A. S. and KHATOR, S. K., 1996, Analysis of tool sharing in an FMS: a simulation study. Computers and Industrial Engineering, 30(1), 137-145.
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.1 , pp. 137-145
    • Kashyap, A.S.1    Khator, S.K.2
  • 16
    • 0032784020 scopus 로고    scopus 로고
    • An analysis of heuristics in a dynamic job shop with weighted tardiness objectives
    • KUTANOGLU, E. and SABUNCUOGLU, I., 1999, An analysis of heuristics in a dynamic job shop with weighted tardiness objectives. International Journal of Production Research, 37(1), 165-187.
    • (1999) International Journal of Production Research , vol.37 , Issue.1 , pp. 165-187
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 17
    • 0032097829 scopus 로고    scopus 로고
    • Predictable scheduling of a job shop subject to breakdowns
    • MEHTA, S. V. and UZSOY, R. M., 1998, Predictable scheduling of a job shop subject to breakdowns. IEEE Transactions on Robotics and Automation, 14(3), 365-378.
    • (1998) IEEE Transactions on Robotics and Automation , vol.14 , Issue.3 , pp. 365-378
    • Mehta, S.V.1    Uzsoy, R.M.2
  • 19
    • 0026907894 scopus 로고
    • Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system
    • O'KEEFE, R. M. and KASIRAJAN, T., 1992, Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system. International Journal of Production Research, 30(8), 1753-1772.
    • (1992) International Journal of Production Research , vol.30 , Issue.8 , pp. 1753-1772
    • O'Keefe, R.M.1    Kasirajan, T.2
  • 21
    • 0028452709 scopus 로고
    • Rolling horizon algorithms for single machine dynamic scheduling problem with sequence dependent setup times
    • OVICK, I. M. and UZSOY, R., 1994, Rolling horizon algorithms for single machine dynamic scheduling problem with sequence dependent setup times. International Journal of Production Research, 32, 1243-1263.
    • (1994) International Journal of Production Research , vol.32 , pp. 1243-1263
    • Ovick, I.M.1    Uzsoy, R.2
  • 22
    • 0029404198 scopus 로고
    • Rolling horizon procedures for dynamic parallel machine scheduling problem with sequence dependent setup times
    • OVICK, I. M. and UZSOY, R., 1995, Rolling horizon procedures for dynamic parallel machine scheduling problem with sequence dependent setup times. International Journal of Production Research, 33(11), 3173-3192.
    • (1995) International Journal of Production Research , vol.33 , Issue.11 , pp. 3173-3192
    • Ovick, I.M.1    Uzsoy, R.2
  • 23
    • 0031198746 scopus 로고    scopus 로고
    • Adaptive scheduling in dynamic flexible manufacturing systems: A dynamic rule selection approach
    • PARK, S. C., RAMAN, N. and SHAW, M., 1997, Adaptive scheduling in dynamic flexible manufacturing systems: a dynamic rule selection approach. IEEE Transactions on Robotics and Automation, 13(4), 486-502.
    • (1997) IEEE Transactions on Robotics and Automation , vol.13 , Issue.4 , pp. 486-502
    • Park, S.C.1    Raman, N.2    Shaw, M.3
  • 25
    • 0027594172 scopus 로고
    • Design and evaluation of automated guided vehicle systems for flexible manufacturing systems: An extended Petri net-based approach
    • RAJU, K. R. and CHETTY, O. V. K., 1993, Design and evaluation of automated guided vehicle systems for flexible manufacturing systems: an extended Petri net-based approach. International Journal of Production Research, 31(5), 1069-1096.
    • (1993) International Journal of Production Research , vol.31 , Issue.5 , pp. 1069-1096
    • Raju, K.R.1    Chetty, O.V.K.2
  • 26
    • 0022060472 scopus 로고
    • A loading and dispatching problem in a random flexible manufacturing system
    • SHANKER, K. and TZEN, Y.-J., 1985, A loading and dispatching problem in a random flexible manufacturing system. International Journal of Production Research, 23(3), 579-595.
    • (1985) International Journal of Production Research , vol.23 , Issue.3 , pp. 579-595
    • Shanker, K.1    Tzen, Y.-J.2
  • 27
    • 0033226070 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach
    • SHEFAEI, R. and BRUNN, P., 1999, Workshop scheduling using practical (inaccurate) data Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach. International Journal of Production Research, 37(17), 3913-3925.
    • (1999) International Journal of Production Research , vol.37 , Issue.17 , pp. 3913-3925
    • Shefaei, R.1    Brunn, P.2
  • 28
    • 0028406904 scopus 로고
    • A dynamic job shop scheduling framework: A backward approach
    • SUN, D. and LIN, L., 1994, A dynamic job shop scheduling framework: a backward approach. International Journal of Production Research, 32, 967-985.
    • (1994) International Journal of Production Research , vol.32 , pp. 967-985
    • Sun, D.1    Lin, L.2
  • 29
    • 0033204393 scopus 로고    scopus 로고
    • Multiple-objective scheduling for the hierarchical control of flexible manufacturing systems
    • TUNG, L. F., LIN, L. and NAGI, R., 1999, Multiple-objective scheduling for the hierarchical control of flexible manufacturing systems. International Journal of Flexible Manufacturing Systems, 11(4), 379-409.
    • (1999) International Journal of Flexible Manufacturing Systems , vol.11 , Issue.4 , pp. 379-409
    • Tung, L.F.1    Lin, L.2    Nagi, R.3
  • 30
    • 0026884810 scopus 로고
    • A broader view of the job-shop scheduling problem
    • WEIN, L. M. and CHEVALIER, P. B., 1992, A broader view of the job-shop scheduling problem. Management Science, 38(7), 1018-1033.
    • (1992) Management Science , vol.38 , Issue.7 , pp. 1018-1033
    • Wein, L.M.1    Chevalier, P.B.2
  • 31
    • 0031641158 scopus 로고    scopus 로고
    • Evaluation of scheduling strategies for a dynamic job shop in a tool-shared, flexible manufacturing environment
    • XU, Z. and RANDHAWA, S., 1998, Evaluation of scheduling strategies for a dynamic job shop in a tool-shared, flexible manufacturing environment. Production Planning and Control, 9(1), 74-86.
    • (1998) Production Planning and Control , vol.9 , Issue.1 , pp. 74-86
    • Xu, Z.1    Randhawa, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.