-
1
-
-
84989493292
-
An experiment study of the effectiveness of rolling schedules in production planning
-
BAKER, K. R., 1977, An experiment study of the effectiveness of rolling schedules in production planning. Decision Science, 8, 19-31
-
(1977)
Decision Science
, vol.8
, pp. 19-31
-
-
Baker, K.R.1
-
2
-
-
84949545401
-
-
New York: Wiley
-
BAZARAA, M. S., JARVIS, J. and SHERALI, H. D., 1990, Linear Programming and Network Flows, 2nd edn (New York: Wiley).
-
(1990)
Linear Programming and Network Flows, 2nd Edn.
-
-
Bazaraa, M.S.1
Jarvis, J.2
Sherali, H.D.3
-
3
-
-
84890245567
-
-
New York: Wiley
-
BAZARAA, M. S., SHERALI, H. D. and SHETTY, C. M., 1993, Nonlinear Programming: Theory and Algorithms, 2nd edn (New York: Wiley).
-
(1993)
Nonlinear Programming: Theory and Algorithms, 2nd Edn.
-
-
Bazaraa, M.S.1
Sherali, H.D.2
Shetty, C.M.3
-
4
-
-
0242328805
-
-
Unpublished PhD. Thesis, School of Industrial Engineering, Purdue University, W. Lafayette, IN
-
CHANDRA, J., 1990, Optimization-based opportunistic part dispatching in flexible manufacturing systems. Unpublished PhD. Thesis, School of Industrial Engineering, Purdue University, W. Lafayette, IN.
-
(1990)
Optimization-based Opportunistic Part Dispatching in Flexible Manufacturing Systems
-
-
Chandra, J.1
-
5
-
-
0026253933
-
Intelligent dispatching for flexible manufacturing
-
CHANDRA, J. and TALAVAGE, J., 1991, Intelligent dispatching for flexible manufacturing. International Journal of Production Research, 29(11), 2259-2278.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.11
, pp. 2259-2278
-
-
Chandra, J.1
Talavage, J.2
-
6
-
-
0242360257
-
Effects of tool loading and replenishing practices on design and operation of flexible manufacturing centers
-
CHEN, F. F., Xu, D. D. and KER, J. I., 1993, Effects of tool loading and replenishing practices on design and operation of flexible manufacturing centers. Transactions of NAMRI/SME, 21, 391-398.
-
(1993)
Transactions of NAMRI/SME
, vol.21
, pp. 391-398
-
-
Chen, F.F.1
Xu, D.D.2
Ker, J.I.3
-
7
-
-
85009916807
-
Integrating part and tool scheduling in an FMS with multiple setup machine: An optimization based rolling time horizon approach
-
Institute of Industrial Engineers, Atlanta, GA
-
CHEN, J. and CHEN, F. F., 2001, Integrating part and tool scheduling in an FMS with multiple setup machine: an optimization based rolling time horizon approach. Proceedings of the 2001 Industrial Engineering Research Conference, Institute of Industrial Engineers, Atlanta, GA.
-
(2001)
Proceedings of the 2001 Industrial Engineering Research Conference
-
-
Chen, J.1
Chen, F.F.2
-
8
-
-
0000522889
-
Analysis of periodic and event-driven rescheduling policies in dynamics shops
-
CHURCH, L. K. and UZSOY, R., 1992, Analysis of periodic and event-driven rescheduling policies in dynamics shops. International Journal of Computer Integrated Manufacturing, 5, 153-163.
-
(1992)
International Journal of Computer Integrated Manufacturing
, vol.5
, pp. 153-163
-
-
Church, L.K.1
Uzsoy, R.2
-
9
-
-
0004113622
-
-
Reading, MA: Addison Wesley
-
CONWAY, R. W., MAXWELL, W. L. and MILLER, L. W., 1967, Theory of Scheduling (Reading, MA: Addison Wesley).
-
(1967)
Theory of Scheduling
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
10
-
-
0026883892
-
Tooling constraints and shop floor scheduling: Evaluating the impact of sequence dependency
-
GHOSH, S., MELNYK, S. A. and RAGATZ, G. L., 1992, Tooling constraints and shop floor scheduling: evaluating the impact of sequence dependency. International Journal of Production Research, 30(6), 1237-1253.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.6
, pp. 1237-1253
-
-
Ghosh, S.1
Melnyk, S.A.2
Ragatz, G.L.3
-
11
-
-
0000329136
-
Simulation of tool and part flow in FMS
-
GRIECO, A. Q., SEMERARO, T. T. and TOMA, S., 1995, Simulation of tool and part flow in FMS. International Journal of Production Research, 33(3), 643-658.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.3
, pp. 643-658
-
-
Grieco, A.Q.1
Semeraro, T.T.2
Toma, S.3
-
12
-
-
0026374056
-
A transient-based real-time scheduling algorithm in FMS
-
ISHII, N. and TALAVAGE, J. 1991, A transient-based real-time scheduling algorithm in FMS. International Journal of Production Research, 29(12), 2501-2520.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.12
, pp. 2501-2520
-
-
Ishii, N.1
Talavage, J.2
-
13
-
-
0002514818
-
A posed hierarchical control model for automated manufacturing systems
-
JONES, A. and MCLEAN, C., 1986, A posed hierarchical control model for automated manufacturing systems. Journal of Manufacturing Systems, 5(1), 15-25.
-
(1986)
Journal of Manufacturing Systems
, vol.5
, Issue.1
, pp. 15-25
-
-
Jones, A.1
McLean, C.2
-
14
-
-
0029760756
-
Analysis of tool sharing in an FMS: A simulation study
-
KASHYAP, A. S. and KHATOR, S. K., 1996, Analysis of tool sharing in an FMS: a simulation study. Computers and Industrial Engineering, 30(1), 137-145.
-
(1996)
Computers and Industrial Engineering
, vol.30
, Issue.1
, pp. 137-145
-
-
Kashyap, A.S.1
Khator, S.K.2
-
15
-
-
0033099219
-
Real time operation in single stage multimachine systems
-
KOO, P.-H. and TANCHOCO, J. M. A., 1999, Real time operation in single stage multimachine systems. International Journal of Production Research, 37(5), 1023-1039.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.5
, pp. 1023-1039
-
-
Koo, P.-H.1
Tanchoco, J.M.A.2
-
16
-
-
0032784020
-
An analysis of heuristics in a dynamic job shop with weighted tardiness objectives
-
KUTANOGLU, E. and SABUNCUOGLU, I., 1999, An analysis of heuristics in a dynamic job shop with weighted tardiness objectives. International Journal of Production Research, 37(1), 165-187.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.1
, pp. 165-187
-
-
Kutanoglu, E.1
Sabuncuoglu, I.2
-
17
-
-
0032097829
-
Predictable scheduling of a job shop subject to breakdowns
-
MEHTA, S. V. and UZSOY, R. M., 1998, Predictable scheduling of a job shop subject to breakdowns. IEEE Transactions on Robotics and Automation, 14(3), 365-378.
-
(1998)
IEEE Transactions on Robotics and Automation
, vol.14
, Issue.3
, pp. 365-378
-
-
Mehta, S.V.1
Uzsoy, R.M.2
-
18
-
-
84952253486
-
Job shop scheduling heuristics and frequency of scheduling
-
MUHLEMANN, A. P., LOCKETT, A. G. and FARN, C. K., 1982, Job shop scheduling heuristics and frequency of scheduling. International Journal of Production Research, 20, 227-241.
-
(1982)
International Journal of Production Research
, vol.20
, pp. 227-241
-
-
Muhlemann, A.P.1
Lockett, A.G.2
Farn, C.K.3
-
19
-
-
0026907894
-
Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system
-
O'KEEFE, R. M. and KASIRAJAN, T., 1992, Interaction between dispatching and next station selection rules in a dedicated flexible manufacturing system. International Journal of Production Research, 30(8), 1753-1772.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.8
, pp. 1753-1772
-
-
O'Keefe, R.M.1
Kasirajan, T.2
-
21
-
-
0028452709
-
Rolling horizon algorithms for single machine dynamic scheduling problem with sequence dependent setup times
-
OVICK, I. M. and UZSOY, R., 1994, Rolling horizon algorithms for single machine dynamic scheduling problem with sequence dependent setup times. International Journal of Production Research, 32, 1243-1263.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1243-1263
-
-
Ovick, I.M.1
Uzsoy, R.2
-
22
-
-
0029404198
-
Rolling horizon procedures for dynamic parallel machine scheduling problem with sequence dependent setup times
-
OVICK, I. M. and UZSOY, R., 1995, Rolling horizon procedures for dynamic parallel machine scheduling problem with sequence dependent setup times. International Journal of Production Research, 33(11), 3173-3192.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.11
, pp. 3173-3192
-
-
Ovick, I.M.1
Uzsoy, R.2
-
23
-
-
0031198746
-
Adaptive scheduling in dynamic flexible manufacturing systems: A dynamic rule selection approach
-
PARK, S. C., RAMAN, N. and SHAW, M., 1997, Adaptive scheduling in dynamic flexible manufacturing systems: a dynamic rule selection approach. IEEE Transactions on Robotics and Automation, 13(4), 486-502.
-
(1997)
IEEE Transactions on Robotics and Automation
, vol.13
, Issue.4
, pp. 486-502
-
-
Park, S.C.1
Raman, N.2
Shaw, M.3
-
24
-
-
0034172309
-
Information-based dynamic manufacturing system scheduling
-
PIRAMUTHU, S., SHAW, M. and FULKERSON, B., 2000, Information-based dynamic manufacturing system scheduling. International Journal of Flexible Manufacturing Systems, 12, 219-234.
-
(2000)
International Journal of Flexible Manufacturing Systems
, vol.12
, pp. 219-234
-
-
Piramuthu, S.1
Shaw, M.2
Fulkerson, B.3
-
25
-
-
0027594172
-
Design and evaluation of automated guided vehicle systems for flexible manufacturing systems: An extended Petri net-based approach
-
RAJU, K. R. and CHETTY, O. V. K., 1993, Design and evaluation of automated guided vehicle systems for flexible manufacturing systems: an extended Petri net-based approach. International Journal of Production Research, 31(5), 1069-1096.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.5
, pp. 1069-1096
-
-
Raju, K.R.1
Chetty, O.V.K.2
-
26
-
-
0022060472
-
A loading and dispatching problem in a random flexible manufacturing system
-
SHANKER, K. and TZEN, Y.-J., 1985, A loading and dispatching problem in a random flexible manufacturing system. International Journal of Production Research, 23(3), 579-595.
-
(1985)
International Journal of Production Research
, vol.23
, Issue.3
, pp. 579-595
-
-
Shanker, K.1
Tzen, Y.-J.2
-
27
-
-
0033226070
-
Workshop scheduling using practical (inaccurate) data Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach
-
SHEFAEI, R. and BRUNN, P., 1999, Workshop scheduling using practical (inaccurate) data Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach. International Journal of Production Research, 37(17), 3913-3925.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.17
, pp. 3913-3925
-
-
Shefaei, R.1
Brunn, P.2
-
28
-
-
0028406904
-
A dynamic job shop scheduling framework: A backward approach
-
SUN, D. and LIN, L., 1994, A dynamic job shop scheduling framework: a backward approach. International Journal of Production Research, 32, 967-985.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 967-985
-
-
Sun, D.1
Lin, L.2
-
29
-
-
0033204393
-
Multiple-objective scheduling for the hierarchical control of flexible manufacturing systems
-
TUNG, L. F., LIN, L. and NAGI, R., 1999, Multiple-objective scheduling for the hierarchical control of flexible manufacturing systems. International Journal of Flexible Manufacturing Systems, 11(4), 379-409.
-
(1999)
International Journal of Flexible Manufacturing Systems
, vol.11
, Issue.4
, pp. 379-409
-
-
Tung, L.F.1
Lin, L.2
Nagi, R.3
-
30
-
-
0026884810
-
A broader view of the job-shop scheduling problem
-
WEIN, L. M. and CHEVALIER, P. B., 1992, A broader view of the job-shop scheduling problem. Management Science, 38(7), 1018-1033.
-
(1992)
Management Science
, vol.38
, Issue.7
, pp. 1018-1033
-
-
Wein, L.M.1
Chevalier, P.B.2
-
31
-
-
0031641158
-
Evaluation of scheduling strategies for a dynamic job shop in a tool-shared, flexible manufacturing environment
-
XU, Z. and RANDHAWA, S., 1998, Evaluation of scheduling strategies for a dynamic job shop in a tool-shared, flexible manufacturing environment. Production Planning and Control, 9(1), 74-86.
-
(1998)
Production Planning and Control
, vol.9
, Issue.1
, pp. 74-86
-
-
Xu, Z.1
Randhawa, S.2
|