-
2
-
-
0037211465
-
Managing multi-project environments through constant work-in-process
-
Anavi-Isakow, S. and Golany, B. (2003), "Managing multi-project environments through constant work-in-process", International Journal of Project Management, Vol. 21, pp. 9-18.
-
(2003)
International Journal of Project Management
, vol.21
, pp. 9-18
-
-
Anavi-Isakow, S.1
Golany, B.2
-
3
-
-
0004296770
-
-
1st ed. Wiley Hoboken, NJ ISBN 0-471-11593-2
-
Askin, R.G. and Goldberg, J.B. (2002), Design and Analysis of Lean Production Systems, 1st ed., Wiley, Hoboken, NJ, ISBN 0-471-11593-2.
-
(2002)
Design and Analysis of Lean Production Systems
-
-
Askin, R.G.1
Goldberg, J.B.2
-
4
-
-
12244251452
-
A mixed integer-programming model for a two line CONWIP-based production and assembly system
-
Cao, D. and Chen, M. (2005), "A mixed integer-programming model for a two line CONWIP-based production and assembly system", International Journal of Production Economics, Vol. 95 No. 3, pp. 317-26.
-
(2005)
International Journal of Production Economics
, vol.95
, Issue.3
, pp. 317-26
-
-
Cao, D.1
Chen, M.2
-
5
-
-
0010766984
-
Order release mechanisms in supply chain management: A simulation approach
-
Chan, F.T.S., Humphreys, P. and Lu, T.H. (2001), "Order release mechanisms in supply chain management: a simulation approach", International Journal of Physical Distribution & Logistics Management, Vol. 31 No. 2, pp. 124-39.
-
(2001)
International Journal of Physical Distribution & Logistics Management
, vol.31
, Issue.2
, pp. 124-39
-
-
Chan, F.T.S.1
Humphreys, P.2
Lu, T.H.3
-
6
-
-
33846829848
-
An intelligent multi-constraint finite capacity-based lot release system for semiconductor backend assembly environment
-
Chua, T., Liu, M., Wang, F., Yan, W. and Cai, T. (2007), "An intelligent multi-constraint finite capacity-based lot release system for semiconductor backend assembly environment", Robotics & Computer-Integrated Manufacturing, Vol. 23 No. 3, pp. 326-38.
-
(2007)
Robotics & Computer-Integrated Manufacturing
, vol.23
, Issue.3
, pp. 326-38
-
-
Chua, T.1
Liu, M.2
Wang, F.3
Yan, W.4
Cai, T.5
-
7
-
-
0006454724
-
CONWIP assembly with deterministic processing and random outages
-
Duenyas, I. and Hopp, W.J. (1992), "CONWIP assembly with deterministic processing and random outages", IIE Transactions, ABI/INFORM Global, Vol. 24 No. 4, p. 97.
-
(1992)
IIE Transactions, ABI/INFORM Global
, vol.24
, Issue.4
, pp. 97
-
-
Duenyas, I.1
Hopp, W.J.2
-
8
-
-
33746097662
-
Estimating the throughput of an exponential CONWIP assembly system
-
Duenyas, I. and Hopp, W.J. (1993), "Estimating the throughput of an exponential CONWIP assembly system", Queuing Systems, Vol. 14, pp. 135-57.
-
(1993)
Queuing Systems
, vol.14
, pp. 135-57
-
-
Duenyas, I.1
Hopp, W.J.2
-
9
-
-
0034672912
-
Input control and dispatching rules in a dynamic CONWIP flow-shop
-
Framinan, J.M., Ruiz-Usano, R. and Leisten, R. (2000), "Input control and dispatching rules in a dynamic CONWIP flow-shop", International Journal of Production Research, Vol. 38 No. 18, pp. 4589-98.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.18
, pp. 4589-98
-
-
Framinan, J.M.1
Ruiz-Usano, R.2
Leisten, R.3
-
10
-
-
0035155610
-
The production performance benefits from JIT implementation
-
Fullerton, R.R. and McWatters, C.S. (2001), "The production performance benefits from JIT implementation", Journal of Operations Management, Vol. 19, pp. 81-96.
-
(2001)
Journal of Operations Management
, vol.19
, pp. 81-96
-
-
Fullerton, R.R.1
McWatters, C.S.2
-
11
-
-
33845311564
-
Hierarchical cross-training in work-in-process-constrained systems
-
Gel, E.S., Hopp, W.J. and van Oyen, M.P. (2007), "Hierarchical cross-training in work-in-process-constrained systems", IIE Transactions, Vol. 39 No. 2, pp. 125-43.
-
(2007)
IIE Transactions
, vol.39
, Issue.2
, pp. 125-43
-
-
Gel, E.S.1
Hopp, W.J.2
Van Oyen, M.P.3
-
12
-
-
3242726703
-
A comparison of hybrid push/pull and CONWIP/pull production inventory control policies
-
Geraghty, J. and Heavey, C. (2004), "A comparison of hybrid push/pull and CONWIP/pull production inventory control policies", International Journal of Production Economics, Vol. 91, pp. 75-90.
-
(2004)
International Journal of Production Economics
, vol.91
, pp. 75-90
-
-
Geraghty, J.1
Heavey, C.2
-
13
-
-
0031124565
-
Mathematical programming formulation of CONWIP-based production lines
-
Herer, Y.T. and Masin, M. (1997), "Mathematical programming formulation of CONWIP-based production lines", International Journal of Production Research, Vol. 35, pp. 1067-76.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 1067-76
-
-
Herer, Y.T.1
Masin, M.2
-
14
-
-
0032046661
-
Setting WIP levels with statistical throughput control (STC) in CONWIP production lines
-
Hopp, W.J. and Roof, M.L. (1998), "Setting WIP levels with statistical throughput control (STC) in CONWIP production lines", International Journal of Production Research, Vol. 36, pp. 867-82.
-
(1998)
International Journal of Production Research
, vol.36
, pp. 867-82
-
-
Hopp, W.J.1
Roof, M.L.2
-
15
-
-
33847040477
-
Make-to-order scheduling in foundry semiconductor fabrication
-
Kang, K.H. and Lee, Y.H. (2007), "Make-to-order scheduling in foundry semiconductor fabrication", International Journal of Production Research, Vol. 45 No. 3, pp. 615-30.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.3
, pp. 615-30
-
-
Kang, K.H.1
Lee, Y.H.2
-
16
-
-
33746238958
-
Production control in a two-stage system
-
Li, H. and Liu, L. (2006), "Production control in a two-stage system", European Journal of Operational Research, Vol. 174 No. 2, pp. 887-904.
-
(2006)
European Journal of Operational Research
, vol.174
, Issue.2
, pp. 887-904
-
-
Li, H.1
Liu, L.2
-
17
-
-
0037431950
-
Exploring the utilization of a CONWIP system for supply chain management: A comparison with fully integrated supply chains
-
Ovalle, O.R. and Marquez, A.C. (2003), "Exploring the utilization of a CONWIP system for supply chain management: a comparison with fully integrated supply chains", Int. J. Production Economics, Vol. 83, pp. 195-215.
-
(2003)
Int. J. Production Economics
, vol.83
, pp. 195-215
-
-
Ovalle, O.R.1
Marquez, A.C.2
-
18
-
-
4344710166
-
How successfully does JIT handle machine breakdowns in an automated manufacturing system?
-
Özbayrak, M., Cagil, G. and Kubat, C. (2004), "How successfully does JIT handle machine breakdowns in an automated manufacturing system?", Journal of Manufacturing Technology Management, Vol. 15 No. 6, pp. 479-94.
-
(2004)
Journal of Manufacturing Technology Management
, vol.15
, Issue.6
, pp. 479-94
-
-
Özbayrak, M.1
Cagil, G.2
Kubat, C.3
-
21
-
-
27844560093
-
Allocating work in process in a multiple-product CONWIP system with lost sales
-
Ryan, S.M. and Vorasayan, J. (2005), "Allocating work in process in a multiple-product CONWIP system with lost sales", International Journal of Production Research, Vol. 43 No. 2, pp. 223-46.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.2
, pp. 223-46
-
-
Ryan, S.M.1
Vorasayan, J.2
-
22
-
-
0025430443
-
CONWIP: A pull alternative to Kanban
-
Spearman, M.L., Woodruff, D.L. and Hopp, W.J. (1990), "CONWIP: a pull alternative to Kanban", International Journal of Production Research, Vol. 28 No. 5, pp. 879-94.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.5
, pp. 879-94
-
-
Spearman, M.L.1
Woodruff, D.L.2
Hopp, W.J.3
-
23
-
-
33748712013
-
Parallel algorithm for setting WIP levels for multi-product CONWIP systems
-
Wang, L.V. and Prabhu, V. (2006), "Parallel algorithm for setting WIP levels for multi-product CONWIP systems", International Journal of Production Research, Vol. 44 No. 21, pp. 4681-93.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.21
, pp. 4681-93
-
-
Wang, L.V.1
Prabhu, V.2
-
25
-
-
23744516541
-
Benchmarking JIT: An analysis of JIT implementations in the manufacturing service and public sectors
-
Yasin, M.M., Wafa, M. and Small, M.H. (2004), "Benchmarking JIT: an analysis of JIT implementations in the manufacturing service and public sectors", Benchmarking: An International Journal, Vol. 11 No. 1, pp. 74-92.
-
(2004)
Benchmarking: An International Journal
, vol.11
, Issue.1
, pp. 74-92
-
-
Yasin, M.M.1
Wafa, M.2
Small, M.H.3
-
26
-
-
0035883116
-
A mathematical programming model for production planning using CONWIP
-
Zhang, W. and Chen, M. (2001), "A mathematical programming model for production planning using CONWIP", International Journal of Production Research, Vol. 39, pp. 2723-34.
-
(2001)
International Journal of Production Research
, vol.39
, pp. 2723-34
-
-
Zhang, W.1
Chen, M.2
-
28
-
-
0035393434
-
A methodology to customize pull control systems
-
Gaury, E.G.A., Kleijnen, J.P.C. and Pierreval, H. (2001), "A methodology to customize pull control systems", Journal of the Operational Research Society, Vol. 52 No. 7, pp. 789-99.
-
(2001)
Journal of the Operational Research Society
, vol.52
, Issue.7
, pp. 789-99
-
-
Gaury, E.G.A.1
Kleijnen, J.P.C.2
Pierreval, H.3
-
29
-
-
0033749924
-
An evolutionary approach to select a pull system among Kanban, CONWIP and hybrid
-
Gaury, E.G.A., Pierreval, H. and Kleijnen, J.P.C. (2000), "An evolutionary approach to select a pull system among Kanban, CONWIP and hybrid", Journal of Intelligent Manufacturing, Vol. 11 No. 2, pp. 157-67.
-
(2000)
Journal of Intelligent Manufacturing
, vol.11
, Issue.2
, pp. 157-67
-
-
Gaury, E.G.A.1
Pierreval, H.2
Kleijnen, J.P.C.3
-
30
-
-
0026168681
-
Optimal hybrid push/pull control strategies for a parallel multi-stage system: Part i
-
Hodgson, T.J. and Wang, D. (1991a), "Optimal hybrid push/pull control strategies for a parallel multi-stage system: Part I", International Journal of Production Research, Vol. 29 No. 6, pp. 1279-87.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.6
, pp. 1279-87
-
-
Hodgson, T.J.1
Wang, D.2
-
31
-
-
0026187108
-
Optimal hybrid push/pull control strategies for a parallel multi-stage system: Part II
-
Hodgson, T.J. and Wang, D. (1991b), "Optimal hybrid push/pull control strategies for a parallel multi-stage system: Part II", International Journal of Production Research, Vol. 29 No. 7, pp. 1453-60.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.7
, pp. 1453-60
-
-
Hodgson, T.J.1
Wang, D.2
-
33
-
-
0029424955
-
Comparison of push/pull hybrid manufacturing control strategies
-
Orth, M.J. and Coskunoglu, O. (1995), "Comparison of push/pull hybrid manufacturing control strategies", Proceedings of Industrial Engineering Research, Nashville, TN, USA, IIE, Norcross, GA, USA, pp. 881-90.
-
(1995)
Proceedings of Industrial Engineering Research, Nashville, TN, USA, IIE, Norcross, GA, USA
, pp. 881-90
-
-
Orth, M.J.1
Coskunoglu, O.2
-
34
-
-
0030166976
-
Comparing integration strategies in production ordering systems
-
Takahashi, K. and Soshiroda, M. (1996), "Comparing integration strategies in production ordering systems", International Journal of Production Economics, Vol. 44 Nos 1/2, pp. 83-9.
-
(1996)
International Journal of Production Economics
, vol.44
, Issue.12
, pp. 83-9
-
-
Takahashi, K.1
Soshiroda, M.2
|