메뉴 건너뛰기




Volumn 95, Issue 3, 2005, Pages 317-326

A mixed integer programming model for a two line CONWIP-based production and assembly system

Author keywords

CONWIP; Production scheduling; TSP

Indexed keywords

FABRICATION; INTEGER PROGRAMMING; NONLINEAR SYSTEMS; PROBLEM SOLVING; PRODUCT DEVELOPMENT; SCHEDULING; STRATEGIC PLANNING; TRAVELING SALESMAN PROBLEM;

EID: 12244251452     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2004.01.002     Document Type: Article
Times cited : (35)

References (17)
  • 3
    • 0026153765 scopus 로고
    • Determining the number of Kanbans in a multiproduct, multistage production system
    • Bard J., Golany B. Determining the number of Kanbans in a multiproduct, multistage production system. International Journal of Production Research. 29:1991;881-895
    • (1991) International Journal of Production Research , vol.29 , pp. 881-895
    • Bard, J.1    Golany, B.2
  • 4
    • 0023330726 scopus 로고
    • A mathematical programming approach to a deterministic Kanban system
    • Bitran G.R., Chang L. A mathematical programming approach to a deterministic Kanban system. Management Science. 33:1987;427-441
    • (1987) Management Science , vol.33 , pp. 427-441
    • Bitran, G.R.1    Chang, L.2
  • 6
    • 0031124565 scopus 로고    scopus 로고
    • Mathematical programming formulation of CONWIP-based production lines and relationships to MRP
    • Herer Y.T., Masin M. Mathematical programming formulation of CONWIP-based production lines and relationships to MRP. International Journal of Production Research. 35:1997;1067-1076
    • (1997) International Journal of Production Research , vol.35 , pp. 1067-1076
    • Herer, Y.T.1    Masin, M.2
  • 7
    • 0032046661 scopus 로고    scopus 로고
    • Setting WIP levels with statistical throughput control (STC) in CONWIP production lines
    • Hopp W.J., Roof M.L. Setting WIP levels with statistical throughput control (STC) in CONWIP production lines. International Journal of Production Research. 36:1998;867-882
    • (1998) International Journal of Production Research , vol.36 , pp. 867-882
    • Hopp, W.J.1    Roof, M.L.2
  • 9
    • 0025262876 scopus 로고
    • A mathematical programming approach for determining workcentre lotsizes in a just-in-time system with signal Kanban
    • Philipoom P.R., Rees L.P., Taylor B.W., Huang P.Y. A mathematical programming approach for determining workcentre lotsizes in a just-in-time system with signal Kanban. International Journal of Production Research. 28:1990;1-15
    • (1990) International Journal of Production Research , vol.28 , pp. 1-15
    • Philipoom, P.R.1    Rees, L.P.2    Taylor, B.W.3    Huang, P.Y.4
  • 10
    • 0029734386 scopus 로고    scopus 로고
    • Simultaneously determining the number of Kanbans, container sizes, and final-assembly sequence of products in a just-in-time shop
    • Philipoom P.R., Rees L.P., Taylor B.W. Simultaneously determining the number of Kanbans, container sizes, and final-assembly sequence of products in a just-in-time shop. International Journal of Production Research. 34:1996;51-69
    • (1996) International Journal of Production Research , vol.34 , pp. 51-69
    • Philipoom, P.R.1    Rees, L.P.2    Taylor, B.W.3
  • 14
    • 0000996514 scopus 로고
    • Customer service in pull production systems
    • Spearman M.L. Customer service in pull production systems. Operations Research. 40:1992;948-958
    • (1992) Operations Research , vol.40 , pp. 948-958
    • Spearman, M.L.1
  • 17
    • 0035883116 scopus 로고    scopus 로고
    • A mathematical programming model for production planning using CONWIP
    • Zhang W., Chen M. A mathematical programming model for production planning using CONWIP. International Journal of Production Research. 39:2001;2723-2734
    • (2001) International Journal of Production Research , vol.39 , pp. 2723-2734
    • Zhang, W.1    Chen, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.