-
3
-
-
0026153765
-
Determining the number of Kanbans in a multiproduct, multistage production system
-
Bard J., Golany B. Determining the number of Kanbans in a multiproduct, multistage production system. International Journal of Production Research. 29:1991;881-895
-
(1991)
International Journal of Production Research
, vol.29
, pp. 881-895
-
-
Bard, J.1
Golany, B.2
-
4
-
-
0023330726
-
A mathematical programming approach to a deterministic Kanban system
-
Bitran G.R., Chang L. A mathematical programming approach to a deterministic Kanban system. Management Science. 33:1987;427-441
-
(1987)
Management Science
, vol.33
, pp. 427-441
-
-
Bitran, G.R.1
Chang, L.2
-
6
-
-
0031124565
-
Mathematical programming formulation of CONWIP-based production lines and relationships to MRP
-
Herer Y.T., Masin M. Mathematical programming formulation of CONWIP-based production lines and relationships to MRP. International Journal of Production Research. 35:1997;1067-1076
-
(1997)
International Journal of Production Research
, vol.35
, pp. 1067-1076
-
-
Herer, Y.T.1
Masin, M.2
-
7
-
-
0032046661
-
Setting WIP levels with statistical throughput control (STC) in CONWIP production lines
-
Hopp W.J., Roof M.L. Setting WIP levels with statistical throughput control (STC) in CONWIP production lines. International Journal of Production Research. 36:1998;867-882
-
(1998)
International Journal of Production Research
, vol.36
, pp. 867-882
-
-
Hopp, W.J.1
Roof, M.L.2
-
9
-
-
0025262876
-
A mathematical programming approach for determining workcentre lotsizes in a just-in-time system with signal Kanban
-
Philipoom P.R., Rees L.P., Taylor B.W., Huang P.Y. A mathematical programming approach for determining workcentre lotsizes in a just-in-time system with signal Kanban. International Journal of Production Research. 28:1990;1-15
-
(1990)
International Journal of Production Research
, vol.28
, pp. 1-15
-
-
Philipoom, P.R.1
Rees, L.P.2
Taylor, B.W.3
Huang, P.Y.4
-
10
-
-
0029734386
-
Simultaneously determining the number of Kanbans, container sizes, and final-assembly sequence of products in a just-in-time shop
-
Philipoom P.R., Rees L.P., Taylor B.W. Simultaneously determining the number of Kanbans, container sizes, and final-assembly sequence of products in a just-in-time shop. International Journal of Production Research. 34:1996;51-69
-
(1996)
International Journal of Production Research
, vol.34
, pp. 51-69
-
-
Philipoom, P.R.1
Rees, L.P.2
Taylor, B.W.3
-
14
-
-
0000996514
-
Customer service in pull production systems
-
Spearman M.L. Customer service in pull production systems. Operations Research. 40:1992;948-958
-
(1992)
Operations Research
, vol.40
, pp. 948-958
-
-
Spearman, M.L.1
-
17
-
-
0035883116
-
A mathematical programming model for production planning using CONWIP
-
Zhang W., Chen M. A mathematical programming model for production planning using CONWIP. International Journal of Production Research. 39:2001;2723-2734
-
(2001)
International Journal of Production Research
, vol.39
, pp. 2723-2734
-
-
Zhang, W.1
Chen, M.2
|