-
1
-
-
33746192329
-
-
Ayhan, H., Wortman, M.A., 1996. Real time job release policy for assembly operations, Tech. Rep., ISE, Georgia Institute of Technology.
-
-
-
-
4
-
-
0031071396
-
A comparison of solution approaches for the fixed-sequence economic lot scheduling problem
-
Bourland K.E., and Yano C.A. A comparison of solution approaches for the fixed-sequence economic lot scheduling problem. IIE Transactions 29 (1997) 103-108
-
(1997)
IIE Transactions
, vol.29
, pp. 103-108
-
-
Bourland, K.E.1
Yano, C.A.2
-
5
-
-
0027632197
-
Scheduling networks of queues: Heavy traffic analysis of a multistation closed network
-
Chevalier P.B., and Wein L.M. Scheduling networks of queues: Heavy traffic analysis of a multistation closed network. Operations Research 41 (1993) 734-758
-
(1993)
Operations Research
, vol.41
, pp. 734-758
-
-
Chevalier, P.B.1
Wein, L.M.2
-
7
-
-
0028547827
-
A simple release policy for network of queues with controllable inputs
-
Duenyas I. A simple release policy for network of queues with controllable inputs. Operations Research 42 (1994) 1162-1171
-
(1994)
Operations Research
, vol.42
, pp. 1162-1171
-
-
Duenyas, I.1
-
8
-
-
0000167230
-
Release policies for assembly systems
-
Duenyas I., and Keblis M.F. Release policies for assembly systems. IIE Transactions 27 (1995) 507-518
-
(1995)
IIE Transactions
, vol.27
, pp. 507-518
-
-
Duenyas, I.1
Keblis, M.F.2
-
9
-
-
0028769382
-
The discrete lot-sizing and scheduling problem with sequence-dependent setup costs
-
Fleischmann B. The discrete lot-sizing and scheduling problem with sequence-dependent setup costs. European Journal of Operational Research 75 (1994) 395-404
-
(1994)
European Journal of Operational Research
, vol.75
, pp. 395-404
-
-
Fleischmann, B.1
-
10
-
-
0027927413
-
A capacitated multi-item and multi-echelon scheduling problem
-
Gallego G., and Joneja D. A capacitated multi-item and multi-echelon scheduling problem. Operations Research 42 (1994) 92-101
-
(1994)
Operations Research
, vol.42
, pp. 92-101
-
-
Gallego, G.1
Joneja, D.2
-
13
-
-
0031071788
-
Dynamic lot size/sequencing policies in a multi-product, single-machine system
-
Hodgson T.J., Ge G., King R.E., and Said H. Dynamic lot size/sequencing policies in a multi-product, single-machine system. IIE Transactions 29 (1997) 127-137
-
(1997)
IIE Transactions
, vol.29
, pp. 127-137
-
-
Hodgson, T.J.1
Ge, G.2
King, R.E.3
Said, H.4
-
15
-
-
84986946649
-
Evaluating order release mechanisms in a job shop with sequence-dependent setup times
-
Kim S.C., and Bobrowski P.M. Evaluating order release mechanisms in a job shop with sequence-dependent setup times. Production and Operations Management 4 (1995) 163-180
-
(1995)
Production and Operations Management
, vol.4
, pp. 163-180
-
-
Kim, S.C.1
Bobrowski, P.M.2
-
16
-
-
0033080326
-
An (S, s) model for inventory with exponential lifetimes and renewal demands
-
Liu L., and Shi D. An (S, s) model for inventory with exponential lifetimes and renewal demands. Naval Research Logistics 46 (1999) 39-56
-
(1999)
Naval Research Logistics
, vol.46
, pp. 39-56
-
-
Liu, L.1
Shi, D.2
-
19
-
-
0026953379
-
Capacity-based order review/release strategies to improve manufacturing performance
-
Philipoom P.R., and Fry T.D. Capacity-based order review/release strategies to improve manufacturing performance. International Journal of Production Research 30 (1992) 2559-2572
-
(1992)
International Journal of Production Research
, vol.30
, pp. 2559-2572
-
-
Philipoom, P.R.1
Fry, T.D.2
-
20
-
-
84985757538
-
An evaluation of order release mechanisms in a job shop environment
-
Ragatz G.L., and Mabert V.A. An evaluation of order release mechanisms in a job shop environment. Decision Science 19 (1988) 167-189
-
(1988)
Decision Science
, vol.19
, pp. 167-189
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
23
-
-
0026208470
-
An analytical congestion model for closed production systems with IFR processing times
-
Spearman M.L. An analytical congestion model for closed production systems with IFR processing times. Management Science 37 (1991) 1015-1029
-
(1991)
Management Science
, vol.37
, pp. 1015-1029
-
-
Spearman, M.L.1
-
24
-
-
0026859945
-
Push and pull production systems: Issues and comparisons
-
Spearman M.L., and Zazanis M.A. Push and pull production systems: Issues and comparisons. Operations Research 40 (1992) 521-532
-
(1992)
Operations Research
, vol.40
, pp. 521-532
-
-
Spearman, M.L.1
Zazanis, M.A.2
-
26
-
-
0001962762
-
Dynamic version of the economic lot size model
-
Wagner H., and Whitin T. Dynamic version of the economic lot size model. Management Science 5 (1958) 89-96
-
(1958)
Management Science
, vol.5
, pp. 89-96
-
-
Wagner, H.1
Whitin, T.2
-
27
-
-
0025510925
-
Scheduling networks of queues: Heavy traffic analysis of a two-station network with controllable inputs
-
Wein L.M. Scheduling networks of queues: Heavy traffic analysis of a two-station network with controllable inputs. Operations Research 38 (1990) 1065-1078
-
(1990)
Operations Research
, vol.38
, pp. 1065-1078
-
-
Wein, L.M.1
-
28
-
-
0026859187
-
Scheduling networks of queues: Heavy traffic analysis of a multistation network with controllable inputs
-
Wein L.M. Scheduling networks of queues: Heavy traffic analysis of a multistation network with controllable inputs. Operations Research 40 (1992) S312-S334
-
(1992)
Operations Research
, vol.40
-
-
Wein, L.M.1
|