-
1
-
-
33845332563
-
On the introduction of agile, temporary workers into a tandem queueing system
-
Ann Arbor MI: Department of Industrial and Operations Engineering, University of Michigan. Technical report, 48109
-
Ahn, H.-S. and Duenyas, I. and Lewis, M.(2004) On the introduction of agile, temporary workers into a tandem queueing system. Ann Arbor MI: Department of Industrial and Operations Engineering, University of Michigan. Technical report, 48109
-
(2004)
-
-
Ahn, H.-S.1
Duenyas, I.2
Lewis, M.3
-
2
-
-
33845334035
-
Dynamic load balancing with flexible workers
-
Ann Arbor MI: Department of Industrial and Operations Engineering, University of Michigan. Technical report, 48109
-
Ahn, H.-S. and Righter, R.(2004) Dynamic load balancing with flexible workers. Ann Arbor MI: Department of Industrial and Operations Engineering, University of Michigan. Technical report, 48109
-
(2004)
-
-
Ahn, H.-S.1
Righter, R.2
-
3
-
-
33845299375
-
Dynamic task assignment for throughput maximization with worksharing
-
Tucson AZ: Department of Systems and Industrial Engineering, University of Arizona. Technical report, 85721
-
Askin, R. and Chen, J.(2003) Dynamic task assignment for throughput maximization with worksharing. Tucson AZ: Department of Systems and Industrial Engineering, University of Arizona. Technical report, 85721
-
(2003)
-
-
Askin, R.1
Chen, J.2
-
4
-
-
0002622989
-
A production line that balances itself
-
[CSA]
-
Bartholdi, J. and Eisenstein, D. (1996) A production line that balances itself Operations Research, 44(1), pp. 21-34. http://www.csa.com/htbin/ linkabst.cgi?issn=0030-364X&vol=44&iss=1&firstpage=21 [CSA]
-
(1996)
Operations Research
, vol.44
, Issue.1
, pp. 21-34
-
-
Bartholdi, J.1
Eisenstein, D.2
-
5
-
-
0033116330
-
Integer programming to schedule a hierarchical workforce with variable demands
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0377-2217&vol= 114&iss=&firstpage=105 [CSA]
-
Billionnet, A. (1999) Integer programming to schedule a hierarchical workforce with variable demands European Journal of Operational Research, 114, pp. 105-114. http://dx.doi.org/ 10.1016%2FS0377-2217%2898%2900182-9 [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=0377-2217&vol=114&iss=&firstpage=105 [CSA]
-
(1999)
European Journal of Operational Research
, vol.114
, pp. 105-114
-
-
Billionnet, A.1
-
6
-
-
33845295312
-
Throughput maximization in serial production lines with work sharing
-
Tucson AZ: Department of Systems and Industrial Engineering, University of Arizona. Technical report
-
Chen, J. and Askin, R.(2003) Throughput maximization in serial production lines with work sharing. Tucson AZ: Department of Systems and Industrial Engineering, University of Arizona. Technical report
-
(2003)
-
-
Chen, J.1
Askin, R.2
-
7
-
-
0033356539
-
A simulation analysis of sequencing rules in a flexible flowline
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0377-2217&vol= 119&iss=&firstpage=440 [CSA]
-
Costa, M.-T. and Ferria, J. (1999) A simulation analysis of sequencing rules in a flexible flowline European Journal of Operational Research, 119, pp. 440-450. http://dx.doi.org/10.1016%2FS0377-2217%2899%2900145-9 [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0377-2217&vol= 119&iss=&firstpage=440 [CSA]
-
(1999)
European Journal of Operational Research
, vol.119
, pp. 440-450
-
-
Costa, M.-T.1
Ferria, J.2
-
8
-
-
0026163585
-
Off-day scheduling with hierarchical worker categories
-
[INFOTRIEVE] http://www.csa.com/htbin/linkabst.cgi?issn= 0030-364X&vol=39&iss=&firstpage=484 [CSA]
-
Emmons, H. and Burns, R. (1991) Off-day scheduling with hierarchical worker categories Operations Research, 39, pp. 484-495. http://www4.infotrieve.com/newmedline/detail.asp?NameID= 10112157&Session=&searchQuery=Operations+Research%5BJournal+ Name%5D+AND+39%5BVolume%5D+AND+484%5BPage+Number%5D+AND+ 1991%5BPublication+Date%5D+AND+Emmons%5BAuthor+Name%5D&count=1 [INFOTRIEVE] http://www.csa.com/htbin/linkabst.cgi?issn= 0030-364X&vol=39&iss=&firstpage=484 [CSA]
-
(1991)
Operations Research
, vol.39
, pp. 484-495
-
-
Emmons, H.1
Burns, R.2
-
10
-
-
0036778653
-
Factors affecting opportunity of worksharing as a dynamic line balancing mechanism
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0740-817X&vol= 34&iss=10&firstpage=847 [CSA]
-
Gel, E. and Hopp, W. and Van Oyen, M. (2002) Factors affecting opportunity of worksharing as a dynamic line balancing mechanism IIE Transactions, 34(10), pp. 847-863. http://dx.doi.org/ 10.1023%2FA%3A1015736608979 [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=0740-817X&vol=34&iss=10&firstpage=847 [CSA]
-
(2002)
IIE Transactions
, vol.34
, Issue.10
, pp. 847-863
-
-
Gel, E.1
Hopp, W.2
Van Oyen, M.3
-
11
-
-
3843105812
-
Modeling and analysis of flexible queueing systems
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0028-1441&vol= 51&iss=5&firstpage=755 [CSA]
-
Gurumurthi, S. and Benjaafar, S. (2004) Modeling and analysis of flexible queueing systems Naval Research Logistics, 51(5), pp. 755-782. http://dx.doi.org/10.1002%2Fnav.20020 [CROSSREF] http://www.csa.com/ htbin/linkabst.cgi?issn=0028-1441&vol=51&iss=5&firstpage=755 [CSA]
-
(2004)
Naval Research Logistics
, vol.51
, Issue.5
, pp. 755-782
-
-
Gurumurthi, S.1
Benjaafar, S.2
-
12
-
-
25144508112
-
To pull or not to pull: What is the question?
-
[INFOTRIEVE] http://dx.doi.org/10.1287%2Fmsom.1030.0028 [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=&vol=6&iss= 5&firstpage=133 [CSA]
-
Hopp, W. and Spearman, M. (2004) To pull or not to pull: What is the question? Manufacturing & Service Operations Management, 6(2), pp. 133-148. http://www4.infotrieve.com/newmedline/detail.asp?NameID= 17128273&Session=&searchQuery=Manufacturing+%26+Service+ Operations+Management%5BJournal+Name%5D+AND+6%5BVolume%5D+AND+133%5BPage+ Number%5D+AND+2004%5BPublication+Date%5D+AND+Hopp%5BAuthor+ Name%5D&count=10367 [INFOTRIEVE] http://dx.doi.org/10.1287%2Fmsom. 1030.0028 [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=&vol= 6&iss=5&firstpage=133 [CSA]
-
(2004)
Manufacturing & Service Operations Management
, vol.6
, Issue.2
, pp. 133-148
-
-
Hopp, W.1
Spearman, M.2
-
14
-
-
1242309349
-
Benefits of skill chaining in production lines with cross-trained workers
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0025-1909&vol= 50&iss=1&firstpage=83 [CSA]
-
Hopp, W. and Tekin, E. and Van Oyen, M. (2004) Benefits of skill chaining in production lines with cross-trained workers Management Science, 50(1), pp. 83-98. http://dx.doi.org/10.1287%2Fmnsc.1030.0166 [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0025-1909&vol= 50&iss=1&firstpage=83 [CSA]
-
(2004)
Management Science
, vol.50
, Issue.1
, pp. 83-98
-
-
Hopp, W.1
Tekin, E.2
Van Oyen, M.3
-
15
-
-
4444342794
-
Agile workforce evaluation: A framework for cross-training and coordination
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0740-817X&vol= 36&iss=10&firstpage=919 [CSA]
-
Hopp, W. and Van Oyen, M. (2004) Agile workforce evaluation: A framework for cross-training and coordination IIE Transactions, 36(10), pp. 919-940. http://dx.doi.org/10.1080%2F07408170490487759 [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0740-817X&vol=36&iss= 10&firstpage=919 [CSA]
-
(2004)
IIE Transactions
, vol.36
, Issue.10
, pp. 919-940
-
-
Hopp, W.1
Van Oyen, M.2
-
16
-
-
27344450977
-
Serial agile production systems with automation
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0030-364X&vol= 53&iss=5&firstpage=852 [CSA]
-
Hopp, W. and Iravani, S. and Shou, B. (2005) Serial agile production systems with automation Operations Research, 53(5), pp. 852-866. http://dx.doi.org/10.1287%2Fopre.1050.0226 [CROSSREF] http://www.csa.com/ htbin/linkabst.cgi?issn=0030-364X&vol=53&iss=5&firstpage=852 [CSA]
-
(2005)
Operations Research
, vol.53
, Issue.5
, pp. 852-866
-
-
Hopp, W.1
Iravani, S.2
Shou, B.3
-
17
-
-
2442670603
-
Chained cross-training of assembly line workers
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0020-7543&vol= 42&iss=10&firstpage=1899 [CSA]
-
Inman, R. and Jordan, W. and Blumenfeld, D. (2004) Chained cross-training of assembly line workers International Journal of Production Research, 42(10), pp. 1899-1910. http://dx.doi.org/ 10.1080%2F00207540410001666224 [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=0020-7543&vol=42&iss=10&firstpage=1899 [CSA]
-
(2004)
International Journal of Production Research
, vol.42
, Issue.10
, pp. 1899-1910
-
-
Inman, R.1
Jordan, W.2
Blumenfeld, D.3
-
18
-
-
14944368645
-
Structural flexibility: A new perspective on the design of manufacturing and service operations
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0025-1909&vol= 51&iss=2&firstpage=151 [CSA]
-
Iravani, S. and Van Oyen, M. and Sims, K. (2005) Structural flexibility: a new perspective on the design of manufacturing and service operations Management Science, 51(2), pp. 151-166. http://dx.doi.org/ 10.1287%2Fmnsc.1040.0333 [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=0025-1909&vol=51&iss=2&firstpage=151 [CSA]
-
(2005)
Management Science
, vol.51
, Issue.2
, pp. 151-166
-
-
Iravani, S.1
Van Oyen, M.2
Sims, K.3
-
19
-
-
0029290411
-
Principles on the benefits of manufacturing process flexibility
-
[CSA]
-
Jordan, W. and Graves, S. (1995) Principles on the benefits of manufacturing process flexibility Management Science, 41(4), pp. 577-594. http://www.csa.com/htbin/linkabst.cgi?issn=0025-1909&vol= 41&iss=4&firstpage=577 [CSA]
-
(1995)
Management Science
, vol.41
, Issue.4
, pp. 577-594
-
-
Jordan, W.1
Graves, S.2
-
20
-
-
0002929809
-
Management of worksharing systems
-
[INFOTRIEVE] http://dx.doi.org/10.1287%2Fmsom.2.1.49.23263 [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=&vol=2&iss= 4&firstpage=49 [CSA]
-
McClain, J. and Thomas, L. and Schultz, K. (2000) Management of worksharing systems Manufacturing & Service Operations Management, 2(1), pp. 49-67. http://www4.infotrieve.com/newmedline/detail.asp?NameID= 17128273&Session=&searchQuery=Manufacturing+%26+Service+ Operations+Management%5BJournal+Name%5D+AND+2%5BVolume%5D+AND+49%5BPage+ Number%5D+AND+2000%5BPublication+Date%5D+AND+McClain%5BAuthor+ Name%5D&count=10367 [INFOTRIEVE] http://dx.doi.org/ 10.1287%2Fmsom.2.1.49.23263 [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=&vol=2&iss=4&firstpage=49 [CSA]
-
(2000)
Manufacturing & Service Operations Management
, vol.2
, Issue.1
, pp. 49-67
-
-
McClain, J.1
Thomas, L.2
Schultz, K.3
-
21
-
-
0026938787
-
On-the-fly line balancing with very little WIP
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0925-5273&vol= 27&iss=&firstpage=283 [CSA]
-
McClain, J. and Thomas, L. and Sox, C. (1992) On-the-fly line balancing with very little WIP International Journal of Production Economics, 27, pp. 283-289. http://dx.doi.org/10.1016%2F0925-5273%2892%2990102-D [CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0925-5273&vol= 27&iss=&firstpage=283 [CSA]
-
(1992)
International Journal of Production Economics
, vol.27
, pp. 283-289
-
-
McClain, J.1
Thomas, L.2
Sox, C.3
-
22
-
-
0003449926
-
-
2nd edn.. Atlanta GA: Institute of Industrial Engineers
-
Monden, Y. (1993) The Toyota Production System, 2nd edn.. Atlanta GA: Institute of Industrial Engineers.
-
(1993)
The Toyota Production System
-
-
Monden, Y.1
-
23
-
-
0033873325
-
An algorithm for multiple shift scheduling of hierarchical workforce on four-day and three-day workweeks
-
[CSA]
-
Narasimhan, R. (2000) An algorithm for multiple shift scheduling of hierarchical workforce on four-day and three-day workweeks INFOR, 38(1), pp. 14-32. http://www.csa.com/htbin/linkabst.cgi?issn=0812-9304&vol= 38&iss=1&firstpage=14 [CSA]
-
(2000)
INFOR
, vol.38
, Issue.1
, pp. 14-32
-
-
Narasimhan, R.1
-
24
-
-
0003094666
-
The use of dynamic (state-dependent) assembly-line balancing to improve throughput
-
[CSA]
-
Ostolaza, J. and McClain, J. and Thomas, L. (1990) The use of dynamic (state-dependent) assembly-line balancing to improve throughput Journal of Manufacturing Operations Management, 3, pp. 105-133. http://www.csa. com/htbin/linkabst.cgi?issn=&vol=3&iss=1&firstpage= 105 [CSA]
-
(1990)
Journal of Manufacturing Operations Management
, vol.3
, pp. 105-133
-
-
Ostolaza, J.1
McClain, J.2
Thomas, L.3
-
26
-
-
4444299054
-
-
Chicago IL: Department of Information Systems and Operations Management, Loyola University of Chicago. Technical report, 60626
-
Sennott, L. and Van Oyen, M. and Iravani, S.(2001) Optimal dynamic assignment of a flexible worker on an open production line with specialists. Chicago IL: Department of Information Systems and Operations Management, Loyola University of Chicago. Technical report, 60626
-
(2001)
Optimal Dynamic Assignment of A Flexible Worker on an Open Production Line With Specialists
-
-
Sennott, L.1
Van Oyen, M.2
Iravani, S.3
-
28
-
-
0035452548
-
Performance opportunity for workforce agility in collaborative and noncollaborative work systems
-
[CROSSREF] http://www.csa.com/htbin/linkabst.cgi?issn=0740-817X&vol= 33&iss=9&firstpage=761 [CSA]
-
Van Oyen, M. and Gel, E. and Hopp, W. (2001) Performance opportunity for workforce agility in collaborative and noncollaborative work systems IIE Transactions, 33(9), pp. 761-777. http://dx.doi.org/ 10.1023%2FA%3A1010997816249 [CROSSREF] http://www.csa.com/htbin/ linkabst.cgi?issn=0740-817X&vol=33&iss=9&firstpage=761 [CSA]
-
(2001)
IIE Transactions
, vol.33
, Issue.9
, pp. 761-777
-
-
Van Oyen, M.1
Gel, E.2
Hopp, W.3
-
29
-
-
0000906215
-
Self-buffering, self-balancing, self-.ushing production lines
-
Zavadlav, E., McClain, J.O. and Thomas, L.J. (1996) Self-buffering, self-balancing, self-.ushing production lines. Management Science, 42(8), 1151-1164
-
(1996)
Management Science
, vol.42
, Issue.8
, pp. 1151-1164
-
-
Zavadlav, E.1
McClain, J.O.2
Thomas, L.J.3
|