-
1
-
-
0032710315
-
Match-up scheduling under a machine breakdown
-
Akturk, M.S. and Gorgulu, E. (1999), "Match-up scheduling under a machine breakdown", European Journal of Operational Research, Vol. 112, pp. 81-97.
-
(1999)
European Journal of Operational Research
, vol.112
, pp. 81-97
-
-
Akturk, M.S.1
Gorgulu, E.2
-
2
-
-
0032114994
-
Simulation modelling and analysis of a JIT production system
-
Baykoc, O.F. and Erol, S. (1998), "Simulation modelling and analysis of a JIT production system", International Journal of Production Economics, Vol. 55, pp. 203-12.
-
(1998)
International Journal of Production Economics
, vol.55
, pp. 203-212
-
-
Baykoc, O.F.1
Erol, S.2
-
3
-
-
0034288465
-
The extended kanban control system for production coordination of assembly manufacturing system
-
Chaouiya, C., Liberopoulos, G. and Dallery, Y. (2000), "The extended kanban control system for production coordination of assembly manufacturing system", IIE Transactions, Vol. 32, pp. 999-1012.
-
(2000)
IIE Transactions
, vol.32
, pp. 999-1012
-
-
Chaouiya, C.1
Liberopoulos, G.2
Dallery, Y.3
-
4
-
-
0042044389
-
Using simulation to evaluate the introduction of a kanban subsystem within an MRP-controlled manufacturing environment
-
De Semet, R. and Gelders, L. (1998), "Using simulation to evaluate the introduction of a kanban subsystem within an MRP-controlled manufacturing environment", International Journal of Production Economics, Vol 56-57, pp. 111-22.
-
(1998)
International Journal of Production Economics
, vol.56-57
, pp. 111-122
-
-
De Semet, R.1
Gelders, L.2
-
5
-
-
0032158240
-
Simulation approach in comparison of a pull system in a cell production system with a push system in a conventional production system according to flexible cost: A case study
-
Ertay, T. (1998), "Simulation approach in comparison of a pull system in a cell production system with a push system in a conventional production system according to flexible cost: a case study", International Journal of Production Economics, Vol. 56-57, pp. 145-55.
-
(1998)
International Journal of Production Economics
, vol.56-57
, pp. 145-155
-
-
Ertay, T.1
-
6
-
-
0034691902
-
Push and pull strategies for controlling multistage production systems
-
Grosfeld-Nir, A., Magazine, M. and Vanberkel, A. (2000), "Push and pull strategies for controlling multistage production systems", International Journal of Production Research, Vol. 38 No. 11, pp. 2361-75.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.11
, pp. 2361-2375
-
-
Grosfeld-Nir, A.1
Magazine, M.2
Vanberkel, A.3
-
7
-
-
3543124095
-
Flexible kanban system
-
Gupta, S.M., Al-Turki, Y.A.Y. and Perry, R.F. (1999), "Flexible kanban system", International Journal of Operations & Production Management, Vol. 19 No. 10, pp. 106-9.
-
(1999)
International Journal of Operations & Production Management
, vol.19
, Issue.10
, pp. 106-109
-
-
Gupta, S.M.1
Al-Turki, Y.A.Y.2
Perry, R.F.3
-
8
-
-
0032668814
-
Scheduling in job shops with machine breakdowns: An experimental study
-
Holthaus, O. (1999), "Scheduling in job shops with machine breakdowns: an experimental study", Computers & Industrial Engineering, Vol. 36 No. 1, pp. 137-62.
-
(1999)
Computers & Industrial Engineering
, vol.36
, Issue.1
, pp. 137-162
-
-
Holthaus, O.1
-
9
-
-
0027963805
-
Embedding JIT in MRP: The case of job shops
-
Huq, Z. and Huq, F. (1994), "Embedding JIT in MRP: the case of job shops", Journal of Manufacturing Systems, Vol. 13 No. 3, pp. 153-61.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, Issue.3
, pp. 153-161
-
-
Huq, Z.1
Huq, F.2
-
10
-
-
0031221480
-
Lead time and response time in a pull production control system
-
Kim, I. and Tang, C.S. (1997), "Lead time and response time in a pull production control system", European Journal of Operational Research, Vol. 101, pp. 474-585.
-
(1997)
European Journal of Operational Research
, vol.101
, pp. 474-585
-
-
Kim, I.1
Tang, C.S.2
-
11
-
-
0032764917
-
Analysis of production-inventory systems with machine breakdowns and shutdowns
-
Liu, B. and Cao, J. (1999), "Analysis of production-inventory systems with machine breakdowns and shutdowns", Computers & Operations Research, Vol. 26, pp. 73-91.
-
(1999)
Computers & Operations Research
, vol.26
, pp. 73-91
-
-
Liu, B.1
Cao, J.2
-
12
-
-
0035708905
-
Understanding the fundamentals of kanban and CONWIP pull systems using simulation
-
Marek, R.P., Elkins, D.A. and Smith, D.R. (2001), "Understanding the fundamentals of kanban and CONWIP pull systems using simulation", Proceedings of the 2001 Winter Simulation Conference, pp. 921-9.
-
(2001)
Proceedings of the 2001 Winter Simulation Conference
, pp. 921-929
-
-
Marek, R.P.1
Elkins, D.A.2
Smith, D.R.3
-
13
-
-
0026711394
-
Basic concepts of JIT modelling
-
Mejabi, O. and Wasserman, G.S. (1992), "Basic concepts of JIT modelling", International Journal of Production Research, Vol. 30 No. 1, pp. 141-9.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.1
, pp. 141-149
-
-
Mejabi, O.1
Wasserman, G.S.2
-
15
-
-
0030145045
-
Performance modeling of multistage production systems operating under hybrid push/pull control
-
Pandey, P.C. and Khokhajaikiat, P. (1996), "Performance modeling of multistage production systems operating under hybrid push/pull control", International Journal of Production Economics, Vol. 43 No. 1, pp. 17-28.
-
(1996)
International Journal of Production Economics
, vol.43
, Issue.1
, pp. 17-28
-
-
Pandey, P.C.1
Khokhajaikiat, P.2
-
16
-
-
0024865074
-
Simulating a just-in-time production system
-
Sarker, B.R. (1989), "Simulating a just-in-time production system", Computers & Industrial Engineering, Vol. 16 No. 1, pp. 127-37.
-
(1989)
Computers & Industrial Engineering
, vol.16
, Issue.1
, pp. 127-137
-
-
Sarker, B.R.1
-
17
-
-
0002336648
-
Simulation analysis of just-in-time production systems
-
Savsar, M. and Al-Jawini, A. (1995), "Simulation analysis of just-in-time production systems", International Journal of Production Economics, Vol. 42, pp. 67-78.
-
(1995)
International Journal of Production Economics
, vol.42
, pp. 67-78
-
-
Savsar, M.1
Al-Jawini, A.2
-
18
-
-
0034692675
-
A neural network procedure for kanban allocation in JIT production control systems
-
Savsar, M. and Choueiki, M.M. (2000), "A neural network procedure for kanban allocation in JIT production control systems", International Journal of Production Research, Vol. 38 No. 14, pp. 3247-65.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.14
, pp. 3247-3265
-
-
Savsar, M.1
Choueiki, M.M.2
-
19
-
-
0031118685
-
Evaluation of alternative routeing policies in scheduling a job-shop-type FMS
-
Tunali, S. (1997), "Evaluation of alternative routeing policies in scheduling a job-shop-type FMS", Computers & Industrial Engineering, Vol. 32 No. 2, pp. 243-50.
-
(1997)
Computers & Industrial Engineering
, vol.32
, Issue.2
, pp. 243-250
-
-
Tunali, S.1
-
20
-
-
3943049520
-
Determining the number of kanbans: A step toward non-stop production
-
Wang, H. and Wang, H.P. (1990), "Determining the number of kanbans: a step toward non-stop production", International Journal of Production Research, Vol. 28 No. 11, pp. 427-41.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.11
, pp. 427-441
-
-
Wang, H.1
Wang, H.P.2
|