메뉴 건너뛰기




Volumn 15, Issue 6, 2004, Pages 479-494

How successfully does JIT handle machine breakdowns in an automated manufacturing system?

Author keywords

Breakdowns; Industrial performance; Just in time; Manufacturing industries; Manufacturing systems

Indexed keywords

BREAKDOWNS; INDUSTRIAL PERFORMANCE; MANUFACTURING INDUSTRIES; MANUFACTURING SYSTEMS;

EID: 4344710166     PISSN: 1741038X     EISSN: None     Source Type: Journal    
DOI: 10.1108/17410380410547889     Document Type: Article
Times cited : (5)

References (20)
  • 2
    • 0032114994 scopus 로고    scopus 로고
    • Simulation modelling and analysis of a JIT production system
    • Baykoc, O.F. and Erol, S. (1998), "Simulation modelling and analysis of a JIT production system", International Journal of Production Economics, Vol. 55, pp. 203-12.
    • (1998) International Journal of Production Economics , vol.55 , pp. 203-212
    • Baykoc, O.F.1    Erol, S.2
  • 3
    • 0034288465 scopus 로고    scopus 로고
    • The extended kanban control system for production coordination of assembly manufacturing system
    • Chaouiya, C., Liberopoulos, G. and Dallery, Y. (2000), "The extended kanban control system for production coordination of assembly manufacturing system", IIE Transactions, Vol. 32, pp. 999-1012.
    • (2000) IIE Transactions , vol.32 , pp. 999-1012
    • Chaouiya, C.1    Liberopoulos, G.2    Dallery, Y.3
  • 4
    • 0042044389 scopus 로고    scopus 로고
    • Using simulation to evaluate the introduction of a kanban subsystem within an MRP-controlled manufacturing environment
    • De Semet, R. and Gelders, L. (1998), "Using simulation to evaluate the introduction of a kanban subsystem within an MRP-controlled manufacturing environment", International Journal of Production Economics, Vol 56-57, pp. 111-22.
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 111-122
    • De Semet, R.1    Gelders, L.2
  • 5
    • 0032158240 scopus 로고    scopus 로고
    • Simulation approach in comparison of a pull system in a cell production system with a push system in a conventional production system according to flexible cost: A case study
    • Ertay, T. (1998), "Simulation approach in comparison of a pull system in a cell production system with a push system in a conventional production system according to flexible cost: a case study", International Journal of Production Economics, Vol. 56-57, pp. 145-55.
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 145-155
    • Ertay, T.1
  • 8
    • 0032668814 scopus 로고    scopus 로고
    • Scheduling in job shops with machine breakdowns: An experimental study
    • Holthaus, O. (1999), "Scheduling in job shops with machine breakdowns: an experimental study", Computers & Industrial Engineering, Vol. 36 No. 1, pp. 137-62.
    • (1999) Computers & Industrial Engineering , vol.36 , Issue.1 , pp. 137-162
    • Holthaus, O.1
  • 9
    • 0027963805 scopus 로고
    • Embedding JIT in MRP: The case of job shops
    • Huq, Z. and Huq, F. (1994), "Embedding JIT in MRP: the case of job shops", Journal of Manufacturing Systems, Vol. 13 No. 3, pp. 153-61.
    • (1994) Journal of Manufacturing Systems , vol.13 , Issue.3 , pp. 153-161
    • Huq, Z.1    Huq, F.2
  • 10
    • 0031221480 scopus 로고    scopus 로고
    • Lead time and response time in a pull production control system
    • Kim, I. and Tang, C.S. (1997), "Lead time and response time in a pull production control system", European Journal of Operational Research, Vol. 101, pp. 474-585.
    • (1997) European Journal of Operational Research , vol.101 , pp. 474-585
    • Kim, I.1    Tang, C.S.2
  • 11
    • 0032764917 scopus 로고    scopus 로고
    • Analysis of production-inventory systems with machine breakdowns and shutdowns
    • Liu, B. and Cao, J. (1999), "Analysis of production-inventory systems with machine breakdowns and shutdowns", Computers & Operations Research, Vol. 26, pp. 73-91.
    • (1999) Computers & Operations Research , vol.26 , pp. 73-91
    • Liu, B.1    Cao, J.2
  • 15
    • 0030145045 scopus 로고    scopus 로고
    • Performance modeling of multistage production systems operating under hybrid push/pull control
    • Pandey, P.C. and Khokhajaikiat, P. (1996), "Performance modeling of multistage production systems operating under hybrid push/pull control", International Journal of Production Economics, Vol. 43 No. 1, pp. 17-28.
    • (1996) International Journal of Production Economics , vol.43 , Issue.1 , pp. 17-28
    • Pandey, P.C.1    Khokhajaikiat, P.2
  • 16
    • 0024865074 scopus 로고
    • Simulating a just-in-time production system
    • Sarker, B.R. (1989), "Simulating a just-in-time production system", Computers & Industrial Engineering, Vol. 16 No. 1, pp. 127-37.
    • (1989) Computers & Industrial Engineering , vol.16 , Issue.1 , pp. 127-137
    • Sarker, B.R.1
  • 18
    • 0034692675 scopus 로고    scopus 로고
    • A neural network procedure for kanban allocation in JIT production control systems
    • Savsar, M. and Choueiki, M.M. (2000), "A neural network procedure for kanban allocation in JIT production control systems", International Journal of Production Research, Vol. 38 No. 14, pp. 3247-65.
    • (2000) International Journal of Production Research , vol.38 , Issue.14 , pp. 3247-3265
    • Savsar, M.1    Choueiki, M.M.2
  • 19
    • 0031118685 scopus 로고    scopus 로고
    • Evaluation of alternative routeing policies in scheduling a job-shop-type FMS
    • Tunali, S. (1997), "Evaluation of alternative routeing policies in scheduling a job-shop-type FMS", Computers & Industrial Engineering, Vol. 32 No. 2, pp. 243-50.
    • (1997) Computers & Industrial Engineering , vol.32 , Issue.2 , pp. 243-250
    • Tunali, S.1
  • 20
    • 3943049520 scopus 로고
    • Determining the number of kanbans: A step toward non-stop production
    • Wang, H. and Wang, H.P. (1990), "Determining the number of kanbans: a step toward non-stop production", International Journal of Production Research, Vol. 28 No. 11, pp. 427-41.
    • (1990) International Journal of Production Research , vol.28 , Issue.11 , pp. 427-441
    • Wang, H.1    Wang, H.P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.