-
1
-
-
0022604509
-
Solution of scheduling problems of job shop type FMS with alternative machine tools
-
Abdin MF (1986) Solution of scheduling problems of job shop type FMS with alternative machine tools. Comput Ind Eng 11(1):19-21
-
(1986)
Comput Ind Eng
, vol.11
, Issue.1
, pp. 19-21
-
-
Abdin, M.F.1
-
2
-
-
0030263614
-
Tool allocation and machining conditions optimization for CNC machines
-
Akturk MS, Avci S (1996) Tool allocation and machining conditions optimization for CNC machines. Euro J Operat Res 94:335-348
-
(1996)
Euro J Operat Res
, vol.94
, pp. 335-348
-
-
Akturk, M.S.1
Avci, S.2
-
3
-
-
0030085521
-
Scheduling of automated guided vehicles in a decision making heirarchy
-
Akturk MS, Yilmaz H (1996) Scheduling of automated guided vehicles in a decision making heirarchy. Intl J Product Res 34(2):577-591
-
(1996)
Intl J Product Res
, vol.34
, Issue.2
, pp. 577-591
-
-
Akturk, M.S.1
Yilmaz, H.2
-
4
-
-
0032070825
-
A model of machine-tool selection and operation in FMS
-
Atmani A, Lashkari RS (1998) A model of machine-tool selection and operation in FMS. Intl J Product Res 36(5):1339-1349
-
(1998)
Intl J Product Res
, vol.36
, Issue.5
, pp. 1339-1349
-
-
Atmani, A.1
Lashkari, R.S.2
-
5
-
-
0024657351
-
Measuring the economic effectiveness of flexible automation: A new approach
-
Azzone G, Bertele U (1989) Measuring the economic effectiveness of flexible automation: a new approach. Intl J Product Res 27:735-746
-
(1989)
Intl J Product Res
, vol.27
, pp. 735-746
-
-
Azzone, G.1
Bertele, U.2
-
6
-
-
84914769676
-
Techniques for measuring the effectiveness of automation
-
Azzone G, Bertele U (1991) Techniques for measuring the effectiveness of automation. Manuf Syst 48:1-45
-
(1991)
Manuf Syst
, vol.48
, pp. 1-45
-
-
Azzone, G.1
Bertele, U.2
-
8
-
-
0029310275
-
Model of a universal manufacturing interface in CIM for small and medium sized companies
-
Balic J, Zivec Z, Cus F (1995) Model of a universal manufacturing interface in CIM for small and medium sized companies. J Mater Process Technol 52(1):102-114
-
(1995)
J Mater Process Technol
, vol.52
, Issue.1
, pp. 102-114
-
-
Balic, J.1
Zivec, Z.2
Cus, F.3
-
9
-
-
0037308525
-
Optimization of intelligent FMS using data flow matrix method
-
Balic J, Pahole I (2003) Optimization of intelligent FMS using data flow matrix method. J Mater Process Technol 133(1-2):13-20
-
(2003)
J Mater Process Technol
, vol.133
, Issue.1-2
, pp. 13-20
-
-
Balic, J.1
Pahole, I.2
-
10
-
-
0032072164
-
A Petri Net model for the operation design and analysis of segmented flow topology (SFT) AGV system
-
Barad M, Sinriech D (1998) A Petri Net model for the operation design and analysis of segmented flow topology (SFT) AGV system. Intl J Product Res 36(5):1401-1426
-
(1998)
Intl J Product Res
, vol.36
, Issue.5
, pp. 1401-1426
-
-
Barad, M.1
Sinriech, D.2
-
11
-
-
0029288391
-
Solving the job shop scheduling problem with Tabu search
-
Barness JW, Chambers JB (1995) Solving the job shop scheduling problem with Tabu search. IIE Trans 27(2):257-263
-
(1995)
IIE Trans
, vol.27
, Issue.2
, pp. 257-263
-
-
Barness, J.W.1
Chambers, J.B.2
-
12
-
-
0024621009
-
Decentralized control of automated guided vehicles on a simple loop
-
Bartholdi J J, Platzman KK (1989) Decentralized control of automated guided vehicles on a simple loop. IIE Trans 21(1):76-81
-
(1989)
IIE Trans
, vol.21
, Issue.1
, pp. 76-81
-
-
Bartholdi, J.J.1
Platzman, K.K.2
-
13
-
-
0038911894
-
An integrating framework for FMS diffusion. OMEGA: Intl
-
Belassi W, Fadlalla A (1998) An integrating framework for FMS diffusion. OMEGA: Intl J Manag Sci 26(6):699-713
-
(1998)
J Manag Sci
, vol.26
, Issue.6
, pp. 699-713
-
-
Belassi, W.1
Fadlalla, A.2
-
14
-
-
0037109624
-
Decentralized autonomous AGV system for material handling
-
Berman S, Edan Y (2002) Decentralized autonomous AGV system for material handling. Intl J Product Res 40(15):3995-4006
-
(2002)
Intl J Product Res
, vol.40
, Issue.15
, pp. 3995-4006
-
-
Berman, S.1
Edan, Y.2
-
15
-
-
1842635125
-
Quantification of flexibility in advanced manufacturing systems using fuzzy concept
-
Beskese A, Kahraman C, Irani Z (2004) Quantification of flexibility in advanced manufacturing systems using fuzzy concept. Intl J Product Econ 89(1):45-56
-
(2004)
Intl J Product Econ
, vol.89
, Issue.1
, pp. 45-56
-
-
Beskese, A.1
Kahraman, C.2
Irani, Z.3
-
16
-
-
0032184565
-
Analytic process of resource: A practical approach for scheduling
-
Bing WX (1998) Analytic process of resource: a practical approach for scheduling. Comput Ind Eng 35(1-2):97-100
-
(1998)
Comput Ind Eng
, vol.35
, Issue.1-2
, pp. 97-100
-
-
Bing, W.X.1
-
17
-
-
0035341621
-
A hybrid genetic algorithm for the container loading problem
-
Bortfield A, Gehring H (2001) A hybrid genetic algorithm for the container loading problem. Euro J Operat Res 131(1):143-161
-
(2001)
Euro J Operat Res
, vol.131
, Issue.1
, pp. 143-161
-
-
Bortfield, A.1
Gehring, H.2
-
18
-
-
0000424475
-
Classification of flexible manufacturing systems
-
Browne J, Dubois D, Rathmill K, Sethi SP, Steck KE (1984) Classification of flexible manufacturing systems. FMS Mag 2(2):114-117
-
(1984)
FMS Mag
, vol.2
, Issue.2
, pp. 114-117
-
-
Browne, J.1
Dubois, D.2
Rathmill, K.3
Sethi, S.P.4
Steck, K.E.5
-
19
-
-
0031210787
-
Real-time operational control of an FMS with full routing flexibility
-
Bryne MD, Chutima P (1997) Real-time operational control of an FMS with full routing flexibility. Intl J Product Econ 51(1-2):109-113
-
(1997)
Intl J Product Econ
, vol.51
, Issue.1-2
, pp. 109-113
-
-
Bryne, M.D.1
Chutima, P.2
-
20
-
-
0002688837
-
Tandem configuration for AGV systems offers flexibility and simplicity
-
Bozer Y A, Srinivasan MM (1989) Tandem configuration for AGV systems offers flexibility and simplicity. Ind Eng 21(2):23-27
-
(1989)
Ind Eng
, vol.21
, Issue.2
, pp. 23-27
-
-
Bozer, Y.A.1
Srinivasan, M.M.2
-
23
-
-
0022287412
-
Flexibility and productivity in manufacturing systems
-
Chicago, pp
-
Buzzacott J, Mandelbaum M (1985) Flexibility and productivity in manufacturing systems. In: Proceedings of IIE conference, Chicago, pp 404-413
-
(1985)
Proceedings of IIE conference
, pp. 404-413
-
-
Buzzacott, J.1
Mandelbaum, M.2
-
24
-
-
0022757590
-
Flexible manufacturing systems: A review of analytical models
-
Buzzacott J, Yao D (1986) Flexible manufacturing systems: a review of analytical models. Manag Sci 32(7):890-905
-
(1986)
Manag Sci
, vol.32
, Issue.7
, pp. 890-905
-
-
Buzzacott, J.1
Yao, D.2
-
25
-
-
0033705901
-
A genetic algorithm for scheduling staff of mixed skills under multi-criteria
-
Cai X, Li KN (2000) A genetic algorithm for scheduling staff of mixed skills under multi-criteria. Euro J Operat Res 125(2):359-369
-
(2000)
Euro J Operat Res
, vol.125
, Issue.2
, pp. 359-369
-
-
Cai, X.1
Li, K.N.2
-
26
-
-
0033115993
-
Evaluation of operational control rules in scheduling a flexible manufacturing system
-
Chan FTS (1999) Evaluation of operational control rules in scheduling a flexible manufacturing system. Robot Comput Integrat Manuf 15(2):121-132
-
(1999)
Robot Comput Integrat Manuf
, vol.15
, Issue.2
, pp. 121-132
-
-
Chan, F.T.S.1
-
27
-
-
3242671403
-
Analysis of dynamic control strategies of an FMS under different scenarios
-
Chan FTS, Chan HK (2004) Analysis of dynamic control strategies of an FMS under different scenarios. Robot Comput Integral Manuf 20(5):423-437
-
(2004)
Robot Comput Integral Manuf
, vol.20
, Issue.5
, pp. 423-437
-
-
Chan, F.T.S.1
Chan, H.K.2
-
28
-
-
33644751275
-
Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS
-
Chan FTS, Swarnkar R (2006) Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS. Robot Comput Integrat Manuf 22(4):353-362
-
(2006)
Robot Comput Integrat Manuf
, vol.22
, Issue.4
, pp. 353-362
-
-
Chan, F.T.S.1
Swarnkar, R.2
-
29
-
-
0033907504
-
The development of intelligent decision support tools to aid the design of flexible manufacturing systems
-
Chan FTS, Jiang B, Tang NKH (2000) The development of intelligent decision support tools to aid the design of flexible manufacturing systems. Intl J Product Econ 65:73-84
-
(2000)
Intl J Product Econ
, vol.65
, pp. 73-84
-
-
Chan, F.T.S.1
Jiang, B.2
Tang, N.K.H.3
-
30
-
-
0038481221
-
Analysis of dynamic dispatching rules for a flexible manufacturing system
-
Chan FTS, Chan HK, Lau HCW, Ip RWL (2003) Analysis of dynamic dispatching rules for a flexible manufacturing system. J Mater Process Technol 138(1-3):325-331
-
(2003)
J Mater Process Technol
, vol.138
, Issue.1-3
, pp. 325-331
-
-
Chan, F.T.S.1
Chan, H.K.2
Lau, H.C.W.3
Ip, R.W.L.4
-
31
-
-
33746855485
-
Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach
-
Chan FTS, Chung SH, Chan LY, Finke G, Tiwari MK (2006) Solving distributed FMS scheduling problems subject to maintenance: genetic algorithms approach. Robot Comput Integral Manuf 22(5-6):493-504
-
(2006)
Robot Comput Integral Manuf
, vol.22
, Issue.5-6
, pp. 493-504
-
-
Chan, F.T.S.1
Chung, S.H.2
Chan, L.Y.3
Finke, G.4
Tiwari, M.K.5
-
32
-
-
0026253933
-
Intelligent dispatching for flexible manufacturing
-
Chandra J, Talavage J (1991) Intelligent dispatching for flexible manufacturing. Intl J Product Res 29(11):2259-2278
-
(1991)
Intl J Product Res
, vol.29
, Issue.11
, pp. 2259-2278
-
-
Chandra, J.1
Talavage, J.2
-
33
-
-
0012331828
-
Experimental investigation of quasi-real-lime scheduling in flexible manufacturing systems
-
Rajan Suri (eds) Ann arbor, MI, pp
-
Chang YL, Sullivan RS, Bagchi U (1984) Experimental investigation of quasi-real-lime scheduling in flexible manufacturing systems. In: Proceedings of the first ORSA/TIMS conference on flexible manufacturing systems, Stecke KE, Rajan Suri (eds) Ann arbor, MI, pp 307-312
-
(1984)
Proceedings of the first ORSA/TIMS conference on flexible manufacturing systems, Stecke KE
, pp. 307-312
-
-
Chang, Y.L.1
Sullivan, R.S.2
Bagchi, U.3
-
34
-
-
0026254174
-
Effects of loading and routing decisions on performance of flexible manufacturing systems
-
Chen IJ, Chung CH (1991) Effects of loading and routing decisions on performance of flexible manufacturing systems. Intl J Product Res 29(11):2209-2225
-
(1991)
Intl J Product Res
, vol.29
, Issue.11
, pp. 2209-2225
-
-
Chen, I.J.1
Chung, C.H.2
-
35
-
-
0030085520
-
An examination of flexibility measurements and performance of flexible manufacturing systems
-
Chen IJ, Chung CH (1996) An examination of flexibility measurements and performance of flexible manufacturing systems. Intl J Product Res 34(2):379-394
-
(1996)
Intl J Product Res
, vol.34
, Issue.2
, pp. 379-394
-
-
Chen, I.J.1
Chung, C.H.2
-
36
-
-
13844322261
-
A novel approach to production planning of flexible manufacturing systems using an efficient multi-objective genetic algorithm
-
Chen J-H, Ho S-Y (2005) A novel approach to production planning of flexible manufacturing systems using an efficient multi-objective genetic algorithm. Intl J of Mach Tools Manuf 45:949-957
-
(2005)
Intl J of Mach Tools Manuf
, vol.45
, pp. 949-957
-
-
Chen, J.-H.1
Ho, S.-Y.2
-
37
-
-
0025429972
-
A multiobjective evaluation of flexible manufacturing system loading heuristics
-
Chen Y-J, Askin RG (1990) A multiobjective evaluation of flexible manufacturing system loading heuristics. Intl J Product Res 28(5):895-911
-
(1990)
Intl J Product Res
, vol.28
, Issue.5
, pp. 895-911
-
-
Chen, Y.-J.1
Askin, R.G.2
-
38
-
-
0037420927
-
Iterative methods of flexible manufacturing system
-
Ching WK, Loh AW (2003) Iterative methods of flexible manufacturing system. Intl J Appl Math Comput 141:553-564
-
(2003)
Intl J Appl Math Comput
, vol.141
, pp. 553-564
-
-
Ching, W.K.1
Loh, A.W.2
-
39
-
-
0026417692
-
A survey of maintenance models for multi-unit systems
-
Cho DI, Parlar M (1991) A survey of maintenance models for multi-unit systems. Euro J Operat Res 51(1):1-23
-
(1991)
Euro J Operat Res
, vol.51
, Issue.1
, pp. 1-23
-
-
Cho, D.I.1
Parlar, M.2
-
40
-
-
0031231627
-
Changing human resources to make flexible manufacturing systems (FMSs) successful
-
Cordero R (1997) Changing human resources to make flexible manufacturing systems (FMSs) successful. J High Technol Manag Res 8(2):263-275
-
(1997)
J High Technol Manag Res
, vol.8
, Issue.2
, pp. 263-275
-
-
Cordero, R.1
-
41
-
-
0032099721
-
A constraint based genetic algorithm for concurrent engineering
-
Cormier D, O'Grady P, Saini E (1998) A constraint based genetic algorithm for concurrent engineering. Intl J Product Res 36(6):1679-1697
-
(1998)
Intl J Product Res
, vol.36
, Issue.6
, pp. 1679-1697
-
-
Cormier, D.1
O'Grady, P.2
Saini, E.3
-
42
-
-
0023834152
-
An overview of advance manufacturing technology
-
Craven FW, Slatter RR (1988) An overview of advance manufacturing technology. Appl Ergonom 19(1):9-16
-
(1988)
Appl Ergonom
, vol.19
, Issue.1
, pp. 9-16
-
-
Craven, F.W.1
Slatter, R.R.2
-
43
-
-
34249669034
-
-
Dadone P, Van Landingham HF, Maino B (May 1997) Fuzzy techniques for controlling flexible manufacturing systems. In: Proceedings of the IASTED international conference control'97, Cancum, Mexico
-
Dadone P, Van Landingham HF, Maino B (May 1997) Fuzzy techniques for controlling flexible manufacturing systems. In: Proceedings of the IASTED international conference control'97, Cancum, Mexico
-
-
-
-
45
-
-
0029732144
-
The measurement of flexibility in manufacturing systems
-
Das SK (1996) The measurement of flexibility in manufacturing systems. Intl J Flexible Manuf Syst 8(1):67-93
-
(1996)
Intl J Flexible Manuf Syst
, vol.8
, Issue.1
, pp. 67-93
-
-
Das, S.K.1
-
46
-
-
0040088481
-
Selection of routes in a flexible manufacturing facility
-
Das SK, Nagendra P (1997) Selection of routes in a flexible manufacturing facility. Intl J Product Econ 48(3):237-247
-
(1997)
Intl J Product Econ
, vol.48
, Issue.3
, pp. 237-247
-
-
Das, S.K.1
Nagendra, P.2
-
47
-
-
38249015520
-
A multi objective decision for the evaluation of advanced manufacturing system technologies
-
Demmel JG, Askin RG (1992) A multi objective decision for the evaluation of advanced manufacturing system technologies. J Manuf Syst 11:179-194
-
(1992)
J Manuf Syst
, vol.11
, pp. 179-194
-
-
Demmel, J.G.1
Askin, R.G.2
-
48
-
-
0001041967
-
Measuring manufacturing flexibility: An empirical investigation
-
Dixon JR (1992) Measuring manufacturing flexibility: an empirical investigation. Euro J Operat Res 60:131-143
-
(1992)
Euro J Operat Res
, vol.60
, pp. 131-143
-
-
Dixon, J.R.1
-
49
-
-
0000250053
-
Dynamic control of flexible manufacturing system
-
Dolinska M, Bessant CB (1995) Dynamic control of flexible manufacturing system. Intl J Adv Manuf Technol 10:131-138
-
(1995)
Intl J Adv Manuf Technol
, vol.10
, pp. 131-138
-
-
Dolinska, M.1
Bessant, C.B.2
-
50
-
-
0032645739
-
A distributed genetic algorithm for deterministic and stochastic labour scheduling problems
-
Eatson FF, Mansour N (1999) A distributed genetic algorithm for deterministic and stochastic labour scheduling problems. Euro J Operat Res 118(3):505-523
-
(1999)
Euro J Operat Res
, vol.118
, Issue.3
, pp. 505-523
-
-
Eatson, F.F.1
Mansour, N.2
-
51
-
-
12244256124
-
Scheduling tasks on a flexible manufacturing machine to minimize tool change delays
-
Ecker KH, Gupta JND (2005) Scheduling tasks on a flexible manufacturing machine to minimize tool change delays. Euro J Operat Res 164(3):627-638
-
(2005)
Euro J Operat Res
, vol.164
, Issue.3
, pp. 627-638
-
-
Ecker, K.H.1
Gupta, J.N.D.2
-
52
-
-
0021423836
-
Characterization of automatic guided vehicle dispatching rules
-
Egbelu PJ, Tanchoco JMA (1984) Characterization of automatic guided vehicle dispatching rules. Intl J Product Res 22(3):359-374
-
(1984)
Intl J Product Res
, vol.22
, Issue.3
, pp. 359-374
-
-
Egbelu, P.J.1
Tanchoco, J.M.A.2
-
53
-
-
0022785934
-
Potentials for bi-directional guide-path for automatic guided vehicle based Systems
-
Egbelu PJ, Tanchoco JMA (1986) Potentials for bi-directional guide-path for automatic guided vehicle based Systems. Intl J Product Res 24(5):1075-1097
-
(1986)
Intl J Product Res
, vol.24
, Issue.5
, pp. 1075-1097
-
-
Egbelu, P.J.1
Tanchoco, J.M.A.2
-
55
-
-
0024732435
-
FMS implementation procedure: A case study
-
Fry TD, Smith AE (1989) FMS implementation procedure: a case study. IIE Trans 21(3):288-293
-
(1989)
IIE Trans
, vol.21
, Issue.3
, pp. 288-293
-
-
Fry, T.D.1
Smith, A.E.2
-
56
-
-
0037328890
-
A modeling technique for loading and scheduling problems in FMS
-
Gamila MA, Motavalli S (2003) A modeling technique for loading and scheduling problems in FMS. Robot Comput Integrat Manuf 19(1-2):45-54
-
(2003)
Robot Comput Integrat Manuf
, vol.19
, Issue.1-2
, pp. 45-54
-
-
Gamila, M.A.1
Motavalli, S.2
-
57
-
-
0023349893
-
Flow path design for automated guided vehicle systems
-
Gaskins RJ, Tanchoco JMA (1987) Flow path design for automated guided vehicle systems. Intl J Product Res 25(5):667-676
-
(1987)
Intl J Product Res
, vol.25
, Issue.5
, pp. 667-676
-
-
Gaskins, R.J.1
Tanchoco, J.M.A.2
-
58
-
-
0042363455
-
Analysis of the structural measures of flexibility and agility using a measurement theoretical framework
-
Giachetti RE, Martinez LD, Saenz OA, Chen C (2003) Analysis of the structural measures of flexibility and agility using a measurement theoretical framework. Intl J Product Econ 86(1):47-62
-
(2003)
Intl J Product Econ
, vol.86
, Issue.1
, pp. 47-62
-
-
Giachetti, R.E.1
Martinez, L.D.2
Saenz, O.A.3
Chen, C.4
-
59
-
-
0026904594
-
Routing flexibility and production scheduling in a flexible manufacturing system
-
Ghosh S, Gaimon C (1992) Routing flexibility and production scheduling in a flexible manufacturing system. Euro J Operat Res 60(3):344-364
-
(1992)
Euro J Operat Res
, vol.60
, Issue.3
, pp. 344-364
-
-
Ghosh, S.1
Gaimon, C.2
-
60
-
-
0000904077
-
Messy genetic algorithm: Motivation analysis and first results
-
Goldberg DE, Korb B, Deb K (1989) Messy genetic algorithm: motivation analysis and first results. Complex Syst 3(5):493-530
-
(1989)
Complex Syst
, vol.3
, Issue.5
, pp. 493-530
-
-
Goldberg, D.E.1
Korb, B.2
Deb, K.3
-
61
-
-
0027591340
-
A synthesis of decision models for tool management in automated manufacturing
-
Gray AE, Siedmann AS, Stecke KE (1993) A synthesis of decision models for tool management in automated manufacturing. Manag Sci 39(5):549-567
-
(1993)
Manag Sci
, vol.39
, Issue.5
, pp. 549-567
-
-
Gray, A.E.1
Siedmann, A.S.2
Stecke, K.E.3
-
63
-
-
0035482386
-
A review of different approaches to the FMS loading problem
-
Grieco A, Semeraro Q, Tolio T (2001) A review of different approaches to the FMS loading problem. Intl J Flex Manuf Syst 13(4):361-384
-
(2001)
Intl J Flex Manuf Syst
, vol.13
, Issue.4
, pp. 361-384
-
-
Grieco, A.1
Semeraro, Q.2
Tolio, T.3
-
65
-
-
0032639332
-
Machine loading and part type selection in flexible manufacturing systems
-
Guerrero F, Lozano S, Koltai T, Larraneta J (1999) Machine loading and part type selection in flexible manufacturing systems. Intl J Product Res 37(6):1303-1317
-
(1999)
Intl J Product Res
, vol.37
, Issue.6
, pp. 1303-1317
-
-
Guerrero, F.1
Lozano, S.2
Koltai, T.3
Larraneta, J.4
-
66
-
-
0024128445
-
Organizational issues of flexible manufacturing systems
-
Gupta YP (1988) Organizational issues of flexible manufacturing systems. Technovation 8:255-269
-
(1988)
Technovation
, vol.8
, pp. 255-269
-
-
Gupta, Y.P.1
-
67
-
-
0021493814
-
Flexibility and productivity in complex production processes
-
Gustavsson S (1984) Flexibility and productivity in complex production processes. Intl J Product Res 22:801-808
-
(1984)
Intl J Product Res
, vol.22
, pp. 801-808
-
-
Gustavsson, S.1
-
68
-
-
0032001992
-
Multicriteria inventory classification using a genetic algorithm
-
Guvenir HA, Erel E (1998) Multicriteria inventory classification using a genetic algorithm. Euro J Operat Res 105(1):29-37
-
(1998)
Euro J Operat Res
, vol.105
, Issue.1
, pp. 29-37
-
-
Guvenir, H.A.1
Erel, E.2
-
69
-
-
0005874462
-
Investigating the application potential of simulation to real-time control decision
-
Harmonosky CM, Robohn SF (1995) Investigating the application potential of simulation to real-time control decision. Intl J Comput Integral Manuf 8(2):126-132
-
(1995)
Intl J Comput Integral Manuf
, vol.8
, Issue.2
, pp. 126-132
-
-
Harmonosky, C.M.1
Robohn, S.F.2
-
70
-
-
0010844051
-
An exchange heuristic embedded with simulated annealing for due-dates job-shop scheduling
-
He Z, Yang T, Tiger A (1996) An exchange heuristic embedded with simulated annealing for due-dates job-shop scheduling. Euro J Operat Res 91(1):99-117
-
(1996)
Euro J Operat Res
, vol.91
, Issue.1
, pp. 99-117
-
-
He, Z.1
Yang, T.2
Tiger, A.3
-
71
-
-
0032131897
-
Heuristics for minimizing tool switches when scheduling part types on a flexible machine
-
Hertz A, Laporte G, Mittaz M, Stecke K (1998) Heuristics for minimizing tool switches when scheduling part types on a flexible machine. IIE Trans 30:689-694
-
(1998)
IIE Trans
, vol.30
, pp. 689-694
-
-
Hertz, A.1
Laporte, G.2
Mittaz, M.3
Stecke, K.4
-
72
-
-
33750732963
-
A simulation study on the performance of pick-up dispatching rules for multi-load AGVs
-
Ho YC, Liu HC (2006) A simulation study on the performance of pick-up dispatching rules for multi-load AGVs. Comput Industr Eng 51(3):445-463
-
(2006)
Comput Industr Eng
, vol.51
, Issue.3
, pp. 445-463
-
-
Ho, Y.C.1
Liu, H.C.2
-
73
-
-
0032304826
-
An overview of path decision and dispatching methods for automated guided vehicles
-
Hoff EB, Sarker BR (1998) An overview of path decision and dispatching methods for automated guided vehicles. Integral Manuf Syst 9(5):296-307
-
(1998)
Integral Manuf Syst
, vol.9
, Issue.5
, pp. 296-307
-
-
Hoff, E.B.1
Sarker, B.R.2
-
74
-
-
0001596526
-
-
Hutchison J (1991) Current and future issues concerning FMS scheduling. OMEGA Intl J Manag Sci 19(6):529-537
-
Hutchison J (1991) Current and future issues concerning FMS scheduling. OMEGA Intl J Manag Sci 19(6):529-537
-
-
-
-
75
-
-
0001805208
-
A quantification of the value of flexibility
-
Hutchison OK, Sinha D (1989) A quantification of the value of flexibility. J Manuf Syst 8(1):47-57
-
(1989)
J Manuf Syst
, vol.8
, Issue.1
, pp. 47-57
-
-
Hutchison, O.K.1
Sinha, D.2
-
76
-
-
0036820215
-
Impact of interruption on schedule execution in flexible manufacturing systems
-
Jain S, Foley WJ (2002) Impact of interruption on schedule execution in flexible manufacturing systems. Intl J Flex Manuf Syst 14(4):319-344
-
(2002)
Intl J Flex Manuf Syst
, vol.14
, Issue.4
, pp. 319-344
-
-
Jain, S.1
Foley, W.J.2
-
78
-
-
0009338739
-
Optimal flow path design of uni-directional AGV system
-
Kaspi M, Tanchoco JMA (1990) Optimal flow path design of uni-directional AGV system. Intl J Product Res 28(6):1023-1030
-
(1990)
Intl J Product Res
, vol.28
, Issue.6
, pp. 1023-1030
-
-
Kaspi, M.1
Tanchoco, J.M.A.2
-
79
-
-
0037278646
-
Hierarchical control of production and maintenance rates in manufacturing
-
Kenne JP, Boukas EK (2003) Hierarchical control of production and maintenance rates in manufacturing. J Qual Mainten Eng 9(1):66-82
-
(2003)
J Qual Mainten Eng
, vol.9
, Issue.1
, pp. 66-82
-
-
Kenne, J.P.1
Boukas, E.K.2
-
80
-
-
0037773196
-
An intelligent hierarchical workstation control model for FMS
-
Keung KW, Ip WH, Yuen D (2003) An intelligent hierarchical workstation control model for FMS. J Mater Process Technol 139(1-3):134-139
-
(2003)
J Mater Process Technol
, vol.139
, Issue.1-3
, pp. 134-139
-
-
Keung, K.W.1
Ip, W.H.2
Yuen, D.3
-
81
-
-
0027342202
-
Heuristic approach for loading problems in flexible manufacturing systems
-
Kim YD, Yano CA (1993) Heuristic approach for loading problems in flexible manufacturing systems. IIE Trans 25(1):26-39
-
(1993)
IIE Trans
, vol.25
, Issue.1
, pp. 26-39
-
-
Kim, Y.D.1
Yano, C.A.2
-
82
-
-
0026383580
-
Conflict-free shortest-time bi-directional AGV routing
-
Kim CW, Tanchoco JMA (1991) Conflict-free shortest-time bi-directional AGV routing. Intl J Product Res 29(12):2377-2391
-
(1991)
Intl J Product Res
, vol.29
, Issue.12
, pp. 2377-2391
-
-
Kim, C.W.1
Tanchoco, J.M.A.2
-
85
-
-
0033340198
-
Reconfigurable manufacturing systems
-
Koren Y, Heisel U, Jovane F, Moriwaki T, Pritschow G, Ulsoy G, Van Brussel H (1999) Reconfigurable manufacturing systems. Annal CIRP 48(2);527-540
-
(1999)
Annal CIRP
, vol.48
, Issue.2
, pp. 527-540
-
-
Koren, Y.1
Heisel, U.2
Jovane, F.3
Moriwaki, T.4
Pritschow, G.5
Ulsoy, G.6
Van Brussel, H.7
-
86
-
-
17844366577
-
Modeling of manufacturing systems and robot motions
-
Kost GG, Zdanowicz R (2005) Modeling of manufacturing systems and robot motions. J Mater Process Technol 164-165:1369-1378
-
(2005)
J Mater Process Technol
, vol.164-165
, pp. 1369-1378
-
-
Kost, G.G.1
Zdanowicz, R.2
-
87
-
-
0026261413
-
An optimal tool selection procedure for the initial design phase of a flexible manufacturing systems
-
Kouvelis P (1991) An optimal tool selection procedure for the initial design phase of a flexible manufacturing systems. Euro J Operat Res 55(2):201-210
-
(1991)
Euro J Operat Res
, vol.55
, Issue.2
, pp. 201-210
-
-
Kouvelis, P.1
-
88
-
-
34249651694
-
Pilot plants to assist FMS/CIM Evaluation. Desig Ind Appl Comput Integral
-
Kovacs GL (1992) Pilot plants to assist FMS/CIM Evaluation. Desig Ind Appl Comput Integral Manuf Syst 5(1):54-60
-
(1992)
Manuf Syst
, vol.5
, Issue.1
, pp. 54-60
-
-
Kovacs, G.L.1
-
89
-
-
0034634829
-
A genetic algorithm for FMS part type selection and machine loading
-
Kumar N, Shankar K (2000) A genetic algorithm for FMS part type selection and machine loading. Intl J Product Res 38(16):3861-3887
-
(2000)
Intl J Product Res
, vol.38
, Issue.16
, pp. 3861-3887
-
-
Kumar, N.1
Shankar, K.2
-
90
-
-
0025460582
-
Joint consideration of grouping and loading problems in a flexible manufacturing system
-
Kumar P, Tewari NK, Singh N (1990) Joint consideration of grouping and loading problems in a flexible manufacturing system. Intl J Product Res 28(7):1345-1356
-
(1990)
Intl J Product Res
, vol.28
, Issue.7
, pp. 1345-1356
-
-
Kumar, P.1
Tewari, N.K.2
Singh, N.3
-
91
-
-
33748437416
-
Solving machine-loading problem of a flexible manufacturing system with a constraint-based genetic algorithm
-
Kumar A, Prakash, Tiwari MK, Shankar R, Baveja A (2006) Solving machine-loading problem of a flexible manufacturing system with a constraint-based genetic algorithm. Euro J Operat Res 175(2):1043-1069
-
(2006)
Euro J Operat Res
, vol.175
, Issue.2
, pp. 1043-1069
-
-
Kumar, A.1
Prakash2
Tiwari, M.K.3
Shankar, R.4
Baveja, A.5
-
92
-
-
0030182638
-
Dispatching, routing and scheduling of two automated guided vehicles in a flexible manufacturing systems
-
Langevin A, Lauzon D, Riopel D (1996) Dispatching, routing and scheduling of two automated guided vehicles in a flexible manufacturing systems. Intl J Flex Manuf Syst 8(3):247-262
-
(1996)
Intl J Flex Manuf Syst
, vol.8
, Issue.3
, pp. 247-262
-
-
Langevin, A.1
Lauzon, D.2
Riopel, D.3
-
94
-
-
0023416625
-
A new formulation of operation allocation problem in flexible manufacturing systems: Mathematical modeling and computational experience
-
Lashkari RS, Dutta SP, Padhye AM (1987) A new formulation of operation allocation problem in flexible manufacturing systems: mathematical modeling and computational experience. Intl J Product Res 25(9):1267-1283
-
(1987)
Intl J Product Res
, vol.25
, Issue.9
, pp. 1267-1283
-
-
Lashkari, R.S.1
Dutta, S.P.2
Padhye, A.M.3
-
95
-
-
0026982303
-
FMS scheduling using petri nets and heuristic search
-
Nice, France
-
Lee DY, DiCesare F (1992) FMS scheduling using petri nets and heuristic search. In: Proceedings of the IEEE international conference on robotics and automation, Nice, France, vol 2, pp 1057-1062
-
(1992)
Proceedings of the IEEE international conference on robotics and automation
, vol.2
, pp. 1057-1062
-
-
Lee, D.Y.1
DiCesare, F.2
-
96
-
-
0030398243
-
Load selection of automated guided vehicles in flexible manufacturing systems
-
Lee J, Tangjarukij M, Zhu Z (1996) Load selection of automated guided vehicles in flexible manufacturing systems. Intl J Product Res 34(12):3388-3400
-
(1996)
Intl J Product Res
, vol.34
, Issue.12
, pp. 3388-3400
-
-
Lee, J.1
Tangjarukij, M.2
Zhu, Z.3
-
97
-
-
0024771924
-
A multi-objective production planning model in a flexible manufacturing environment
-
Lee SM, Jung HJ (1989) A multi-objective production planning model in a flexible manufacturing environment. Intl J Product Res 27(11):1981-1992
-
(1989)
Intl J Product Res
, vol.27
, Issue.11
, pp. 1981-1992
-
-
Lee, S.M.1
Jung, H.J.2
-
98
-
-
0034230637
-
A hybrid genetic algorithm for the open shop scheduling problem
-
Liaw C (2000) A hybrid genetic algorithm for the open shop scheduling problem. Euro J Operat Res 124(1):28-42
-
(2000)
Euro J Operat Res
, vol.124
, Issue.1
, pp. 28-42
-
-
Liaw, C.1
-
99
-
-
0001130388
-
An algorithm for routing control of a tandem guided vehicle system
-
Lin JT, Dgen PK (1994) An algorithm for routing control of a tandem guided vehicle system. Intl J Product Res 32:2735-2750
-
(1994)
Intl J Product Res
, vol.32
, pp. 2735-2750
-
-
Lin, J.T.1
Dgen, P.K.2
-
100
-
-
0030106944
-
The classification of FMS scheduling problems
-
Liu J, Maccarthy BL (1996) The classification of FMS scheduling problems. Intl J Product Res 34(3):647-656
-
(1996)
Intl J Product Res
, vol.34
, Issue.3
, pp. 647-656
-
-
Liu, J.1
Maccarthy, B.L.2
-
101
-
-
23344453490
-
Modelling and heuristics of FMS scheduling with multiple objectives
-
Low C, Yip Y, Wu T (2006) Modelling and heuristics of FMS scheduling with multiple objectives. Comput Operat Res 33:674-694
-
(2006)
Comput Operat Res
, vol.33
, pp. 674-694
-
-
Low, C.1
Yip, Y.2
Wu, T.3
-
102
-
-
21844525546
-
The organizational side of flexible manufacturing technology
-
Maffei MJ, Meredith J (1994) The organizational side of flexible manufacturing technology. Intl J Operat Product Manag 14(8):17-34
-
(1994)
Intl J Operat Product Manag
, vol.14
, Issue.8
, pp. 17-34
-
-
Maffei, M.J.1
Meredith, J.2
-
104
-
-
0000687077
-
A model for the design of zone control automated guided vehicle systems
-
Malmborg CI (1990) A model for the design of zone control automated guided vehicle systems. Intl J Product Res 28(10):1741-1758
-
(1990)
Intl J Product Res
, vol.28
, Issue.10
, pp. 1741-1758
-
-
Malmborg, C.I.1
-
105
-
-
0025482436
-
Design of an automated guided vehicle-based material handling system for a flexible manufacturing system
-
Mahadevan B, Narendran TT (1990) Design of an automated guided vehicle-based material handling system for a flexible manufacturing system. Intl J Product Res 28(9): 1611-1622
-
(1990)
Intl J Product Res
, vol.28
, Issue.9
, pp. 1611-1622
-
-
Mahadevan, B.1
Narendran, T.T.2
-
106
-
-
0032688266
-
An object-oriented rule-based framework for the specification of flexible manufacturing systems
-
Mak KL, Wong STW, Lau HYK (1999) An object-oriented rule-based framework for the specification of flexible manufacturing systems. Comput Industry 39(2):127-146
-
(1999)
Comput Industry
, vol.39
, Issue.2
, pp. 127-146
-
-
Mak, K.L.1
Wong, S.T.W.2
Lau, H.Y.K.3
-
107
-
-
0025420589
-
Automating fixture design-from imitating practice to understanding principles
-
Markus A, Ruutkay Z, Vancza J (1990) Automating fixture design-from imitating practice to understanding principles. Comput Industry 14(1-3):99-108
-
(1990)
Comput Industry
, vol.14
, Issue.1-3
, pp. 99-108
-
-
Markus, A.1
Ruutkay, Z.2
Vancza, J.3
-
108
-
-
0027809916
-
Impacts of vendor project management methods on flexible manufacturing systems implementation: A field study
-
McCutcheon DM (1993) Impacts of vendor project management methods on flexible manufacturing systems implementation: a field study. J Eng Technol Manag 10(4):339-362
-
(1993)
J Eng Technol Manag
, vol.10
, Issue.4
, pp. 339-362
-
-
McCutcheon, D.M.1
-
109
-
-
0031246073
-
Developing a hybrid programmable logic controller platform for a flexible manufacturing system
-
McDermott KJ, Yao W A (1997) Developing a hybrid programmable logic controller platform for a flexible manufacturing system. Intl J Flex Manuf Syst 9(4):367-374
-
(1997)
Intl J Flex Manuf Syst
, vol.9
, Issue.4
, pp. 367-374
-
-
McDermott, K.J.1
Yao, W.A.2
-
110
-
-
0020140765
-
Design of automatic guided vehicle systems
-
Maxwell WL, Muckstadt JA (1982) Design of automatic guided vehicle systems. IIE Trans 14(2):114-124
-
(1982)
IIE Trans
, vol.14
, Issue.2
, pp. 114-124
-
-
Maxwell, W.L.1
Muckstadt, J.A.2
-
112
-
-
0031192667
-
A genetic algorithm for multi-mode resource constrained project scheduling problem
-
Mori M, Tseng CC (1997) A genetic algorithm for multi-mode resource constrained project scheduling problem. Euro J Operat Res 100(1):134-141
-
(1997)
Euro J Operat Res
, vol.100
, Issue.1
, pp. 134-141
-
-
Mori, M.1
Tseng, C.C.2
-
113
-
-
0026914581
-
A heuristic procedure for loading problems in flexible manufacturing systems
-
Mukhopadhyay SK, Midha S, Krishna (1992) A heuristic procedure for loading problems in flexible manufacturing systems. Intl J Product Res 10(9):2213-2228
-
(1992)
Intl J Product Res
, vol.10
, Issue.9
, pp. 2213-2228
-
-
Mukhopadhyay, S.K.1
Midha, S.2
Krishna3
-
116
-
-
34249728711
-
An expert system for real-time scheduling in flexible manufacturing system. Inform Decision Technol 18:151-170 Nasir N, Elsayad EA (1990) Job shop scheduling with alternative machines
-
Naidu EB, Vishwanadham N (1992) An expert system for real-time scheduling in flexible manufacturing system. Inform Decision Technol 18:151-170 Nasir N, Elsayad EA (1990) Job shop scheduling with alternative machines. Intl J Product Res 28(9):1595-1609
-
(1992)
Intl J Product Res
, vol.28
, Issue.9
, pp. 1595-1609
-
-
Naidu, E.B.1
Vishwanadham, N.2
-
117
-
-
0022675338
-
A scoring model for flexible manufacturing system project selection
-
Nelson CA (1986) A scoring model for flexible manufacturing system project selection. Euro J Operat Res 24(3):346-359
-
(1986)
Euro J Operat Res
, vol.24
, Issue.3
, pp. 346-359
-
-
Nelson, C.A.1
-
118
-
-
0024699978
-
Flexible manufacturing systems: Present developments and trends
-
O'Grady P (1989) Flexible manufacturing systems: present developments and trends. Comput Industry 12(3):241-251
-
(1989)
Comput Industry
, vol.12
, Issue.3
, pp. 241-251
-
-
O'Grady, P.1
-
119
-
-
0028518336
-
A new FMS architecture based upon networked DSP servo technology
-
Overmars AH, Toncich DJ (1994) A new FMS architecture based upon networked DSP servo technology. Intl J Flex Manuf Syst 6(4):311-331
-
(1994)
Intl J Flex Manuf Syst
, vol.6
, Issue.4
, pp. 311-331
-
-
Overmars, A.H.1
Toncich, D.J.2
-
120
-
-
0024065468
-
A simulation study of multiple-load-carrying automated guided vehicles in a flexible manufacturing system
-
Ozden M (1988) A simulation study of multiple-load-carrying automated guided vehicles in a flexible manufacturing system. Intl J Product Res 26(8):1353-1366
-
(1988)
Intl J Product Res
, vol.26
, Issue.8
, pp. 1353-1366
-
-
Ozden, M.1
-
121
-
-
1842870764
-
An Economic evaluation model for advanced manufacturing systems
-
Park CS, Son YK (1988) An Economic evaluation model for advanced manufacturing systems. Eng Econ 34:1-26
-
(1988)
Eng Econ
, vol.34
, pp. 1-26
-
-
Park, C.S.1
Son, Y.K.2
-
122
-
-
24144490639
-
A methodology for creating a virtual model for a flexible manufacturing system
-
Park SC (2005) A methodology for creating a virtual model for a flexible manufacturing system. Comput Industry 56(7):734-746
-
(2005)
Comput Industry
, vol.56
, Issue.7
, pp. 734-746
-
-
Park, S.C.1
-
123
-
-
0032681956
-
Manufacturing flexibility: Measures and relationships
-
Parker RP, Wirth A (1999) Manufacturing flexibility: measures and relationships. Euro J Operat Res 118(3):429-449
-
(1999)
Euro J Operat Res
, vol.118
, Issue.3
, pp. 429-449
-
-
Parker, R.P.1
Wirth, A.2
-
124
-
-
0010441326
-
An age-based replacement policy with non-zero repair times for a continuous production process
-
Pintelon LMA, Van Puyvelde FLB, Gelders LF (1995) An age-based replacement policy with non-zero repair times for a continuous production process. Intl J Product Res 33(8):2111-2123
-
(1995)
Intl J Product Res
, vol.33
, Issue.8
, pp. 2111-2123
-
-
Pintelon, L.M.A.1
Van Puyvelde, F.L.B.2
Gelders, L.F.3
-
125
-
-
0006743786
-
-
Primrose PU, Leonard R (1991) Selecting Technology for Investment in Flexible Manufacturing. Intl J Flex Manuf Syst 4(1):51-77
-
Primrose PU, Leonard R (1991) Selecting Technology for Investment in Flexible Manufacturing. Intl J Flex Manuf Syst 4(1):51-77
-
-
-
-
126
-
-
0035838746
-
A bi-directional path layout for conflict-free routing of AGVs
-
Qiu L, Hsu WJ (2001) A bi-directional path layout for conflict-free routing of AGVs. Intl J Product Res 39(10):2177-2195
-
(2001)
Intl J Product Res
, vol.39
, Issue.10
, pp. 2177-2195
-
-
Qiu, L.1
Hsu, W.J.2
-
127
-
-
0037085134
-
Scheduling and routing algorithms for AGVs: A survey
-
Qiu L, Hsu WJ, Huang SY, Wang H (2002) Scheduling and routing algorithms for AGVs: a survey. Intl J Product Res 40(3):745-760
-
(2002)
Intl J Product Res
, vol.40
, Issue.3
, pp. 745-760
-
-
Qiu, L.1
Hsu, W.J.2
Huang, S.Y.3
Wang, H.4
-
128
-
-
0029659077
-
Machine loading in flexible manufacturing systems considering routing flexibility
-
Rajamani D, Adil GK (1996) Machine loading in flexible manufacturing systems considering routing flexibility. Intl J Adv Manuf Technol 11(5):372-380
-
(1996)
Intl J Adv Manuf Technol
, vol.11
, Issue.5
, pp. 372-380
-
-
Rajamani, D.1
Adil, G.K.2
-
129
-
-
0032071781
-
Determination of optimal AGV fleet size for an FMS
-
Rajotia S, Shankar K, Batra JL (1998) Determination of optimal AGV fleet size for an FMS. Intl J Product Res 36(5):1177-1198
-
(1998)
Intl J Product Res
, vol.36
, Issue.5
, pp. 1177-1198
-
-
Rajotia, S.1
Shankar, K.2
Batra, J.L.3
-
130
-
-
21344484785
-
Strategic framework for implementing flexible manufacturing systems in India
-
Rao KVS, Deshmukh SG (1994) Strategic framework for implementing flexible manufacturing systems in India. Intl J Operat Product Manag 14(4):50-63
-
(1994)
Intl J Operat Product Manag
, vol.14
, Issue.4
, pp. 50-63
-
-
Rao, K.V.S.1
Deshmukh, S.G.2
-
131
-
-
33846610995
-
Mathematical model for optimal and phased implementation of flexible manufacturing systems
-
Rezaie K, Ostadi BA (2007) Mathematical model for optimal and phased implementation of flexible manufacturing systems. Appl Math Comput 184(2):729-736
-
(2007)
Appl Math Comput
, vol.184
, Issue.2
, pp. 729-736
-
-
Rezaie, K.1
Ostadi, B.A.2
-
132
-
-
0002740677
-
Competitive effect on technology diffusion
-
Robertson TS, Gatignon H (1986) Competitive effect on technology diffusion. J Market 50:1-12
-
(1986)
J Market
, vol.50
, pp. 1-12
-
-
Robertson, T.S.1
Gatignon, H.2
-
133
-
-
0344443735
-
-
Sabuncuoglu I, Lahmar M (2005) An evaluative study of operation grouping policies in an FMS. Intl J Flex Manuf Syst 15(3):217-239
-
Sabuncuoglu I, Lahmar M (2005) An evaluative study of operation grouping policies in an FMS. Intl J Flex Manuf Syst 15(3):217-239
-
-
-
-
134
-
-
3242708643
-
Product-based and resource-based heterarchical approaches for dynamic FMS scheduling
-
Sallez Y, Trentesaux D, Berger T, Tahon C (2004) Product-based and resource-based heterarchical approaches for dynamic FMS scheduling. Comput Ind Eng 46(4):611-623
-
(2004)
Comput Ind Eng
, vol.46
, Issue.4
, pp. 611-623
-
-
Sallez, Y.1
Trentesaux, D.2
Berger, T.3
Tahon, C.4
-
135
-
-
0030241688
-
Flexible scheduling in a machining center through genetic algorithms
-
Sakawa M, Kato K, Mori T (1996) Flexible scheduling in a machining center through genetic algorithms. Comput Ind Eng 30(4):931-940
-
(1996)
Comput Ind Eng
, vol.30
, Issue.4
, pp. 931-940
-
-
Sakawa, M.1
Kato, K.2
Mori, T.3
-
136
-
-
0036644049
-
Modeling the machine loading problem of FMS and its solution using a Tabu-search based heuristic
-
Sarma UMBS, Kant S, Rai R, Tiwari MK (2002) Modeling the machine loading problem of FMS and its solution using a Tabu-search based heuristic. Intl J Comput Integr Manuf 15(4):285-295
-
(2002)
Intl J Comput Integr Manuf
, vol.15
, Issue.4
, pp. 285-295
-
-
Sarma, U.M.B.S.1
Kant, S.2
Rai, R.3
Tiwari, M.K.4
-
137
-
-
0023384747
-
The machine loading and tool allocation problem in a flexible manufacturing system
-
Sarin SC, Chen CS (1987) The machine loading and tool allocation problem in a flexible manufacturing system. Intl J Product Res 25(7):1081-1094
-
(1987)
Intl J Product Res
, vol.25
, Issue.7
, pp. 1081-1094
-
-
Sarin, S.C.1
Chen, C.S.2
-
138
-
-
0030783952
-
An empirical analysis of productivity and complexity for flexible manufacturing system
-
Sarkis J (1997) An empirical analysis of productivity and complexity for flexible manufacturing system. Intl J Product Econ 48:39-48
-
(1997)
Intl J Product Econ
, vol.48
, pp. 39-48
-
-
Sarkis, J.1
-
139
-
-
0032648655
-
Integrating flexible process plans with scheduling in flexible manufacturing systems
-
Saygin C, Kilic SE (1999) Integrating flexible process plans with scheduling in flexible manufacturing systems. Intl J Adv Manuf Technol 15(4):268-280
-
(1999)
Intl J Adv Manuf Technol
, vol.15
, Issue.4
, pp. 268-280
-
-
Saygin, C.1
Kilic, S.E.2
-
140
-
-
0025419819
-
Modelling and scheduling of flexible manufacturing systems
-
Sawik T (1990) Modelling and scheduling of flexible manufacturing systems. Euro J Operat Res 45(7):177-190
-
(1990)
Euro J Operat Res
, vol.45
, Issue.7
, pp. 177-190
-
-
Sawik, T.1
-
141
-
-
34248539177
-
Flexibility in manufacturing: A survey
-
Sethi AK, Sethi SP (1990) Flexibility in manufacturing: a survey. Intl J Flex Manuf Syst 2(4): 289-328
-
(1990)
Intl J Flex Manuf Syst
, vol.2
, Issue.4
, pp. 289-328
-
-
Sethi, A.K.1
Sethi, S.P.2
-
142
-
-
0024673709
-
Some selection methodologies for the loading problem in flexible manufacturing system
-
Shankar K, Sriniwasulu A (1989) Some selection methodologies for the loading problem in flexible manufacturing system. Intl J Product Res 27(6):1019-1034
-
(1989)
Intl J Product Res
, vol.27
, Issue.6
, pp. 1019-1034
-
-
Shankar, K.1
Sriniwasulu, A.2
-
143
-
-
2442646633
-
Production scheduling in a flexible manufacturing system under random demand
-
Sharafali M, Co HC, Goh M (2004) Production scheduling in a flexible manufacturing system under random demand. Euro J Operat Res 158(1):89-102
-
(2004)
Euro J Operat Res
, vol.158
, Issue.1
, pp. 89-102
-
-
Sharafali, M.1
Co, H.C.2
Goh, M.3
-
144
-
-
0024682175
-
An artificial intelligence approach to the scheduling of flexible manufaturing systems
-
Shaw MJ, Whinston AB (1989) An artificial intelligence approach to the scheduling of flexible manufaturing systems. HE Trans 21:170-183
-
(1989)
HE Trans
, vol.21
, pp. 170-183
-
-
Shaw, M.J.1
Whinston, A.B.2
-
146
-
-
0032182983
-
Definition and classification of manufacturing flexibility types and measures
-
Shewchuk JP, Moodie CL (1998) Definition and classification of manufacturing flexibility types and measures. Intl J Flex Manuf Syst 10(4):325-349
-
(1998)
Intl J Flex Manuf Syst
, vol.10
, Issue.4
, pp. 325-349
-
-
Shewchuk, J.P.1
Moodie, C.L.2
-
148
-
-
0027625847
-
A comparison of two intelligent scheduling systems for flexible manufacturing systems
-
Smith AE, Fry TD, Philipoom PR, Sweigart JE (1993) A comparison of two intelligent scheduling systems for flexible manufacturing systems. Exp Syst Appl 6:299-308
-
(1993)
Exp Syst Appl
, vol.6
, pp. 299-308
-
-
Smith, A.E.1
Fry, T.D.2
Philipoom, P.R.3
Sweigart, J.E.4
-
149
-
-
0028452748
-
Multiperiod tool and production assignment in flexible manufacturing systems
-
Sodhi MS, Askin RG, Sen S (1994) Multiperiod tool and production assignment in flexible manufacturing systems. Intl J Product Res 32(6): 1281-1294
-
(1994)
Intl J Product Res
, vol.32
, Issue.6
, pp. 1281-1294
-
-
Sodhi, M.S.1
Askin, R.G.2
Sen, S.3
-
151
-
-
38249043028
-
Cell concepts for flexible automated manufacturing
-
Spur G, Seligar G, Vichweger B (1986) Cell concepts for flexible automated manufacturing. J Manuf Syst 5(3):171-179
-
(1986)
J Manuf Syst
, vol.5
, Issue.3
, pp. 171-179
-
-
Spur, G.1
Seligar, G.2
Vichweger, B.3
-
152
-
-
0026139677
-
Selecting a flexible manufacturing system using a multi criteria analysis
-
Stam A, Kuula M (1991) Selecting a flexible manufacturing system using a multi criteria analysis. Intl J Product Res 29:803-820
-
(1991)
Intl J Product Res
, vol.29
, pp. 803-820
-
-
Stam, A.1
Kuula, M.2
-
153
-
-
84952242943
-
Loading and tool control policies for a flexible manufacturing system
-
Stecke KE, Solberg James J (1981) Loading and tool control policies for a flexible manufacturing system. Intl J Product Res 19(5):491-490
-
(1981)
Intl J Product Res
, vol.19
, Issue.5
, pp. 491-490
-
-
Stecke, K.E.1
Solberg James, J.2
-
155
-
-
0020718128
-
Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems
-
Stecke KE (1983) Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems. Manag Sci 29(3):273-287
-
(1983)
Manag Sci
, vol.29
, Issue.3
, pp. 273-287
-
-
Stecke, K.E.1
-
156
-
-
0022676091
-
A hierarchical approach to solve machine grouping and loading of flexible manufacturing systems
-
Stecke KE (1986) A hierarchical approach to solve machine grouping and loading of flexible manufacturing systems. Euro J Operat Res 24(3):369-378
-
(1986)
Euro J Operat Res
, vol.24
, Issue.3
, pp. 369-378
-
-
Stecke, K.E.1
-
157
-
-
0025486035
-
Towards an integrated evaluation of flexible automation investments
-
Suresh NC (1990) Towards an integrated evaluation of flexible automation investments. Intl J Product Res 28:1657-1672
-
(1990)
Intl J Product Res
, vol.28
, pp. 1657-1672
-
-
Suresh, N.C.1
-
158
-
-
0026219874
-
An extended multi-objective replacement model for flexible automation investments
-
Suresh NC (1991) An extended multi-objective replacement model for flexible automation investments. Intl J Product Res 28:1823-1844
-
(1991)
Intl J Product Res
, vol.28
, pp. 1823-1844
-
-
Suresh, N.C.1
-
159
-
-
0023596514
-
Economic measure of productivity. Quality and Flexibility in Advanced Manufacturing Systems
-
Son YK, Park CS (1987) Economic measure of productivity. Quality and Flexibility in Advanced Manufacturing Systems. J Manuf Syst 6(3):193-206
-
(1987)
J Manuf Syst
, vol.6
, Issue.3
, pp. 193-206
-
-
Son, Y.K.1
Park, C.S.2
-
160
-
-
0010309827
-
Quantifying opportunity costs associated with adding manufacturing flexibility
-
Son YK, Park CS (1990) Quantifying opportunity costs associated with adding manufacturing flexibility. Intl J Product Res 28:1183-1194
-
(1990)
Intl J Product Res
, vol.28
, pp. 1183-1194
-
-
Son, Y.K.1
Park, C.S.2
-
161
-
-
0026122444
-
A cost estimation model for advanced manufacturing systems
-
Son YK (1991) A cost estimation model for advanced manufacturing systems. Intl J Product Res 29:441-452
-
(1991)
Intl J Product Res
, vol.29
, pp. 441-452
-
-
Son, Y.K.1
-
162
-
-
1842864950
-
Modeling machine loading problems of FMSs and its solution methodology using a Tabu search and simulated annealing-based heuristic approach
-
Swarnkar R, Tiwari MK (2004) Modeling machine loading problems of FMSs and its solution methodology using a Tabu search and simulated annealing-based heuristic approach. Robot Comput Integrat Manuf 20(3):199-209
-
(2004)
Robot Comput Integrat Manuf
, vol.20
, Issue.3
, pp. 199-209
-
-
Swarnkar, R.1
Tiwari, M.K.2
-
163
-
-
0029389278
-
Comparison of dynamic routing techniques for automatic guided vehicle systems
-
Taghaboni F, Tanchoco JMA (1995) Comparison of dynamic routing techniques for automatic guided vehicle systems. Intl J Product Res 33(10):2653-2669
-
(1995)
Intl J Product Res
, vol.33
, Issue.10
, pp. 2653-2669
-
-
Taghaboni, F.1
Tanchoco, J.M.A.2
-
164
-
-
0026837787
-
OSL-optimal single loop guided paths for AGVs
-
Tanchoco JMA, Sinriech D (1992) OSL-optimal single loop guided paths for AGVs. Intl J Product Res 30(3):665-681
-
(1992)
Intl J Product Res
, vol.30
, Issue.3
, pp. 665-681
-
-
Tanchoco, J.M.A.1
Sinriech, D.2
-
165
-
-
0031197478
-
A heuristic solution approach to machine loading problem of FMS and its Petri-Net model
-
Tiwari MK, Hazarika B, Vidyarthi NK, Jaggi P, Mukhopadhyay SK (1997) A heuristic solution approach to machine loading problem of FMS and its Petri-Net model. Intl J Product Res 35(8):2269-2284
-
(1997)
Intl J Product Res
, vol.35
, Issue.8
, pp. 2269-2284
-
-
Tiwari, M.K.1
Hazarika, B.2
Vidyarthi, N.K.3
Jaggi, P.4
Mukhopadhyay, S.K.5
-
166
-
-
0034692672
-
Solving machine loading problem in flexible manufacturing system using genetic algorithm based heuristic approach
-
Tiwari MK, Vidyarthi NK (2000) Solving machine loading problem in flexible manufacturing system using genetic algorithm based heuristic approach. Intl J Product Res 38(14):3357-3384
-
(2000)
Intl J Product Res
, vol.38
, Issue.14
, pp. 3357-3384
-
-
Tiwari, M.K.1
Vidyarthi, N.K.2
-
167
-
-
34047209778
-
A comprehensive methodology for manufacturing system evaluation and comparison
-
Troxle JN, Blank L (1989) A comprehensive methodology for manufacturing system evaluation and comparison. J Manuf Syst 8:175-183
-
(1989)
J Manuf Syst
, vol.8
, pp. 175-183
-
-
Troxle, J.N.1
Blank, L.2
-
168
-
-
0032659169
-
A comparison between machine flexibility and routing flexibility
-
Tsubone H, Horikawa M (1999) A comparison between machine flexibility and routing flexibility. Intl J Flex Manuf Syst 11(1):83-101
-
(1999)
Intl J Flex Manuf Syst
, vol.11
, Issue.1
, pp. 83-101
-
-
Tsubone, H.1
Horikawa, M.2
-
170
-
-
0010310480
-
Strategic optimization cycle as a competitive tool for economic justification of advanced manufacturing systems
-
Venk S (1990) Strategic optimization cycle as a competitive tool for economic justification of advanced manufacturing systems. J Manuf Syst 9:194-205
-
(1990)
J Manuf Syst
, vol.9
, pp. 194-205
-
-
Venk, S.1
-
171
-
-
34249836688
-
Cutting tool management in computer integrated manufacturing
-
Veeramani D, Uptom DM, Barash MM (1992) Cutting tool management in computer integrated manufacturing. Intl J Flex Manuf Syst 3(3-4):237-265
-
(1992)
Intl J Flex Manuf Syst
, vol.3
, Issue.3-4
, pp. 237-265
-
-
Veeramani, D.1
Uptom, D.M.2
Barash, M.M.3
-
172
-
-
0032649736
-
Failure rate distribution for flexible manufacturing systems: An empirical study
-
Vineyard M, Gyampah KA, Meredith JP (1999) Failure rate distribution for flexible manufacturing systems: an empirical study. Euro J Operat Res 116(1):139-155
-
(1999)
Euro J Operat Res
, vol.116
, Issue.1
, pp. 139-155
-
-
Vineyard, M.1
Gyampah, K.A.2
Meredith, J.P.3
-
173
-
-
27744600972
-
Survey of research in the design and control of automated guided vehicle systems
-
Vis IFA (2006) Survey of research in the design and control of automated guided vehicle systems. Euro J Operat Res 170(3):677-709
-
(2006)
Euro J Operat Res
, vol.170
, Issue.3
, pp. 677-709
-
-
Vis, I.F.A.1
-
174
-
-
0037381598
-
Combined Petri net modeling and AI based heuristic hybrid search for flexible manufacturing system-part I Petri net modeling and heuristic search
-
Yu H, Reyes A, Lang S, Lloyd S (2003) Combined Petri net modeling and AI based heuristic hybrid search for flexible manufacturing system-part I Petri net modeling and heuristic search. Intl J Comput Ind Eng 44:527-543
-
(2003)
Intl J Comput Ind Eng
, vol.44
, pp. 527-543
-
-
Yu, H.1
Reyes, A.2
Lang, S.3
Lloyd, S.4
-
175
-
-
0033341387
-
Scheduling with alternatives: A link between process planning and scheduling
-
Weintraub A, Cormier D, Hodgson T, King R, Wilson J, Zozom A (1999) Scheduling with alternatives: A link between process planning and scheduling. HE Trans 31(11): 1093-1102
-
(1999)
HE Trans
, vol.31
, Issue.11
, pp. 1093-1102
-
-
Weintraub, A.1
Cormier, D.2
Hodgson, T.3
King, R.4
Wilson, J.5
Zozom, A.6
-
176
-
-
0025894230
-
Job shop scheduling with tool constraints: A Tabu search approach
-
Widmer M (1991) Job shop scheduling with tool constraints: a Tabu search approach. J Operat Res Soc 42(1):75-82
-
(1991)
J Operat Res Soc
, vol.42
, Issue.1
, pp. 75-82
-
-
Widmer, M.1
-
177
-
-
0026188740
-
Incorporating the uncertainty of decision judgments in analytical hierarchy process
-
Zahir MS (1991) Incorporating the uncertainty of decision judgments in analytical hierarchy process. Euro J Operat Res 53(2):206-216
-
(1991)
Euro J Operat Res
, vol.53
, Issue.2
, pp. 206-216
-
-
Zahir, M.S.1
-
178
-
-
0035246266
-
A genetic algorithm approach to the scheduling of FMS with multiple routes
-
Zhao C, Wu Z (2001) A genetic algorithm approach to the scheduling of FMS with multiple routes. Intl J Flex Manuf Syst 13(1):71-88
-
(2001)
Intl J Flex Manuf Syst
, vol.13
, Issue.1
, pp. 71-88
-
-
Zhao, C.1
Wu, Z.2
-
179
-
-
0032679081
-
Jointly solving the group scheduling and machine speed selection problem: A hybrid Tabu simulated and simulated annealing approach
-
Zofaghari S, Liang M (1999) Jointly solving the group scheduling and machine speed selection problem: a hybrid Tabu simulated and simulated annealing approach. Intl J Product Res 37(10):2377-2397
-
(1999)
Intl J Product Res
, vol.37
, Issue.10
, pp. 2377-2397
-
-
Zofaghari, S.1
Liang, M.2
|