메뉴 건너뛰기




Volumn 19, Issue 1, 2007, Pages 1-40

A review of some issues and identification of some barriers in the implementation of FMS

Author keywords

Adaptation; Barriers; Flexible manufacturing systems; Implementation; Transition

Indexed keywords

ALGORITHMS; COMPETITIVE INTELLIGENCE; SOCIETIES AND INSTITUTIONS;

EID: 34249669630     PISSN: 09206299     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10696-007-9015-7     Document Type: Review
Times cited : (49)

References (179)
  • 1
    • 0022604509 scopus 로고
    • Solution of scheduling problems of job shop type FMS with alternative machine tools
    • Abdin MF (1986) Solution of scheduling problems of job shop type FMS with alternative machine tools. Comput Ind Eng 11(1):19-21
    • (1986) Comput Ind Eng , vol.11 , Issue.1 , pp. 19-21
    • Abdin, M.F.1
  • 2
    • 0030263614 scopus 로고    scopus 로고
    • Tool allocation and machining conditions optimization for CNC machines
    • Akturk MS, Avci S (1996) Tool allocation and machining conditions optimization for CNC machines. Euro J Operat Res 94:335-348
    • (1996) Euro J Operat Res , vol.94 , pp. 335-348
    • Akturk, M.S.1    Avci, S.2
  • 3
    • 0030085521 scopus 로고    scopus 로고
    • Scheduling of automated guided vehicles in a decision making heirarchy
    • Akturk MS, Yilmaz H (1996) Scheduling of automated guided vehicles in a decision making heirarchy. Intl J Product Res 34(2):577-591
    • (1996) Intl J Product Res , vol.34 , Issue.2 , pp. 577-591
    • Akturk, M.S.1    Yilmaz, H.2
  • 4
    • 0032070825 scopus 로고    scopus 로고
    • A model of machine-tool selection and operation in FMS
    • Atmani A, Lashkari RS (1998) A model of machine-tool selection and operation in FMS. Intl J Product Res 36(5):1339-1349
    • (1998) Intl J Product Res , vol.36 , Issue.5 , pp. 1339-1349
    • Atmani, A.1    Lashkari, R.S.2
  • 5
    • 0024657351 scopus 로고
    • Measuring the economic effectiveness of flexible automation: A new approach
    • Azzone G, Bertele U (1989) Measuring the economic effectiveness of flexible automation: a new approach. Intl J Product Res 27:735-746
    • (1989) Intl J Product Res , vol.27 , pp. 735-746
    • Azzone, G.1    Bertele, U.2
  • 6
    • 84914769676 scopus 로고
    • Techniques for measuring the effectiveness of automation
    • Azzone G, Bertele U (1991) Techniques for measuring the effectiveness of automation. Manuf Syst 48:1-45
    • (1991) Manuf Syst , vol.48 , pp. 1-45
    • Azzone, G.1    Bertele, U.2
  • 8
    • 0029310275 scopus 로고
    • Model of a universal manufacturing interface in CIM for small and medium sized companies
    • Balic J, Zivec Z, Cus F (1995) Model of a universal manufacturing interface in CIM for small and medium sized companies. J Mater Process Technol 52(1):102-114
    • (1995) J Mater Process Technol , vol.52 , Issue.1 , pp. 102-114
    • Balic, J.1    Zivec, Z.2    Cus, F.3
  • 9
    • 0037308525 scopus 로고    scopus 로고
    • Optimization of intelligent FMS using data flow matrix method
    • Balic J, Pahole I (2003) Optimization of intelligent FMS using data flow matrix method. J Mater Process Technol 133(1-2):13-20
    • (2003) J Mater Process Technol , vol.133 , Issue.1-2 , pp. 13-20
    • Balic, J.1    Pahole, I.2
  • 10
    • 0032072164 scopus 로고    scopus 로고
    • A Petri Net model for the operation design and analysis of segmented flow topology (SFT) AGV system
    • Barad M, Sinriech D (1998) A Petri Net model for the operation design and analysis of segmented flow topology (SFT) AGV system. Intl J Product Res 36(5):1401-1426
    • (1998) Intl J Product Res , vol.36 , Issue.5 , pp. 1401-1426
    • Barad, M.1    Sinriech, D.2
  • 11
    • 0029288391 scopus 로고
    • Solving the job shop scheduling problem with Tabu search
    • Barness JW, Chambers JB (1995) Solving the job shop scheduling problem with Tabu search. IIE Trans 27(2):257-263
    • (1995) IIE Trans , vol.27 , Issue.2 , pp. 257-263
    • Barness, J.W.1    Chambers, J.B.2
  • 12
    • 0024621009 scopus 로고
    • Decentralized control of automated guided vehicles on a simple loop
    • Bartholdi J J, Platzman KK (1989) Decentralized control of automated guided vehicles on a simple loop. IIE Trans 21(1):76-81
    • (1989) IIE Trans , vol.21 , Issue.1 , pp. 76-81
    • Bartholdi, J.J.1    Platzman, K.K.2
  • 13
    • 0038911894 scopus 로고    scopus 로고
    • An integrating framework for FMS diffusion. OMEGA: Intl
    • Belassi W, Fadlalla A (1998) An integrating framework for FMS diffusion. OMEGA: Intl J Manag Sci 26(6):699-713
    • (1998) J Manag Sci , vol.26 , Issue.6 , pp. 699-713
    • Belassi, W.1    Fadlalla, A.2
  • 14
    • 0037109624 scopus 로고    scopus 로고
    • Decentralized autonomous AGV system for material handling
    • Berman S, Edan Y (2002) Decentralized autonomous AGV system for material handling. Intl J Product Res 40(15):3995-4006
    • (2002) Intl J Product Res , vol.40 , Issue.15 , pp. 3995-4006
    • Berman, S.1    Edan, Y.2
  • 15
    • 1842635125 scopus 로고    scopus 로고
    • Quantification of flexibility in advanced manufacturing systems using fuzzy concept
    • Beskese A, Kahraman C, Irani Z (2004) Quantification of flexibility in advanced manufacturing systems using fuzzy concept. Intl J Product Econ 89(1):45-56
    • (2004) Intl J Product Econ , vol.89 , Issue.1 , pp. 45-56
    • Beskese, A.1    Kahraman, C.2    Irani, Z.3
  • 16
    • 0032184565 scopus 로고    scopus 로고
    • Analytic process of resource: A practical approach for scheduling
    • Bing WX (1998) Analytic process of resource: a practical approach for scheduling. Comput Ind Eng 35(1-2):97-100
    • (1998) Comput Ind Eng , vol.35 , Issue.1-2 , pp. 97-100
    • Bing, W.X.1
  • 17
    • 0035341621 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the container loading problem
    • Bortfield A, Gehring H (2001) A hybrid genetic algorithm for the container loading problem. Euro J Operat Res 131(1):143-161
    • (2001) Euro J Operat Res , vol.131 , Issue.1 , pp. 143-161
    • Bortfield, A.1    Gehring, H.2
  • 19
    • 0031210787 scopus 로고    scopus 로고
    • Real-time operational control of an FMS with full routing flexibility
    • Bryne MD, Chutima P (1997) Real-time operational control of an FMS with full routing flexibility. Intl J Product Econ 51(1-2):109-113
    • (1997) Intl J Product Econ , vol.51 , Issue.1-2 , pp. 109-113
    • Bryne, M.D.1    Chutima, P.2
  • 20
    • 0002688837 scopus 로고
    • Tandem configuration for AGV systems offers flexibility and simplicity
    • Bozer Y A, Srinivasan MM (1989) Tandem configuration for AGV systems offers flexibility and simplicity. Ind Eng 21(2):23-27
    • (1989) Ind Eng , vol.21 , Issue.2 , pp. 23-27
    • Bozer, Y.A.1    Srinivasan, M.M.2
  • 21
    • 2642567726 scopus 로고    scopus 로고
    • Tool allocation in flexible manufacturing system with tool alternatives
    • Buyurgan N, Soygin C, Engin Kilic SES (2004) Tool allocation in flexible manufacturing system with tool alternatives. Robotics Comput-Integrat Manuf 20(4):341-349
    • (2004) Robotics Comput-Integrat Manuf , vol.20 , Issue.4 , pp. 341-349
    • Buyurgan, N.1    Soygin, C.2    Engin Kilic, S.E.S.3
  • 23
    • 0022287412 scopus 로고
    • Flexibility and productivity in manufacturing systems
    • Chicago, pp
    • Buzzacott J, Mandelbaum M (1985) Flexibility and productivity in manufacturing systems. In: Proceedings of IIE conference, Chicago, pp 404-413
    • (1985) Proceedings of IIE conference , pp. 404-413
    • Buzzacott, J.1    Mandelbaum, M.2
  • 24
    • 0022757590 scopus 로고
    • Flexible manufacturing systems: A review of analytical models
    • Buzzacott J, Yao D (1986) Flexible manufacturing systems: a review of analytical models. Manag Sci 32(7):890-905
    • (1986) Manag Sci , vol.32 , Issue.7 , pp. 890-905
    • Buzzacott, J.1    Yao, D.2
  • 25
    • 0033705901 scopus 로고    scopus 로고
    • A genetic algorithm for scheduling staff of mixed skills under multi-criteria
    • Cai X, Li KN (2000) A genetic algorithm for scheduling staff of mixed skills under multi-criteria. Euro J Operat Res 125(2):359-369
    • (2000) Euro J Operat Res , vol.125 , Issue.2 , pp. 359-369
    • Cai, X.1    Li, K.N.2
  • 26
    • 0033115993 scopus 로고    scopus 로고
    • Evaluation of operational control rules in scheduling a flexible manufacturing system
    • Chan FTS (1999) Evaluation of operational control rules in scheduling a flexible manufacturing system. Robot Comput Integrat Manuf 15(2):121-132
    • (1999) Robot Comput Integrat Manuf , vol.15 , Issue.2 , pp. 121-132
    • Chan, F.T.S.1
  • 27
    • 3242671403 scopus 로고    scopus 로고
    • Analysis of dynamic control strategies of an FMS under different scenarios
    • Chan FTS, Chan HK (2004) Analysis of dynamic control strategies of an FMS under different scenarios. Robot Comput Integral Manuf 20(5):423-437
    • (2004) Robot Comput Integral Manuf , vol.20 , Issue.5 , pp. 423-437
    • Chan, F.T.S.1    Chan, H.K.2
  • 28
    • 33644751275 scopus 로고    scopus 로고
    • Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS
    • Chan FTS, Swarnkar R (2006) Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS. Robot Comput Integrat Manuf 22(4):353-362
    • (2006) Robot Comput Integrat Manuf , vol.22 , Issue.4 , pp. 353-362
    • Chan, F.T.S.1    Swarnkar, R.2
  • 29
    • 0033907504 scopus 로고    scopus 로고
    • The development of intelligent decision support tools to aid the design of flexible manufacturing systems
    • Chan FTS, Jiang B, Tang NKH (2000) The development of intelligent decision support tools to aid the design of flexible manufacturing systems. Intl J Product Econ 65:73-84
    • (2000) Intl J Product Econ , vol.65 , pp. 73-84
    • Chan, F.T.S.1    Jiang, B.2    Tang, N.K.H.3
  • 30
    • 0038481221 scopus 로고    scopus 로고
    • Analysis of dynamic dispatching rules for a flexible manufacturing system
    • Chan FTS, Chan HK, Lau HCW, Ip RWL (2003) Analysis of dynamic dispatching rules for a flexible manufacturing system. J Mater Process Technol 138(1-3):325-331
    • (2003) J Mater Process Technol , vol.138 , Issue.1-3 , pp. 325-331
    • Chan, F.T.S.1    Chan, H.K.2    Lau, H.C.W.3    Ip, R.W.L.4
  • 31
    • 33746855485 scopus 로고    scopus 로고
    • Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach
    • Chan FTS, Chung SH, Chan LY, Finke G, Tiwari MK (2006) Solving distributed FMS scheduling problems subject to maintenance: genetic algorithms approach. Robot Comput Integral Manuf 22(5-6):493-504
    • (2006) Robot Comput Integral Manuf , vol.22 , Issue.5-6 , pp. 493-504
    • Chan, F.T.S.1    Chung, S.H.2    Chan, L.Y.3    Finke, G.4    Tiwari, M.K.5
  • 32
    • 0026253933 scopus 로고
    • Intelligent dispatching for flexible manufacturing
    • Chandra J, Talavage J (1991) Intelligent dispatching for flexible manufacturing. Intl J Product Res 29(11):2259-2278
    • (1991) Intl J Product Res , vol.29 , Issue.11 , pp. 2259-2278
    • Chandra, J.1    Talavage, J.2
  • 34
    • 0026254174 scopus 로고
    • Effects of loading and routing decisions on performance of flexible manufacturing systems
    • Chen IJ, Chung CH (1991) Effects of loading and routing decisions on performance of flexible manufacturing systems. Intl J Product Res 29(11):2209-2225
    • (1991) Intl J Product Res , vol.29 , Issue.11 , pp. 2209-2225
    • Chen, I.J.1    Chung, C.H.2
  • 35
    • 0030085520 scopus 로고    scopus 로고
    • An examination of flexibility measurements and performance of flexible manufacturing systems
    • Chen IJ, Chung CH (1996) An examination of flexibility measurements and performance of flexible manufacturing systems. Intl J Product Res 34(2):379-394
    • (1996) Intl J Product Res , vol.34 , Issue.2 , pp. 379-394
    • Chen, I.J.1    Chung, C.H.2
  • 36
    • 13844322261 scopus 로고    scopus 로고
    • A novel approach to production planning of flexible manufacturing systems using an efficient multi-objective genetic algorithm
    • Chen J-H, Ho S-Y (2005) A novel approach to production planning of flexible manufacturing systems using an efficient multi-objective genetic algorithm. Intl J of Mach Tools Manuf 45:949-957
    • (2005) Intl J of Mach Tools Manuf , vol.45 , pp. 949-957
    • Chen, J.-H.1    Ho, S.-Y.2
  • 37
    • 0025429972 scopus 로고
    • A multiobjective evaluation of flexible manufacturing system loading heuristics
    • Chen Y-J, Askin RG (1990) A multiobjective evaluation of flexible manufacturing system loading heuristics. Intl J Product Res 28(5):895-911
    • (1990) Intl J Product Res , vol.28 , Issue.5 , pp. 895-911
    • Chen, Y.-J.1    Askin, R.G.2
  • 38
    • 0037420927 scopus 로고    scopus 로고
    • Iterative methods of flexible manufacturing system
    • Ching WK, Loh AW (2003) Iterative methods of flexible manufacturing system. Intl J Appl Math Comput 141:553-564
    • (2003) Intl J Appl Math Comput , vol.141 , pp. 553-564
    • Ching, W.K.1    Loh, A.W.2
  • 39
    • 0026417692 scopus 로고
    • A survey of maintenance models for multi-unit systems
    • Cho DI, Parlar M (1991) A survey of maintenance models for multi-unit systems. Euro J Operat Res 51(1):1-23
    • (1991) Euro J Operat Res , vol.51 , Issue.1 , pp. 1-23
    • Cho, D.I.1    Parlar, M.2
  • 40
    • 0031231627 scopus 로고    scopus 로고
    • Changing human resources to make flexible manufacturing systems (FMSs) successful
    • Cordero R (1997) Changing human resources to make flexible manufacturing systems (FMSs) successful. J High Technol Manag Res 8(2):263-275
    • (1997) J High Technol Manag Res , vol.8 , Issue.2 , pp. 263-275
    • Cordero, R.1
  • 41
    • 0032099721 scopus 로고    scopus 로고
    • A constraint based genetic algorithm for concurrent engineering
    • Cormier D, O'Grady P, Saini E (1998) A constraint based genetic algorithm for concurrent engineering. Intl J Product Res 36(6):1679-1697
    • (1998) Intl J Product Res , vol.36 , Issue.6 , pp. 1679-1697
    • Cormier, D.1    O'Grady, P.2    Saini, E.3
  • 42
    • 0023834152 scopus 로고
    • An overview of advance manufacturing technology
    • Craven FW, Slatter RR (1988) An overview of advance manufacturing technology. Appl Ergonom 19(1):9-16
    • (1988) Appl Ergonom , vol.19 , Issue.1 , pp. 9-16
    • Craven, F.W.1    Slatter, R.R.2
  • 43
    • 34249669034 scopus 로고    scopus 로고
    • Dadone P, Van Landingham HF, Maino B (May 1997) Fuzzy techniques for controlling flexible manufacturing systems. In: Proceedings of the IASTED international conference control'97, Cancum, Mexico
    • Dadone P, Van Landingham HF, Maino B (May 1997) Fuzzy techniques for controlling flexible manufacturing systems. In: Proceedings of the IASTED international conference control'97, Cancum, Mexico
  • 45
    • 0029732144 scopus 로고    scopus 로고
    • The measurement of flexibility in manufacturing systems
    • Das SK (1996) The measurement of flexibility in manufacturing systems. Intl J Flexible Manuf Syst 8(1):67-93
    • (1996) Intl J Flexible Manuf Syst , vol.8 , Issue.1 , pp. 67-93
    • Das, S.K.1
  • 46
    • 0040088481 scopus 로고    scopus 로고
    • Selection of routes in a flexible manufacturing facility
    • Das SK, Nagendra P (1997) Selection of routes in a flexible manufacturing facility. Intl J Product Econ 48(3):237-247
    • (1997) Intl J Product Econ , vol.48 , Issue.3 , pp. 237-247
    • Das, S.K.1    Nagendra, P.2
  • 47
    • 38249015520 scopus 로고
    • A multi objective decision for the evaluation of advanced manufacturing system technologies
    • Demmel JG, Askin RG (1992) A multi objective decision for the evaluation of advanced manufacturing system technologies. J Manuf Syst 11:179-194
    • (1992) J Manuf Syst , vol.11 , pp. 179-194
    • Demmel, J.G.1    Askin, R.G.2
  • 48
    • 0001041967 scopus 로고
    • Measuring manufacturing flexibility: An empirical investigation
    • Dixon JR (1992) Measuring manufacturing flexibility: an empirical investigation. Euro J Operat Res 60:131-143
    • (1992) Euro J Operat Res , vol.60 , pp. 131-143
    • Dixon, J.R.1
  • 49
    • 0000250053 scopus 로고
    • Dynamic control of flexible manufacturing system
    • Dolinska M, Bessant CB (1995) Dynamic control of flexible manufacturing system. Intl J Adv Manuf Technol 10:131-138
    • (1995) Intl J Adv Manuf Technol , vol.10 , pp. 131-138
    • Dolinska, M.1    Bessant, C.B.2
  • 50
    • 0032645739 scopus 로고    scopus 로고
    • A distributed genetic algorithm for deterministic and stochastic labour scheduling problems
    • Eatson FF, Mansour N (1999) A distributed genetic algorithm for deterministic and stochastic labour scheduling problems. Euro J Operat Res 118(3):505-523
    • (1999) Euro J Operat Res , vol.118 , Issue.3 , pp. 505-523
    • Eatson, F.F.1    Mansour, N.2
  • 51
    • 12244256124 scopus 로고    scopus 로고
    • Scheduling tasks on a flexible manufacturing machine to minimize tool change delays
    • Ecker KH, Gupta JND (2005) Scheduling tasks on a flexible manufacturing machine to minimize tool change delays. Euro J Operat Res 164(3):627-638
    • (2005) Euro J Operat Res , vol.164 , Issue.3 , pp. 627-638
    • Ecker, K.H.1    Gupta, J.N.D.2
  • 52
    • 0021423836 scopus 로고
    • Characterization of automatic guided vehicle dispatching rules
    • Egbelu PJ, Tanchoco JMA (1984) Characterization of automatic guided vehicle dispatching rules. Intl J Product Res 22(3):359-374
    • (1984) Intl J Product Res , vol.22 , Issue.3 , pp. 359-374
    • Egbelu, P.J.1    Tanchoco, J.M.A.2
  • 53
    • 0022785934 scopus 로고
    • Potentials for bi-directional guide-path for automatic guided vehicle based Systems
    • Egbelu PJ, Tanchoco JMA (1986) Potentials for bi-directional guide-path for automatic guided vehicle based Systems. Intl J Product Res 24(5):1075-1097
    • (1986) Intl J Product Res , vol.24 , Issue.5 , pp. 1075-1097
    • Egbelu, P.J.1    Tanchoco, J.M.A.2
  • 55
    • 0024732435 scopus 로고
    • FMS implementation procedure: A case study
    • Fry TD, Smith AE (1989) FMS implementation procedure: a case study. IIE Trans 21(3):288-293
    • (1989) IIE Trans , vol.21 , Issue.3 , pp. 288-293
    • Fry, T.D.1    Smith, A.E.2
  • 56
    • 0037328890 scopus 로고    scopus 로고
    • A modeling technique for loading and scheduling problems in FMS
    • Gamila MA, Motavalli S (2003) A modeling technique for loading and scheduling problems in FMS. Robot Comput Integrat Manuf 19(1-2):45-54
    • (2003) Robot Comput Integrat Manuf , vol.19 , Issue.1-2 , pp. 45-54
    • Gamila, M.A.1    Motavalli, S.2
  • 57
    • 0023349893 scopus 로고
    • Flow path design for automated guided vehicle systems
    • Gaskins RJ, Tanchoco JMA (1987) Flow path design for automated guided vehicle systems. Intl J Product Res 25(5):667-676
    • (1987) Intl J Product Res , vol.25 , Issue.5 , pp. 667-676
    • Gaskins, R.J.1    Tanchoco, J.M.A.2
  • 58
    • 0042363455 scopus 로고    scopus 로고
    • Analysis of the structural measures of flexibility and agility using a measurement theoretical framework
    • Giachetti RE, Martinez LD, Saenz OA, Chen C (2003) Analysis of the structural measures of flexibility and agility using a measurement theoretical framework. Intl J Product Econ 86(1):47-62
    • (2003) Intl J Product Econ , vol.86 , Issue.1 , pp. 47-62
    • Giachetti, R.E.1    Martinez, L.D.2    Saenz, O.A.3    Chen, C.4
  • 59
    • 0026904594 scopus 로고
    • Routing flexibility and production scheduling in a flexible manufacturing system
    • Ghosh S, Gaimon C (1992) Routing flexibility and production scheduling in a flexible manufacturing system. Euro J Operat Res 60(3):344-364
    • (1992) Euro J Operat Res , vol.60 , Issue.3 , pp. 344-364
    • Ghosh, S.1    Gaimon, C.2
  • 60
    • 0000904077 scopus 로고
    • Messy genetic algorithm: Motivation analysis and first results
    • Goldberg DE, Korb B, Deb K (1989) Messy genetic algorithm: motivation analysis and first results. Complex Syst 3(5):493-530
    • (1989) Complex Syst , vol.3 , Issue.5 , pp. 493-530
    • Goldberg, D.E.1    Korb, B.2    Deb, K.3
  • 61
    • 0027591340 scopus 로고
    • A synthesis of decision models for tool management in automated manufacturing
    • Gray AE, Siedmann AS, Stecke KE (1993) A synthesis of decision models for tool management in automated manufacturing. Manag Sci 39(5):549-567
    • (1993) Manag Sci , vol.39 , Issue.5 , pp. 549-567
    • Gray, A.E.1    Siedmann, A.S.2    Stecke, K.E.3
  • 63
    • 0035482386 scopus 로고    scopus 로고
    • A review of different approaches to the FMS loading problem
    • Grieco A, Semeraro Q, Tolio T (2001) A review of different approaches to the FMS loading problem. Intl J Flex Manuf Syst 13(4):361-384
    • (2001) Intl J Flex Manuf Syst , vol.13 , Issue.4 , pp. 361-384
    • Grieco, A.1    Semeraro, Q.2    Tolio, T.3
  • 65
    • 0032639332 scopus 로고    scopus 로고
    • Machine loading and part type selection in flexible manufacturing systems
    • Guerrero F, Lozano S, Koltai T, Larraneta J (1999) Machine loading and part type selection in flexible manufacturing systems. Intl J Product Res 37(6):1303-1317
    • (1999) Intl J Product Res , vol.37 , Issue.6 , pp. 1303-1317
    • Guerrero, F.1    Lozano, S.2    Koltai, T.3    Larraneta, J.4
  • 66
    • 0024128445 scopus 로고
    • Organizational issues of flexible manufacturing systems
    • Gupta YP (1988) Organizational issues of flexible manufacturing systems. Technovation 8:255-269
    • (1988) Technovation , vol.8 , pp. 255-269
    • Gupta, Y.P.1
  • 67
    • 0021493814 scopus 로고
    • Flexibility and productivity in complex production processes
    • Gustavsson S (1984) Flexibility and productivity in complex production processes. Intl J Product Res 22:801-808
    • (1984) Intl J Product Res , vol.22 , pp. 801-808
    • Gustavsson, S.1
  • 68
    • 0032001992 scopus 로고    scopus 로고
    • Multicriteria inventory classification using a genetic algorithm
    • Guvenir HA, Erel E (1998) Multicriteria inventory classification using a genetic algorithm. Euro J Operat Res 105(1):29-37
    • (1998) Euro J Operat Res , vol.105 , Issue.1 , pp. 29-37
    • Guvenir, H.A.1    Erel, E.2
  • 69
    • 0005874462 scopus 로고
    • Investigating the application potential of simulation to real-time control decision
    • Harmonosky CM, Robohn SF (1995) Investigating the application potential of simulation to real-time control decision. Intl J Comput Integral Manuf 8(2):126-132
    • (1995) Intl J Comput Integral Manuf , vol.8 , Issue.2 , pp. 126-132
    • Harmonosky, C.M.1    Robohn, S.F.2
  • 70
    • 0010844051 scopus 로고    scopus 로고
    • An exchange heuristic embedded with simulated annealing for due-dates job-shop scheduling
    • He Z, Yang T, Tiger A (1996) An exchange heuristic embedded with simulated annealing for due-dates job-shop scheduling. Euro J Operat Res 91(1):99-117
    • (1996) Euro J Operat Res , vol.91 , Issue.1 , pp. 99-117
    • He, Z.1    Yang, T.2    Tiger, A.3
  • 71
    • 0032131897 scopus 로고    scopus 로고
    • Heuristics for minimizing tool switches when scheduling part types on a flexible machine
    • Hertz A, Laporte G, Mittaz M, Stecke K (1998) Heuristics for minimizing tool switches when scheduling part types on a flexible machine. IIE Trans 30:689-694
    • (1998) IIE Trans , vol.30 , pp. 689-694
    • Hertz, A.1    Laporte, G.2    Mittaz, M.3    Stecke, K.4
  • 72
    • 33750732963 scopus 로고    scopus 로고
    • A simulation study on the performance of pick-up dispatching rules for multi-load AGVs
    • Ho YC, Liu HC (2006) A simulation study on the performance of pick-up dispatching rules for multi-load AGVs. Comput Industr Eng 51(3):445-463
    • (2006) Comput Industr Eng , vol.51 , Issue.3 , pp. 445-463
    • Ho, Y.C.1    Liu, H.C.2
  • 73
    • 0032304826 scopus 로고    scopus 로고
    • An overview of path decision and dispatching methods for automated guided vehicles
    • Hoff EB, Sarker BR (1998) An overview of path decision and dispatching methods for automated guided vehicles. Integral Manuf Syst 9(5):296-307
    • (1998) Integral Manuf Syst , vol.9 , Issue.5 , pp. 296-307
    • Hoff, E.B.1    Sarker, B.R.2
  • 74
    • 0001596526 scopus 로고    scopus 로고
    • Hutchison J (1991) Current and future issues concerning FMS scheduling. OMEGA Intl J Manag Sci 19(6):529-537
    • Hutchison J (1991) Current and future issues concerning FMS scheduling. OMEGA Intl J Manag Sci 19(6):529-537
  • 75
    • 0001805208 scopus 로고
    • A quantification of the value of flexibility
    • Hutchison OK, Sinha D (1989) A quantification of the value of flexibility. J Manuf Syst 8(1):47-57
    • (1989) J Manuf Syst , vol.8 , Issue.1 , pp. 47-57
    • Hutchison, O.K.1    Sinha, D.2
  • 76
    • 0036820215 scopus 로고    scopus 로고
    • Impact of interruption on schedule execution in flexible manufacturing systems
    • Jain S, Foley WJ (2002) Impact of interruption on schedule execution in flexible manufacturing systems. Intl J Flex Manuf Syst 14(4):319-344
    • (2002) Intl J Flex Manuf Syst , vol.14 , Issue.4 , pp. 319-344
    • Jain, S.1    Foley, W.J.2
  • 78
    • 0009338739 scopus 로고
    • Optimal flow path design of uni-directional AGV system
    • Kaspi M, Tanchoco JMA (1990) Optimal flow path design of uni-directional AGV system. Intl J Product Res 28(6):1023-1030
    • (1990) Intl J Product Res , vol.28 , Issue.6 , pp. 1023-1030
    • Kaspi, M.1    Tanchoco, J.M.A.2
  • 79
    • 0037278646 scopus 로고    scopus 로고
    • Hierarchical control of production and maintenance rates in manufacturing
    • Kenne JP, Boukas EK (2003) Hierarchical control of production and maintenance rates in manufacturing. J Qual Mainten Eng 9(1):66-82
    • (2003) J Qual Mainten Eng , vol.9 , Issue.1 , pp. 66-82
    • Kenne, J.P.1    Boukas, E.K.2
  • 80
    • 0037773196 scopus 로고    scopus 로고
    • An intelligent hierarchical workstation control model for FMS
    • Keung KW, Ip WH, Yuen D (2003) An intelligent hierarchical workstation control model for FMS. J Mater Process Technol 139(1-3):134-139
    • (2003) J Mater Process Technol , vol.139 , Issue.1-3 , pp. 134-139
    • Keung, K.W.1    Ip, W.H.2    Yuen, D.3
  • 81
    • 0027342202 scopus 로고
    • Heuristic approach for loading problems in flexible manufacturing systems
    • Kim YD, Yano CA (1993) Heuristic approach for loading problems in flexible manufacturing systems. IIE Trans 25(1):26-39
    • (1993) IIE Trans , vol.25 , Issue.1 , pp. 26-39
    • Kim, Y.D.1    Yano, C.A.2
  • 82
    • 0026383580 scopus 로고
    • Conflict-free shortest-time bi-directional AGV routing
    • Kim CW, Tanchoco JMA (1991) Conflict-free shortest-time bi-directional AGV routing. Intl J Product Res 29(12):2377-2391
    • (1991) Intl J Product Res , vol.29 , Issue.12 , pp. 2377-2391
    • Kim, C.W.1    Tanchoco, J.M.A.2
  • 86
    • 17844366577 scopus 로고    scopus 로고
    • Modeling of manufacturing systems and robot motions
    • Kost GG, Zdanowicz R (2005) Modeling of manufacturing systems and robot motions. J Mater Process Technol 164-165:1369-1378
    • (2005) J Mater Process Technol , vol.164-165 , pp. 1369-1378
    • Kost, G.G.1    Zdanowicz, R.2
  • 87
    • 0026261413 scopus 로고
    • An optimal tool selection procedure for the initial design phase of a flexible manufacturing systems
    • Kouvelis P (1991) An optimal tool selection procedure for the initial design phase of a flexible manufacturing systems. Euro J Operat Res 55(2):201-210
    • (1991) Euro J Operat Res , vol.55 , Issue.2 , pp. 201-210
    • Kouvelis, P.1
  • 88
    • 34249651694 scopus 로고
    • Pilot plants to assist FMS/CIM Evaluation. Desig Ind Appl Comput Integral
    • Kovacs GL (1992) Pilot plants to assist FMS/CIM Evaluation. Desig Ind Appl Comput Integral Manuf Syst 5(1):54-60
    • (1992) Manuf Syst , vol.5 , Issue.1 , pp. 54-60
    • Kovacs, G.L.1
  • 89
    • 0034634829 scopus 로고    scopus 로고
    • A genetic algorithm for FMS part type selection and machine loading
    • Kumar N, Shankar K (2000) A genetic algorithm for FMS part type selection and machine loading. Intl J Product Res 38(16):3861-3887
    • (2000) Intl J Product Res , vol.38 , Issue.16 , pp. 3861-3887
    • Kumar, N.1    Shankar, K.2
  • 90
    • 0025460582 scopus 로고
    • Joint consideration of grouping and loading problems in a flexible manufacturing system
    • Kumar P, Tewari NK, Singh N (1990) Joint consideration of grouping and loading problems in a flexible manufacturing system. Intl J Product Res 28(7):1345-1356
    • (1990) Intl J Product Res , vol.28 , Issue.7 , pp. 1345-1356
    • Kumar, P.1    Tewari, N.K.2    Singh, N.3
  • 91
    • 33748437416 scopus 로고    scopus 로고
    • Solving machine-loading problem of a flexible manufacturing system with a constraint-based genetic algorithm
    • Kumar A, Prakash, Tiwari MK, Shankar R, Baveja A (2006) Solving machine-loading problem of a flexible manufacturing system with a constraint-based genetic algorithm. Euro J Operat Res 175(2):1043-1069
    • (2006) Euro J Operat Res , vol.175 , Issue.2 , pp. 1043-1069
    • Kumar, A.1    Prakash2    Tiwari, M.K.3    Shankar, R.4    Baveja, A.5
  • 92
    • 0030182638 scopus 로고    scopus 로고
    • Dispatching, routing and scheduling of two automated guided vehicles in a flexible manufacturing systems
    • Langevin A, Lauzon D, Riopel D (1996) Dispatching, routing and scheduling of two automated guided vehicles in a flexible manufacturing systems. Intl J Flex Manuf Syst 8(3):247-262
    • (1996) Intl J Flex Manuf Syst , vol.8 , Issue.3 , pp. 247-262
    • Langevin, A.1    Lauzon, D.2    Riopel, D.3
  • 94
    • 0023416625 scopus 로고
    • A new formulation of operation allocation problem in flexible manufacturing systems: Mathematical modeling and computational experience
    • Lashkari RS, Dutta SP, Padhye AM (1987) A new formulation of operation allocation problem in flexible manufacturing systems: mathematical modeling and computational experience. Intl J Product Res 25(9):1267-1283
    • (1987) Intl J Product Res , vol.25 , Issue.9 , pp. 1267-1283
    • Lashkari, R.S.1    Dutta, S.P.2    Padhye, A.M.3
  • 96
    • 0030398243 scopus 로고    scopus 로고
    • Load selection of automated guided vehicles in flexible manufacturing systems
    • Lee J, Tangjarukij M, Zhu Z (1996) Load selection of automated guided vehicles in flexible manufacturing systems. Intl J Product Res 34(12):3388-3400
    • (1996) Intl J Product Res , vol.34 , Issue.12 , pp. 3388-3400
    • Lee, J.1    Tangjarukij, M.2    Zhu, Z.3
  • 97
    • 0024771924 scopus 로고
    • A multi-objective production planning model in a flexible manufacturing environment
    • Lee SM, Jung HJ (1989) A multi-objective production planning model in a flexible manufacturing environment. Intl J Product Res 27(11):1981-1992
    • (1989) Intl J Product Res , vol.27 , Issue.11 , pp. 1981-1992
    • Lee, S.M.1    Jung, H.J.2
  • 98
    • 0034230637 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the open shop scheduling problem
    • Liaw C (2000) A hybrid genetic algorithm for the open shop scheduling problem. Euro J Operat Res 124(1):28-42
    • (2000) Euro J Operat Res , vol.124 , Issue.1 , pp. 28-42
    • Liaw, C.1
  • 99
    • 0001130388 scopus 로고
    • An algorithm for routing control of a tandem guided vehicle system
    • Lin JT, Dgen PK (1994) An algorithm for routing control of a tandem guided vehicle system. Intl J Product Res 32:2735-2750
    • (1994) Intl J Product Res , vol.32 , pp. 2735-2750
    • Lin, J.T.1    Dgen, P.K.2
  • 100
    • 0030106944 scopus 로고    scopus 로고
    • The classification of FMS scheduling problems
    • Liu J, Maccarthy BL (1996) The classification of FMS scheduling problems. Intl J Product Res 34(3):647-656
    • (1996) Intl J Product Res , vol.34 , Issue.3 , pp. 647-656
    • Liu, J.1    Maccarthy, B.L.2
  • 101
    • 23344453490 scopus 로고    scopus 로고
    • Modelling and heuristics of FMS scheduling with multiple objectives
    • Low C, Yip Y, Wu T (2006) Modelling and heuristics of FMS scheduling with multiple objectives. Comput Operat Res 33:674-694
    • (2006) Comput Operat Res , vol.33 , pp. 674-694
    • Low, C.1    Yip, Y.2    Wu, T.3
  • 102
    • 21844525546 scopus 로고
    • The organizational side of flexible manufacturing technology
    • Maffei MJ, Meredith J (1994) The organizational side of flexible manufacturing technology. Intl J Operat Product Manag 14(8):17-34
    • (1994) Intl J Operat Product Manag , vol.14 , Issue.8 , pp. 17-34
    • Maffei, M.J.1    Meredith, J.2
  • 104
    • 0000687077 scopus 로고
    • A model for the design of zone control automated guided vehicle systems
    • Malmborg CI (1990) A model for the design of zone control automated guided vehicle systems. Intl J Product Res 28(10):1741-1758
    • (1990) Intl J Product Res , vol.28 , Issue.10 , pp. 1741-1758
    • Malmborg, C.I.1
  • 105
    • 0025482436 scopus 로고
    • Design of an automated guided vehicle-based material handling system for a flexible manufacturing system
    • Mahadevan B, Narendran TT (1990) Design of an automated guided vehicle-based material handling system for a flexible manufacturing system. Intl J Product Res 28(9): 1611-1622
    • (1990) Intl J Product Res , vol.28 , Issue.9 , pp. 1611-1622
    • Mahadevan, B.1    Narendran, T.T.2
  • 106
    • 0032688266 scopus 로고    scopus 로고
    • An object-oriented rule-based framework for the specification of flexible manufacturing systems
    • Mak KL, Wong STW, Lau HYK (1999) An object-oriented rule-based framework for the specification of flexible manufacturing systems. Comput Industry 39(2):127-146
    • (1999) Comput Industry , vol.39 , Issue.2 , pp. 127-146
    • Mak, K.L.1    Wong, S.T.W.2    Lau, H.Y.K.3
  • 107
    • 0025420589 scopus 로고
    • Automating fixture design-from imitating practice to understanding principles
    • Markus A, Ruutkay Z, Vancza J (1990) Automating fixture design-from imitating practice to understanding principles. Comput Industry 14(1-3):99-108
    • (1990) Comput Industry , vol.14 , Issue.1-3 , pp. 99-108
    • Markus, A.1    Ruutkay, Z.2    Vancza, J.3
  • 108
    • 0027809916 scopus 로고
    • Impacts of vendor project management methods on flexible manufacturing systems implementation: A field study
    • McCutcheon DM (1993) Impacts of vendor project management methods on flexible manufacturing systems implementation: a field study. J Eng Technol Manag 10(4):339-362
    • (1993) J Eng Technol Manag , vol.10 , Issue.4 , pp. 339-362
    • McCutcheon, D.M.1
  • 109
    • 0031246073 scopus 로고    scopus 로고
    • Developing a hybrid programmable logic controller platform for a flexible manufacturing system
    • McDermott KJ, Yao W A (1997) Developing a hybrid programmable logic controller platform for a flexible manufacturing system. Intl J Flex Manuf Syst 9(4):367-374
    • (1997) Intl J Flex Manuf Syst , vol.9 , Issue.4 , pp. 367-374
    • McDermott, K.J.1    Yao, W.A.2
  • 110
    • 0020140765 scopus 로고
    • Design of automatic guided vehicle systems
    • Maxwell WL, Muckstadt JA (1982) Design of automatic guided vehicle systems. IIE Trans 14(2):114-124
    • (1982) IIE Trans , vol.14 , Issue.2 , pp. 114-124
    • Maxwell, W.L.1    Muckstadt, J.A.2
  • 112
    • 0031192667 scopus 로고    scopus 로고
    • A genetic algorithm for multi-mode resource constrained project scheduling problem
    • Mori M, Tseng CC (1997) A genetic algorithm for multi-mode resource constrained project scheduling problem. Euro J Operat Res 100(1):134-141
    • (1997) Euro J Operat Res , vol.100 , Issue.1 , pp. 134-141
    • Mori, M.1    Tseng, C.C.2
  • 113
    • 0026914581 scopus 로고
    • A heuristic procedure for loading problems in flexible manufacturing systems
    • Mukhopadhyay SK, Midha S, Krishna (1992) A heuristic procedure for loading problems in flexible manufacturing systems. Intl J Product Res 10(9):2213-2228
    • (1992) Intl J Product Res , vol.10 , Issue.9 , pp. 2213-2228
    • Mukhopadhyay, S.K.1    Midha, S.2    Krishna3
  • 116
    • 34249728711 scopus 로고
    • An expert system for real-time scheduling in flexible manufacturing system. Inform Decision Technol 18:151-170 Nasir N, Elsayad EA (1990) Job shop scheduling with alternative machines
    • Naidu EB, Vishwanadham N (1992) An expert system for real-time scheduling in flexible manufacturing system. Inform Decision Technol 18:151-170 Nasir N, Elsayad EA (1990) Job shop scheduling with alternative machines. Intl J Product Res 28(9):1595-1609
    • (1992) Intl J Product Res , vol.28 , Issue.9 , pp. 1595-1609
    • Naidu, E.B.1    Vishwanadham, N.2
  • 117
    • 0022675338 scopus 로고
    • A scoring model for flexible manufacturing system project selection
    • Nelson CA (1986) A scoring model for flexible manufacturing system project selection. Euro J Operat Res 24(3):346-359
    • (1986) Euro J Operat Res , vol.24 , Issue.3 , pp. 346-359
    • Nelson, C.A.1
  • 118
    • 0024699978 scopus 로고
    • Flexible manufacturing systems: Present developments and trends
    • O'Grady P (1989) Flexible manufacturing systems: present developments and trends. Comput Industry 12(3):241-251
    • (1989) Comput Industry , vol.12 , Issue.3 , pp. 241-251
    • O'Grady, P.1
  • 119
    • 0028518336 scopus 로고
    • A new FMS architecture based upon networked DSP servo technology
    • Overmars AH, Toncich DJ (1994) A new FMS architecture based upon networked DSP servo technology. Intl J Flex Manuf Syst 6(4):311-331
    • (1994) Intl J Flex Manuf Syst , vol.6 , Issue.4 , pp. 311-331
    • Overmars, A.H.1    Toncich, D.J.2
  • 120
    • 0024065468 scopus 로고
    • A simulation study of multiple-load-carrying automated guided vehicles in a flexible manufacturing system
    • Ozden M (1988) A simulation study of multiple-load-carrying automated guided vehicles in a flexible manufacturing system. Intl J Product Res 26(8):1353-1366
    • (1988) Intl J Product Res , vol.26 , Issue.8 , pp. 1353-1366
    • Ozden, M.1
  • 121
    • 1842870764 scopus 로고
    • An Economic evaluation model for advanced manufacturing systems
    • Park CS, Son YK (1988) An Economic evaluation model for advanced manufacturing systems. Eng Econ 34:1-26
    • (1988) Eng Econ , vol.34 , pp. 1-26
    • Park, C.S.1    Son, Y.K.2
  • 122
    • 24144490639 scopus 로고    scopus 로고
    • A methodology for creating a virtual model for a flexible manufacturing system
    • Park SC (2005) A methodology for creating a virtual model for a flexible manufacturing system. Comput Industry 56(7):734-746
    • (2005) Comput Industry , vol.56 , Issue.7 , pp. 734-746
    • Park, S.C.1
  • 123
    • 0032681956 scopus 로고    scopus 로고
    • Manufacturing flexibility: Measures and relationships
    • Parker RP, Wirth A (1999) Manufacturing flexibility: measures and relationships. Euro J Operat Res 118(3):429-449
    • (1999) Euro J Operat Res , vol.118 , Issue.3 , pp. 429-449
    • Parker, R.P.1    Wirth, A.2
  • 124
    • 0010441326 scopus 로고
    • An age-based replacement policy with non-zero repair times for a continuous production process
    • Pintelon LMA, Van Puyvelde FLB, Gelders LF (1995) An age-based replacement policy with non-zero repair times for a continuous production process. Intl J Product Res 33(8):2111-2123
    • (1995) Intl J Product Res , vol.33 , Issue.8 , pp. 2111-2123
    • Pintelon, L.M.A.1    Van Puyvelde, F.L.B.2    Gelders, L.F.3
  • 125
    • 0006743786 scopus 로고    scopus 로고
    • Primrose PU, Leonard R (1991) Selecting Technology for Investment in Flexible Manufacturing. Intl J Flex Manuf Syst 4(1):51-77
    • Primrose PU, Leonard R (1991) Selecting Technology for Investment in Flexible Manufacturing. Intl J Flex Manuf Syst 4(1):51-77
  • 126
    • 0035838746 scopus 로고    scopus 로고
    • A bi-directional path layout for conflict-free routing of AGVs
    • Qiu L, Hsu WJ (2001) A bi-directional path layout for conflict-free routing of AGVs. Intl J Product Res 39(10):2177-2195
    • (2001) Intl J Product Res , vol.39 , Issue.10 , pp. 2177-2195
    • Qiu, L.1    Hsu, W.J.2
  • 127
    • 0037085134 scopus 로고    scopus 로고
    • Scheduling and routing algorithms for AGVs: A survey
    • Qiu L, Hsu WJ, Huang SY, Wang H (2002) Scheduling and routing algorithms for AGVs: a survey. Intl J Product Res 40(3):745-760
    • (2002) Intl J Product Res , vol.40 , Issue.3 , pp. 745-760
    • Qiu, L.1    Hsu, W.J.2    Huang, S.Y.3    Wang, H.4
  • 128
    • 0029659077 scopus 로고    scopus 로고
    • Machine loading in flexible manufacturing systems considering routing flexibility
    • Rajamani D, Adil GK (1996) Machine loading in flexible manufacturing systems considering routing flexibility. Intl J Adv Manuf Technol 11(5):372-380
    • (1996) Intl J Adv Manuf Technol , vol.11 , Issue.5 , pp. 372-380
    • Rajamani, D.1    Adil, G.K.2
  • 129
    • 0032071781 scopus 로고    scopus 로고
    • Determination of optimal AGV fleet size for an FMS
    • Rajotia S, Shankar K, Batra JL (1998) Determination of optimal AGV fleet size for an FMS. Intl J Product Res 36(5):1177-1198
    • (1998) Intl J Product Res , vol.36 , Issue.5 , pp. 1177-1198
    • Rajotia, S.1    Shankar, K.2    Batra, J.L.3
  • 130
    • 21344484785 scopus 로고
    • Strategic framework for implementing flexible manufacturing systems in India
    • Rao KVS, Deshmukh SG (1994) Strategic framework for implementing flexible manufacturing systems in India. Intl J Operat Product Manag 14(4):50-63
    • (1994) Intl J Operat Product Manag , vol.14 , Issue.4 , pp. 50-63
    • Rao, K.V.S.1    Deshmukh, S.G.2
  • 131
    • 33846610995 scopus 로고    scopus 로고
    • Mathematical model for optimal and phased implementation of flexible manufacturing systems
    • Rezaie K, Ostadi BA (2007) Mathematical model for optimal and phased implementation of flexible manufacturing systems. Appl Math Comput 184(2):729-736
    • (2007) Appl Math Comput , vol.184 , Issue.2 , pp. 729-736
    • Rezaie, K.1    Ostadi, B.A.2
  • 132
    • 0002740677 scopus 로고
    • Competitive effect on technology diffusion
    • Robertson TS, Gatignon H (1986) Competitive effect on technology diffusion. J Market 50:1-12
    • (1986) J Market , vol.50 , pp. 1-12
    • Robertson, T.S.1    Gatignon, H.2
  • 133
    • 0344443735 scopus 로고    scopus 로고
    • Sabuncuoglu I, Lahmar M (2005) An evaluative study of operation grouping policies in an FMS. Intl J Flex Manuf Syst 15(3):217-239
    • Sabuncuoglu I, Lahmar M (2005) An evaluative study of operation grouping policies in an FMS. Intl J Flex Manuf Syst 15(3):217-239
  • 134
    • 3242708643 scopus 로고    scopus 로고
    • Product-based and resource-based heterarchical approaches for dynamic FMS scheduling
    • Sallez Y, Trentesaux D, Berger T, Tahon C (2004) Product-based and resource-based heterarchical approaches for dynamic FMS scheduling. Comput Ind Eng 46(4):611-623
    • (2004) Comput Ind Eng , vol.46 , Issue.4 , pp. 611-623
    • Sallez, Y.1    Trentesaux, D.2    Berger, T.3    Tahon, C.4
  • 135
    • 0030241688 scopus 로고    scopus 로고
    • Flexible scheduling in a machining center through genetic algorithms
    • Sakawa M, Kato K, Mori T (1996) Flexible scheduling in a machining center through genetic algorithms. Comput Ind Eng 30(4):931-940
    • (1996) Comput Ind Eng , vol.30 , Issue.4 , pp. 931-940
    • Sakawa, M.1    Kato, K.2    Mori, T.3
  • 136
    • 0036644049 scopus 로고    scopus 로고
    • Modeling the machine loading problem of FMS and its solution using a Tabu-search based heuristic
    • Sarma UMBS, Kant S, Rai R, Tiwari MK (2002) Modeling the machine loading problem of FMS and its solution using a Tabu-search based heuristic. Intl J Comput Integr Manuf 15(4):285-295
    • (2002) Intl J Comput Integr Manuf , vol.15 , Issue.4 , pp. 285-295
    • Sarma, U.M.B.S.1    Kant, S.2    Rai, R.3    Tiwari, M.K.4
  • 137
    • 0023384747 scopus 로고
    • The machine loading and tool allocation problem in a flexible manufacturing system
    • Sarin SC, Chen CS (1987) The machine loading and tool allocation problem in a flexible manufacturing system. Intl J Product Res 25(7):1081-1094
    • (1987) Intl J Product Res , vol.25 , Issue.7 , pp. 1081-1094
    • Sarin, S.C.1    Chen, C.S.2
  • 138
    • 0030783952 scopus 로고    scopus 로고
    • An empirical analysis of productivity and complexity for flexible manufacturing system
    • Sarkis J (1997) An empirical analysis of productivity and complexity for flexible manufacturing system. Intl J Product Econ 48:39-48
    • (1997) Intl J Product Econ , vol.48 , pp. 39-48
    • Sarkis, J.1
  • 139
    • 0032648655 scopus 로고    scopus 로고
    • Integrating flexible process plans with scheduling in flexible manufacturing systems
    • Saygin C, Kilic SE (1999) Integrating flexible process plans with scheduling in flexible manufacturing systems. Intl J Adv Manuf Technol 15(4):268-280
    • (1999) Intl J Adv Manuf Technol , vol.15 , Issue.4 , pp. 268-280
    • Saygin, C.1    Kilic, S.E.2
  • 140
    • 0025419819 scopus 로고
    • Modelling and scheduling of flexible manufacturing systems
    • Sawik T (1990) Modelling and scheduling of flexible manufacturing systems. Euro J Operat Res 45(7):177-190
    • (1990) Euro J Operat Res , vol.45 , Issue.7 , pp. 177-190
    • Sawik, T.1
  • 141
    • 34248539177 scopus 로고
    • Flexibility in manufacturing: A survey
    • Sethi AK, Sethi SP (1990) Flexibility in manufacturing: a survey. Intl J Flex Manuf Syst 2(4): 289-328
    • (1990) Intl J Flex Manuf Syst , vol.2 , Issue.4 , pp. 289-328
    • Sethi, A.K.1    Sethi, S.P.2
  • 142
    • 0024673709 scopus 로고
    • Some selection methodologies for the loading problem in flexible manufacturing system
    • Shankar K, Sriniwasulu A (1989) Some selection methodologies for the loading problem in flexible manufacturing system. Intl J Product Res 27(6):1019-1034
    • (1989) Intl J Product Res , vol.27 , Issue.6 , pp. 1019-1034
    • Shankar, K.1    Sriniwasulu, A.2
  • 143
    • 2442646633 scopus 로고    scopus 로고
    • Production scheduling in a flexible manufacturing system under random demand
    • Sharafali M, Co HC, Goh M (2004) Production scheduling in a flexible manufacturing system under random demand. Euro J Operat Res 158(1):89-102
    • (2004) Euro J Operat Res , vol.158 , Issue.1 , pp. 89-102
    • Sharafali, M.1    Co, H.C.2    Goh, M.3
  • 144
    • 0024682175 scopus 로고
    • An artificial intelligence approach to the scheduling of flexible manufaturing systems
    • Shaw MJ, Whinston AB (1989) An artificial intelligence approach to the scheduling of flexible manufaturing systems. HE Trans 21:170-183
    • (1989) HE Trans , vol.21 , pp. 170-183
    • Shaw, M.J.1    Whinston, A.B.2
  • 146
    • 0032182983 scopus 로고    scopus 로고
    • Definition and classification of manufacturing flexibility types and measures
    • Shewchuk JP, Moodie CL (1998) Definition and classification of manufacturing flexibility types and measures. Intl J Flex Manuf Syst 10(4):325-349
    • (1998) Intl J Flex Manuf Syst , vol.10 , Issue.4 , pp. 325-349
    • Shewchuk, J.P.1    Moodie, C.L.2
  • 148
    • 0027625847 scopus 로고
    • A comparison of two intelligent scheduling systems for flexible manufacturing systems
    • Smith AE, Fry TD, Philipoom PR, Sweigart JE (1993) A comparison of two intelligent scheduling systems for flexible manufacturing systems. Exp Syst Appl 6:299-308
    • (1993) Exp Syst Appl , vol.6 , pp. 299-308
    • Smith, A.E.1    Fry, T.D.2    Philipoom, P.R.3    Sweigart, J.E.4
  • 149
    • 0028452748 scopus 로고
    • Multiperiod tool and production assignment in flexible manufacturing systems
    • Sodhi MS, Askin RG, Sen S (1994) Multiperiod tool and production assignment in flexible manufacturing systems. Intl J Product Res 32(6): 1281-1294
    • (1994) Intl J Product Res , vol.32 , Issue.6 , pp. 1281-1294
    • Sodhi, M.S.1    Askin, R.G.2    Sen, S.3
  • 151
    • 38249043028 scopus 로고
    • Cell concepts for flexible automated manufacturing
    • Spur G, Seligar G, Vichweger B (1986) Cell concepts for flexible automated manufacturing. J Manuf Syst 5(3):171-179
    • (1986) J Manuf Syst , vol.5 , Issue.3 , pp. 171-179
    • Spur, G.1    Seligar, G.2    Vichweger, B.3
  • 152
    • 0026139677 scopus 로고
    • Selecting a flexible manufacturing system using a multi criteria analysis
    • Stam A, Kuula M (1991) Selecting a flexible manufacturing system using a multi criteria analysis. Intl J Product Res 29:803-820
    • (1991) Intl J Product Res , vol.29 , pp. 803-820
    • Stam, A.1    Kuula, M.2
  • 153
    • 84952242943 scopus 로고
    • Loading and tool control policies for a flexible manufacturing system
    • Stecke KE, Solberg James J (1981) Loading and tool control policies for a flexible manufacturing system. Intl J Product Res 19(5):491-490
    • (1981) Intl J Product Res , vol.19 , Issue.5 , pp. 491-490
    • Stecke, K.E.1    Solberg James, J.2
  • 155
    • 0020718128 scopus 로고
    • Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems
    • Stecke KE (1983) Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems. Manag Sci 29(3):273-287
    • (1983) Manag Sci , vol.29 , Issue.3 , pp. 273-287
    • Stecke, K.E.1
  • 156
    • 0022676091 scopus 로고
    • A hierarchical approach to solve machine grouping and loading of flexible manufacturing systems
    • Stecke KE (1986) A hierarchical approach to solve machine grouping and loading of flexible manufacturing systems. Euro J Operat Res 24(3):369-378
    • (1986) Euro J Operat Res , vol.24 , Issue.3 , pp. 369-378
    • Stecke, K.E.1
  • 157
    • 0025486035 scopus 로고
    • Towards an integrated evaluation of flexible automation investments
    • Suresh NC (1990) Towards an integrated evaluation of flexible automation investments. Intl J Product Res 28:1657-1672
    • (1990) Intl J Product Res , vol.28 , pp. 1657-1672
    • Suresh, N.C.1
  • 158
    • 0026219874 scopus 로고
    • An extended multi-objective replacement model for flexible automation investments
    • Suresh NC (1991) An extended multi-objective replacement model for flexible automation investments. Intl J Product Res 28:1823-1844
    • (1991) Intl J Product Res , vol.28 , pp. 1823-1844
    • Suresh, N.C.1
  • 159
    • 0023596514 scopus 로고
    • Economic measure of productivity. Quality and Flexibility in Advanced Manufacturing Systems
    • Son YK, Park CS (1987) Economic measure of productivity. Quality and Flexibility in Advanced Manufacturing Systems. J Manuf Syst 6(3):193-206
    • (1987) J Manuf Syst , vol.6 , Issue.3 , pp. 193-206
    • Son, Y.K.1    Park, C.S.2
  • 160
    • 0010309827 scopus 로고
    • Quantifying opportunity costs associated with adding manufacturing flexibility
    • Son YK, Park CS (1990) Quantifying opportunity costs associated with adding manufacturing flexibility. Intl J Product Res 28:1183-1194
    • (1990) Intl J Product Res , vol.28 , pp. 1183-1194
    • Son, Y.K.1    Park, C.S.2
  • 161
    • 0026122444 scopus 로고
    • A cost estimation model for advanced manufacturing systems
    • Son YK (1991) A cost estimation model for advanced manufacturing systems. Intl J Product Res 29:441-452
    • (1991) Intl J Product Res , vol.29 , pp. 441-452
    • Son, Y.K.1
  • 162
    • 1842864950 scopus 로고    scopus 로고
    • Modeling machine loading problems of FMSs and its solution methodology using a Tabu search and simulated annealing-based heuristic approach
    • Swarnkar R, Tiwari MK (2004) Modeling machine loading problems of FMSs and its solution methodology using a Tabu search and simulated annealing-based heuristic approach. Robot Comput Integrat Manuf 20(3):199-209
    • (2004) Robot Comput Integrat Manuf , vol.20 , Issue.3 , pp. 199-209
    • Swarnkar, R.1    Tiwari, M.K.2
  • 163
    • 0029389278 scopus 로고
    • Comparison of dynamic routing techniques for automatic guided vehicle systems
    • Taghaboni F, Tanchoco JMA (1995) Comparison of dynamic routing techniques for automatic guided vehicle systems. Intl J Product Res 33(10):2653-2669
    • (1995) Intl J Product Res , vol.33 , Issue.10 , pp. 2653-2669
    • Taghaboni, F.1    Tanchoco, J.M.A.2
  • 164
    • 0026837787 scopus 로고
    • OSL-optimal single loop guided paths for AGVs
    • Tanchoco JMA, Sinriech D (1992) OSL-optimal single loop guided paths for AGVs. Intl J Product Res 30(3):665-681
    • (1992) Intl J Product Res , vol.30 , Issue.3 , pp. 665-681
    • Tanchoco, J.M.A.1    Sinriech, D.2
  • 165
    • 0031197478 scopus 로고    scopus 로고
    • A heuristic solution approach to machine loading problem of FMS and its Petri-Net model
    • Tiwari MK, Hazarika B, Vidyarthi NK, Jaggi P, Mukhopadhyay SK (1997) A heuristic solution approach to machine loading problem of FMS and its Petri-Net model. Intl J Product Res 35(8):2269-2284
    • (1997) Intl J Product Res , vol.35 , Issue.8 , pp. 2269-2284
    • Tiwari, M.K.1    Hazarika, B.2    Vidyarthi, N.K.3    Jaggi, P.4    Mukhopadhyay, S.K.5
  • 166
    • 0034692672 scopus 로고    scopus 로고
    • Solving machine loading problem in flexible manufacturing system using genetic algorithm based heuristic approach
    • Tiwari MK, Vidyarthi NK (2000) Solving machine loading problem in flexible manufacturing system using genetic algorithm based heuristic approach. Intl J Product Res 38(14):3357-3384
    • (2000) Intl J Product Res , vol.38 , Issue.14 , pp. 3357-3384
    • Tiwari, M.K.1    Vidyarthi, N.K.2
  • 167
    • 34047209778 scopus 로고
    • A comprehensive methodology for manufacturing system evaluation and comparison
    • Troxle JN, Blank L (1989) A comprehensive methodology for manufacturing system evaluation and comparison. J Manuf Syst 8:175-183
    • (1989) J Manuf Syst , vol.8 , pp. 175-183
    • Troxle, J.N.1    Blank, L.2
  • 168
    • 0032659169 scopus 로고    scopus 로고
    • A comparison between machine flexibility and routing flexibility
    • Tsubone H, Horikawa M (1999) A comparison between machine flexibility and routing flexibility. Intl J Flex Manuf Syst 11(1):83-101
    • (1999) Intl J Flex Manuf Syst , vol.11 , Issue.1 , pp. 83-101
    • Tsubone, H.1    Horikawa, M.2
  • 170
    • 0010310480 scopus 로고
    • Strategic optimization cycle as a competitive tool for economic justification of advanced manufacturing systems
    • Venk S (1990) Strategic optimization cycle as a competitive tool for economic justification of advanced manufacturing systems. J Manuf Syst 9:194-205
    • (1990) J Manuf Syst , vol.9 , pp. 194-205
    • Venk, S.1
  • 171
    • 34249836688 scopus 로고
    • Cutting tool management in computer integrated manufacturing
    • Veeramani D, Uptom DM, Barash MM (1992) Cutting tool management in computer integrated manufacturing. Intl J Flex Manuf Syst 3(3-4):237-265
    • (1992) Intl J Flex Manuf Syst , vol.3 , Issue.3-4 , pp. 237-265
    • Veeramani, D.1    Uptom, D.M.2    Barash, M.M.3
  • 172
    • 0032649736 scopus 로고    scopus 로고
    • Failure rate distribution for flexible manufacturing systems: An empirical study
    • Vineyard M, Gyampah KA, Meredith JP (1999) Failure rate distribution for flexible manufacturing systems: an empirical study. Euro J Operat Res 116(1):139-155
    • (1999) Euro J Operat Res , vol.116 , Issue.1 , pp. 139-155
    • Vineyard, M.1    Gyampah, K.A.2    Meredith, J.P.3
  • 173
    • 27744600972 scopus 로고    scopus 로고
    • Survey of research in the design and control of automated guided vehicle systems
    • Vis IFA (2006) Survey of research in the design and control of automated guided vehicle systems. Euro J Operat Res 170(3):677-709
    • (2006) Euro J Operat Res , vol.170 , Issue.3 , pp. 677-709
    • Vis, I.F.A.1
  • 174
    • 0037381598 scopus 로고    scopus 로고
    • Combined Petri net modeling and AI based heuristic hybrid search for flexible manufacturing system-part I Petri net modeling and heuristic search
    • Yu H, Reyes A, Lang S, Lloyd S (2003) Combined Petri net modeling and AI based heuristic hybrid search for flexible manufacturing system-part I Petri net modeling and heuristic search. Intl J Comput Ind Eng 44:527-543
    • (2003) Intl J Comput Ind Eng , vol.44 , pp. 527-543
    • Yu, H.1    Reyes, A.2    Lang, S.3    Lloyd, S.4
  • 175
    • 0033341387 scopus 로고    scopus 로고
    • Scheduling with alternatives: A link between process planning and scheduling
    • Weintraub A, Cormier D, Hodgson T, King R, Wilson J, Zozom A (1999) Scheduling with alternatives: A link between process planning and scheduling. HE Trans 31(11): 1093-1102
    • (1999) HE Trans , vol.31 , Issue.11 , pp. 1093-1102
    • Weintraub, A.1    Cormier, D.2    Hodgson, T.3    King, R.4    Wilson, J.5    Zozom, A.6
  • 176
    • 0025894230 scopus 로고
    • Job shop scheduling with tool constraints: A Tabu search approach
    • Widmer M (1991) Job shop scheduling with tool constraints: a Tabu search approach. J Operat Res Soc 42(1):75-82
    • (1991) J Operat Res Soc , vol.42 , Issue.1 , pp. 75-82
    • Widmer, M.1
  • 177
    • 0026188740 scopus 로고
    • Incorporating the uncertainty of decision judgments in analytical hierarchy process
    • Zahir MS (1991) Incorporating the uncertainty of decision judgments in analytical hierarchy process. Euro J Operat Res 53(2):206-216
    • (1991) Euro J Operat Res , vol.53 , Issue.2 , pp. 206-216
    • Zahir, M.S.1
  • 178
    • 0035246266 scopus 로고    scopus 로고
    • A genetic algorithm approach to the scheduling of FMS with multiple routes
    • Zhao C, Wu Z (2001) A genetic algorithm approach to the scheduling of FMS with multiple routes. Intl J Flex Manuf Syst 13(1):71-88
    • (2001) Intl J Flex Manuf Syst , vol.13 , Issue.1 , pp. 71-88
    • Zhao, C.1    Wu, Z.2
  • 179
    • 0032679081 scopus 로고    scopus 로고
    • Jointly solving the group scheduling and machine speed selection problem: A hybrid Tabu simulated and simulated annealing approach
    • Zofaghari S, Liang M (1999) Jointly solving the group scheduling and machine speed selection problem: a hybrid Tabu simulated and simulated annealing approach. Intl J Product Res 37(10):2377-2397
    • (1999) Intl J Product Res , vol.37 , Issue.10 , pp. 2377-2397
    • Zofaghari, S.1    Liang, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.