-
3
-
-
0023984228
-
Strategic analysis of integrated production-distribution systems: models and methods
-
Cohen M.A., and Lee H.L. Strategic analysis of integrated production-distribution systems: models and methods. Oper Res 36 2 (1998) 216-228
-
(1998)
Oper Res
, vol.36
, Issue.2
, pp. 216-228
-
-
Cohen, M.A.1
Lee, H.L.2
-
4
-
-
0032136666
-
Supply chain design and analysis: models and methods
-
Beamon B.M. Supply chain design and analysis: models and methods. Int J Prod Econ 55 1 (1999) 281-294
-
(1999)
Int J Prod Econ
, vol.55
, Issue.1
, pp. 281-294
-
-
Beamon, B.M.1
-
5
-
-
0036267651
-
Production-distribution planning in supply chain using a hybrid approach
-
Lee Y.H., Kim S.H., and Moon C. Production-distribution planning in supply chain using a hybrid approach. Prod Plan Control 13 1 (2002) 35-46
-
(2002)
Prod Plan Control
, vol.13
, Issue.1
, pp. 35-46
-
-
Lee, Y.H.1
Kim, S.H.2
Moon, C.3
-
6
-
-
0041760308
-
Coordinated supply chain management
-
Thomas D.J., and Griffin P.M. Coordinated supply chain management. Eur J Oper Res 94 1 (1996) 1-15
-
(1996)
Eur J Oper Res
, vol.94
, Issue.1
, pp. 1-15
-
-
Thomas, D.J.1
Griffin, P.M.2
-
8
-
-
0001629567
-
Strategic directions in real-time and embedded systems
-
Stankovic J. Strategic directions in real-time and embedded systems. ACM Comput Surv 28 4 (1996) 751-763
-
(1996)
ACM Comput Surv
, vol.28
, Issue.4
, pp. 751-763
-
-
Stankovic, J.1
-
9
-
-
0030397154
-
A distributed scheduling and shop floor control method
-
Kim K.H., Bae J.W., Song J.Y., and Lee H.Y. A distributed scheduling and shop floor control method. Comput Ind Eng 31 3/4 (1996) 583-586
-
(1996)
Comput Ind Eng
, vol.31
, Issue.3-4
, pp. 583-586
-
-
Kim, K.H.1
Bae, J.W.2
Song, J.Y.3
Lee, H.Y.4
-
10
-
-
0142165709
-
Negotiation-based multi-stage production control using distributed shortest path algorithm
-
Wang K.J. Negotiation-based multi-stage production control using distributed shortest path algorithm. Int J Comput Integr Manuf 16 1 (2003) 38-47
-
(2003)
Int J Comput Integr Manuf
, vol.16
, Issue.1
, pp. 38-47
-
-
Wang, K.J.1
-
11
-
-
3142771788
-
Wasp-like agents for distributed factory coordination
-
Cicirello V.A. Wasp-like agents for distributed factory coordination. Auton Agents Multi-Agent Syst 8 (2004) 237-266
-
(2004)
Auton Agents Multi-Agent Syst
, vol.8
, pp. 237-266
-
-
Cicirello, V.A.1
-
13
-
-
0029489059
-
-
DiNatale M, Stankovic JA. Applicability of simulated annealing methods to real-time scheduling and jitter control. In: 16th IEEE real-time systems symposium, Pisa, Italy, 1995. p. 190-9.
-
-
-
-
14
-
-
0036507916
-
Web-based multi-functional scheduling system for a distributed manufacturing environment
-
Jia H.Z., Fuh J.Y.H., Nee A.Y.C., and Zheng Y.F. Web-based multi-functional scheduling system for a distributed manufacturing environment. Concurrent Eng: Res Appl 10 1 (2002) 27-39
-
(2002)
Concurrent Eng: Res Appl
, vol.10
, Issue.1
, pp. 27-39
-
-
Jia, H.Z.1
Fuh, J.Y.H.2
Nee, A.Y.C.3
Zheng, Y.F.4
-
15
-
-
30844449000
-
Application of genetic algorithms with dominant genes in distributed scheduling problem in FMS
-
Chan F.T.S., Chung S.H., and Chan P.L.Y. Application of genetic algorithms with dominant genes in distributed scheduling problem in FMS. Int J Prod Res 44 3 (2006) 523-543
-
(2006)
Int J Prod Res
, vol.44
, Issue.3
, pp. 523-543
-
-
Chan, F.T.S.1
Chung, S.H.2
Chan, P.L.Y.3
-
16
-
-
0031237953
-
A heuristic approach to the multi-task-multiprocessor assignment problem using the empty-slots method and rate-monotonic scheduling
-
Santos J., Ferro E., Orozco J., and Cayssials R. A heuristic approach to the multi-task-multiprocessor assignment problem using the empty-slots method and rate-monotonic scheduling. J Real-time Syst 13 (1997) 167-199
-
(1997)
J Real-time Syst
, vol.13
, pp. 167-199
-
-
Santos, J.1
Ferro, E.2
Orozco, J.3
Cayssials, R.4
-
17
-
-
0026865757
-
Allocating hard realtime tasks: an NP-hard problem made easy
-
Tindell K.W., Burns A., and Wellings A.J. Allocating hard realtime tasks: an NP-hard problem made easy. J Real-time Syst 4 (1992) 145-165
-
(1992)
J Real-time Syst
, vol.4
, pp. 145-165
-
-
Tindell, K.W.1
Burns, A.2
Wellings, A.J.3
-
18
-
-
0033471112
-
Management of industrial maintenance-economic evaluation of maintenance policies
-
Lofsten H. Management of industrial maintenance-economic evaluation of maintenance policies. Int J Oper Prod Manage 19 7 (1999) 716-737
-
(1999)
Int J Oper Prod Manage
, vol.19
, Issue.7
, pp. 716-737
-
-
Lofsten, H.1
-
19
-
-
0032649736
-
Theory and methodology failure rate distributions for flexible manufacturing systems: an empirical study
-
Vineyard. M., Amoako-Gyampah K., and Meredith J.R. Theory and methodology failure rate distributions for flexible manufacturing systems: an empirical study. Eur J Oper Res 116 (1999) 139-155
-
(1999)
Eur J Oper Res
, vol.116
, pp. 139-155
-
-
Vineyard., M.1
Amoako-Gyampah, K.2
Meredith, J.R.3
-
20
-
-
0028456013
-
A decision model for corrective maintenance management
-
Sheu C., and Krajewski L.J. A decision model for corrective maintenance management. Int J Prod Res 32 6 (1994) 1365-1382
-
(1994)
Int J Prod Res
, vol.32
, Issue.6
, pp. 1365-1382
-
-
Sheu, C.1
Krajewski, L.J.2
-
21
-
-
0037359219
-
Evaluation of a maintenance strategy by the analysis of the rate of repair
-
Peres F., and Noyes D. Evaluation of a maintenance strategy by the analysis of the rate of repair. Qual Reliab Eng Int 19 (2003) 129-148
-
(2003)
Qual Reliab Eng Int
, vol.19
, pp. 129-148
-
-
Peres, F.1
Noyes, D.2
-
22
-
-
0025481509
-
Manufacturing flow control and preventive maintenance a stochastic control approach
-
Boukas E.K., and Haurie A. Manufacturing flow control and preventive maintenance a stochastic control approach. IEEE Trans Autom Control 33 9 (1990) 1024-1031
-
(1990)
IEEE Trans Autom Control
, vol.33
, Issue.9
, pp. 1024-1031
-
-
Boukas, E.K.1
Haurie, A.2
-
23
-
-
0037278646
-
Hierarchical control of production and maintenance rates in manufacturing systems
-
Kenne J.P., and Boukas E.K. Hierarchical control of production and maintenance rates in manufacturing systems. J Qual Maint Eng 9 1 (2003) 66-82
-
(2003)
J Qual Maint Eng
, vol.9
, Issue.1
, pp. 66-82
-
-
Kenne, J.P.1
Boukas, E.K.2
-
24
-
-
10444282169
-
Implementation of total productive maintenance: a case study
-
Chan F.T.S., Lau H.C.W., Ip R.W.L., Chan H.K., and Kong S. Implementation of total productive maintenance: a case study. Int J Prod Econ 95 1 (2005) 71-94
-
(2005)
Int J Prod Econ
, vol.95
, Issue.1
, pp. 71-94
-
-
Chan, F.T.S.1
Lau, H.C.W.2
Ip, R.W.L.3
Chan, H.K.4
Kong, S.5
-
25
-
-
0030242695
-
A tutorial survey of job-shop scheduling problems using genetic algorithms-I
-
Cheung R., Gen M., and Tsujimura Y. A tutorial survey of job-shop scheduling problems using genetic algorithms-I. Comput Ind Eng 30 4 (1996) 983-997
-
(1996)
Comput Ind Eng
, vol.30
, Issue.4
, pp. 983-997
-
-
Cheung, R.1
Gen, M.2
Tsujimura, Y.3
-
26
-
-
0032599591
-
A tutorial survey of job-shop scheduling problems using genetic algorithms-II
-
Cheng R., Gen M., and Tsujimura Y. A tutorial survey of job-shop scheduling problems using genetic algorithms-II. Comput Ind Eng 37 1 (1999) 51-55
-
(1999)
Comput Ind Eng
, vol.37
, Issue.1
, pp. 51-55
-
-
Cheng, R.1
Gen, M.2
Tsujimura, Y.3
-
27
-
-
0031168629
-
Single process plan scheduling with genetic algorithm
-
Jain A.K., and ElMaraghy H.A. Single process plan scheduling with genetic algorithm. Prod Plan Control 8 4 (1997) 363-376
-
(1997)
Prod Plan Control
, vol.8
, Issue.4
, pp. 363-376
-
-
Jain, A.K.1
ElMaraghy, H.A.2
-
28
-
-
0032131027
-
Hybrid genetic algorithms for a multiple-objective scheduling problem
-
Cavalieri S., and Gaiardelli P. Hybrid genetic algorithms for a multiple-objective scheduling problem. J Intell Manuf 9 (1998) 361-367
-
(1998)
J Intell Manuf
, vol.9
, pp. 361-367
-
-
Cavalieri, S.1
Gaiardelli, P.2
-
30
-
-
0031192667
-
Genetic algorithms for multi-mode resource constrained project scheduling problem
-
Mori M., and Tseng C.C. Genetic algorithms for multi-mode resource constrained project scheduling problem. Eur J Oper Res 100 1 (1997) 134-141
-
(1997)
Eur J Oper Res
, vol.100
, Issue.1
, pp. 134-141
-
-
Mori, M.1
Tseng, C.C.2
-
32
-
-
0032599597
-
Genetic algorithms for the job-shop scheduling problem with unrelated paralled constraints: heuristics mixing method machines and precedence
-
Ghedjati F. Genetic algorithms for the job-shop scheduling problem with unrelated paralled constraints: heuristics mixing method machines and precedence. Comput Ind Eng 73 (1999) 39-42
-
(1999)
Comput Ind Eng
, vol.73
, pp. 39-42
-
-
Ghedjati, F.1
-
35
-
-
0028413979
-
Scheduling flexible manufacturing systems using petri nets and heuristic search
-
Lee D.Y., and DiCesare F. Scheduling flexible manufacturing systems using petri nets and heuristic search. IEEE Trans Robot Autom 10 2 (1994) 123-132
-
(1994)
IEEE Trans Robot Autom
, vol.10
, Issue.2
, pp. 123-132
-
-
Lee, D.Y.1
DiCesare, F.2
-
36
-
-
0242493312
-
Scheduling of flexible manufacturing systems: an ant colony optimization approach
-
Kumar R., Tiwari M.K., and Shankar R. Scheduling of flexible manufacturing systems: an ant colony optimization approach. IMechE 217 Part B (2003) 1443-1453
-
(2003)
IMechE
, vol.217
, Issue.PART B
, pp. 1443-1453
-
-
Kumar, R.1
Tiwari, M.K.2
Shankar, R.3
|