-
1
-
-
0000229534
-
Match-up scheduling with multiple resources, release dates and disruptions
-
(May-June)
-
Bean, J. C., Birge, J. R., Mittenthal, J., and Noon, C. E., "Match-up Scheduling with Multiple Resources, Release Dates and Disruptions," Operations Research, Vol. 39, No. 3, pp. 470-483 (May-June 1991).
-
(1991)
Operations Research
, vol.39
, Issue.3
, pp. 470-483
-
-
Bean, J.C.1
Birge, J.R.2
Mittenthal, J.3
Noon, C.E.4
-
2
-
-
0012331828
-
Experimental investigation of quasi realtime scheduling in flexible manufacturing systems
-
K. E. Stecke and Rajan Suri (Eds.), Ann Arbor, MI; (August)
-
Chang, Y. L., Sullivan, R. S., and Bagchi, U., "Experimental Investigation of Quasi Realtime Scheduling in Flexible Manufacturing Systems," Proceedings of the First ORSA/TIMS Conference on Flexible Manufacturing Systems, K. E. Stecke and Rajan Suri (Eds.), Ann Arbor, MI, pp. 307-312 (August 1984).
-
(1984)
Proceedings of the First ORSA/TIMS Conference on Flexible Manufacturing Systems
, pp. 307-312
-
-
Chang, Y.L.1
Sullivan, R.S.2
Bagchi, U.3
-
3
-
-
0020928628
-
Job shop scheduling optimization in real-time production control
-
(October)
-
Filip, F. G., Neagu, G., and Donciulescu, D. A., "Job Shop Scheduling Optimization in Real-time Production Control," Computers in Industry, Vol. 4, No. 4, pp. 395-403 (October 1983).
-
(1983)
Computers in Industry
, vol.4
, Issue.4
, pp. 395-403
-
-
Filip, F.G.1
Neagu, G.2
Donciulescu, D.A.3
-
4
-
-
0012221116
-
Using simulation generators for modeling manufacturing systems
-
J. V. Leonard and G. W. Zobrist (Eds.), Ablex, Norwood, NJ
-
Foley, W. J., Jain, S., and Haddock, J., "Using Simulation Generators for Modeling Manufacturing Systems," Progress in Simulation, J. V. Leonard and G. W. Zobrist (Eds.), Ablex, Norwood, NJ (1990).
-
(1990)
Progress in Simulation
-
-
Foley, W.J.1
Jain, S.2
Haddock, J.3
-
5
-
-
0023984547
-
Computerized shop floor scheduling
-
(March)
-
Goldratt, E. M., "Computerized Shop Floor Scheduling," International Journal of Production Research, Vol. 26, No. 3, pp. 443-455 (March 1988).
-
(1988)
International Journal of Production Research
, vol.26
, Issue.3
, pp. 443-455
-
-
Goldratt, E.M.1
-
6
-
-
0025004840
-
ReDS-a dynamic planning, scheduling, and control system for manufacturing
-
Hadavi, K., Shahraray, M. S., and Voigt, K., "ReDS-A Dynamic Planning, Scheduling, and Control System for Manufacturing," Journal of Manufacturing Systems, Vol. 9, No. 4, pp. 332-344 (1990).
-
(1990)
Journal of Manufacturing Systems
, vol.9
, Issue.4
, pp. 332-344
-
-
Hadavi, K.1
Shahraray, M.S.2
Voigt, K.3
-
7
-
-
0031121196
-
Rule-based ARIMA models for FMS
-
(April)
-
Ip, W. H., "Rule-Based ARIMA Models for FMS," Journal of Materials Processing Technology, Vol. 66, Nos. 1-3, pp. 240-243 (April 1997).
-
(1997)
Journal of Materials Processing Technology
, vol.66
, Issue.1-3
, pp. 240-243
-
-
Ip, W.H.1
-
8
-
-
0012265297
-
Decision framework for interruption handling in flexible manufacturing systems
-
Ph.D. dissertation, Rensselaer Polytechnic Institute, Troy, New York
-
Jain, S., "Decision Framework for Interruption Handling in Flexible Manufacturing Systems." Ph.D. dissertation, Rensselaer Polytechnic Institute, Troy, New York (1988).
-
(1988)
-
-
Jain, S.1
-
9
-
-
0003043947
-
Design of a knowledge-based on-line simulation system to control a manufacturing shop floor
-
(July)
-
Manivannan, S. and Banks, J., "Design of a Knowledge-Based On-Line Simulation System to Control a Manufacturing Shop Floor," IIE Transactions, Vol. 24, No. 3, pp. 72-83 (July 1992).
-
(1992)
IIE Transactions
, vol.24
, Issue.3
, pp. 72-83
-
-
Manivannan, S.1
Banks, J.2
-
10
-
-
84952253486
-
Job shop scheduling heuristics and frequency of scheduling
-
Muhlemann, A. P., Lockett, A. G., and Farn, C. K., "Job Shop Scheduling Heuristics and Frequency of Scheduling," International Journal of Production Research, Vol. 20, No. 2, pp. 227-241 (1982).
-
(1982)
International Journal of Production Research
, vol.20
, Issue.2
, pp. 227-241
-
-
Muhlemann, A.P.1
Lockett, A.G.2
Farn, C.K.3
-
11
-
-
0033079770
-
Routing automated guided vehicles in the presence of interruptions
-
(February)
-
Narasimhan, R., Batta, R., and Karwan, M. H., "Routing Automated Guided Vehicles in the Presence of Interruptions," International Journal of Production Research, Vol. 37, No. 3, pp. 653-681 (February 1999).
-
(1999)
International Journal of Production Research
, vol.37
, Issue.3
, pp. 653-681
-
-
Narasimhan, R.1
Batta, R.2
Karwan, M.H.3
-
12
-
-
0026222801
-
Data-driven generic simulators for flexible manufacturing systems
-
O'Keefe, R. M. and Haddock, J., "Data-driven Generic Simulators for Flexible Manufacturing Systems," International Journal of Production Research, Vol. 29, No. 9, pp. 1795-1810 (1990).
-
(1990)
International Journal of Production Research
, vol.29
, Issue.9
, pp. 1795-1810
-
-
O'Keefe, R.M.1
Haddock, J.2
-
13
-
-
0033333439
-
Introduction to FACTOR/AIM
-
P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans (Eds.); (December)
-
O'Reilly, J. J. and Lilegdon, W. R., "Introduction to FACTOR/AIM," 1999 Winter Simulation Conference Proceedings, P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans (Eds.), pp. 201-207 (December 1999).
-
(1999)
1999 Winter Simulation Conference Proceedings
, pp. 201-207
-
-
O'Reilly, J.J.1
Lilegdon, W.R.2
-
14
-
-
0000107307
-
Characterizing the manufacturing scheduling problem
-
Parunak, H. V. D., "Characterizing the Manufacturing Scheduling Problem," Journal of Manufacturing Systems, Vol. 10, No. 3, pp. 241-259 (1991).
-
(1991)
Journal of Manufacturing Systems
, vol.10
, Issue.3
, pp. 241-259
-
-
Parunak, H.V.D.1
-
15
-
-
0032266776
-
Autosched AP by autosimulations
-
D. J. Medeiros, E. F. Watson, J. S. Carson, and M.S. Manivannan (Eds.); (December)
-
Phillips, T., "Autosched AP by Autosimulations," 1998 Winter Simulation Conference Proceedings, D. J. Medeiros, E. F. Watson, J. S. Carson, and M.S. Manivannan (Eds.), pp. 219-222 (December 1998).
-
(1998)
1998 Winter Simulation Conference Proceedings
, pp. 219-222
-
-
Phillips, T.1
-
16
-
-
0025056203
-
The operations assistant: A new manufacturing resource management tool
-
Samadi, B., Morris, R. J. T., Rubin, L. D., Wong, W. S., and Ekroot, B. C., "The Operations Assistant: A New Manufacturing Resource Management Tool," Journal of Manufacturing Systems, Vol. 9, No. 4, pp. 303-314 (1990).
-
(1990)
Journal of Manufacturing Systems
, vol.9
, Issue.4
, pp. 303-314
-
-
Samadi, B.1
Morris, R.J.T.2
Rubin, L.D.3
Wong, W.S.4
Ekroot, B.C.5
-
18
-
-
0002225228
-
Characteristics of U.S. flexible manufacturing systems-a survey
-
K. E. Stecke and R. Suri (Eds.), Elsevier Science Publishers B. V., Amsterdam
-
Smith, M. L., Ramesh, R., Dudek, R. A., and Blair, E. Z., "Characteristics of U.S. Flexible Manufacturing Systems-A Survey," Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications, K. E. Stecke and R. Suri (Eds.), Elsevier Science Publishers B. V., Amsterdam, pp. 477-486 (1986).
-
(1986)
Proceedings of the Second ORSA/TIMS Conference on Flexible Manufacturing Systems: Operations Research Models and Applications
, pp. 477-486
-
-
Smith, M.L.1
Ramesh, R.2
Dudek, R.A.3
Blair, E.Z.4
-
20
-
-
0021607371
-
Decision support requirements in flexible manufacturing
-
Suri, R. and Whitney, C. K., "Decision Support Requirements in Flexible Manufacturing," Journal of Manufacturing Systems, Vol. 3, pp. 61-69 (1984).
-
(1984)
Journal of Manufacturing Systems
, vol.3
, pp. 61-69
-
-
Suri, R.1
Whitney, C.K.2
-
21
-
-
38249014416
-
A knowledge-based simulation architecture to analyze interruptions in a flexible manufacturing system
-
Tayanithi, P., Manivannan, S., and Banks, J., "A Knowledge-Based Simulation Architecture to Analyze Interruptions in a Flexible Manufacturing System," Journal of Manufacturing Systems, Vol. 11, No. 3, pp. 195-214 (1992).
-
(1992)
Journal of Manufacturing Systems
, vol.11
, Issue.3
, pp. 195-214
-
-
Tayanithi, P.1
Manivannan, S.2
Banks, J.3
-
22
-
-
0027150722
-
Complexity reduction during interruption analysis in a flexible manufacturing system using knowledge-based on-line simulation
-
Tayanithi, P., Manivannan, S., and Banks, J., "Complexity Reduction During Interruption Analysis in a Flexible Manufacturing System using Knowledge-Based On-Line Simulation," Journal of Manufacturing Systems, Vol. 12, No. 2, pp. 153-169 (1993).
-
(1993)
Journal of Manufacturing Systems
, vol.12
, Issue.2
, pp. 153-169
-
-
Tayanithi, P.1
Manivannan, S.2
Banks, J.3
-
23
-
-
0003929853
-
-
Irwin/McGraw-Hill, New York
-
Vollmann, T. E., Berry, W. L., and Whybark, D. C., Manufacturing Planning and Control Systems (4th ed.), Irwin/McGraw-Hill, New York, pp. 540-545 (1997).
-
(1997)
Manufacturing Planning and Control Systems (4th Ed.)
, pp. 540-545
-
-
Vollmann, T.E.1
Berry, W.L.2
Whybark, D.C.3
|