메뉴 건너뛰기




Volumn 14, Issue 4, 2002, Pages 319-344

Impact of interruptions on schedule execution in flexible manufacturing systems

Author keywords

Absorption; FMS; Interruption; Propagation; Scheduling

Indexed keywords

COMPUTER INTEGRATED MANUFACTURING; COMPUTER SIMULATION; FAILURE (MECHANICAL); KNOWLEDGE BASED SYSTEMS; PRODUCTION; SCHEDULING;

EID: 0036820215     PISSN: 09206299     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1020952823369     Document Type: Article
Times cited : (12)

References (23)
  • 1
    • 0000229534 scopus 로고
    • Match-up scheduling with multiple resources, release dates and disruptions
    • (May-June)
    • Bean, J. C., Birge, J. R., Mittenthal, J., and Noon, C. E., "Match-up Scheduling with Multiple Resources, Release Dates and Disruptions," Operations Research, Vol. 39, No. 3, pp. 470-483 (May-June 1991).
    • (1991) Operations Research , vol.39 , Issue.3 , pp. 470-483
    • Bean, J.C.1    Birge, J.R.2    Mittenthal, J.3    Noon, C.E.4
  • 2
    • 0012331828 scopus 로고
    • Experimental investigation of quasi realtime scheduling in flexible manufacturing systems
    • K. E. Stecke and Rajan Suri (Eds.), Ann Arbor, MI; (August)
    • Chang, Y. L., Sullivan, R. S., and Bagchi, U., "Experimental Investigation of Quasi Realtime Scheduling in Flexible Manufacturing Systems," Proceedings of the First ORSA/TIMS Conference on Flexible Manufacturing Systems, K. E. Stecke and Rajan Suri (Eds.), Ann Arbor, MI, pp. 307-312 (August 1984).
    • (1984) Proceedings of the First ORSA/TIMS Conference on Flexible Manufacturing Systems , pp. 307-312
    • Chang, Y.L.1    Sullivan, R.S.2    Bagchi, U.3
  • 3
    • 0020928628 scopus 로고
    • Job shop scheduling optimization in real-time production control
    • (October)
    • Filip, F. G., Neagu, G., and Donciulescu, D. A., "Job Shop Scheduling Optimization in Real-time Production Control," Computers in Industry, Vol. 4, No. 4, pp. 395-403 (October 1983).
    • (1983) Computers in Industry , vol.4 , Issue.4 , pp. 395-403
    • Filip, F.G.1    Neagu, G.2    Donciulescu, D.A.3
  • 4
    • 0012221116 scopus 로고
    • Using simulation generators for modeling manufacturing systems
    • J. V. Leonard and G. W. Zobrist (Eds.), Ablex, Norwood, NJ
    • Foley, W. J., Jain, S., and Haddock, J., "Using Simulation Generators for Modeling Manufacturing Systems," Progress in Simulation, J. V. Leonard and G. W. Zobrist (Eds.), Ablex, Norwood, NJ (1990).
    • (1990) Progress in Simulation
    • Foley, W.J.1    Jain, S.2    Haddock, J.3
  • 5
  • 6
    • 0025004840 scopus 로고
    • ReDS-a dynamic planning, scheduling, and control system for manufacturing
    • Hadavi, K., Shahraray, M. S., and Voigt, K., "ReDS-A Dynamic Planning, Scheduling, and Control System for Manufacturing," Journal of Manufacturing Systems, Vol. 9, No. 4, pp. 332-344 (1990).
    • (1990) Journal of Manufacturing Systems , vol.9 , Issue.4 , pp. 332-344
    • Hadavi, K.1    Shahraray, M.S.2    Voigt, K.3
  • 7
    • 0031121196 scopus 로고    scopus 로고
    • Rule-based ARIMA models for FMS
    • (April)
    • Ip, W. H., "Rule-Based ARIMA Models for FMS," Journal of Materials Processing Technology, Vol. 66, Nos. 1-3, pp. 240-243 (April 1997).
    • (1997) Journal of Materials Processing Technology , vol.66 , Issue.1-3 , pp. 240-243
    • Ip, W.H.1
  • 8
    • 0012265297 scopus 로고
    • Decision framework for interruption handling in flexible manufacturing systems
    • Ph.D. dissertation, Rensselaer Polytechnic Institute, Troy, New York
    • Jain, S., "Decision Framework for Interruption Handling in Flexible Manufacturing Systems." Ph.D. dissertation, Rensselaer Polytechnic Institute, Troy, New York (1988).
    • (1988)
    • Jain, S.1
  • 9
    • 0003043947 scopus 로고
    • Design of a knowledge-based on-line simulation system to control a manufacturing shop floor
    • (July)
    • Manivannan, S. and Banks, J., "Design of a Knowledge-Based On-Line Simulation System to Control a Manufacturing Shop Floor," IIE Transactions, Vol. 24, No. 3, pp. 72-83 (July 1992).
    • (1992) IIE Transactions , vol.24 , Issue.3 , pp. 72-83
    • Manivannan, S.1    Banks, J.2
  • 11
    • 0033079770 scopus 로고    scopus 로고
    • Routing automated guided vehicles in the presence of interruptions
    • (February)
    • Narasimhan, R., Batta, R., and Karwan, M. H., "Routing Automated Guided Vehicles in the Presence of Interruptions," International Journal of Production Research, Vol. 37, No. 3, pp. 653-681 (February 1999).
    • (1999) International Journal of Production Research , vol.37 , Issue.3 , pp. 653-681
    • Narasimhan, R.1    Batta, R.2    Karwan, M.H.3
  • 12
    • 0026222801 scopus 로고
    • Data-driven generic simulators for flexible manufacturing systems
    • O'Keefe, R. M. and Haddock, J., "Data-driven Generic Simulators for Flexible Manufacturing Systems," International Journal of Production Research, Vol. 29, No. 9, pp. 1795-1810 (1990).
    • (1990) International Journal of Production Research , vol.29 , Issue.9 , pp. 1795-1810
    • O'Keefe, R.M.1    Haddock, J.2
  • 13
    • 0033333439 scopus 로고    scopus 로고
    • Introduction to FACTOR/AIM
    • P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans (Eds.); (December)
    • O'Reilly, J. J. and Lilegdon, W. R., "Introduction to FACTOR/AIM," 1999 Winter Simulation Conference Proceedings, P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans (Eds.), pp. 201-207 (December 1999).
    • (1999) 1999 Winter Simulation Conference Proceedings , pp. 201-207
    • O'Reilly, J.J.1    Lilegdon, W.R.2
  • 14
    • 0000107307 scopus 로고
    • Characterizing the manufacturing scheduling problem
    • Parunak, H. V. D., "Characterizing the Manufacturing Scheduling Problem," Journal of Manufacturing Systems, Vol. 10, No. 3, pp. 241-259 (1991).
    • (1991) Journal of Manufacturing Systems , vol.10 , Issue.3 , pp. 241-259
    • Parunak, H.V.D.1
  • 15
    • 0032266776 scopus 로고    scopus 로고
    • Autosched AP by autosimulations
    • D. J. Medeiros, E. F. Watson, J. S. Carson, and M.S. Manivannan (Eds.); (December)
    • Phillips, T., "Autosched AP by Autosimulations," 1998 Winter Simulation Conference Proceedings, D. J. Medeiros, E. F. Watson, J. S. Carson, and M.S. Manivannan (Eds.), pp. 219-222 (December 1998).
    • (1998) 1998 Winter Simulation Conference Proceedings , pp. 219-222
    • Phillips, T.1
  • 20
    • 0021607371 scopus 로고
    • Decision support requirements in flexible manufacturing
    • Suri, R. and Whitney, C. K., "Decision Support Requirements in Flexible Manufacturing," Journal of Manufacturing Systems, Vol. 3, pp. 61-69 (1984).
    • (1984) Journal of Manufacturing Systems , vol.3 , pp. 61-69
    • Suri, R.1    Whitney, C.K.2
  • 21
    • 38249014416 scopus 로고
    • A knowledge-based simulation architecture to analyze interruptions in a flexible manufacturing system
    • Tayanithi, P., Manivannan, S., and Banks, J., "A Knowledge-Based Simulation Architecture to Analyze Interruptions in a Flexible Manufacturing System," Journal of Manufacturing Systems, Vol. 11, No. 3, pp. 195-214 (1992).
    • (1992) Journal of Manufacturing Systems , vol.11 , Issue.3 , pp. 195-214
    • Tayanithi, P.1    Manivannan, S.2    Banks, J.3
  • 22
    • 0027150722 scopus 로고
    • Complexity reduction during interruption analysis in a flexible manufacturing system using knowledge-based on-line simulation
    • Tayanithi, P., Manivannan, S., and Banks, J., "Complexity Reduction During Interruption Analysis in a Flexible Manufacturing System using Knowledge-Based On-Line Simulation," Journal of Manufacturing Systems, Vol. 12, No. 2, pp. 153-169 (1993).
    • (1993) Journal of Manufacturing Systems , vol.12 , Issue.2 , pp. 153-169
    • Tayanithi, P.1    Manivannan, S.2    Banks, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.