메뉴 건너뛰기




Volumn 141, Issue 2-3, 2003, Pages 553-564

Iterative methods for flexible manufacturing systems

Author keywords

Flexible manufacturing system; Preconditioned conjugate gradient method

Indexed keywords

ALGORITHMS; CONVERGENCE OF NUMERICAL METHODS; FLEXIBLE MANUFACTURING SYSTEMS; MAINTENANCE; PROBABILITY DISTRIBUTIONS;

EID: 0037420927     PISSN: 00963003     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0096-3003(02)00275-8     Document Type: Article
Times cited : (6)

References (12)
  • 1
    • 0022757590 scopus 로고
    • Flexible manufacturing systems: A review of analytic models
    • Buzacott J., Yao D. Flexible manufacturing systems: a review of analytic models. Manage. Sci. 32:1986;890-905.
    • (1986) Manage. Sci. , vol.32 , pp. 890-905
    • Buzacott, J.1    Yao, D.2
  • 2
    • 0000592564 scopus 로고
    • Iterative methods for overflow queueing models I
    • Chan R. Iterative methods for overflow queueing models I. Numer. Math. 51:1987;143-180.
    • (1987) Numer. Math. , vol.51 , pp. 143-180
    • Chan, R.1
  • 3
    • 21944446582 scopus 로고    scopus 로고
    • Circulant preconditioners for failure prone manufacturing systems
    • Ching W. Circulant preconditioners for failure prone manufacturing systems. Lin. Alg. Appl. 266:1997;161-180.
    • (1997) Lin. Alg. Appl. , vol.266 , pp. 161-180
    • Ching, W.1
  • 4
    • 0031275243 scopus 로고    scopus 로고
    • Markov modulated Poisson processes for multi-location inventory problems
    • Ching W. Markov modulated Poisson processes for multi-location inventory problems. Int. J. Prod. Econ. 53:1997;217-223.
    • (1997) Int. J. Prod. Econ. , vol.53 , pp. 217-223
    • Ching, W.1
  • 5
    • 0032068393 scopus 로고    scopus 로고
    • An inventory model for manufacturing systems with delivery time guarantees
    • Ching W. An inventory model for manufacturing systems with delivery time guarantees. Int. J. Comput. Opn. Res. 25:1998;367-377.
    • (1998) Int. J. Comput. Opn. Res. , vol.25 , pp. 367-377
    • Ching, W.1
  • 6
    • 0032182743 scopus 로고    scopus 로고
    • A production model with delivery guarantees for manufacturing systems with early set-up
    • Ching W. A production model with delivery guarantees for manufacturing systems with early set-up. Int. J. Comput. Ind. Eng. 35:1998;121-124.
    • (1998) Int. J. Comput. Ind. Eng. , vol.35 , pp. 121-124
    • Ching, W.1
  • 7
    • 0039768884 scopus 로고    scopus 로고
    • Circulant preconditioners for Markov modulated Poisson processes and their applications to manufacturing systems
    • Ching W., Chan R., Zhou X. Circulant preconditioners for Markov modulated Poisson processes and their applications to manufacturing systems. SIAM J. Matrix Anal. Appl. 18:1997;464-481.
    • (1997) SIAM J. Matrix Anal. Appl. , vol.18 , pp. 464-481
    • Ching, W.1    Chan, R.2    Zhou, X.3
  • 8
  • 10
    • 0028495053 scopus 로고
    • Optimality of hedging point policies in the production control of failure prone manufacturing systems
    • Hu J., Vakili P., Yu G. Optimality of hedging point policies in the production control of failure prone manufacturing systems. IEEE Trans. Automat. Contr. 39:1994;1875-1880.
    • (1994) IEEE Trans. Automat. Contr. , vol.39 , pp. 1875-1880
    • Hu, J.1    Vakili, P.2    Yu, G.3
  • 11
    • 0002716979 scopus 로고
    • CGS, a fast Lanczos-type solver for non-symmetric linear systems
    • Sonneveld P. CGS, a fast Lanczos-type solver for non-symmetric linear systems. SIAM J. Sci. Comput. 10:1989;36-52.
    • (1989) SIAM J. Sci. Comput. , vol.10 , pp. 36-52
    • Sonneveld, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.