메뉴 건너뛰기




Volumn 19, Issue 1-2, 2003, Pages 45-54

A modeling technique for loading and scheduling problems in FMS

Author keywords

[No Author keywords available]

Indexed keywords

FLEXIBLE MANUFACTURING SYSTEMS; INTEGER PROGRAMMING; LOADING; MACHINE TOOLS; PLANNING; PRODUCTION CONTROL; SCHEDULING;

EID: 0037328890     PISSN: 07365845     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0736-5845(02)00061-3     Document Type: Conference Paper
Times cited : (51)

References (18)
  • 1
    • 0026850995 scopus 로고
    • A comparison of tool management strategies and part selection rules for a flexible manufacturing system
    • Amoako-gyamph K., Meredith J.R., Raturi A. A comparison of tool management strategies and part selection rules for a flexible manufacturing system. Int J Prod Res. 30(4):1992;733-748.
    • (1992) Int J Prod Res , vol.30 , Issue.4 , pp. 733-748
    • Amoako-Gyamph, K.1    Meredith, J.R.2    Raturi, A.3
  • 2
    • 0029370637 scopus 로고
    • A production planning for flexible manufacturing systems with set up cost consideration
    • Atmani A. A production planning for flexible manufacturing systems with set up cost consideration. Comput Ind Eng. 29(1-4):1995;723-727.
    • (1995) Comput Ind Eng , vol.29 , Issue.1-4 , pp. 723-727
    • Atmani, A.1
  • 3
    • 38249025740 scopus 로고
    • The cutting path and tool selection problem in computer aided process planning
    • Bard J.F., Feo T.A. The cutting path and tool selection problem in computer Aided process planning. J Flexible Manuf Systems. 8(1):1989;17-26.
    • (1989) J Flexible Manuf Systems , vol.8 , Issue.1 , pp. 17-26
    • Bard, J.F.1    Feo, T.A.2
  • 4
    • 0030268879 scopus 로고    scopus 로고
    • Sequential modeling of the planning and scheduling problems of flexible manufacturing systems
    • Chen I.J., Chung C. Sequential modeling of the planning and Scheduling Problems of flexible manufacturing systems. J Oper Res Society. 47(10):1996;1216-1227.
    • (1996) J Oper Res Society , vol.47 , Issue.10 , pp. 1216-1227
    • Chen, I.J.1    Chung, C.2
  • 5
    • 0029376894 scopus 로고
    • Taxonomy of scheduling systems as a basis for the study of strategic behavior
    • Dessouky M.I., Morary N., Kijowski B. Taxonomy of scheduling systems as a basis for the study of strategic Behavior. Human Factors. 37(3):1995;443-472.
    • (1995) Human Factors , vol.37 , Issue.3 , pp. 443-472
    • Dessouky, M.I.1    Morary, N.2    Kijowski, B.3
  • 6
    • 0013324531 scopus 로고
    • Automated tool management in flexible manufacturing
    • Elmaraghy H.A. Automated tool management in flexible manufacturing. J Manuf System. 4:1985;1-13.
    • (1985) J Manuf System , vol.4 , pp. 1-13
    • Elmaraghy, H.A.1
  • 7
    • 0026883892 scopus 로고
    • Tooling constraints and shop floor scheduling: Evaluating the impact of sequence dependency
    • Ghosh S, Melnyk SA, Ragatz GL. Tooling constraints and shop floor scheduling: evaluating the impact of sequence dependency. Int J Prod Res 1992; 6: 1237-52.
    • (1992) Int J Prod Res , vol.6 , pp. 1237-1252
    • Ghosh, S.1    Melnyk, S.A.2    Ragatz, G.L.3
  • 8
    • 0002117744 scopus 로고
    • Equipment selection and task assignment for multi product assembly system design
    • Graves S.C., Redfield C.H. Equipment selection and task assignment for multi product assembly system design. Int J Flexible Manuf Systems. 1(1):1988;31-50.
    • (1988) Int J Flexible Manuf Systems , vol.1 , Issue.1 , pp. 31-50
    • Graves, S.C.1    Redfield, C.H.2
  • 9
    • 0027591340 scopus 로고
    • A synthesis of decision models for tool management in automated manufacturing
    • Gray A.E., Seidmann A., Stecke K.E. A synthesis of decision models for tool management in automated manufacturing. Manage Sci. 39(5):1993;549-567.
    • (1993) Manage Sci , vol.39 , Issue.5 , pp. 549-567
    • Gray, A.E.1    Seidmann, A.2    Stecke, K.E.3
  • 10
    • 0024716540 scopus 로고
    • Real time tool control and job dispatching in flexible manufacturing systems
    • Han M, Na YK, Hogg GL. Real time tool control and job dispatching in flexible manufacturing systems. Int J of Prod Res 1989; 8: 1257-67.
    • (1989) Int J of Prod Res , vol.8 , pp. 1257-1267
    • Han, M.1    Na, Y.K.2    Hogg, G.L.3
  • 11
    • 0029772740 scopus 로고    scopus 로고
    • An integrated decision support system for FMS production planning and scheduling problems
    • Jang S.Y., Park J., Park N. An Integrated decision support system for FMS production planning and scheduling problems. Int J Adv Manuf Technol. 11:1996;101-110.
    • (1996) Int J Adv Manuf Technol , vol.11 , pp. 101-110
    • Jang, S.Y.1    Park, J.2    Park, N.3
  • 12
    • 0029760756 scopus 로고    scopus 로고
    • Analysis of tool sharing in an FMS: A simulation study
    • Kashyap A.S., Khator S. Analysis of tool sharing in an FMS. a simulation study Comput Ind Eng. 30(1):1996;137-145.
    • (1996) Comput Ind Eng , vol.30 , Issue.1 , pp. 137-145
    • Kashyap, A.S.1    Khator, S.2
  • 13
    • 0030106944 scopus 로고    scopus 로고
    • The classification of FMS scheduling problems
    • Liu J., Maccarthy B.L. The classification of FMS Scheduling problems. Int J Prod Res. 34(3):1996;647-656.
    • (1996) Int J Prod Res , vol.34 , Issue.3 , pp. 647-656
    • Liu, J.1    Maccarthy, B.L.2
  • 15
    • 0031275801 scopus 로고    scopus 로고
    • Due date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
    • Roh H.K., Kim Y.D. Due date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter. Int J Prod Res. 35(11):1997;2989-3003.
    • (1997) Int J Prod Res , vol.35 , Issue.11 , pp. 2989-3003
    • Roh, H.K.1    Kim, Y.D.2
  • 16
    • 0023384747 scopus 로고
    • The machine loading and tool allocation problem in flexible manufacturing system
    • Sarin S.C., Chen C.S. The machine loading and tool allocation problem in flexible manufacturing system. Int J Prod Res. 25(7):1987;1081-1094.
    • (1987) Int J Prod Res , vol.25 , Issue.7 , pp. 1081-1094
    • Sarin, S.C.1    Chen, C.S.2
  • 17
    • 0020718128 scopus 로고
    • Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems
    • Stecke K.E. Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems. Manage Sci. 29(3):1983;273-288.
    • (1983) Manage Sci , vol.29 , Issue.3 , pp. 273-288
    • Stecke, K.E.1
  • 18
    • 0030126463 scopus 로고    scopus 로고
    • A queuing network model for flexible manufacturing systems with tool management
    • Tetzlaff U.A. A queuing network model for flexible manufacturing systems with tool management. IIE Trans. 28:1996;309-317.
    • (1996) IIE Trans , vol.28 , pp. 309-317
    • Tetzlaff, U.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.