-
1
-
-
0000312362
-
Scheduling and control of flexible manufacturing systems: A critical review
-
Basnet, C., and Mize, J. H., 1994, Scheduling and control of flexible manufacturing systems: a critical review. International Journal of Computer Integrated Manufacturing, 7 (6), 340-355.
-
(1994)
International Journal of Computer Integrated Manufacturing
, vol.7
, Issue.6
, pp. 340-355
-
-
Basnet, C.1
Mize, J.H.2
-
2
-
-
0024765468
-
A bottleneck-based beam searchfor job scheduling in a flexible manufacturing system
-
Chang, Y., Matsuo, H., and Sullivan, R. S., 1989, A bottleneck-based beam searchfor job scheduling in a flexible manufacturing system. International Journal of Production Research, 27, 1949-1961.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1949-1961
-
-
Chang, Y.1
Matsuo, H.2
Sullivan, R.S.3
-
3
-
-
0003768964
-
-
Englewood Cliffs, NJ: Prentice Hall)
-
Groover, M. Project, and Zimmers, E. W., Jr., 1984, CAD/CAM: Computer Aided Design and Manufacturing (Englewood Cliffs, NJ: Prentice Hall).
-
(1984)
CAD/CAM: Computer Aided Design and Manufacturing
-
-
Groover, M.P.1
Zimmers, E.W.2
-
4
-
-
0004076205
-
-
PhD thesis, University of California, Berkeley, CA
-
Hwang, S. S., 1986, Models for production planning in flexible manufacturing system. PhD thesis, University of California, Berkeley, CA.
-
(1986)
Models for Production Planning in Flexible Manufacturing System.
-
-
Hwang, S.S.1
-
5
-
-
0024872203
-
Expert simulation for on-line scheduling
-
Jain, S., Barber, K., and Osterfeld, D., 1989, Expert simulation for on-line scheduling. Proceedings of the 1989 Winter Simulation Conference, pp. 930-935.
-
(1989)
Proceedings of the 1989 Winter Simulation Conference
, pp. 930-935
-
-
Jain, S.1
Barber, K.2
Osterfeld, D.3
-
6
-
-
0024770085
-
Optimization by simulated annealing: An experimental evaluation: Part 1, Graph partitioning
-
Johnson, D. S., Aragon, C. R., McGeoch, L. A., and Schevon, C., 1989, Optimization by simulated annealing: an experimental evaluation: part 1, Graph partitioning. Operations Research, 37, 865-891.
-
(1989)
Operations Research
, vol.37
, pp. 865-891
-
-
Johnson, D.S.1
Aragon, C.R.2
Mc Geoch, L.A.3
Schevon, C.4
-
7
-
-
0025460582
-
Joint consideration of grouping and loading problems in a flexible manufacturing system
-
Kumar, P., Tewari, N. K., and Singh, N., 1990, Joint consideration of grouping and loading problems in a flexible manufacturing system. International Journal of Production Research, 28, 1345-1356.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 1345-1356
-
-
Kumar, P.1
Tewari, N.K.2
Singh, N.3
-
8
-
-
0026239447
-
Heuristic solution to the scheduling problem in a flexible manufacturing system
-
Mukhopadhyay, S. K., Maiti, B., and Garg, S., 1991, Heuristic solution to the scheduling problem in a flexible manufacturing system. International Journal of Production Research, 29 (10), 2003-2024.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.10
, pp. 2003-2024
-
-
Mukhopadhyay, S.K.1
Maiti, B.2
Garg, S.3
-
9
-
-
85010540987
-
A heuristic procedure for loading problems in FMS
-
Mukhopadhyay, S. K., Midha, S., and Murlikrishna, M., 1992, A heuristic procedure for loading problems in FMS. International Journal of Production Research, 27 (6), 1019-1034.
-
(1992)
International Journal of Production Research
, vol.27
, Issue.6
, pp. 1019-1034
-
-
Mukhopadhyay, S.K.1
Midha, S.2
Murlikrishna, M.3
-
10
-
-
0030190236
-
Priority-based tool allocation in a flexible manufacturing system
-
Mukhopadhyay, S. K., and Sahu, S. K., 1996, Priority-based tool allocation in a flexible manufacturing system. International Journal of Production Research, 34 (7), 1995-201.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.7
, pp. 1995-2201
-
-
Mukhopadhyay, S.K.1
Sahu, S.K.2
-
11
-
-
0002070405
-
Solving machine loading problem of FMS by conjoint measurement
-
Jerusalem
-
Mukhopadhyay, S. K., and Tiwari, M. K., 1995, Solving machine loading problem of FMS by conjoint measurement. Proceedings of the 13th ICPR, Jerusalem, pp. 74-76.
-
(1995)
Proceedings of the 13Th ICPR
, pp. 74-76
-
-
Mukhopadhyay, S.K.1
Tiwari, M.K.2
-
13
-
-
0024673709
-
Some solution methodologies for a loading problem in a flexible manufacturing system
-
Shanker, K., and Srinivasulu, A., 1989, Some solution methodologies for a loading problem in a flexible manufacturing system. International Journal of Production Research, 27 (6), 1019-1034.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.6
, pp. 1019-1034
-
-
Shanker, K.1
Srinivasulu, A.2
-
14
-
-
0027814376
-
Scheduling in a cellular manufacturing system: A simulated annealing approach
-
Sridhar, J., and Rajendran, C., 1993, Scheduling in a cellular manufacturing system: a simulated annealing approach. International Journal of Production Research, 31 (12). 2927-2945.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.12
, pp. 2927-2945
-
-
Sridhar, J.1
Rajendran, C.2
-
15
-
-
0020718128
-
Formulation of solution of non integer production planning problems in flexible manufacturing systems
-
Stecke, K. E., 1983, Formulation of solution of non integer production planning problems in flexible manufacturing systems. Management Science, 29, 273-288.
-
(1983)
Management Science
, vol.29
, pp. 273-288
-
-
Stecke, K.E.1
-
16
-
-
84952242943
-
Loading and control policies for a flexible manufacturing system
-
Stecke, K. E., and Solberg, J. J., 1981, Loading and control policies for a flexible manufacturing system. International Journal of Production Research, 19 (5), 481-490.
-
(1981)
International Journal of Production Research
, vol.19
, Issue.5
, pp. 481-490
-
-
Stecke, K.E.1
Solberg, J.J.2
-
17
-
-
0000423498
-
Stochastic assembly line balancing using simulated annealing
-
Suresh, G., and Sahu, S., 1994, Stochastic assembly line balancing using simulated annealing. International Journal of Production Research, 32 (8), 1801-1810.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.8
, pp. 1801-1810
-
-
Suresh, G.1
Sahu, S.2
|