-
1
-
-
0001491488
-
The Effect of Routing and Machine Flexibility on Performance of Manufacturing Systems
-
Benjaafar, S., Talvage, J. J., and Ramakrishnan, R., "The Effect of Routing and Machine Flexibility on Performance of Manufacturing Systems," International Journal of Computer Integrated Manufacturing, Vol. 8, No. 4, pp. 265-276 (1995).
-
(1995)
International Journal of Computer Integrated Manufacturing
, vol.8
, Issue.4
, pp. 265-276
-
-
Benjaafar, S.1
Talvage, J.J.2
Ramakrishnan, R.3
-
2
-
-
0030146089
-
Modeling, Measurement, and Evaluation of Sequencing, Flexibility in Manufacturing Systems
-
Benjaafar, S. and Ramakrishnan, R., "Modeling, Measurement, and Evaluation of Sequencing, Flexibility in Manufacturing Systems," International Journal of Production Research, Vol. 34, No. 5, pp. 1195-1220 (1996a).
-
(1996)
International Journal of Production Research
, vol.34
, Issue.5
, pp. 1195-1220
-
-
Benjaafar, S.1
Ramakrishnan, R.2
-
3
-
-
0344412428
-
Sequence Flexibility and Performance of Manufacturing Systems
-
University of Minnesota
-
Benjaafar, S. and Ramakrishnan, R., "Sequence Flexibility and Performance of Manufacturing Systems," Technical Report, University of Minnesota (1996b).
-
(1996)
Technical Report
-
-
Benjaafar, S.1
Ramakrishnan, R.2
-
4
-
-
0022794511
-
A Branch and Bound Approach for Machine Load Balancing in Flexible Manufacturing Systems
-
Berrada, M. and Stecke, K. E., "A Branch and Bound Approach for Machine Load Balancing in Flexible Manufacturing Systems," Management Science, Vol. 32, No. 10, pp. 1316-1335 (1986).
-
(1986)
Management Science
, vol.32
, Issue.10
, pp. 1316-1335
-
-
Berrada, M.1
Stecke, K.E.2
-
5
-
-
0025644101
-
Machine Loading and Alternate Routing in a Flexible Manufacturing System
-
Bretthauer, K. M. and Venkatramanan, M. A., "Machine Loading and Alternate Routing in a Flexible Manufacturing System," Computers and Industrial Engineering, Vol. 18, No. 3, pp. 341-350 (1990).
-
(1990)
Computers and Industrial Engineering
, vol.18
, Issue.3
, pp. 341-350
-
-
Bretthauer, K.M.1
Venkatramanan, M.A.2
-
6
-
-
0031189965
-
Impact of Routing Flexibility on the Performance of an FMS - A Simulation Study
-
Caprihan, R. and Wadhwa, S., "Impact of Routing Flexibility on the Performance of an FMS-A Simulation Study," International Journal of Flexible Manufacturing Systems, Vol. 9, pp. 273-298 (1997).
-
(1997)
International Journal of Flexible Manufacturing Systems
, vol.9
, pp. 273-298
-
-
Caprihan, R.1
Wadhwa, S.2
-
7
-
-
0000098624
-
A Bottleneck Based Beam Search for Job Scheduling in Flexible Manufacturing Systems
-
Chang, Y. L., Sullivan, R. S., and Bagchi, U., "A Bottleneck Based Beam Search for Job Scheduling in Flexible Manufacturing Systems," Annals of Operation Research, Vol. 3, pp. 355-377 (1985).
-
(1985)
Annals of Operation Research
, vol.3
, pp. 355-377
-
-
Chang, Y.L.1
Sullivan, R.S.2
Bagchi, U.3
-
8
-
-
0023385665
-
Experimental Investigation of Flexible Manufacturing System Scheduling Decision Rule
-
Denzler, D. R. and Boe, W. J., "Experimental Investigation of Flexible Manufacturing System Scheduling Decision Rule," International Journal of Production Research, Vol. 25, No. 7, pp. 979-994 (1987).
-
(1987)
International Journal of Production Research
, vol.25
, Issue.7
, pp. 979-994
-
-
Denzler, D.R.1
Boe, W.J.2
-
9
-
-
0021423836
-
Characterization of Automatic Guided Vehicle Dispatching Rules
-
Egbelu, P. J. and Tanchoco, J. M. A., "Characterization of Automatic Guided Vehicle Dispatching Rules," International Journal of Production Research, Vol. 22, No. 3, pp. 359-374 (1984).
-
(1984)
International Journal of Production Research
, vol.22
, Issue.3
, pp. 359-374
-
-
Egbelu, P.J.1
Tanchoco, J.M.A.2
-
10
-
-
0026836252
-
Flexibility Trade-offs in a Random Flexible Manufacturing System
-
Gupta, Y. P. and Goyal, S., "Flexibility Trade-offs in a Random Flexible Manufacturing System," International Journal of Production Research, Vol. 30, No. 3, pp. 527-557 (1992).
-
(1992)
International Journal of Production Research
, vol.30
, Issue.3
, pp. 527-557
-
-
Gupta, Y.P.1
Goyal, S.2
-
11
-
-
0002016604
-
A Simulation Study of FMS Tool Allocation Procedures
-
Gympah, K. A. and Meredith, J. R., "A Simulation Study of FMS Tool Allocation Procedures," Journal of Manufacturing System, Vol. 15, pp. 419-431 (1996).
-
(1996)
Journal of Manufacturing System
, vol.15
, pp. 419-431
-
-
Gympah, K.A.1
Meredith, J.R.2
-
12
-
-
0028401319
-
Flexible Process Plans: Their Value in Flexible Automation Systems
-
Hutchinson, G. K. and Pflughoeft, K. A., "Flexible Process Plans: Their Value in Flexible Automation Systems," International Journal of Production Research, Vol. 32, No. 3, pp. 707-719 (1994).
-
(1994)
International Journal of Production Research
, vol.32
, Issue.3
, pp. 707-719
-
-
Hutchinson, G.K.1
Pflughoeft, K.A.2
-
13
-
-
0002463140
-
Postindustrial Manufacturing
-
November-December
-
Jaikumar, R., "Postindustrial Manufacturing," Harvard Business Review, pp. 69-76 (November-December 1986).
-
(1986)
Harvard Business Review
, pp. 69-76
-
-
Jaikumar, R.1
-
14
-
-
0028594405
-
Simulation Based Real Time Scheduling in a FMS
-
Kim, M. M. and Kim, Y. D., "Simulation Based Real Time Scheduling in a FMS," Journal of Manufacturing Systems, Vol. 13, pp. 85-93 (1994).
-
(1994)
Journal of Manufacturing Systems
, vol.13
, pp. 85-93
-
-
Kim, M.M.1
Kim, Y.D.2
-
15
-
-
0027342202
-
Heuristic Approaches for Loading Problems in Flexible Manufacturing System
-
Kim, Y. D. and Yano, C. A., "Heuristic Approaches for Loading Problems in Flexible Manufacturing System," IIE Transactions, Vol. 25, No. 1, pp. 26-39 (1994).
-
(1994)
IIE Transactions
, vol.25
, Issue.1
, pp. 26-39
-
-
Kim, Y.D.1
Yano, C.A.2
-
16
-
-
0034634829
-
A Genetic Algorithm for FMS Part Type Selection and Machine Loading
-
Kumar, H. and Shanker, K., "A Genetic Algorithm for FMS Part Type Selection and Machine Loading," International Journal of Production Research, Vol. 38, No. 16, pp. 3861-3887 (2000).
-
(2000)
International Journal of Production Research
, vol.38
, Issue.16
, pp. 3861-3887
-
-
Kumar, H.1
Shanker, K.2
-
17
-
-
0022160824
-
Flexible Manufacturing Systems: A Structural Approach
-
Kusiak, A., "Flexible Manufacturing Systems: A Structural Approach," International Journal of Production Research, Vol. 23, No. 6, pp. 1057-1073 (1985).
-
(1985)
International Journal of Production Research
, vol.23
, Issue.6
, pp. 1057-1073
-
-
Kusiak, A.1
-
19
-
-
0004312378
-
-
McGraw-Hill, New York
-
Law, A. and Kelton, W., Simulation Modeling and Analysis, 3rd edition, McGraw-Hill, New York (1999).
-
(1999)
Simulation Modeling and Analysis, 3rd Edition
-
-
Law, A.1
Kelton, W.2
-
20
-
-
0000699496
-
Effectiveness of Flexible Routing Control
-
Lin, G. Y. and Solberg, J. J., "Effectiveness of Flexible Routing Control," International Journal of Flexible Manufacturing Systems, Vol. 3, Nos. 3/4, pp. 189-211 (1991).
-
(1991)
International Journal of Flexible Manufacturing Systems
, vol.3
, Issue.3-4
, pp. 189-211
-
-
Lin, G.Y.1
Solberg, J.J.2
-
21
-
-
0026914581
-
A Heuristic Procedure for Loading Problem in Flexible Manufacturing System
-
Mukhopadhyay, S. K., Midha, S., and Krishna, V. A., "A Heuristic Procedure for Loading Problem in Flexible Manufacturing System," International Journal of Production Research, Vol. 30, No. 9, pp. 2213-2228 (1992).
-
(1992)
International Journal of Production Research
, vol.30
, Issue.9
, pp. 2213-2228
-
-
Mukhopadhyay, S.K.1
Midha, S.2
Krishna, V.A.3
-
22
-
-
0032098662
-
FMS Machine Loading: A Simulated Annealing Approach
-
Mukhopadhyay, S. K., Singh, M. K., and Srivastava, R., "FMS Machine Loading: A Simulated Annealing Approach," International Journal of Production Research, Vol. 36, No. 6, pp. 1526-1547 (1998).
-
(1998)
International Journal of Production Research
, vol.36
, Issue.6
, pp. 1526-1547
-
-
Mukhopadhyay, S.K.1
Singh, M.K.2
Srivastava, R.3
-
23
-
-
0025482435
-
Job Shop Scheduling with Alternative Machines
-
Nasr, N. and Elsayed, E. A., "Job Shop Scheduling with Alternative Machines," International Journal of Production Research, Vol. 28, No. 9, pp. 1595-1609 (1990).
-
(1990)
International Journal of Production Research
, vol.28
, Issue.9
, pp. 1595-1609
-
-
Nasr, N.1
Elsayed, E.A.2
-
24
-
-
0032121744
-
Part Type Selection and Machine Loading and Part Type Volume Determination Problem in FMS Planning
-
Nayak, G. K. and Acharya, D., "Part Type Selection and Machine Loading and Part Type Volume Determination Problem in FMS Planning," International Journal of Production Research, Vol. 36, No. 7, pp. 1801-1824 (1998).
-
(1998)
International Journal of Production Research
, vol.36
, Issue.7
, pp. 1801-1824
-
-
Nayak, G.K.1
Acharya, D.2
-
25
-
-
0004009033
-
-
McGraw-Hill, New York
-
Pegden, C. D., Shannon, R. E., and Sadowski, R. P., Introduction to Simulation Using SIMAN, 3rd edition, McGraw-Hill, New York (1991).
-
(1991)
Introduction to Simulation Using SIMAN, 3rd Edition
-
-
Pegden, C.D.1
Shannon, R.E.2
Sadowski, R.P.3
-
26
-
-
84990578231
-
Scheduling with Sequencing Flexibility
-
Rachamadugu, R. and Nandkeolyar, U., "Scheduling with Sequencing Flexibility," Decision Sciences, Vol. 24, No. 2, pp. 315-341 (1992).
-
(1992)
Decision Sciences
, vol.24
, Issue.2
, pp. 315-341
-
-
Rachamadugu, R.1
Nandkeolyar, U.2
-
27
-
-
0026898533
-
Experimental Investigation of FMS Machine and AGV Scheduling Rules Against the Mean Flow-Time Criterion
-
Sabuncuoglu, I. and Hommertzheim, D. L., "Experimental Investigation of FMS Machine and AGV Scheduling Rules Against the Mean Flow-Time Criterion," International Journal of Production Research, Vol. 30, No. 7, pp. 1617-1653 (1992).
-
(1992)
International Journal of Production Research
, vol.30
, Issue.7
, pp. 1617-1653
-
-
Sabuncuoglu, I.1
Hommertzheim, D.L.2
-
28
-
-
0032000573
-
A Beam Search-Based Algorithm and Evaluation of Scheduling Approaches
-
Sabuncuoglu, I. and Karabuk, S., "A Beam Search-Based Algorithm and Evaluation of Scheduling Approaches," IIE Transactions, Vol. 30, No. 2, pp. 179-191 (1998).
-
(1998)
IIE Transactions
, vol.30
, Issue.2
, pp. 179-191
-
-
Sabuncuoglu, I.1
Karabuk, S.2
-
29
-
-
0000179190
-
Rescheduling Frequency in an FMS with Uncertain Processing Times and Unreliable Machines
-
Sabuncuoglu, I. and Karabuk, S., "Rescheduling Frequency in an FMS with Uncertain Processing Times and Unreliable Machines," Journal of Manufacturing Systems, Vol. 18, No. 4, pp. 268-283 (1999).
-
(1999)
Journal of Manufacturing Systems
, vol.18
, Issue.4
, pp. 268-283
-
-
Sabuncuoglu, I.1
Karabuk, S.2
-
30
-
-
0344843989
-
Development of an Integrated Process Planning/Production Scheduling Shell for Agile Manufacturing
-
Sadeh, N. M., Laliberty, T. J., Bryant, R. V. E., and Smith, S. E., "Development of an Integrated Process Planning/Production Scheduling Shell for Agile Manufacturing," in Proceedings of the IJCAI-95 Workshop on Intelligent Manufacturing (1995).
-
(1995)
Proceedings of the IJCAI-95 Workshop on Intelligent Manufacturing
-
-
Sadeh, N.M.1
Laliberty, T.J.2
Bryant, R.V.E.3
Smith, S.E.4
-
31
-
-
0001824597
-
A Multi-Level Machine and Vehicle Scheduling in a Flexible Manufacturing System
-
Sawik, T. J., "A Multi-Level Machine and Vehicle Scheduling in a Flexible Manufacturing System," Mathematical and Computer Modeling, Vol. 23, No. 7, pp. 45-57 (1996).
-
(1996)
Mathematical and Computer Modeling
, vol.23
, Issue.7
, pp. 45-57
-
-
Sawik, T.J.1
-
32
-
-
0031103340
-
An Interactive Approach to Bi-Criterion Loading of a Flexible Assembly System
-
Sawik, T. J., "An Interactive Approach to Bi-Criterion Loading of a Flexible Assembly System," Mathematical and Computer Modeling, Vol. 25, No. 6, pp. 71-83 (1997).
-
(1997)
Mathematical and Computer Modeling
, vol.25
, Issue.6
, pp. 71-83
-
-
Sawik, T.J.1
-
33
-
-
0032095129
-
A Lexicographic Approach to Bi-objective Loading of a Flexible Assembly System
-
Sawik, T. J., "A Lexicographic Approach to Bi-objective Loading of a Flexible Assembly System," European Journal of Operational Research, Vol. 107, No. 3, pp. 656-668 (1998).
-
(1998)
European Journal of Operational Research
, vol.107
, Issue.3
, pp. 656-668
-
-
Sawik, T.J.1
-
34
-
-
0024673709
-
Some Solution Methodologies for Loading Problems in a Flexible Manufacturing System
-
Shanker, K. and Srinivasulu, R., "Some Solution Methodologies for Loading Problems in a Flexible Manufacturing System," International Journal of Production Research, Vol. 27, No. 6, pp. 1019-1034 (1989).
-
(1989)
International Journal of Production Research
, vol.27
, Issue.6
, pp. 1019-1034
-
-
Shanker, K.1
Srinivasulu, R.2
-
35
-
-
0020718128
-
Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
-
Stecke, K. E., "Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems," Management Science, Vol. 29, No. 3, pp. 446-468 (1983).
-
(1983)
Management Science
, vol.29
, Issue.3
, pp. 446-468
-
-
Stecke, K.E.1
-
36
-
-
0022676091
-
A Hierarchical Approach to Solving Machine Grouping and Loading Problems of Flexible Manufacturing Systems
-
Stecke, K. E., "A Hierarchical Approach to Solving Machine Grouping and Loading Problems of Flexible Manufacturing Systems," European Journal of Operational Research, Vol. 24, No. 3, pp. 369-378 (1986).
-
(1986)
European Journal of Operational Research
, vol.24
, Issue.3
, pp. 369-378
-
-
Stecke, K.E.1
-
37
-
-
0031197478
-
A Heuristic Solution Approach to the Machine Loading Problem of FMS and its Petrinet Model
-
Tiwari, M. K., Hazarika, B., Vidyarthi, N. K., Jaggi, P., and Mukhopadhyay, S. K., "A Heuristic Solution Approach to the Machine Loading Problem of FMS and its Petrinet Model," International Journal of Production Research, Vol. 35, No. 8, pp. 2269-2284 (1997).
-
(1997)
International Journal of Production Research
, vol.35
, Issue.8
, pp. 2269-2284
-
-
Tiwari, M.K.1
Hazarika, B.2
Vidyarthi, N.K.3
Jaggi, P.4
Mukhopadhyay, S.K.5
-
38
-
-
0034692672
-
Solving Machine Loading Problem in a Flexible Manufacturing System Using a Genetic Algorithm Based Heuristic Approach
-
Tiwari, M. K. and Vidyarthi, N. K., "Solving Machine Loading Problem in a Flexible Manufacturing System Using a Genetic Algorithm Based Heuristic Approach," International Journal of Production Research, Vol. 38, No. 14, pp. 3375-3384 (2000).
-
(2000)
International Journal of Production Research
, vol.38
, Issue.14
, pp. 3375-3384
-
-
Tiwari, M.K.1
Vidyarthi, N.K.2
-
39
-
-
0035917218
-
Machine Loading Problem of FMS: A Fuzzy-Based Heuristic Approach
-
Vidyarthi, N. K. and Tiwari, M. K., "Machine Loading Problem of FMS: A Fuzzy-Based Heuristic Approach," International Journal of Production Research, Vol. 39, No. 5, pp. 953-979 (2001).
-
(2001)
International Journal of Production Research
, vol.39
, Issue.5
, pp. 953-979
-
-
Vidyarthi, N.K.1
Tiwari, M.K.2
-
40
-
-
0000944468
-
An Integrated Model of Process Planning and Production Scheduling
-
Zhang, H. and Mallur, S., "An Integrated Model of Process Planning and Production Scheduling," International Journal of Computer Integrated Manufacturing, Vol. 7, No. 6, pp. 356-364 (1994).
-
(1994)
International Journal of Computer Integrated Manufacturing
, vol.7
, Issue.6
, pp. 356-364
-
-
Zhang, H.1
Mallur, S.2
|