메뉴 건너뛰기




Volumn 19, Issue 6, 1991, Pages 529-537

Current and future issues concerning FMS scheduling

Author keywords

FMS; scheduling

Indexed keywords


EID: 0001596526     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/0305-0483(91)90003-C     Document Type: Article
Times cited : (29)

References (39)
  • 8
    • 84912868745 scopus 로고
    • Computer aided design and computer aided manufacturing
    • 4th ed., J White, John Wiley and Sons, New York
    • (1987) Production Handbook , pp. 815-820
    • Crowley1
  • 13
    • 0042683981 scopus 로고
    • Scheduling of flow shops
    • 2nd edn., Laboratory for Information and Decision Systems, Massachusetts Institute of Technology, Cambridge, MA
    • (1979) Report No. LIDS-R-1049
    • Hitz1
  • 23
    • 21544443957 scopus 로고
    • World trends in flexible manufacturing systems
    • (1982) FMS Mag. , vol.1 , Issue.1 , pp. 4-5
    • Merchant1
  • 32
    • 3342981820 scopus 로고
    • Machine utilization achieved using balanced FMS production ratios in a simulated setting
    • (1988) Ann. Op. Res. , pp. 229-267
    • Sarin1    Stecke2
  • 33
    • 0022060472 scopus 로고
    • A loading and dispatching problem in a random flexible manufacturing system
    • (1985) Int. J. Prod. Res. , vol.23 , Issue.3 , pp. 579-595
    • Shanker1    Tzen2
  • 38
    • 0022097890 scopus 로고
    • Scheduling/rescheduling in the manufacturing operating system environment
    • (1985) Int. J. Prod. Res. , vol.23 , Issue.4 , pp. 705-722
    • Yamamoto1    Nof2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.