-
2
-
-
85176687997
-
-
G. Reimer Material requirements planning and theory of constraints: Can they coexist? A case study Prod. Inventory Manage J. 48 52 1991
-
(1991)
, pp. 48-52
-
-
Reimer, G.1
-
3
-
-
0024104839
-
-
C. Lozinski C. R. Glassey Bottleneck starvation indicators for shop floor control IEEE Trans. Semiconduct. Manufact. 1 147 153 Nov. 1988 66 660 17988
-
(1988)
, vol.1
, pp. 147-153
-
-
Lozinski, C.1
Glassey, C.R.2
-
4
-
-
0027609191
-
-
G. Zapfel H. Missbauer New concept for production planning and control Euro. J. Operat. Res. 67 297 320 1993
-
(1993)
, vol.67
, pp. 297-320
-
-
Zapfel, G.1
Missbauer, H.2
-
5
-
-
0020500356
-
-
M. L. Smith A. Seidman Due date selection procedure for job-shop simulation Comput. Ind. Eng. 7 3 199 207 1983
-
(1983)
, vol.7
, Issue.3
, pp. 199-207
-
-
Smith, M.L.1
Seidman, A.2
-
6
-
-
0026186620
-
-
M. M. Vig K. J. Dooley Dynamic rules for due-date assignment Int. J. Prod. Res. 29 7 1361 1377 1991
-
(1991)
, vol.29
, Issue.7
, pp. 1361-1377
-
-
Vig, M.M.1
Dooley, K.J.2
-
7
-
-
0018454859
-
-
J. K. Weeks A simulation study of predictable due-dates Manage Sci. 25 4 363 373 1979
-
(1979)
, vol.25
, Issue.4
, pp. 363-373
-
-
Weeks, J.K.1
-
8
-
-
0027850894
-
-
A. C. Kaplan A. T. Urnal A probabilistic cost-based due date assignment model for job shops Int. J. Prod. Res. 31 12 2817 2834 1993
-
(1993)
, vol.31
, Issue.12
, pp. 2817-2834
-
-
Kaplan, A.C.1
Urnal, A.T.2
-
9
-
-
0027657253
-
-
S. T. Enns Job shop flow time prediction and tardiness control using queueing analysis Int. J. Prod. Res. 31 9 2045 2057 1993
-
(1993)
, vol.31
, Issue.9
, pp. 2045-2057
-
-
Enns, S.T.1
-
10
-
-
85176667211
-
-
T. C. E. Chen M. C. Gupta Survey of scheduling research involving due date determining decisions Eur. J. Oper. Res. 38 156 166 1989
-
(1989)
, vol.38
, pp. 156-166
-
-
Chen, T.C.E.1
Gupta, M.C.2
-
11
-
-
85176690722
-
-
H. Yan S. Lou S. Sethi A. Gardel P. Deosthali Testing the robustness of two-boundary control policies in semiconductor manufacturing IEEE Trans. Semiconduct. Manufact. 9 1 24 Feb. 1996 66 10608 492825
-
(1996)
, vol.9
, pp. 1-24
-
-
Yan, H.1
Lou, S.2
Sethi, S.3
Gardel, A.4
Deosthali, P.5
-
12
-
-
85176666291
-
-
South-Western OH, Cincinnati
-
M. M. Umble M. L. Srikanth Synchronous Manufacturing 1990 South-Western OH, Cincinnati
-
(1990)
-
-
Umble, M.M.1
Srikanth, M.L.2
-
13
-
-
85176670092
-
-
CRC New York
-
J. H. Dshalalow Advances in Queueing: Theory, Methods, and Open Problems 1995 CRC New York
-
(1995)
-
-
Dshalalow, J.H.1
-
14
-
-
85176667028
-
-
Taiwan, R.O.C., Hsinchu
-
J. R. May S. H. Chung The design of dispatching rule for the primary machines of wafer fabrication factories 1996 M.S. thesis Taiwan, R.O.C., Hsinchu
-
(1996)
-
-
May, J.R.1
Chung, S.H.2
-
15
-
-
0001385963
-
-
C. H. Smith E. D. Minor H. J. Wen Regression-based due date assignment rules for improved assembly shop performance Int. J. Prod. Res. 33 9 2375 2385 1995
-
(1995)
, vol.33
, Issue.9
, pp. 2375-2385
-
-
Smith, C.H.1
Minor, E.D.2
Wen, H.J.3
-
16
-
-
85176681842
-
-
Springer-Verlag New York
-
H.-P. Wiendahl Load-Oriented Manufacturing Control 1995 Springer-Verlag New York
-
(1995)
-
-
Wiendahl, H.-P.1
-
17
-
-
85176694002
-
-
Kluwer MA, Boston
-
L. F. Atherton R. W. Atherton Wafer Fabrication: Factory Performance and Analysis 1995 Kluwer MA, Boston
-
(1995)
-
-
Atherton, L.F.1
Atherton, R.W.2
|