메뉴 건너뛰기




Volumn 1, Issue 2-3, 2000, Pages 318-327

A bottleneck-based due-date assignment methodology

Author keywords

Bottleneck; due date assignment; on time delivery; Tabu search

Indexed keywords


EID: 19344367489     PISSN: 13682148     EISSN: None     Source Type: Journal    
DOI: 10.1504/ijmtm.2000.001336     Document Type: Article
Times cited : (5)

References (19)
  • 1
    • 0027540852 scopus 로고
    • An investigation of due-date assignment using workload information of a dynamic shop
    • Udo, G. (1993) ‘An investigation of due-date assignment using workload information of a dynamic shop’, International Journal of Production Economics, Vol. 29, pp.89–101.
    • (1993) International Journal of Production Economics , vol.29 , pp. 89-101
    • Udo, G.1
  • 2
    • 0028730645 scopus 로고
    • A study of factors affecting due-date predictability in a simulated dynamic job shop
    • Chang, F-C.R. (1994) ‘A study of factors affecting due-date predictability in a simulated dynamic job shop’, Journal of Manufacturing Systems, Vol. 13, No. 6, pp.393–400.
    • (1994) Journal of Manufacturing Systems , vol.13 , Issue.6 , pp. 393-400
    • Chang, F.-C.R.1
  • 3
    • 0030172572 scopus 로고    scopus 로고
    • Dynamic assignation of due-dates in an assembly shop based in simulation
    • Roman, D.B. and Valle, A.G. (1996) ‘Dynamic assignation of due-dates in an assembly shop based in simulation’, International Journal of Production Research, Vol. 34, No. 6, pp.1539–1554.
    • (1996) International Journal of Production Research , vol.34 , Issue.6 , pp. 1539-1554
    • Roman, D.B.1    Valle, A.G.2
  • 4
    • 0001385963 scopus 로고
    • Regression-based due-date assignment rules for improved assembly shop performance
    • Smith, C.H., Minor, E.D. and Wen, H.J. (1995) ‘Regression-based due-date assignment rules for improved assembly shop performance’, International Journal of Production Research, Vol. 33, No. 9, pp.2375–2385.
    • (1995) International Journal of Production Research , vol.33 , Issue.9 , pp. 2375-2385
    • Smith, C.H.1    Minor, E.D.2    Wen, H.J.3
  • 6
    • 0031332607 scopus 로고    scopus 로고
    • Integrating order release control with due-date assignment rules
    • Tsai, C-H., Chang, C-T and Li, R-K. (1997) ‘Integrating order release control with due-date assignment rules’, International Journal of Production Research, Vol. 35, No. 12, pp.3379–3392.
    • (1997) International Journal of Production Research , vol.35 , Issue.12 , pp. 3379-3392
    • Tsai, C.-H.1    Chang, C.-T.2    Li, R.-K.3
  • 7
    • 0032041372 scopus 로고    scopus 로고
    • Job shop scheduling for missed due-date performance
    • Cheng, T.C.E. and Jiang, J. (1998) ‘Job shop scheduling for missed due-date performance’, Computers and Industrial Engineering, Vol. 34, No. 2, pp.297–307.
    • (1998) Computers and Industrial Engineering , vol.34 , Issue.2 , pp. 297-307
    • Cheng, T.C.E.1    Jiang, J.2
  • 8
    • 0000482128 scopus 로고
    • Due-date setting methodologies based on simulated annealing - an experimental study in a real-life job shop
    • Raghu, T.S. and Rajendran, C. (1995) ‘Due-date setting methodologies based on simulated annealing - an experimental study in a real-life job shop’, International Journal of Production Research, Vol. 33, No. 9, pp.2535–2554.
    • (1995) International Journal of Production Research , vol.33 , Issue.9 , pp. 2535-2554
    • Raghu, T.S.1    Rajendran, C.2
  • 9
    • 0030145024 scopus 로고    scopus 로고
    • Determination of due-dates in job shop scheduling by simulated annealing
    • Mamalis, A.G. and Malagardis, I. (1996) ‘Determination of due-dates in job shop scheduling by simulated annealing’, Computer Integrated Manufacturing Systems, Vol. 9, No. 2, pp.65–72.
    • (1996) Computer Integrated Manufacturing Systems , vol.9 , Issue.2 , pp. 65-72
    • Mamalis, A.G.1    Malagardis, I.2
  • 10
    • 0032043112 scopus 로고    scopus 로고
    • Scheduling to minimize mean tardiness and weighted mean tardiness in flowshop and flowline-based manufacturing cell
    • Parthasarathy, S. and Rajendran, C. (1998) ‘Scheduling to minimize mean tardiness and weighted mean tardiness in flowshop and flowline-based manufacturing cell’, Computers and Industrial Engineering, Vol. 34, No. 2, pp.531–546.
    • (1998) Computers and Industrial Engineering , vol.34 , Issue.2 , pp. 531-546
    • Parthasarathy, S.1    Rajendran, C.2
  • 12
    • 0031383018 scopus 로고    scopus 로고
    • An operation scheme for make-to-order jobshop production systems
    • Choi, K., Kim, S., Lee, H. and Kwon, I. (1997) ‘An operation scheme for make-to-order jobshop production systems’, Computers and Industrial Engineering, Vol. 33, No. 3, pp.765–768.
    • (1997) Computers and Industrial Engineering , vol.33 , Issue.3 , pp. 765-768
    • Choi, K.1    Kim, S.2    Lee, H.3    Kwon, I.4
  • 13
    • 0001153814 scopus 로고
    • A dynamic forecasting model for job shop flowtime prediction and tardiness control
    • Enns, S.T. (1995) ‘A dynamic forecasting model for job shop flowtime prediction and tardiness control’, International Journal of Production Research, Vol. 33, No. 5, pp.1295–1312.
    • (1995) International Journal of Production Research , vol.33 , Issue.5 , pp. 1295-1312
    • Enns, S.T.1
  • 14
    • 0031102504 scopus 로고    scopus 로고
    • Capacity driven due-date settings in make-to-order production systems
    • Ozdamar, L. and Yazgac, T. (1997) ‘Capacity driven due-date settings in make-to-order production systems’, International Journal of Production Economics, Vol. 49, pp.29–44.
    • (1997) International Journal of Production Economics , vol.49 , pp. 29-44
    • Ozdamar, L.1    Yazgac, T.2
  • 15
    • 0027850894 scopus 로고
    • A probabilistic cost-based due-date assignment model for job shops
    • Kaplan, A.C. and Unal, A.T. (1993) ‘A probabilistic cost-based due-date assignment model for job shops’, International Journal of Production Research, Vol. 31, No. 12, pp.2817–2834.
    • (1993) International Journal of Production Research , vol.31 , Issue.12 , pp. 2817-2834
    • Kaplan, A.C.1    Unal, A.T.2
  • 16
    • 0029405890 scopus 로고
    • The sensitivity of job mix and load capacity bottlenecks on inventory and due-date performance in a manufacturing systems
    • Huq, Z. and Bernardo, J.J. (1995) ‘The sensitivity of job mix and load capacity bottlenecks on inventory and due-date performance in a manufacturing systems’, Production Planning and Control, Vol. 6, No. 6, pp.516–529.
    • (1995) Production Planning and Control , vol.6 , Issue.6 , pp. 516-529
    • Huq, Z.1    Bernardo, J.J.2
  • 19
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control
    • Uzsoy, R., Lee, C-Y and Martin-Vega, L.A. (1994) ‘A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control’, IIE Transactions, Vol. 26, No. 5, pp.44–55.
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 44-55
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.