-
1
-
-
0027540852
-
An investigation of due-date assignment using workload information of a dynamic shop
-
Udo, G. (1993) ‘An investigation of due-date assignment using workload information of a dynamic shop’, International Journal of Production Economics, Vol. 29, pp.89–101.
-
(1993)
International Journal of Production Economics
, vol.29
, pp. 89-101
-
-
Udo, G.1
-
2
-
-
0028730645
-
A study of factors affecting due-date predictability in a simulated dynamic job shop
-
Chang, F-C.R. (1994) ‘A study of factors affecting due-date predictability in a simulated dynamic job shop’, Journal of Manufacturing Systems, Vol. 13, No. 6, pp.393–400.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, Issue.6
, pp. 393-400
-
-
Chang, F.-C.R.1
-
3
-
-
0030172572
-
Dynamic assignation of due-dates in an assembly shop based in simulation
-
Roman, D.B. and Valle, A.G. (1996) ‘Dynamic assignation of due-dates in an assembly shop based in simulation’, International Journal of Production Research, Vol. 34, No. 6, pp.1539–1554.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.6
, pp. 1539-1554
-
-
Roman, D.B.1
Valle, A.G.2
-
4
-
-
0001385963
-
Regression-based due-date assignment rules for improved assembly shop performance
-
Smith, C.H., Minor, E.D. and Wen, H.J. (1995) ‘Regression-based due-date assignment rules for improved assembly shop performance’, International Journal of Production Research, Vol. 33, No. 9, pp.2375–2385.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.9
, pp. 2375-2385
-
-
Smith, C.H.1
Minor, E.D.2
Wen, H.J.3
-
6
-
-
0031332607
-
Integrating order release control with due-date assignment rules
-
Tsai, C-H., Chang, C-T and Li, R-K. (1997) ‘Integrating order release control with due-date assignment rules’, International Journal of Production Research, Vol. 35, No. 12, pp.3379–3392.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.12
, pp. 3379-3392
-
-
Tsai, C.-H.1
Chang, C.-T.2
Li, R.-K.3
-
7
-
-
0032041372
-
Job shop scheduling for missed due-date performance
-
Cheng, T.C.E. and Jiang, J. (1998) ‘Job shop scheduling for missed due-date performance’, Computers and Industrial Engineering, Vol. 34, No. 2, pp.297–307.
-
(1998)
Computers and Industrial Engineering
, vol.34
, Issue.2
, pp. 297-307
-
-
Cheng, T.C.E.1
Jiang, J.2
-
8
-
-
0000482128
-
Due-date setting methodologies based on simulated annealing - an experimental study in a real-life job shop
-
Raghu, T.S. and Rajendran, C. (1995) ‘Due-date setting methodologies based on simulated annealing - an experimental study in a real-life job shop’, International Journal of Production Research, Vol. 33, No. 9, pp.2535–2554.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.9
, pp. 2535-2554
-
-
Raghu, T.S.1
Rajendran, C.2
-
9
-
-
0030145024
-
Determination of due-dates in job shop scheduling by simulated annealing
-
Mamalis, A.G. and Malagardis, I. (1996) ‘Determination of due-dates in job shop scheduling by simulated annealing’, Computer Integrated Manufacturing Systems, Vol. 9, No. 2, pp.65–72.
-
(1996)
Computer Integrated Manufacturing Systems
, vol.9
, Issue.2
, pp. 65-72
-
-
Mamalis, A.G.1
Malagardis, I.2
-
10
-
-
0032043112
-
Scheduling to minimize mean tardiness and weighted mean tardiness in flowshop and flowline-based manufacturing cell
-
Parthasarathy, S. and Rajendran, C. (1998) ‘Scheduling to minimize mean tardiness and weighted mean tardiness in flowshop and flowline-based manufacturing cell’, Computers and Industrial Engineering, Vol. 34, No. 2, pp.531–546.
-
(1998)
Computers and Industrial Engineering
, vol.34
, Issue.2
, pp. 531-546
-
-
Parthasarathy, S.1
Rajendran, C.2
-
11
-
-
0026186620
-
Dynamic rules for due-date assignment
-
Vig, M.M. and Dooley, K.J. (1991) ‘Dynamic rules for due-date assignment’, International Journal of Production Research, Vol. 29, No. 7, pp.1361–1377.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.7
, pp. 1361-1377
-
-
Vig, M.M.1
Dooley, K.J.2
-
12
-
-
0031383018
-
An operation scheme for make-to-order jobshop production systems
-
Choi, K., Kim, S., Lee, H. and Kwon, I. (1997) ‘An operation scheme for make-to-order jobshop production systems’, Computers and Industrial Engineering, Vol. 33, No. 3, pp.765–768.
-
(1997)
Computers and Industrial Engineering
, vol.33
, Issue.3
, pp. 765-768
-
-
Choi, K.1
Kim, S.2
Lee, H.3
Kwon, I.4
-
13
-
-
0001153814
-
A dynamic forecasting model for job shop flowtime prediction and tardiness control
-
Enns, S.T. (1995) ‘A dynamic forecasting model for job shop flowtime prediction and tardiness control’, International Journal of Production Research, Vol. 33, No. 5, pp.1295–1312.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.5
, pp. 1295-1312
-
-
Enns, S.T.1
-
14
-
-
0031102504
-
Capacity driven due-date settings in make-to-order production systems
-
Ozdamar, L. and Yazgac, T. (1997) ‘Capacity driven due-date settings in make-to-order production systems’, International Journal of Production Economics, Vol. 49, pp.29–44.
-
(1997)
International Journal of Production Economics
, vol.49
, pp. 29-44
-
-
Ozdamar, L.1
Yazgac, T.2
-
15
-
-
0027850894
-
A probabilistic cost-based due-date assignment model for job shops
-
Kaplan, A.C. and Unal, A.T. (1993) ‘A probabilistic cost-based due-date assignment model for job shops’, International Journal of Production Research, Vol. 31, No. 12, pp.2817–2834.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.12
, pp. 2817-2834
-
-
Kaplan, A.C.1
Unal, A.T.2
-
16
-
-
0029405890
-
The sensitivity of job mix and load capacity bottlenecks on inventory and due-date performance in a manufacturing systems
-
Huq, Z. and Bernardo, J.J. (1995) ‘The sensitivity of job mix and load capacity bottlenecks on inventory and due-date performance in a manufacturing systems’, Production Planning and Control, Vol. 6, No. 6, pp.516–529.
-
(1995)
Production Planning and Control
, vol.6
, Issue.6
, pp. 516-529
-
-
Huq, Z.1
Bernardo, J.J.2
-
17
-
-
0031999276
-
Dynamic Buffering
-
Gardiner, S.C. and Blackstone, J.R. (1998) ‘Dynamic Buffering’, International Journal of Production Research, Vol. 36, No. 2, pp.333–342.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.2
, pp. 333-342
-
-
Gardiner, S.C.1
Blackstone, J.R.2
-
19
-
-
0028496979
-
A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control
-
Uzsoy, R., Lee, C-Y and Martin-Vega, L.A. (1994) ‘A review of production planning and scheduling models in the semiconductor industry part II: Shop-floor control’, IIE Transactions, Vol. 26, No. 5, pp.44–55.
-
(1994)
IIE Transactions
, vol.26
, Issue.5
, pp. 44-55
-
-
Uzsoy, R.1
Lee, C.-Y.2
Martin-Vega, L.A.3
|