메뉴 건너뛰기




Volumn 89, Issue 2, 1996, Pages 400-407

A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis

Author keywords

Heuristics; Project scheduling; Resource allocation

Indexed keywords

ALGORITHMS; DECISION MAKING; HEURISTIC METHODS; ITERATIVE METHODS; RESOURCE ALLOCATION;

EID: 0030574808     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/0377-2217(94)00272-X     Document Type: Article
Times cited : (48)

References (8)
  • 1
    • 0001849846 scopus 로고
    • Heuristic techniques for resource constrained project scheduling: A review and an empirical analysis
    • R. Slowinski and J. Weglarz (eds.), Elsevier Science Publishers, Amsterdam
    • Alvarez-Valdes, R., and Tamarit, J.M., "Heuristic techniques for resource constrained project scheduling: A review and an empirical analysis", in: R. Slowinski and J. Weglarz (eds.), Advances in Project Scheduling, Elsevier Science Publishers, Amsterdam, 1989, 113-134.
    • (1989) Advances in Project Scheduling , pp. 113-134
    • Alvarez-Valdes, R.1    Tamarit, J.M.2
  • 3
    • 0016498438 scopus 로고
    • A comparison of heuristics and optimum solutions in resource constrained project scheduling
    • Davis, E.W., and Patterson, J.H., "A comparison of heuristics and optimum solutions in resource constrained project scheduling", Management Science 21 (1975) 944-955.
    • (1975) Management Science , vol.21 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 4
    • 0026822242 scopus 로고
    • An iterative scheduling technique for resource-constrained project scheduling
    • Li, K.Y., and Willis, R.J., "An iterative scheduling technique for resource-constrained project scheduling", European Journal of Operational Research 56 (1992) 370-379.
    • (1992) European Journal of Operational Research , vol.56 , pp. 370-379
    • Li, K.Y.1    Willis, R.J.2
  • 5
    • 0009627197 scopus 로고
    • A local constraint based analysis approach to project scheduling under general resource constraints
    • Özdamar, L., and Ulusoy, G., "A local constraint based analysis approach to project scheduling under general resource constraints", European Journal of Operational Research 79 (1994) 287-298.
    • (1994) European Journal of Operational Research , vol.79 , pp. 287-298
    • Özdamar, L.1    Ulusoy, G.2
  • 6
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple resource constrained project scheduling problem
    • Patterson, J.H., "A comparison of exact approaches for solving the multiple resource constrained project scheduling problem", Management Science 30 (1984) 854-867.
    • (1984) Management Science , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 7
    • 84974870375 scopus 로고
    • Heuristic performance and network/resource characteristics in resource-constrained project scheduling
    • Ulusoy, G., and Özdamar, L., "Heuristic performance and network/resource characteristics in resource-constrained project scheduling", Journal of the Operational Research Society 40 (1989) 1145-1152.
    • (1989) Journal of the Operational Research Society , vol.40 , pp. 1145-1152
    • Ulusoy, G.1    Özdamar, L.2
  • 8
    • 0028396719 scopus 로고
    • A constraint based perspective in resource constrained project scheduling
    • Ulusoy, G., and Özdamar, L., "A constraint based perspective in resource constrained project scheduling", International Journal of Production Research 32 (1994) 693-705.
    • (1994) International Journal of Production Research , vol.32 , pp. 693-705
    • Ulusoy, G.1    Özdamar, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.