Heuristic algorithms for resource constrained project scheduling: A review and an empirical analysis
-
R. Slowinski and J. Weglarz (Eds.), Elsevier, Amsterdam
-
Alvarez-Valdes, R. and J.M. Tamarit, 1989. "Heuristic algorithms for resource constrained project scheduling: A review and an empirical analysis", in: R. Slowinski and J. Weglarz (Eds.), Advances in Project Scheduling, Elsevier, Amsterdam, pp. 113-134.
-
(1989)
Advances in Project Scheduling
, pp. 113-134
-
-
Alvarez-Valdes, R.1
Tamarit, J.M.2
-
2
-
-
84989743918
-
A new heuristic solution method in resource constrained project scheduling problems
-
Bell, C.E. and J. Han, 1991. "A new heuristic solution method in resource constrained project scheduling problems", Naval Research Logistics, vol. 38, pp. 315-331.
-
(1991)
Naval Research Logistics
, vol.38
, pp. 315-331
-
-
Bell, C.E.1
Han, J.2
-
3
-
-
0025385096
-
Solving resource constrained project scheduling problems by A* search
-
Bell, C.E. and K. Park, 1990. "Solving resource constrained project scheduling problems by A* search", Naval Research Logistics, vol. 37, pp. 61-84.
-
(1990)
Naval Research Logistics
, vol.37
, pp. 61-84
-
-
Bell, C.E.1
Park, K.2
-
4
-
-
0024017013
-
OPAL: A multi-knowledge-based system for industrial job shop scheduling
-
Bensana, E., G. Bel and D. Dubois, 1988. "OPAL: A multi-knowledge-based system for industrial job shop scheduling", International Journal of Production Research, vol. 26, pp. 795-819.
-
(1988)
International Journal of Production Research
, vol.26
, pp. 795-819
-
-
Bensana, E.1
Bel, G.2
Dubois, D.3
-
5
-
-
0025701919
-
Some efficient multi-heuristic procedures for resource-constrained project scheduling
-
Boctor, F.F., 1990. "Some efficient multi-heuristic procedures for resource-constrained project scheduling", European Journal of Operations Research, vol. 49, 3-1.
-
(1990)
European Journal of Operations Research
, vol.49
, pp. 3-11
-
-
Boctor, F.F.1
-
6
-
-
0023362513
-
Project scheduling with resource constraints: A branch and bound approach
-
Christofides, N., R. Alvarez-Valdes and J.M. Tamarit, 1987. "Project scheduling with resource constraints: A branch and bound approach", European Journal of Operations Research, vol. 29, pp. 262-273.
-
(1987)
European Journal of Operations Research
, vol.29
, pp. 262-273
-
-
Christofides, N.1
Alvarez-Valdes, R.2
Tamarit, J.M.3
-
7
-
-
0016498438
-
A comparison of heuristics and optimum solutions in resource constrained project scheduling
-
Davis, E.W. and J.H. Patterson, 1975. "A comparison of heuristics and optimum solutions in resource constrained project scheduling", Management Science, vol. 21, pp. 944-955.
-
(1975)
Management Science
, vol.21
, pp. 944-955
-
-
Davis, E.W.1
Patterson, J.H.2
-
8
-
-
0028766754
-
On a paper by Christofides et al. For solving the multiple-resource constrained single project scheduling problem
-
Demeulmeester, E., W.P. Simpson, S. Baroum, J.H. Patterson and K. Yang, 1994. "On a paper by Christofides et al. for solving the multiple-resource constrained single project scheduling problem", EJOR, vol. 76, pp. 218-228.
-
(1994)
EJOR
, vol.76
, pp. 218-228
-
-
Demeulmeester, E.1
Simpson, W.P.2
Baroum, S.3
Patterson, J.H.4
Yang, K.5
-
9
-
-
0025701916
-
The scheduling of activities to maximize the net present value of projects
-
Elmaghraby, S.E. and W.S. Herroelen, 1990. "The scheduling of activities to maximize the net present value of projects", European Journal of Operational Research, vol. 49, pp. 35-40.
-
(1990)
European Journal of Operational Research
, vol.49
, pp. 35-40
-
-
Elmaghraby, S.E.1
Herroelen, W.S.2
-
10
-
-
85029979236
-
An approach to workshop real time scheduling problems
-
S.Y. Nof and C.L. Moodie (Eds.), NATO ASI Series, F53, Springer, Berlin
-
Erschler, J. and F. Roubellat, 1989a. "An approach to workshop real time scheduling problems", in: S.Y. Nof and C.L. Moodie (Eds.), Advanced Information Technologies for Industrial Material Flow Systems, NATO ASI Series, F53, Springer, Berlin.
-
(1989)
Advanced Information Technologies for Industrial Material Flow Systems
-
-
Erschler, J.1
Roubellat, F.2
-
11
-
-
2442737544
-
An approach for real-time scheduling of activities with time and resource constraints
-
R. Slowinski and J. Weglarz (Eds.), Elsevier, Amsterdam
-
Erschler, J. and F. Roubellat, 1989b. "An approach for real-time scheduling of activities with time and resource constraints", in: R. Slowinski and J. Weglarz (Eds.), Advances in Project Scheduling, Elsevier, Amsterdam, pp. 237-277.
-
(1989)
Advances in Project Scheduling
, pp. 237-277
-
-
Erschler, J.1
Roubellat, F.2
-
12
-
-
0016973040
-
Finding some essential characteristics of the feasible solutions for a scheduling problem
-
Erschler, J., F. Roubellat and J.P. Vernes, 1976. "Finding some essential characteristics of the feasible solutions for a scheduling problem", Operations Research, vol. 24, pp. 774-783.
-
(1976)
Operations Research
, vol.24
, pp. 774-783
-
-
Erschler, J.1
Roubellat, F.2
Vernes, J.P.3
-
13
-
-
0015404241
-
Resource constrained project scheduling - The state of the art
-
Herroelen, W.S., 1972. "Resource constrained project scheduling - The state of the art". Journal of Operational Research Society, vol. 23, pp. 261-275.
-
(1972)
Journal of Operational Research Society
, vol.23
, pp. 261-275
-
-
Herroelen, W.S.1
-
14
-
-
84993051006
-
-
Technical Report No. IE-93-001, Department of Industrial Engineering, Marmara University, Istanbul, Turkey
-
Özdamar, L. and G. Ulusoy, 1993. ̈A heuristic with a branch and bound structure in resource constrained project scheduling", Technical Report No. IE-93-001, Department of Industrial Engineering, Marmara University, Istanbul, Turkey.
-
(1993)
A Heuristic with a Branch and Bound Structure in Resource Constrained Project Scheduling
-
-
Özdamar, L.1
Ulusoy, G.2
-
15
-
-
0009627197
-
A local constraint based analysis approach in project scheduling under general resource constraints
-
Özdamar, L. and G. Ulusoy, 1994. "A local constraint based analysis approach in project scheduling under general resource constraints", European Journal of Operational Research, vol. 79, pp. 287-298.
-
(1994)
European Journal of Operational Research
, vol.79
, pp. 287-298
-
-
Özdamar, L.1
Ulusoy, G.2
-
16
-
-
0029393209
-
A survey on the resource constrained project scheduling problem
-
To appear
-
Özdamar, L. and G. Ulusoy, 1995. "A survey on the resource constrained project scheduling problem", IIE Transactions, To appear.
-
(1995)
IIE Transactions
-
-
Özdamar, L.1
Ulusoy, G.2
-
17
-
-
0027240748
-
Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided approach
-
Padman, R. and D.E. Smith-Daniels, 1993. "Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided approach", European Journal of Operational Research, vol. 64, pp. 295-311.
-
(1993)
European Journal of Operational Research
, vol.64
, pp. 295-311
-
-
Padman, R.1
Smith-Daniels, D.E.2
-
18
-
-
0016935106
-
Project scheduling: The effects of problem structure on heuristic performance
-
Patterson, J.H., 1976. "Project scheduling: The effects of problem structure on heuristic performance", Naval Research Logistics Quarterly, vol. 23, pp. 95-123.
-
(1976)
Naval Research Logistics Quarterly
, vol.23
, pp. 95-123
-
-
Patterson, J.H.1
-
19
-
-
0021460636
-
A comparison of exact approaches for solving the multiple constrained project scheduling
-
Patterson, J.H., 1984. "A comparison of exact approaches for solving the multiple constrained project scheduling", Management Science, vol. 30, pp. 854-867.
-
(1984)
Management Science
, vol.30
, pp. 854-867
-
-
Patterson, J.H.1
-
20
-
-
0016028677
-
A horizon-varying, zero-one approach to project scheduling
-
Patterson, J.H. and W.D. Huber, 1974. "A horizon-varying, zero-one approach to project scheduling", Management Science, vol. 20, pp. 990-998.
-
(1974)
Management Science
, vol.20
, pp. 990-998
-
-
Patterson, J.H.1
Huber, W.D.2
-
21
-
-
0025701909
-
Computational experience with a backtracking algorithm for solving a general class of precedence and resource constrained scheduling problems
-
Patterson, J.H., R. Slowinski, F.B. Talbot and J. Weglarz, 1990. "Computational experience with a backtracking algorithm for solving a general class of precedence and resource constrained scheduling problems", European Journal of Operations Research, vol. 49, pp. 68-79.
-
(1990)
European Journal of Operations Research
, vol.49
, pp. 68-79
-
-
Patterson, J.H.1
Slowinski, R.2
Talbot, F.B.3
Weglarz, J.4
-
22
-
-
0014574409
-
Multi-project scheduling with limited resources: A zero-one programming approach
-
Pritsker, A.A., L.J. Watters and P.M. Wolfe, 1969. "Multi-project scheduling with limited resources: A zero-one programming approach", Management Science, vol. 16, pp. 93-108.
-
(1969)
Management Science
, vol.16
, pp. 93-108
-
-
Pritsker, A.A.1
Watters, L.J.2
Wolfe, P.M.3
-
23
-
-
0022794872
-
A comparison of heuristics for scheduling projects with cash flows and resource restrictions
-
Russell, R.A., 1986. "A comparison of heuristics for scheduling projects with cash flows and resource restrictions". Management Science, vol. 32, pp. 1291-1300.
-
(1986)
Management Science
, vol.32
, pp. 1291-1300
-
-
Russell, R.A.1
-
24
-
-
0019586862
-
Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
-
Slowinski, R., 1981. "Multiobjective network scheduling with efficient use of renewable and nonrenewable resources", European Journal of Operational Research, vol. 7, pp. 265-273.
-
(1981)
European Journal of Operational Research
, vol.7
, pp. 265-273
-
-
Slowinski, R.1
-
25
-
-
0042511276
-
Multiobjective project scheduling under multiple category resource constraints
-
R. Slowinski and J. Weglarz (Eds.), Elsevier, Amsterdam
-
Slowinski, R., 1989. "Multiobjective project scheduling under multiple category resource constraints", in: R. Slowinski and J. Weglarz (Eds.), Advances in Project Scheduling, Elsevier, Amsterdam, pp. 151-167.
-
(1989)
Advances in Project Scheduling
, pp. 151-167
-
-
Slowinski, R.1
-
26
-
-
84985756242
-
Using a late start resource constrained project schedule to improve project net present value
-
Smith-Daniels, D.E. and N.J. Aquilano, 1987. "Using a late start resource constrained project schedule to improve project net present value", Decision Sciences, vol. 18, pp. 617-630.
-
(1987)
Decision Sciences
, vol.18
, pp. 617-630
-
-
Smith-Daniels, D.E.1
Aquilano, N.J.2
-
28
-
-
0020193734
-
Resource constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
-
Talbot, F.B., 1982. "Resource constrained project scheduling with time-resource tradeoffs: The nonpreemptive case", Management Science, vol. 28, pp. 1197-1210.
-
(1982)
Management Science
, vol.28
, pp. 1197-1210
-
-
Talbot, F.B.1
-
29
-
-
0017997005
-
An efficient integer programming algorithm with network cuts for solving resource constrained scheduling problems
-
Talbot, F.B. and J.H. Patterson, 1978. "An efficient integer programming algorithm with network cuts for solving resource constrained scheduling problems". Management Science, vol. 24, pp. 1163-1174.
-
(1978)
Management Science
, vol.24
, pp. 1163-1174
-
-
Talbot, F.B.1
Patterson, J.H.2
-
30
-
-
84974870375
-
Heuristic performance and network/resource characteristics in resource-constrained project scheduling
-
Ulusoy, G. and L. Özdamar, 1989. "Heuristic performance and network/resource characteristics in resource-constrained project scheduling", Journal of Operational Research Society, vol. 40, pp. 1145-1152.
-
(1989)
Journal of Operational Research Society
, vol.40
, pp. 1145-1152
-
-
Ulusoy, G.1
Özdamar, L.2
-
31
-
-
0028396719
-
A constraint based perspective in resource constrained project scheduling
-
Ulusoy G. and L. Ozdamar, 1994. "A constraint based perspective in resource constrained project scheduling", International Journal of Production Research, vol. 32, pp. 693-705.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 693-705
-
-
Ulusoy, G.1
Ozdamar, L.2
-
32
-
-
0022107667
-
Critical path analysis and resource constrained project scheduling - Theory and practice
-
Willis, R.J., 1985. "Critical path analysis and resource constrained project scheduling - Theory and practice", European Journal Operational Research, vol. 21, pp. 149-155.
-
(1985)
European Journal Operational Research
, vol.21
, pp. 149-155
-
-
Willis, R.J.1
-
33
-
-
0027235016
-
Scheduling a project to maximize its not present value: An integer programming approach
-
Yang, K.K., F.B. Talbot and J.H. Patterson, 1993. "Scheduling a project to maximize its not present value: An integer programming approach", European Journal of Operations Research, vol. 64, pp. 188-198.
-
(1993)
European Journal of Operations Research
, vol.64
, pp. 188-198
-
-
Yang, K.K.1
Talbot, F.B.2
Patterson, J.H.3
|