메뉴 건너뛰기




Volumn 14, Issue 4, 2005, Pages 450-467

Manufacturing operations manuscripts published in the first 52 issues of POM: Review, trends, and opportunities

Author keywords

Journals in OM; Literature review; OM Research; Trends and directions in OM research

Indexed keywords


EID: 33646112386     PISSN: 10591478     EISSN: None     Source Type: Journal    
DOI: 10.1111/j.1937-5956.2005.tb00233.x     Document Type: Review
Times cited : (40)

References (110)
  • 1
    • 0003095914 scopus 로고    scopus 로고
    • A technique to minimize overtime in the capacitated MRP problem
    • Adenso-Diaz, B., M. Laguna. 1996. A technique to minimize overtime in the capacitated MRP problem. Production and Operations Management 5(4) 357-370.
    • (1996) Production and Operations Management , vol.5 , Issue.4 , pp. 357-370
    • Adenso-Diaz, B.1    Laguna, M.2
  • 2
    • 84986979930 scopus 로고
    • A model-based decision support system for scheduling lumber drying operations
    • Aggarwal, A. K., R. R. Vemuganti, W. Fetner. 1992. A model-based decision support system for scheduling lumber drying operations. Production and Operations Management 1(3) 320-328.
    • (1992) Production and Operations Management , vol.1 , Issue.3 , pp. 320-328
    • Aggarwal, A.K.1    Vemuganti, R.R.2    Fetner, W.3
  • 3
    • 5644271806 scopus 로고    scopus 로고
    • The value of SKU rationalization in practice (The pooling effect under suboptimal inventory policies and nonnormal demand)
    • Alfaro, J. A., C. J. Corbett. 2003. The value of SKU rationalization in practice (The pooling effect under suboptimal inventory policies and nonnormal demand). Production and Operations Management 12(1) 12-29.
    • (2003) Production and Operations Management , vol.12 , Issue.1 , pp. 12-29
    • Alfaro, J.A.1    Corbett, C.J.2
  • 4
    • 84987014183 scopus 로고
    • Minimizing absolute and squared deviation of completion times from due dates
    • Alidaee, B. 1994. Minimizing absolute and squared deviation of completion times from due dates. Production and Operations Management 3(2) 133-147.
    • (1994) Production and Operations Management , vol.3 , Issue.2 , pp. 133-147
    • Alidaee, B.1
  • 5
    • 0006183587 scopus 로고    scopus 로고
    • A framework for machine scheduling problems with controllable processing times
    • Alidaee, B., G. A. Kochenberger. 1996. A framework for machine scheduling problems with controllable processing times. Production and Operations Management 5(4) 391-405.
    • (1996) Production and Operations Management , vol.5 , Issue.4 , pp. 391-405
    • Alidaee, B.1    Kochenberger, G.A.2
  • 7
    • 1342330563 scopus 로고    scopus 로고
    • A study of the utilization of capacity constrained resources in drum-buffer-rope systems
    • Atwater, J. B., S. S. Chakravorty. 2002. A study of the utilization of capacity constrained resources in drum-buffer-rope systems. Production and Operations Management 11(2) 259-273.
    • (2002) Production and Operations Management , vol.11 , Issue.2 , pp. 259-273
    • Atwater, J.B.1    Chakravorty, S.S.2
  • 8
    • 0346277943 scopus 로고    scopus 로고
    • The impact of simple priority rule combinations on delivery speed and delivery reliability in a hybrid shop
    • Barman, S., R. L. LaForge. 1998. The impact of simple priority rule combinations on delivery speed and delivery reliability in a hybrid shop. Production and Operations Management 7(4) 402-416.
    • (1998) Production and Operations Management , vol.7 , Issue.4 , pp. 402-416
    • Barman, S.1    LaForge, R.L.2
  • 9
    • 84986958388 scopus 로고
    • A review of the Kanban production control research literature
    • Berkley, B. J. 1992. A review of the Kanban production control research literature. Production and Operations Management 1(4) 393-411.
    • (1992) Production and Operations Management , vol.1 , Issue.4 , pp. 393-411
    • Berkley, B.J.1
  • 10
    • 0011782147 scopus 로고    scopus 로고
    • An overview of tradeoff curves in manufacturing systems design
    • Bitran, G. R., R. Morabito. 1999. An overview of tradeoff curves in manufacturing systems design. Production and Operations Management 8(1) 56-75.
    • (1999) Production and Operations Management , vol.8 , Issue.1 , pp. 56-75
    • Bitran, G.R.1    Morabito, R.2
  • 13
    • 11244349649 scopus 로고    scopus 로고
    • Job release control using a cyclic schedule
    • Bowman, R. A. 2002. Job release control using a cyclic schedule. Production and Operations Management 11(2) 274-288.
    • (2002) Production and Operations Management , vol.11 , Issue.2 , pp. 274-288
    • Bowman, R.A.1
  • 14
    • 84986938726 scopus 로고
    • Production control of cyclic schedules with demand and process variability
    • Bowman, R. A., J. A. Muckstadt. 1995. Production control of cyclic schedules with demand and process variability. Production and Operations Management 4(2) 145-162.
    • (1995) Production and Operations Management , vol.4 , Issue.2 , pp. 145-162
    • Bowman, R.A.1    Muckstadt, J.A.2
  • 16
    • 84987012950 scopus 로고
    • A general approach for coordinating production in multiple-cell manufacturing systems
    • Buzacott, J. A., J. G. Shanthikumar. 1992. A general approach for coordinating production in multiple-cell manufacturing systems. Production and Operations Management 1(1) 34-52.
    • (1992) Production and Operations Management , vol.1 , Issue.1 , pp. 34-52
    • Buzacott, J.A.1    Shanthikumar, J.G.2
  • 17
    • 84986977027 scopus 로고
    • Existence and derivation of forecast horizons in a dynamic lot size model with nondecreasing holding costs
    • Bylka, S., S. P. Sethi. 1992. Existence and derivation of forecast horizons in a dynamic lot size model with nondecreasing holding costs. Production and Operations Management 1(2) 212-224.
    • (1992) Production and Operations Management , vol.1 , Issue.2 , pp. 212-224
    • Bylka, S.1    Sethi, S.P.2
  • 18
    • 84987014595 scopus 로고
    • Using short-term dedication for scheduling multiple products on parallel machines
    • Campbell, G. M. 1992. Using short-term dedication for scheduling multiple products on parallel machines. Production and Operations Management 1(3) 295-307.
    • (1992) Production and Operations Management , vol.1 , Issue.3 , pp. 295-307
    • Campbell, G.M.1
  • 19
    • 0347076324 scopus 로고    scopus 로고
    • A model for switching dispatching rules in real time in a flexible manufacturing cell
    • Chakravarty, A. K. 1997. A model for switching dispatching rules in real time in a flexible manufacturing cell. Production and Operations Management 6(4) 398-418.
    • (1997) Production and Operations Management , vol.6 , Issue.4 , pp. 398-418
    • Chakravarty, A.K.1
  • 20
    • 84986938620 scopus 로고
    • The effect of learning on the operation of mixed-model assembly lines
    • Chakravarty, A. K., A. Shtub. 1992. The effect of learning on the operation of mixed-model assembly lines. Production and Operations Management 1(2) 198-211.
    • (1992) Production and Operations Management , vol.1 , Issue.2 , pp. 198-211
    • Chakravarty, A.K.1    Shtub, A.2
  • 21
    • 84986958836 scopus 로고
    • A single-machine scheduling model with fixed-interval deliveries
    • Chand, S., D. Chhajed, R. Traub. 1994. A single-machine scheduling model with fixed-interval deliveries. Production and Operations Management 3(4) 296-307.
    • (1994) Production and Operations Management , vol.3 , Issue.4 , pp. 296-307
    • Chand, S.1    Chhajed, D.2    Traub, R.3
  • 24
    • 0042683734 scopus 로고    scopus 로고
    • Production scheduling of continuous flow lines: Multiple products with setup times and costs
    • Cheng, F., H. Yan, J. Yang. 1998. Production scheduling of continuous flow lines: Multiple products with setup times and costs. Production and Operations Management 7(4) 387-401.
    • (1998) Production and Operations Management , vol.7 , Issue.4 , pp. 387-401
    • Cheng, F.1    Yan, H.2    Yang, J.3
  • 27
    • 5644265165 scopus 로고    scopus 로고
    • Deterministic time-varying demand lot-sizing models with learning and forgetting in setups and production
    • Chiu, H. N., H. M. Chen, L. C. Weng. 2003. Deterministic time-varying demand lot-sizing models with learning and forgetting in setups and production. Production and Operations Management 12(1) 120-127.
    • (2003) Production and Operations Management , vol.12 , Issue.1 , pp. 120-127
    • Chiu, H.N.1    Chen, H.M.2    Weng, L.C.3
  • 28
    • 84987012917 scopus 로고
    • Technical note: A simple model for optimizing the single machine early/tardy problem with sequence-dependent setups
    • Coleman, B. J. 1992. Technical note: A simple model for optimizing the single machine early/tardy problem with sequence-dependent setups. Production and Operations Management 1(2) 225-228.
    • (1992) Production and Operations Management , vol.1 , Issue.2 , pp. 225-228
    • Coleman, B.J.1
  • 29
    • 27844565551 scopus 로고    scopus 로고
    • Comments on an exposition of multiple constraint scheduling
    • Conway, R. 1997. Comments on an exposition of multiple constraint scheduling. Production and Operations Management 6(1) 23-24.
    • (1997) Production and Operations Management , vol.6 , Issue.1 , pp. 23-24
    • Conway, R.1
  • 30
    • 84986959280 scopus 로고
    • A branch and bound procedure for setup problems in flexible manufacturing systems
    • Denizel-Sivri, M., S. S. Erenguc. 1993. A branch and bound procedure for setup problems in flexible manufacturing systems. Production and Operations Management 2(4) 289-305.
    • (1993) Production and Operations Management , vol.2 , Issue.4 , pp. 289-305
    • Denizel-Sivri, M.1    Erenguc, S.S.2
  • 32
    • 0010907503 scopus 로고    scopus 로고
    • Simultaneous batching and scheduling for chemical processing with earliness and tardiness penalties
    • Dessouky, M., B. Kijowski, S. Verma. 1999. Simultaneous batching and scheduling for chemical processing with earliness and tardiness penalties. Production and Operations Management 8(4) 433-444.
    • (1999) Production and Operations Management , vol.8 , Issue.4 , pp. 433-444
    • Dessouky, M.1    Kijowski, B.2    Verma, S.3
  • 33
    • 84987041250 scopus 로고
    • An automatic modeling approach to the strategic analysis of semiconductor fabrication facilities
    • Deuermeyer, B. L., G. L. Curry, R. M. Feldman. 1993. An automatic modeling approach to the strategic analysis of semiconductor fabrication facilities. Production and Operations Management 2(3) 195-220.
    • (1993) Production and Operations Management , vol.2 , Issue.3 , pp. 195-220
    • Deuermeyer, B.L.1    Curry, G.L.2    Feldman, R.M.3
  • 34
    • 0010910039 scopus 로고    scopus 로고
    • Building the POM curriculum for a privatizing economy: An evaluation from manufacturers' perspectives
    • Ebert, R. J., G. Tanner, M. Tuturea. 1998. Building the POM curriculum for a privatizing economy: An evaluation from manufacturers' perspectives. Production and Operations Management 7(2) 171-180.
    • (1998) Production and Operations Management , vol.7 , Issue.2 , pp. 171-180
    • Ebert, R.J.1    Tanner, G.2    Tuturea, M.3
  • 35
    • 0005544962 scopus 로고    scopus 로고
    • Optimal and near optimal control of a two-part-type stochastic manufacturing system with dynamic setups
    • Elhafsi, M., S. X. Bai. 1997. Optimal and near optimal control of a two-part-type stochastic manufacturing system with dynamic setups. Production and Operations Management 6(4) 419-438.
    • (1997) Production and Operations Management , vol.6 , Issue.4 , pp. 419-438
    • Elhafsi, M.1    Bai, S.X.2
  • 37
    • 0000372287 scopus 로고
    • An analysis and discussion of the optimized production technology software and its use
    • Fry, T. D., J. F. Cox, J. H. Blackstone. 1992. An analysis and discussion of the optimized production technology software and its use. Production and Operations Management 1(2) 229-242.
    • (1992) Production and Operations Management , vol.1 , Issue.2 , pp. 229-242
    • Fry, T.D.1    Cox, J.F.2    Blackstone, J.H.3
  • 38
    • 0010777229 scopus 로고    scopus 로고
    • Optimal buffer allocation in asynchronous cyclic mixed-model assembly lines
    • Fuxman, L. 1998. Optimal buffer allocation in asynchronous cyclic mixed-model assembly lines. Production and Operations Management 7(3) 294-311.
    • (1998) Production and Operations Management , vol.7 , Issue.3 , pp. 294-311
    • Fuxman, L.1
  • 39
    • 5644232325 scopus 로고    scopus 로고
    • Analysis of the lead time and learning for capacity expansions
    • Gaimon, C., R. H. Burgess. 2003. Analysis of the lead time and learning for capacity expansions. Production and Operations Management 12(1) 128-140.
    • (2003) Production and Operations Management , vol.12 , Issue.1 , pp. 128-140
    • Gaimon, C.1    Burgess, R.H.2
  • 42
    • 84987032526 scopus 로고
    • Production smoothing under environmental constraints
    • Hartl, R. F. 1995. Production smoothing under environmental constraints. Production and Operations Management 4(1) 46-56.
    • (1995) Production and Operations Management , vol.4 , Issue.1 , pp. 46-56
    • Hartl, R.F.1
  • 43
    • 0010308943 scopus 로고
    • An improved implementation of the Wagner-Whitin Algorithm
    • Heady, R. B., Z. Zhu. 1994. An improved implementation of the Wagner-Whitin Algorithm. Production and Operations Management 3(1) 55-63.
    • (1994) Production and Operations Management , vol.3 , Issue.1 , pp. 55-63
    • Heady, R.B.1    Zhu, Z.2
  • 46
    • 84986958389 scopus 로고
    • Integration in manufacturing: An information theoretic perspective
    • Hsu, C., L. Rattner. 1992. Integration in manufacturing: An information theoretic perspective. Production and Operations Management 1(3) 286-294.
    • (1992) Production and Operations Management , vol.1 , Issue.3 , pp. 286-294
    • Hsu, C.1    Rattner, L.2
  • 47
    • 84987028598 scopus 로고
    • The validity of the independent increments assumption for production: An empirical study of the automotive assembly plant
    • Inman, R. R., M. Leon. 1993. The validity of the independent increments assumption for production: An empirical study of the automotive assembly plant. Production and Operations Management 2(4) 276-288.
    • (1993) Production and Operations Management , vol.2 , Issue.4 , pp. 276-288
    • Inman, R.R.1    Leon, M.2
  • 48
    • 84987045042 scopus 로고
    • Explaining plant-level differences in manufacturing overhead: Structural and executional cost drivers in the world auto industry
    • Ittner, C. D., J. P. MacDuffie. 1995. Explaining plant-level differences in manufacturing overhead: Structural and 7xecutional cost drivers in the world auto industry. Production and Operations Management 4(4).
    • (1995) Production and Operations Management , vol.4 , Issue.4
    • Ittner, C.D.1    MacDuffie, J.P.2
  • 49
    • 5644270229 scopus 로고    scopus 로고
    • Measuring and comparing volume flexibility in the capital goods industry
    • Jack, E. P., A. S. Raturi 2003. Measuring and comparing volume flexibility in the capital goods industry. Production and Operations Management 12(4) 480-501.
    • (2003) Production and Operations Management , vol.12 , Issue.4 , pp. 480-501
    • Jack, E.P.1    Raturi, A.S.2
  • 51
    • 0343006275 scopus 로고    scopus 로고
    • On the relative performance of functional and cellular layouts - An analysis of the model-based comparative studies literature
    • Johnson, D. J., U. Wemmerlöv. 1996. On the relative performance of functional and cellular layouts-an analysis of the model-based comparative studies literature. Production and Operations Management 5(4) 309-334.
    • (1996) Production and Operations Management , vol.5 , Issue.4 , pp. 309-334
    • Johnson, D.J.1    Wemmerlöv, U.2
  • 52
    • 11144341958 scopus 로고    scopus 로고
    • Why does cell implementation stop? Factors influencing cell penetration in manufacturing plants
    • Johnson, D. J., U. Wemmerlöv. 2004. Why does cell implementation stop? Factors influencing cell penetration in manufacturing plants. Production and Operations Management 13(3) 272-290.
    • (2004) Production and Operations Management , vol.13 , Issue.3 , pp. 272-290
    • Johnson, D.J.1    Wemmerlöv, U.2
  • 53
    • 84987049348 scopus 로고
    • A decision theory approach to priority dispatching for job shop scheduling
    • Kanet, J. J., Z. Zhou. 1993. A decision theory approach to priority dispatching for job shop scheduling. Production and Operations Management 2(1) 2-14.
    • (1993) Production and Operations Management , vol.2 , Issue.1 , pp. 2-14
    • Kanet, J.J.1    Zhou, Z.2
  • 56
    • 84986946649 scopus 로고
    • Evaluating order release mechanisms in a job shop with sequence-dependent setup times
    • Kim, S.-C., P. M. Bobrowski. 1995. Evaluating order release mechanisms in a job shop with sequence-dependent setup times. Production and Operations Management 4(2) 163-180.
    • (1995) Production and Operations Management , vol.4 , Issue.2 , pp. 163-180
    • Kim, S.-C.1    Bobrowski, P.M.2
  • 58
    • 0347706676 scopus 로고    scopus 로고
    • Production flow control for a manufacturing system with flexible routings
    • Krämer, F.-J., M. Elhafsi, S. X. Bai. 1997. Production flow control for a manufacturing system with flexible routings. Production and Operations Management 6(1) 37-56.
    • (1997) Production and Operations Management , vol.6 , Issue.1 , pp. 37-56
    • Krämer, F.-J.1    Elhafsi, M.2    Bai, S.X.3
  • 60
    • 84986974382 scopus 로고
    • Introducing international issues into operations management curricula
    • Lawrence, S. R., M. J. Rosenblatt. 1992. Introducing international issues into operations management curricula. Production and Operations Management 1(1) 103-117.
    • (1992) Production and Operations Management , vol.1 , Issue.1 , pp. 103-117
    • Lawrence, S.R.1    Rosenblatt, M.J.2
  • 61
    • 84987012876 scopus 로고
    • Shifting production bottlenecks: Causes, cures, and conundrums
    • Lawrence, S. R., A. H. Buss. 1994. Shifting production bottlenecks: causes, cures, and conundrums. Production and Operations Management 3(1) 21-37.
    • (1994) Production and Operations Management , vol.3 , Issue.1 , pp. 21-37
    • Lawrence, S.R.1    Buss, A.H.2
  • 62
    • 0345701074 scopus 로고    scopus 로고
    • Effects of integrating order/backorder quantity and pricing decisions
    • Lee, W. J., D. Kim. 1998. Effects of integrating order/backorder quantity and pricing decisions. Production and Operations Management 7(3) 312-324.
    • (1998) Production and Operations Management , vol.7 , Issue.3 , pp. 312-324
    • Lee, W.J.1    Kim, D.2
  • 63
    • 0001783648 scopus 로고    scopus 로고
    • A new paradigm for teaching introductory production/operations management
    • Leschke, J. P. 1998. A new paradigm for teaching introductory production/operations management. Production and Operations Management 7(2) 146-159.
    • (1998) Production and Operations Management , vol.7 , Issue.2 , pp. 146-159
    • Leschke, J.P.1
  • 64
    • 0012011429 scopus 로고    scopus 로고
    • A comparison of rules for allocating setup-reduction investments in a capacitated environment
    • Leschke, J. P., E. N. Weiss. 1997. A comparison of rules for allocating setup-reduction investments in a capacitated environment. Production and Operations Management 6(4) 329-340.
    • (1997) Production and Operations Management , vol.6 , Issue.4 , pp. 329-340
    • Leschke, J.P.1    Weiss, E.N.2
  • 65
    • 0346446112 scopus 로고    scopus 로고
    • Investment in setup cost, lead time, and demand predictability improvement in the EOQ model
    • Li, C.-L., S. J. Erlebacher, D. H. Kropp. 1997. Investment in setup cost, lead time, and demand predictability improvement in the EOQ model. Production and Operations Management 6(4) 341-352.
    • (1997) Production and Operations Management , vol.6 , Issue.4 , pp. 341-352
    • Li, C.-L.1    Erlebacher, S.J.2    Kropp, D.H.3
  • 66
    • 84987014351 scopus 로고
    • An economic production quantity model with learning and forgetting considerations
    • Li, C.-L., T. C. E. Cheng. 1994. An economic production quantity model with learning and forgetting considerations. Production and Operations Management 3(2) 118-132.
    • (1994) Production and Operations Management , vol.3 , Issue.2 , pp. 118-132
    • Li, C.-L.1    Cheng, T.C.E.2
  • 67
    • 84987041563 scopus 로고
    • Solving a combined part-selection, machine-loading, and tool-configuration problem in flexible manufacturing systems
    • Liang, M., S. P. Dutta. 1993. Solving a combined part-selection, machine-loading, and tool-configuration problem in flexible manufacturing systems. Production and Operations Management 2(2) 97-113.
    • (1993) Production and Operations Management , vol.2 , Issue.2 , pp. 97-113
    • Liang, M.1    Dutta, S.P.2
  • 68
    • 0039032411 scopus 로고    scopus 로고
    • The empirical determinants of inventory levels in high-volume manufacturing
    • Lieberman, M. B., S. Helper, L. Demeester. 1999. The empirical determinants of inventory levels in high-volume manufacturing. Production and Operations Management 8(1) 44-55.
    • (1999) Production and Operations Management , vol.8 , Issue.1 , pp. 44-55
    • Lieberman, M.B.1    Helper, S.2    Demeester, L.3
  • 69
    • 0040524196 scopus 로고    scopus 로고
    • Improving job shop performance through process queue management under transfer batching
    • Litchfield, J., R. Narasimhan. 2000. Improving job shop performance through process queue management under transfer batching. Production and Operations Management 9(4) 336-348.
    • (2000) Production and Operations Management , vol.9 , Issue.4 , pp. 336-348
    • Litchfield, J.1    Narasimhan, R.2
  • 70
    • 84986959332 scopus 로고
    • Dynamic feeding in a stochastic parallel processing system
    • Liu, J. J. 1992. Dynamic feeding in a stochastic parallel processing system. Production and Operations Management 1(3) 308-319.
    • (1992) Production and Operations Management , vol.1 , Issue.3 , pp. 308-319
    • Liu, J.J.1
  • 71
    • 0001726336 scopus 로고    scopus 로고
    • Improving POM learning: Systems thinking and transparent-box business simulators
    • Machuca, J. A. D. 1998. Improving POM learning: Systems thinking and transparent-box business simulators. Production and Operations Management 7(2) 210-227.
    • (1998) Production and Operations Management , vol.7 , Issue.2 , pp. 210-227
    • Machuca, J.A.D.1
  • 72
    • 3142572907 scopus 로고    scopus 로고
    • Evaluating the Trade-Offs between idling and shutting down production lines in process industries
    • Matta, R., T. Miller. 1996. Evaluating the Trade-Offs between idling and shutting down production lines in process industries. Production and Operations Management 5(4) 371-390.
    • (1996) Production and Operations Management , vol.5 , Issue.4 , pp. 371-390
    • Matta, R.1    Miller, T.2
  • 73
    • 0345460675 scopus 로고    scopus 로고
    • The impact of enterprise information technology adoption on Operational performance: An empirical investigation
    • McAfee, A. 2002. The impact of enterprise information technology adoption on Operational performance: An empirical investigation. Production and Operations Management 11(1) 33-53.
    • (2002) Production and Operations Management , vol.11 , Issue.1 , pp. 33-53
    • McAfee, A.1
  • 74
    • 0001302858 scopus 로고    scopus 로고
    • TPM: Planned and autonomous maintenance: Bridging the gap between practice and research
    • McKone, K. E., E. N. Weiss. 1998. TPM: Planned and autonomous maintenance: bridging the gap between practice and research. Production and Operations Management 7(4) 335-351.
    • (1998) Production and Operations Management , vol.7 , Issue.4 , pp. 335-351
    • McKone, K.E.1    Weiss, E.N.2
  • 75
    • 84987013915 scopus 로고
    • An experimental model for investigating the sensitivity of job shop performance to job release time distribution parameters
    • Melnyk, S. A., D. R. Denzler, G. L. Magnan, L. Fredendall. 1994. An experimental model for investigating the sensitivity of job shop performance to job release time distribution parameters. Production and Operations Management 3(1) 64-74.
    • (1994) Production and Operations Management , vol.3 , Issue.1 , pp. 64-74
    • Melnyk, S.A.1    Denzler, D.R.2    Magnan, G.L.3    Fredendall, L.4
  • 76
    • 0006038152 scopus 로고    scopus 로고
    • A comparison of production scheduling policies on costs, service level, and schedule changes
    • Metters, R., V. Vargas. 1999. A comparison of production scheduling policies on costs, service level, and schedule changes. Production and Operations Management 8(1) 76-91.
    • (1999) Production and Operations Management , vol.8 , Issue.1 , pp. 76-91
    • Metters, R.1    Vargas, V.2
  • 77
    • 3042704313 scopus 로고
    • A tutorial on bottleneck dynamics: A heuristic scheduling methodology
    • Morton, T., V. Narayan, P. Ramnath. 1995. A tutorial on bottleneck dynamics: A heuristic scheduling methodology. Production and Operations Management 4(2) 94-107.
    • (1995) Production and Operations Management , vol.4 , Issue.2 , pp. 94-107
    • Morton, T.1    Narayan, V.2    Ramnath, P.3
  • 78
    • 84987013519 scopus 로고
    • Cellular production systems: A concurrent cluster analytic framework
    • Mosier, C. T., G. E. Martin. 1995. Cellular production systems: A concurrent cluster analytic framework. Production and Operations Management 4(4) 414-420.
    • (1995) Production and Operations Management , vol.4 , Issue.4 , pp. 414-420
    • Mosier, C.T.1    Martin, G.E.2
  • 79
    • 0001204626 scopus 로고    scopus 로고
    • Theories and realities of quantity discounts: An exploratory study
    • Munson, C. L., M. J. Rosenblatt. 1998. Theories and realities of quantity discounts: An exploratory study. Production and Operations Management 7(4) 352-369.
    • (1998) Production and Operations Management , vol.7 , Issue.4 , pp. 352-369
    • Munson, C.L.1    Rosenblatt, M.J.2
  • 80
    • 0010297217 scopus 로고    scopus 로고
    • An evaluation of order picking policies for mail order companies
    • Petersen, C. G. 2000. An evaluation of order picking policies for mail order companies. Production and Operations Management 9(4) 319-335.
    • (2000) Production and Operations Management , vol.9 , Issue.4 , pp. 319-335
    • Petersen, C.G.1
  • 81
    • 27844570132 scopus 로고    scopus 로고
    • Commentary on "An exposition of multiple constraint scheduling as implemented in the goal system."
    • Pinedo, M. 1997. Commentary on "An exposition of multiple constraint scheduling as implemented in the goal system." Production and Operations Management 6(1) 25-27.
    • (1997) Production and Operations Management , vol.6 , Issue.1 , pp. 25-27
    • Pinedo, M.1
  • 82
    • 0011960212 scopus 로고    scopus 로고
    • Performance analysis of an assembly station with input from multiple fabrication lines
    • Rao, P. C., R. Suri. 2000. Performance analysis of an assembly station with input from multiple fabrication lines. Production and Operations Management 9(3) 283-302.
    • (2000) Production and Operations Management , vol.9 , Issue.3 , pp. 283-302
    • Rao, P.C.1    Suri, R.2
  • 83
    • 84987041490 scopus 로고
    • A comparison of order-release and dispatch rules for the dynamic early/tardy problem
    • Rohleder, T. R., G. Scudder. 1993. A comparison of order-release and dispatch rules for the dynamic early/tardy problem. Production and Operations Management 2(3) 221-238.
    • (1993) Production and Operations Management , vol.2 , Issue.3 , pp. 221-238
    • Rohleder, T.R.1    Scudder, G.2
  • 84
    • 0000881471 scopus 로고    scopus 로고
    • Manufacturing quality, reliability and preventive maintenance
    • Sahin, I., H. Polatoglu. 1996. Manufacturing quality, reliability and preventive maintenance. Production and Operations Management 5(2) 132-147.
    • (1996) Production and Operations Management , vol.5 , Issue.2 , pp. 132-147
    • Sahin, I.1    Polatoglu, H.2
  • 86
    • 0010907731 scopus 로고    scopus 로고
    • A new teaching paradigm: The information/control/buffer portfolio
    • Schwarz, L. B. 1998. A new teaching paradigm: The information/control/ buffer portfolio. Production and Operations Management 7(2) 125-131.
    • (1998) Production and Operations Management , vol.7 , Issue.2 , pp. 125-131
    • Schwarz, L.B.1
  • 87
    • 84987005652 scopus 로고
    • Capacity and production decisions in stochastic manufacturing systems: An asymptotic optimal hierarchical approach
    • Sethi S. P., M. I. Taksar, Q. Zhang. 1992. Capacity and production decisions in stochastic manufacturing systems: An asymptotic optimal hierarchical approach. Production and Operations Management 1(4) 367-392.
    • (1992) Production and Operations Management , vol.1 , Issue.4 , pp. 367-392
    • Sethi, S.P.1    Taksar, M.I.2    Zhang, Q.3
  • 88
    • 0011594052 scopus 로고    scopus 로고
    • Optimum schedule for preventive maintenance: A general solution for a partially specified time-to-failure distribution
    • Shore, H. 1996. Optimum schedule for preventive maintenance: a general solution for a partially specified time-to-failure distribution. Production and Operations Management 5(2) 148-162.
    • (1996) Production and Operations Management , vol.5 , Issue.2 , pp. 148-162
    • Shore, H.1
  • 89
    • 0346277942 scopus 로고    scopus 로고
    • Solution procedures with limited sample data for the optimal replacement problem
    • Shore, H. 1998. Solution procedures with limited sample data for the optimal replacement problem. Production and Operations Management 7(4) 417-422.
    • (1998) Production and Operations Management , vol.7 , Issue.4 , pp. 417-422
    • Shore, H.1
  • 90
    • 0002673047 scopus 로고    scopus 로고
    • An exposition of multiple constraint scheduling as implemented in the goal system (formerly disaster TM)
    • Simons, J. V., W. P. Simpson. 1997. An exposition of multiple constraint scheduling as implemented in the goal system (formerly disaster TM). Production and Operations Management 6(1) 3-20.
    • (1997) Production and Operations Management , vol.6 , Issue.1 , pp. 3-20
    • Simons, J.V.1    Simpson, W.P.2
  • 91
    • 0008193301 scopus 로고    scopus 로고
    • Combined production and maintenance scheduling for a multiple-product, single-machine production system
    • Sloan, T. W., J. G. Shanthikumar. 2000. Combined production and maintenance scheduling for a multiple-product, single-machine production system. Production and Operations Management 9(4) 379-399.
    • (2000) Production and Operations Management , vol.9 , Issue.4 , pp. 379-399
    • Sloan, T.W.1    Shanthikumar, J.G.2
  • 92
    • 0040524251 scopus 로고    scopus 로고
    • A comparison of direct cost savings between flexible automation and labor with learning
    • Smunt, T. L., J. Meredith. 2000. A comparison of direct cost savings between flexible automation and labor with learning. Production and Operations Management 9(2) 158-170.
    • (2000) Production and Operations Management , vol.9 , Issue.2 , pp. 158-170
    • Smunt, T.L.1    Meredith, J.2
  • 93
    • 0011718957 scopus 로고    scopus 로고
    • On the theory of constraints and the goal system
    • Spearman, M. L. 1997. On the theory of constraints and the goal system. Production and Operations Management 6(1) 28-33.
    • (1997) Production and Operations Management , vol.6 , Issue.1 , pp. 28-33
    • Spearman, M.L.1
  • 94
    • 0342689524 scopus 로고    scopus 로고
    • An operational planning concept for deep lane storage systems
    • Stadtler, H. 1996. An operational planning concept for deep lane storage systems. Production and Operations Management 5(3) 266-282.
    • (1996) Production and Operations Management , vol.5 , Issue.3 , pp. 266-282
    • Stadtler, H.1
  • 95
    • 0008523243 scopus 로고    scopus 로고
    • Pedagogical challenge: Teaching international production and operations management courses
    • Starr, M. K. 1997. Pedagogical challenge: teaching international production and operations management courses. Production and Operations Management 6(2) 114-121.
    • (1997) Production and Operations Management , vol.6 , Issue.2 , pp. 114-121
    • Starr, M.K.1
  • 97
    • 11244309412 scopus 로고    scopus 로고
    • Time-based pricing and lead time policies for a build-to-order manufacturer
    • Tang, K., J. Tang. 2002. Time-based pricing and lead time policies for a build-to-order manufacturer. Production and Operations Management 11(3) 374-392.
    • (2002) Production and Operations Management , vol.11 , Issue.3 , pp. 374-392
    • Tang, K.1    Tang, J.2
  • 98
    • 11244322814 scopus 로고    scopus 로고
    • A simple heuristic for dynamic order sizing and supplier selection with time-varying data
    • Tempelmeier, H. 2002. A simple heuristic for dynamic order sizing and supplier selection with time-varying data. Production and Operations Management 11(4) 499-515.
    • (2002) Production and Operations Management , vol.11 , Issue.4 , pp. 499-515
    • Tempelmeier, H.1
  • 99
    • 0001961689 scopus 로고    scopus 로고
    • Minimizing total weighted completion time on a single batch processing machine
    • Uzsoy, R., Y. Yang. 1997. Minimizing total weighted completion time on a single batch processing machine. Production and Operations Management 6(1) 57-73.
    • (1997) Production and Operations Management , vol.6 , Issue.1 , pp. 57-73
    • Uzsoy, R.1    Yang, Y.2
  • 101
    • 0000391985 scopus 로고    scopus 로고
    • Frequency of replanning in a rolling horizon master production schedule for a process industry environment: A case study
    • Venkataraman, R. 1996. Frequency of replanning in a rolling horizon master production schedule for a process industry environment: A case study. Production and Operations Management 5(3) 255-265.
    • (1996) Production and Operations Management , vol.5 , Issue.3 , pp. 255-265
    • Venkataraman, R.1
  • 102
    • 84987039918 scopus 로고
    • A branch-and-bound approach for sequencing expansion projects
    • Wang, H. 1995. A branch-and-bound approach for sequencing expansion projects. Production and Operations Management 4(1) 57-75.
    • (1995) Production and Operations Management , vol.4 , Issue.1 , pp. 57-75
    • Wang, H.1
  • 103
    • 3343017423 scopus 로고
    • Scheduling a flexible machining system with dynamic tool movement
    • Webster, S., F. R. Jacobs. 1993. Scheduling a flexible machining system with dynamic tool movement. Production and Operations Management 2(1) 38-54.
    • (1993) Production and Operations Management , vol.2 , Issue.1 , pp. 38-54
    • Webster, S.1    Jacobs, F.R.2
  • 105
    • 0000337208 scopus 로고    scopus 로고
    • Does international operations management need a separate perspective?
    • Whybark, D. C. 1997. Does international operations management need a separate perspective? Production and Operations Management 6(2) 122-130.
    • (1997) Production and Operations Management , vol.6 , Issue.2 , pp. 122-130
    • Whybark, D.C.1
  • 107
    • 84987039881 scopus 로고
    • Sequencing and batching for two classes of jobs with deadlines and setup times
    • Woodruff, D. L., M. L. Spearman. 1992. Sequencing and batching for two classes of jobs with deadlines and setup times. Production and Operations Management 1(1) 87-102.
    • (1992) Production and Operations Management , vol.1 , Issue.1 , pp. 87-102
    • Woodruff, D.L.1    Spearman, M.L.2
  • 108
    • 0040524249 scopus 로고    scopus 로고
    • Robustness of various production control policies in semiconductor manufacturing
    • Yan, H., S. Lou, S. P. Sethi. 2000. Robustness of various production control policies in semiconductor manufacturing. Production and Operations Management 9(2) 171-183.
    • (2000) Production and Operations Management , vol.9 , Issue.2 , pp. 171-183
    • Yan, H.1    Lou, S.2    Sethi, S.P.3
  • 109
    • 0012706318 scopus 로고    scopus 로고
    • Managing a flow line with single-kanban, dual-kanban, or conwip
    • Yang, K. K. 2000. Managing a flow line with single-kanban, dual-kanban, or conwip. Production and Operations Management 9(4) 349-366.
    • (2000) Production and Operations Management , vol.9 , Issue.4 , pp. 349-366
    • Yang, K.K.1
  • 110
    • 0012315837 scopus 로고    scopus 로고
    • Lot-sizing rule and freezing the master production schedule under capacity constraint and deterministic demand
    • Zhao, X., J. Xie, Q. Jiang. 2001. Lot-sizing rule and freezing the master production schedule under capacity constraint and deterministic demand. Production and Operations Management 10(1) 45-67.
    • (2001) Production and Operations Management , vol.10 , Issue.1 , pp. 45-67
    • Zhao, X.1    Xie, J.2    Jiang, Q.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.