메뉴 건너뛰기




Volumn 9, Issue 3, 2000, Pages 262-282

A review of flowshop scheduling research with setup times

Author keywords

Flowshop scheduling; Planning and control; Problem complexity and classification; Review of solution procedures; Setup time influence

Indexed keywords


EID: 0000647451     PISSN: 10591478     EISSN: None     Source Type: Journal    
DOI: 10.1111/j.1937-5956.2000.tb00137.x     Document Type: Review
Times cited : (198)

References (112)
  • 1
    • 0032162519 scopus 로고    scopus 로고
    • Total flowtime in no-wait flowshops with separated setup times
    • ALDOWAISAN, T. AND A. ALLAHVERDI (1998), "Total Flowtime in No-wait Flowshops with Separated Setup Times," Computers and Operations Research, 25, 9, 757-765.
    • (1998) Computers and Operations Research , vol.25 , Issue.9 , pp. 757-765
    • Aldowaisan, T.1    Allahverdi, A.2
  • 2
    • 0034141527 scopus 로고    scopus 로고
    • Minimizing mean flowtime in a two machine flowshop with sequence independent setup times separated
    • ALLAHVERDI, A. (2000), "Minimizing Mean Flowtime in a Two Machine Flowshop with Sequence Independent Setup Times Separated," Computers and Operations Research, 27, 2, 111-127.
    • (2000) Computers and Operations Research , vol.27 , Issue.2 , pp. 111-127
    • Allahverdi, A.1
  • 3
    • 0032163754 scopus 로고    scopus 로고
    • Job lateness in flowshops with setup and removal times separated
    • _ AND T. ALDOWAISAN (1998), "Job Lateness in Flowshops with Setup and Removal Times Separated," Journal of the Operational Research Society, 49, 9, 1001-1006.
    • (1998) Journal of the Operational Research Society , vol.49 , Issue.9 , pp. 1001-1006
    • Aldowaisan, T.1
  • 4
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • _, J. N. D. GUPTA, AND _ (1999), "A Review of Scheduling Research Involving Setup Considerations," OMEGA, International Journal of Management Sciences, 27, 2, 219-239.
    • (1999) OMEGA, International Journal of Management Sciences , vol.27 , Issue.2 , pp. 219-239
    • Gupta, J.N.D.1
  • 5
    • 0002134507 scopus 로고
    • Two-machine flowshop with separated sequence-independent setup times: Mean completion time criterion
    • BAGGA, P. C. AND K. KHURANA (1986), "Two-Machine Flowshop with Separated Sequence-Independent Setup Times: Mean Completion Time Criterion," Indian Journal of Management and Systems, 2, 1, 47-57.
    • (1986) Indian Journal of Management and Systems , vol.2 , Issue.1 , pp. 47-57
    • Bagga, P.C.1    Khurana, K.2
  • 6
    • 0025256245 scopus 로고
    • Scheduling groups of jobs in the two-machine flowshop
    • BAKER, K. R. (1990), "Scheduling Groups of Jobs in the Two-machine Flowshop," Mathematical and Computer Modeling, 13, 3, 29-36.
    • (1990) Mathematical and Computer Modeling , vol.13 , Issue.3 , pp. 29-36
    • Baker, K.R.1
  • 7
    • 21844508729 scopus 로고
    • Lot streaming in the two-machine flow shop with setup times
    • _ (1995), "Lot Streaming in the Two-Machine Flow Shop with Setup Times," Annals of Operations Research, 57, 1-11.
    • (1995) Annals of Operations Research , vol.57 , pp. 1-11
  • 9
    • 0010757151 scopus 로고    scopus 로고
    • Flowshop no-wait scheduling with sequence-dependent setup times and release dates
    • BIANCO, L., P. DELL'OLMO, AND S. GIORDANI (1999), "Flowshop No-Wait Scheduling with Sequence-Dependent Setup Times and Release Dates," INFOR, 37, 1, 3-19.
    • (1999) INFOR , vol.37 , Issue.1 , pp. 3-19
    • Bianco, L.1    Dell'Olmo, P.2    Giordani, S.3
  • 10
    • 84989725928 scopus 로고
    • Scheduling tasks with sequence-dependent processing times
    • _, S. RICCIADELLI, G. RINALDI, AND A. SASSANO (1988), "Scheduling Tasks with Sequence-Dependent Processing Times," Naval Research Logistics, 35, 2, 177-184.
    • (1988) Naval Research Logistics , vol.35 , Issue.2 , pp. 177-184
    • Ricciadelli, S.1    Rinaldi, G.2    Sassano, A.3
  • 11
    • 0002286606 scopus 로고
    • Sequencing production on parallel machines with two magnitudes of sequence-dependent setup cost
    • BITRAN, G. R. AND S. M. GILBERT (1990), "Sequencing Production on Parallel Machines with Two Magnitudes of Sequence-Dependent Setup Cost," Journal of Manufacturing and Operations Management, 3, 1, 24-52.
    • (1990) Journal of Manufacturing and Operations Management , vol.3 , Issue.1 , pp. 24-52
    • Bitran, G.R.1    Gilbert, S.M.2
  • 13
    • 0014807274 scopus 로고
    • A heuristic algorithm for the n-job and m-machine sequencing problem
    • CAMPBELL, H. G., R. A. DUDEK, AND M. L. SMITH (1970), "A Heuristic Algorithm for the n-Job and m-Machine Sequencing Problem," Management Science, 16, 10, 630-637.
    • (1970) Management Science , vol.16 , Issue.10 , pp. 630-637
    • Campbell, H.G.1    Dudek, R.A.2    Smith, M.L.3
  • 14
    • 0026908992 scopus 로고
    • Flow shop scheduling in serial multi-product processes with tansfer and set-up times
    • CAO, J. AND D. C. BEDWORTH (1992), "Flow Shop Scheduling in Serial Multi-Product Processes with Tansfer and Set-up Times," International Journal of Production Research, 30, 8, 1819-1830.
    • (1992) International Journal of Production Research , vol.30 , Issue.8 , pp. 1819-1830
    • Cao, J.1    Bedworth, D.C.2
  • 15
    • 0028698198 scopus 로고
    • Lot streaming in a 2-stage flowshop with setup, processing, and removal times separated
    • CETINKAYA, F. C. (1994), "Lot Streaming in a 2-Stage Flowshop with Setup, Processing, and Removal Times Separated," Journal of Operational Research Society, 45, 12, 1445-1455.
    • (1994) Journal of Operational Research Society , vol.45 , Issue.12 , pp. 1445-1455
    • Cetinkaya, F.C.1
  • 16
    • 0000399972 scopus 로고
    • Unit-sized transfer batch scheduling with setup times
    • _ AND M. S. KAYALIGIL (1992), "Unit-Sized Transfer Batch Scheduling with Setup Times," Computers and Industrial engineering, 22, 2, 177-183.
    • (1992) Computers and Industrial Engineering , vol.22 , Issue.2 , pp. 177-183
    • Kayaligil, M.S.1
  • 17
    • 0012694908 scopus 로고    scopus 로고
    • Approximation algorithms for two-machine flow shop scheduling with batch setup times
    • CHEN, B., C. N. POTTS, AND V. A. STRUSEVICH (1998), "Approximation Algorithms for Two-Machine Flow Shop Scheduling with Batch Setup Times," Mathematical Programming, 82, 1-2, 255-271.
    • (1998) Mathematical Programming , vol.82 , Issue.1-2 , pp. 255-271
    • Chen, B.1    Potts, C.N.2    Strusevich, V.A.3
  • 18
    • 0031076263 scopus 로고    scopus 로고
    • Lot streaming with detached setups in 3-machine flowshops
    • CHEN, J. AND G. STEINER (1997), "Lot Streaming with Detached Setups in 3-machine Flowshops," European Journal of Operational Research, 96, 3, 591-611.
    • (1997) European Journal of Operational Research , vol.96 , Issue.3 , pp. 591-611
    • Chen, J.1    Steiner, G.2
  • 19
    • 0032262156 scopus 로고    scopus 로고
    • Lot streaming with attached setups in three-machine flowshops
    • _ AND _ (1998), "Lot Streaming with Attached Setups in Three-Machine Flowshops," IIE Transactions, 30, 11, 1075-1084.
    • (1998) IIE Transactions , vol.30 , Issue.11 , pp. 1075-1084
  • 20
    • 0032496483 scopus 로고
    • An exact algorithm for batching and scheduling two part types in a mixed shop: A technical note
    • CHENG, T. C. E. AND M. Y. KOVALYOV (1998), "An Exact Algorithm for Batching and Scheduling Two Part Types in a Mixed Shop: A Technical Note," International Journal of Production Economics, 1988, 55, 1, 53-56.
    • (1988) International Journal of Production Economics , vol.55 , Issue.1 , pp. 53-56
    • Cheng, T.C.E.1    Kovalyov, M.Y.2
  • 21
    • 0034159731 scopus 로고    scopus 로고
    • Makespan minimization in the two-machine flowshop batch scheduling problem
    • _, B. M. T. LIN, AND A. TOKER (2000), "Makespan Minimization in the Two-Machine Flowshop Batch Scheduling Problem," Naval Research Logistics, 47, 2, 128-144.
    • (2000) Naval Research Logistics , vol.47 , Issue.2 , pp. 128-144
    • Lin, B.M.T.1    Toker, A.2
  • 22
    • 0032069909 scopus 로고    scopus 로고
    • Batching and scheduling to minimize the makespan in the two-machine flowshop
    • _ AND G. WANG (1998), "Batching and Scheduling to Minimize the Makespan in the Two-Machine Flowshop", IIE Transactions, 30, 5, 447-453.
    • (1998) IIE Transactions , vol.30 , Issue.5 , pp. 447-453
    • Wang, G.1
  • 23
    • 0033078058 scopus 로고    scopus 로고
    • A note on two-machine flexible manufacturing cell scheduling
    • _ AND _ (1999a), "A Note on Two-Machine Flexible Manufacturing Cell Scheduling," IEEE Transactions on Robotics and Automation, 15, 1, 187-190.
    • (1999) IEEE Transactions on Robotics and Automation , vol.15 , Issue.1 , pp. 187-190
  • 24
    • 0032628881 scopus 로고    scopus 로고
    • Scheduling the fabrication and assembly of components in a two-machine flowshop
    • _ AND _ (1999b), "Scheduling the Fabrication and Assembly of Components in a Two-Machine Flowshop," IIE Transactions, 31, 2, 135-143.
    • (1999) IIE Transactions , vol.31 , Issue.2 , pp. 135-143
  • 25
    • 0032789050 scopus 로고    scopus 로고
    • One-operator-two-machine flowshop scheduling with setup and dismounting times
    • _, _, AND C. SRISKANDARAJAH (1999), "One-Operator-Two-Machine Flowshop Scheduling with Setup and Dismounting Times," Computers and Operations Research, 26, 7, 715-730.
    • (1999) Computers and Operations Research , vol.26 , Issue.7 , pp. 715-730
    • Sriskandarajah, C.1
  • 27
    • 0016099706 scopus 로고
    • Two-machine flowshop scheduling problems with sequence dependent setup times: A dynamic programming approach
    • CORWIN, B. D. AND A. O. ESOGBUE (1974), "Two-Machine Flowshop Scheduling Problems with Sequence Dependent Setup Times: A Dynamic Programming Approach," Naval Research Logistics Quarterly, 21, 3, 515-524.
    • (1974) Naval Research Logistics Quarterly , vol.21 , Issue.3 , pp. 515-524
    • Corwin, B.D.1    Esogbue, A.O.2
  • 28
    • 0031139162 scopus 로고    scopus 로고
    • Combinatorial optimization models for production scheduling in automated manufacturing systems
    • CRAMA, Y. (1997), "Combinatorial Optimization Models for Production Scheduling in Automated Manufacturing Systems," European Journal of Operational Research, 99, 1, 136-153.
    • (1997) European Journal of Operational Research , vol.99 , Issue.1 , pp. 136-153
    • Crama, Y.1
  • 29
    • 0033136545 scopus 로고    scopus 로고
    • A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size
    • DANNEBERG, D., T. TAUTENHAHN, AND F. WERNER (1999), "A Comparison of Heuristic Algorithms for Flow Shop Scheduling Problems with Setup Times and Limited Batch Size," Mathematical and Computer Modelling, 29, 9, 101-126.
    • (1999) Mathematical and Computer Modelling , vol.29 , Issue.9 , pp. 101-126
    • Danneberg, D.1    Tautenhahn, T.2    Werner, F.3
  • 30
    • 0017516618 scopus 로고
    • An evaluation of flow shop sequencing heuristics
    • DANNENBRING, D. G. (1967), "An Evaluation of Flow Shop Sequencing Heuristics," Management Science, 23, 11, 1174-1882.
    • (1967) Management Science , vol.23 , Issue.11 , pp. 1174-1882
    • Dannenbring, D.G.1
  • 31
    • 0029407502 scopus 로고
    • A saving index heuristic algorithm for flowshop scheduling with sequence dependent set-up times
    • DAS, S. R., J. N. D. GUPTA, AND B. M. KHUMAWALA (1995), "A Saving Index Heuristic Algorithm for Flowshop Scheduling with Sequence Dependent Set-up Times," Journal of the Operational Research Society, 46, 11, 1365-1373.
    • (1995) Journal of the Operational Research Society , vol.46 , Issue.11 , pp. 1365-1373
    • Das, S.R.1    Gupta, J.N.D.2    Khumawala, B.M.3
  • 32
    • 0025824858 scopus 로고
    • Job lateness in a two-machine flowshop with setup times separated
    • DILEEPAN, P. AND T. SEN (1991), "Job Lateness in a Two-Machine Flowshop with Setup Times Separated," Computers and Operations Research, 18, 6, 549-556.
    • (1991) Computers and Operations Research , vol.18 , Issue.6 , pp. 549-556
    • Dileepan, P.1    Sen, T.2
  • 33
    • 0002499542 scopus 로고
    • The lessons of flowshop schedulig research
    • DUDEK, R. A., S. S. PANWALKAR, AND M. L. SMITH (1991), "The Lessons of Flowshop Schedulig Research," Operations Research, 40, 1, 7-13.
    • (1991) Operations Research , vol.40 , Issue.1 , pp. 7-13
    • Dudek, R.A.1    Panwalkar, S.S.2    Smith, M.L.3
  • 35
    • 0001068310 scopus 로고
    • Sequencing a one-state variable machine; a solvable case of the traveling salesman problem
    • 1964
    • GILMORE, P. C. AND R. E. GOMORY (1964), "Sequencing a One-State Variable Machine; A Solvable Case of the Traveling Salesman Problem," Operations Research, 1964, 12, 5, 655-679.
    • (1964) Operations Research , vol.12 , Issue.5 , pp. 655-679
    • Gilmore, P.C.1    Gomory, R.E.2
  • 38
    • 0015203679 scopus 로고
    • M-stage scheduling problem - A critical appraisal
    • _ (1971), "M-Stage Scheduling Problem - A Critical Appraisal," International Journal of Production Research, 9, 2, 39-47.
    • (1971) International Journal of Production Research , vol.9 , Issue.2 , pp. 39-47
  • 39
    • 0015316023 scopus 로고
    • Heuristic algorithms for multistage flowshop scheduling problem
    • _ (1972a), "Heuristic Algorithms for Multistage Flowshop Scheduling Problem," AIEE Transactions, 4, 1, 11-18.
    • (1972) AIEE Transactions , vol.4 , Issue.1 , pp. 11-18
  • 40
    • 0015403480 scopus 로고
    • Optimal scheduling in multistage flowshop
    • _ (1972b), "Optimal Scheduling in Multistage Flowshop," AIEE Transactions, 4, 3, 238-243.
    • (1972) AIEE Transactions , vol.4 , Issue.3 , pp. 238-243
  • 41
    • 0009383985 scopus 로고
    • A search algorithm for the generalized scheduling problem
    • _ (1975), "A Search Algorithm for the Generalized Scheduling Problem," Computers and Operations Research, 2, 2, 83-90.
    • (1975) Computers and Operations Research , vol.2 , Issue.2 , pp. 83-90
  • 42
    • 0040788390 scopus 로고
    • A Review of Flowshop Scheduling Research L. P. Ritzman et al. (eds.), Martinus Nijhoff, The Hague, Netherlands
    • _ (1979), "A Review of Flowshop Scheduling Research" in Disaggregation: Problems in Manufacturing and Service Organizations, L. P. Ritzman et al. (eds.), Martinus Nijhoff, The Hague, Netherlands, 359-364.
    • (1979) Disaggregation: Problems in Manufacturing and Service Organizations , pp. 359-364
  • 43
    • 0000044050 scopus 로고
    • Flowshop schedules with sequence dependent setup times
    • _ (1986), "Flowshop Schedules with Sequence Dependent Setup Times," Journal of Operations Research Society Japan, 29, 3, 206-219.
    • (1986) Journal of Operations Research Society Japan , vol.29 , Issue.3 , pp. 206-219
  • 44
    • 0009370108 scopus 로고
    • Flowshop scheduling with sequence dependent setup times
    • Washington, D.C.
    • _ (1988), "Flowshop Scheduling with Sequence Dependent Setup Times," Proceedings of the ORSA/TIMS National Meeting, Washington, D.C.
    • (1988) Proceedings of the ORSA/TIMS National Meeting
  • 45
    • 0002311638 scopus 로고
    • Approximate schedules for the two-machine flow-shop with sequence dependent setup times
    • _ AND W. P. DARROW (1985), "Approximate Schedules for the Two-Machine Flow-Shop with Sequence Dependent Setup Times," Indian Journal of Management and Systems, 1, 1, 6-11.
    • (1985) Indian Journal of Management and Systems , vol.1 , Issue.1 , pp. 6-11
    • Darrow, W.P.1
  • 46
    • 0022677934 scopus 로고
    • The two-machine sequence dependent flowshop scheduling problem
    • _ AND _ (1986), ""The Two-Machine Sequence Dependent Flowshop Scheduling Problem,"" European Journal of Operational Research, 24, 3, 439-446.
    • (1986) European Journal of Operational Research , vol.24 , Issue.3 , pp. 439-446
  • 48
    • 0031281269 scopus 로고    scopus 로고
    • Two-stage no-wait scheduling models with setup and removal times
    • _, V. A. SRUSEVICH, AND C. ZWANEVELD (1997), "Two-Stage No-Wait Scheduling Models with Setup and Removal Times," Computers and Operations Research, 24, 11, 1025-1031.
    • (1997) Computers and Operations Research , vol.24 , Issue.11 , pp. 1025-1031
    • Srusevich, V.A.1    Zwaneveld, C.2
  • 49
    • 0001326653 scopus 로고
    • Scheduling a two-stage hybrid flowshop with separable setup and removal times
    • _ AND E. A. TUNC (1994), "Scheduling a Two-Stage Hybrid Flowshop with Separable Setup and Removal Times," European Journal of Operational Research, 77, 3, 415-428.
    • (1994) European Journal of Operational Research , vol.77 , Issue.3 , pp. 415-428
    • Tunc, E.A.1
  • 50
    • 0030134958 scopus 로고    scopus 로고
    • A survey of machine scheduling problems with blocking and no-wait in process
    • HALL, N. G. AND C. SRISKANDARAJAH (1996), "A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process," Operations Research, 44, 3, 510-525.
    • (1996) Operations Research , vol.44 , Issue.3 , pp. 510-525
    • Hall, N.G.1    Sriskandarajah, C.2
  • 52
    • 21844507005 scopus 로고
    • An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal times
    • HAN, W. AND P. DEJAX (1994), "An Efficient Heuristic Based on Machine Workload for the Flowshop Scheduling Problem with Setup and Removal Times," Annals of Operations Research, 50, 263-279.
    • (1994) Annals of Operations Research , vol.50 , pp. 263-279
    • Han, W.1    Dejax, P.2
  • 53
    • 0000613599 scopus 로고
    • Operations scheduling for group technology applications
    • HITOMI, K. AND I. HAM (1976), "Operations Scheduling for Group Technology Applications," CIRP Annals, 25, 419-422.
    • (1976) CIRP Annals , vol.25 , pp. 419-422
    • Hitomi, K.1    Ham, I.2
  • 55
    • 0031383019 scopus 로고    scopus 로고
    • Production sequencing with reentrant work flows and sequence dependent setup times
    • HWANG, H. AND J. U. SUN (1997), "Production Sequencing with Reentrant Work Flows and Sequence Dependent Setup Times," Computers and Industrial Engineering, 33, 3-4, 773-776.
    • (1997) Computers and Industrial Engineering , vol.33 , Issue.3-4 , pp. 773-776
    • Hwang, H.1    Sun, J.U.2
  • 56
    • 0000177367 scopus 로고
    • Application of the branch and bound technique to some flow shop scheduling problem
    • IGNALL, E. ANDN L. E. SCHRAGE (1965), "Application of the Branch and Bound Technique to Some Flow Shop Scheduling Problem," Operations Research, 13, 3, 400-412.
    • (1965) Operations Research , vol.13 , Issue.3 , pp. 400-412
    • Ignall, E.1    Schrage, L.E.2
  • 57
    • 0003075019 scopus 로고
    • Optimal two-and three-stage production schedules with setup times included
    • JOHNSON, S. M. (1954), "Optimal Two-and Three-Stage Production Schedules with Setup Times Included," Naval Research Logistics Quarterly, 1, 1, 61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , Issue.1 , pp. 61-68
    • Johnson, S.M.1
  • 59
    • 0021505170 scopus 로고
    • Minimizing the makespan in a two-machine flowshop with time lags and setup conditions
    • KHURANA, K. AND P. C. BAGGA (1984), "Minimizing the Makespan in a Two-Machine Flowshop with Time Lags and Setup Conditions," Zeitschrift Operations Research, 28, 2, 163-174.
    • (1984) Zeitschrift Operations Research , vol.28 , Issue.2 , pp. 163-174
    • Khurana, K.1    Bagga, P.C.2
  • 60
    • 0001196230 scopus 로고
    • Scheduling of job-block with deadline in n × 2 flowshop problem with separated setup times
    • _ AND _ (1985), "Scheduling of Job-Block with Deadline in n × 2 Flowshop Problem with Separated Setup Times," Indian Journal of Pure Applied Mathematics, 16, 3, 213-224.
    • (1985) Indian Journal of Pure Applied Mathematics , vol.16 , Issue.3 , pp. 213-224
  • 61
    • 0031258498 scopus 로고    scopus 로고
    • Transfer batch scheduling for a two-stage flowshop with identical parallel machines at each stage
    • KIM, J-S., S-H. KANG, AND S. M. LEE (1997), "Transfer Batch Scheduling for a Two-Stage Flowshop with Identical Parallel Machines at Each Stage," OMEGA, International Journal of Management Sciences, 25, 5, 547-555.
    • (1997) OMEGA, International Journal of Management Sciences , vol.25 , Issue.5 , pp. 547-555
    • Kim, J.-S.1    Kang, S.-H.2    Lee, S.M.3
  • 62
    • 0028462998 scopus 로고
    • Impact of sequence-dependent setup times on job shop scheduling performance
    • KIM, S. C. AND P. M. BOBROWSKI (1994), "Impact of Sequence-Dependent Setup Times on Job Shop Scheduling Performance." International Journal of Production Research, 32, 7, 1503-1520.
    • (1994) International Journal of Production Research , vol.32 , Issue.7 , pp. 1503-1520
    • Kim, S.C.1    Bobrowski, P.M.2
  • 63
    • 38249004716 scopus 로고
    • Two-machine shop scheduling problems with batch processing
    • KLEINAN, U. (1993), "Two-Machine Shop Scheduling Problems with Batch Processing," Mathematical and Computer Modelling, 17, 3, 55-66.
    • (1993) Mathematical and Computer Modelling , vol.17 , Issue.3 , pp. 55-66
    • Kleinan, U.1
  • 64
    • 0345901561 scopus 로고
    • Sequencing and scheduling: Algorithms and complexity
    • S. C. Graves, A. H. G. Rinnooy Kan, and P. H. Zipkin (eds.) North Holland, Amsterdam, Netherlands
    • LAWLER, E. L., J. K. LENSTRA, A. H. G. RINNOOY KAN, AND D. B. SHMOYS (1993), "Sequencing and Scheduling: Algorithms and Complexity" in Logistics of Production and Inventory, , S. C. Graves, A. H. G. Rinnooy Kan, and P. H. Zipkin (eds.) North Holland, Amsterdam, Netherlands, 445-522.
    • (1993) Logistics of Production and Inventory , pp. 445-522
    • Lawler, E.L.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3    Shmoys, D.B.4
  • 65
  • 66
    • 0024031525 scopus 로고
    • Concurrent routing, sequencing, and setups for a two-machine flexible manufacturing cell
    • LEE, E.-J. AND P. B. MIRCHANDANI (1988), "Concurrent Routing, Sequencing, and Setups for a Two-Machine Flexible Manufacturing Cell," IEEE Journal of Robotics and Automation, 4, 3, 256-264.
    • (1988) IEEE Journal of Robotics and Automation , vol.4 , Issue.3 , pp. 256-264
    • Lee, E.-J.1    Mirchandani, P.B.2
  • 67
    • 0029491089 scopus 로고
    • Flowshop scheduling of robotic cells with job-dependent transportation and setup effects
    • LEVNER, E., K. KOGAN, AND. O. MAIMON (1995), "Flowshop Scheduling of Robotic Cells with Job-Dependent Transportation and Setup Effects," Journal of the Operational Research Society, 95, 46, 12, 1447-1455.
    • (1995) Journal of the Operational Research Society , vol.95 , Issue.46 , pp. 12
    • Levner, E.1    Kogan, K.2    Maimon, O.3
  • 68
    • 0031248652 scopus 로고    scopus 로고
    • A hybrid two-stage flowshop with part family, batch production, major and minor set-ups
    • LI, S. (1997), "A Hybrid Two-Stage Flowshop with Part Family, Batch Production, Major and Minor Set-ups," European Journal of Operational Research, 102, 1, 142-156.
    • (1997) European Journal of Operational Research , vol.102 , Issue.1 , pp. 142-156
    • Li, S.1
  • 69
    • 0027663578 scopus 로고
    • Two-machine group scheduling problem with blocking and anticipatory setups
    • LOGENDRAN, R. AND C. SRISKANDARAJAH (1993), "Two-Machine Group Scheduling Problem with Blocking and Anticipatory Setups," European Journal of Operational Research, 69, 3, 467-481.
    • (1993) European Journal of Operational Research , vol.69 , Issue.3 , pp. 467-481
    • Logendran, R.1    Sriskandarajah, C.2
  • 70
    • 0024736520 scopus 로고
    • On the complexity of scheduling with batch setups
    • MONMA, C. L. AND C. N. POTTS (1989), "On the Complexity of Scheduling with Batch Setups," Operations Research, 37, 5, 798-804.
    • (1989) Operations Research , vol.37 , Issue.5 , pp. 798-804
    • Monma, C.L.1    Potts, C.N.2
  • 71
    • 0009438549 scopus 로고
    • Two- and three-machine flowshop make-span scheduling problems with additional times separated from processing times
    • NABESHIMA, I. AND S. MARUYAMA (1984), "Two- and Three-Machine Flowshop Make-span Scheduling Problems with Additional Times Separated from Processing Times," Journal of the Operations Research Society of Japan, 27, 4, 348-366.
    • (1984) Journal of the Operations Research Society of Japan , vol.27 , Issue.4 , pp. 348-366
    • Nabeshima, I.1    Maruyama, S.2
  • 73
    • 0032683531 scopus 로고    scopus 로고
    • Scheduling flowshops with finite buffers and sequence-dependent setups times
    • NORMAN, B. A. (1999), "Scheduling Flowshops with Finite Buffers and Sequence-Dependent Setups Times," Computers and Industrial Engineering, 36, 1, 163-177.
    • (1999) Computers and Industrial Engineering , vol.36 , Issue.1 , pp. 163-177
    • Norman, B.A.1
  • 74
    • 0001443508 scopus 로고
    • Shifting bottleneck algorithm for scheduling semiconductor testing operations
    • OVACIK, I. M. AND R. A. UZSOY (1992), "Shifting Bottleneck Algorithm for Scheduling Semiconductor Testing Operations," Journal of Electronics Manufacturing, 2, 119-134.
    • (1992) Journal of Electronics Manufacturing , vol.2 , pp. 119-134
    • Ovacik, I.M.1    Uzsoy, R.A.2
  • 75
    • 0025894270 scopus 로고
    • Analysis of heuristics for job sequencing in manufacturing flow line work-cells
    • PARK T. AND H. J. STEUDEL (1991), "Analysis of Heuristics for Job Sequencing in Manufacturing Flow Line Work-Cells," Computers and Industrial Engineering, 20, 2, 129-140.
    • (1991) Computers and Industrial Engineering , vol.20 , Issue.2 , pp. 129-140
    • Park, T.1    Steudel, H.J.2
  • 77
    • 0031190804 scopus 로고    scopus 로고
    • A simulated annealing heuristic for scheduling to minimize wieghted tardiness in a flowshop with sequence dependent setup times of jobs - A case study
    • PARTHASARATHY, S. AND C. RAJENDRAN (1997a), "A Simulated Annealing Heuristic for Scheduling to Minimize Wieghted Tardiness in a Flowshop with Sequence Dependent Setup Times of Jobs - A Case Study," Production Planning and Control, 8, 5, 475-483.
    • (1997) Production Planning and Control , vol.8 , Issue.5 , pp. 475-483
    • Parthasarathy, S.1    Rajendran, C.2
  • 78
    • 0031145735 scopus 로고    scopus 로고
    • An experimental evaluation of heuristics for scheduling in a real-life flowshop with sequence dependent setup times of jobs
    • _ AND _ (1997b), "An Experimental Evaluation of Heuristics for Scheduling in a Real-Life Flowshop with Sequence Dependent Setup Times of Jobs," International Journal of Production Economics, 49, 3, 255-263.
    • (1997) International Journal of Production Economics , vol.49 , Issue.3 , pp. 255-263
  • 80
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • POTTS, C. N. AND L. N. WASSENHOVE (1992), "Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity," Journal of Operational Research Society, 43, 5, 395-406.
    • (1992) Journal of Operational Research Society , vol.43 , Issue.5 , pp. 395-406
    • Potts, C.N.1    Wassenhove, L.N.2
  • 82
    • 0009311113 scopus 로고
    • Scheduling in serial mixed-storage multiproduct processes with transfer and set-up times
    • G. V. Reklaitis and H. D. Spriggs (eds.), Elsevier Science Publishers, New York
    • RAJAGOPALAN, D. AND I. A. KARIMI (1987), "Scheduling in Serial Mixed-Storage Multiproduct Processes with Transfer and Set-up Times" in Foundations of Computer Aided Process Operations, G. V. Reklaitis and H. D. Spriggs (eds.), Elsevier Science Publishers, New York, 679-686.
    • (1987) Foundations of Computer Aided Process Operations , pp. 679-686
    • Rajagopalan, D.1    Karimi, I.A.2
  • 83
    • 0031234631 scopus 로고    scopus 로고
    • Heuristics for scheduling in a flowshop with setup, processing, and removal times separated
    • RAJENDRAN, C. AND H. ZIEGLER (1997), "Heuristics for Scheduling in a Flowshop with Setup, Processing, and Removal Times Separated," Production Planning and Control, 8, 6, 568-576.
    • (1997) Production Planning and Control , vol.8 , Issue.6 , pp. 568-576
    • Rajendran, C.1    Ziegler, H.2
  • 84
    • 0009316378 scopus 로고    scopus 로고
    • The flowshop scheduling polyhedron with setup times
    • Graduate Program in Operations Research, University of Texas at Austin, Austin, TX
    • RIOS-MERCADO, R. Z. AND J. F. BARD (1996), The Flowshop Scheduling Polyhedron with Setup Times, Technical Report ORP96-07, Graduate Program in Operations Research, University of Texas at Austin, Austin, TX.
    • (1996) Technical Report Orp96-07
    • Rios-Mercado, R.Z.1    Bard, J.F.2
  • 85
    • 0032189491 scopus 로고    scopus 로고
    • Heuristics for the flow line problem with setup costs
    • _ AND _ (1998a), "Heuristics for the Flow Line Problem with Setup Costs," European Journal of Operational Research, 110, 1, 76-98.
    • (1998) European Journal of Operational Research , vol.110 , Issue.1 , pp. 76-98
  • 86
    • 0032068389 scopus 로고    scopus 로고
    • Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups
    • _ AND _ (1998b), "Computational Experience with a Branch-and-Cut Algorithm for Flowshop Scheduling with Setups," Computers and Operations Research, 25, 5, 351-366.
    • (1998) Computers and Operations Research , vol.25 , Issue.5 , pp. 351-366
  • 87
    • 0344672464 scopus 로고    scopus 로고
    • An enhanced TSP-based heuristic for makespan minimization in a flowshop with setup times
    • _ AND _ (1999a), "An Enhanced TSP-Based Heuristic for Makespan Minimization in a Flowshop with Setup Times," Journal of Heuristics, 5, 1, 57-64.
    • (1999) Journal of Heuristics , vol.5 , Issue.1 , pp. 57-64
  • 88
    • 0033359123 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for flowshop scheduling with setup times
    • _ AND _ (1999b), "A Branch-and-Bound Algorithm for Flowshop Scheduling with Setup Times," IEE Transactions, 31, 8, 721-731.
    • (1999) IEE Transactions , vol.31 , Issue.8 , pp. 721-731
  • 89
    • 0016973706 scopus 로고
    • P-complete approximation problems
    • SAHNI, S. AND T. GONZALEZ (1976), "P-Complete Approximation problems," Journal of ACM, 23, 3, 555-565.
    • (1976) Journal of ACM , vol.23 , Issue.3 , pp. 555-565
    • Sahni, S.1    Gonzalez, T.2
  • 91
    • 0033720051 scopus 로고    scopus 로고
    • Scheduling a flowline manufacturing cell with sequence dependent family setup times
    • _, _, AND _ (1999), "Scheduling a Flowline Manufacturing Cell with Sequence Dependent Family Setup Times," European Journal of Operational Research, 125, 2, 324-339.
    • (1999) European Journal of Operational Research , vol.125 , Issue.2 , pp. 324-339
  • 92
    • 0001117904 scopus 로고
    • Optimal schedule in a GT-type flow-shop under series-parallel precedence constraints
    • SEKIGUCHI, Y. (1983), "Optimal Schedule in a GT-Type Flow-Shop under Series-Parallel Precedence Constraints," Journal of Operational Research Society of Japan, 26, 3, 226-251.
    • (1983) Journal of Operational Research Society of Japan , vol.26 , Issue.3 , pp. 226-251
    • Sekiguchi, Y.1
  • 93
    • 0009311112 scopus 로고
    • Heuristics in flow shop scheduling with sequence dependent setup times
    • SIMONS, J. V. (1992), "Heuristics in Flow Shop Scheduling with Sequence Dependent Setup Times," Omega, 20, 2, 215-225.
    • (1992) Omega , vol.20 , Issue.2 , pp. 215-225
    • Simons, J.V.1
  • 95
    • 0002131672 scopus 로고    scopus 로고
    • Heuristics for permutation flowshop scheduling with batch setup times
    • SOTOSKOV, Y. N., T. TAUTENHAHN, AND F. WERNER (1996), "Heuristics for Permutation Flowshop Scheduling with Batch Setup Times," OR Spektrum, 18, 1, 67-80.
    • (1996) OR Spektrum , vol.18 , Issue.1 , pp. 67-80
    • Sotoskov, Y.N.1    Tautenhahn, T.2    Werner, F.3
  • 96
    • 0001751273 scopus 로고
    • A genetic algorithm forfamily and job scheduling a flow-line based manufacturing cell
    • SRIDHAR, J. AND C. RAJENDRAN (1994), "A Genetic Algorithm Forfamily and Job Scheduling a Flow-Line Based Manufacturing Cell," Computers and Industrial Engineering, 27, 1-4, 469-472.
    • (1994) Computers and Industrial Engineering , vol.27 , Issue.1-4 , pp. 469-472
    • Sridhar, J.1    Rajendran, C.2
  • 97
    • 0022806444 scopus 로고
    • A MLP model for the n-job, M-stage flowshop, with sequence dependent setup times
    • SRIKAR, B. N. AND S. GHOSH (1986), "A MLP Model for the n-job, M-Stage Flowshop, with Sequence Dependent Setup Times," International Journal of Production Research, 24, 6, 1459-1472.
    • (1986) International Journal of Production Research , vol.24 , Issue.6 , pp. 1459-1472
    • Srikar, B.N.1    Ghosh, S.2
  • 98
    • 27844432869 scopus 로고
    • On the Srikar-Ghosh MILP model for the N×M SDST flowshop problem
    • STAFFORD, E. F. AND F. T. TSENG (1990), "On the Srikar-Ghosh MILP Model for the N×M SDST Flowshop Problem," International Journal of Production Research, 28, 10, 1817-1830.
    • (1990) International Journal of Production Research , vol.28 , Issue.10 , pp. 1817-1830
    • Stafford, E.F.1    Tseng, F.T.2
  • 99
    • 0009360486 scopus 로고
    • On non-permutation solutions to some two-machine flow shop scheduling models
    • STRUSEVICH, V. A. AND C. ZWANEVELD (1994), "On Non-Permutation Solutions to Some Two-Machine Flow Shop Scheduling Models," Zeischrift fur Operations Research, 39, 3, 305. 319
    • (1994) Zeischrift fur Operations Research , vol.39 , Issue.3 , pp. 305
    • Strusevich, V.A.1    Zwaneveld, C.2
  • 100
    • 0020177876 scopus 로고
    • Sequencing n jobs on two machines with setup, processing and removal times separated
    • 1982
    • SULE, D. R. (1982), "Sequencing n Jobs on Two Machines with Setup, Processing and Removal Times Separated," Naval Research Logistics Quarterly, 1982, 29, 3, 517-519.
    • (1982) Naval Research Logistics Quarterly , vol.29 , Issue.3 , pp. 517-519
    • Sule, D.R.1
  • 101
    • 0020816005 scopus 로고
    • Sequencing on two and three machines with setup, processing and removal times separated
    • _ AND K. Y. HUANG (1983), "Sequencing on Two and Three Machines with Setup, Processing and Removal Times Separated," International Journal of Production Research, 21, 5, 723-732.
    • (1983) International Journal of Production Research , vol.21 , Issue.5 , pp. 723-732
    • Huang, K.Y.1
  • 102
    • 0020736891 scopus 로고
    • Flowshop problems with time-lags
    • SZWARC, W. (1983), "Flowshop Problems with Time-Lags," Management Science, 29, 4-477. 481
    • (1983) Management Science , vol.29 , Issue.4-477 , pp. 481
    • Szwarc, W.1
  • 103
    • 0022895587 scopus 로고
    • The flowshop problem with time lags and separated setup times
    • _ (1986), "The Flowshop Problem with Time Lags and Separated Setup Times," Zeitschrift Operations Research, 30, B15-B22.
    • (1986) Zeitschrift Operations Research , vol.30
  • 104
    • 0023440155 scopus 로고
    • A flow-shop problem with sequence-dependent additive setup times
    • _ AND J. N. D. GUPTA (1987), "A Flow-Shop Problem with Sequence-Dependent Additive Setup Times," Naval Research Logistics, 34, 5, 619-627.
    • (1987) Naval Research Logistics , vol.34 , Issue.5 , pp. 619-627
    • Gupta, J.N.D.1
  • 105
    • 0016430777 scopus 로고
    • A branch and bound for two-stage production sequencing
    • USKUP, G. AND S. B. SMITH (1975), "A Branch and Bound for Two-Stage Production Sequencing," Operations Research, 23, 1, 118-136.
    • (1975) Operations Research , vol.23 , Issue.1 , pp. 118-136
    • Uskup, G.1    Smith, S.B.2
  • 106
    • 84989723711 scopus 로고
    • A simulated annealing approach to scheduling a manufacturing cell
    • VAKHARIA, A. J. AND Y.-L. CHANG (1990), "A Simulated Annealing Approach to Scheduling a Manufacturing Cell," Naval Research Logistics, 37, 6-559. 577 (19
    • (1990) Naval Research Logistics , vol.37 , Issue.6-559 , pp. 577
    • Vakharia, A.J.1    Chang, Y.-L.2
  • 108
    • 0029378595 scopus 로고
    • Optimal lot streaming for multiple products in a two-machine flowshop
    • VICKSON, R. G. (1995), "Optimal Lot Streaming for Multiple Products in a Two-Machine Flowshop," European Journal of Operational Research, 85, 3, 556-575.
    • (1995) European Journal of Operational Research , vol.85 , Issue.3 , pp. 556-575
    • Vickson, R.G.1
  • 109
    • 0026896286 scopus 로고
    • Two and three-machine flowshop scheduling problems with equal size transfer batches
    • _ AND B. E. ALFREDSSON (1992), "Two and Three-Machine Flowshop Scheduling Problems with Equal Size Transfer Batches," International Journal of Production Research, 30, 7, 1551-1575.
    • (1992) International Journal of Production Research , vol.30 , Issue.7 , pp. 1551-1575
    • Alfredsson, B.E.1
  • 110
    • 4243294111 scopus 로고
    • The two-stage hybrid flowshop scheduling problem with sequence-dependent setup times
    • G. Fandel, T. Gulledge, and A. Jones (eds.), Springer, Berlin, Germany
    • VOß, S. (1993), "The Two-stage Hybrid Flowshop Scheduling Problem with Sequence-Dependent Setup Times" in Operations Research in Production Planning and Control, G. Fandel, T. Gulledge, and A. Jones (eds.), Springer, Berlin, Germany, 336-352.
    • (1993) Operations Research in Production Planning and Control , pp. 336-352
    • Voß, S.1
  • 111
    • 0018520161 scopus 로고
    • Optimal two-stage production scheduling with setup times separated
    • YOSHIDA, T. AND K. HITOMI (1979), "Optimal Two-stage Production Scheduling with Setup Times Separated," AIEE Transactions, 11, 3, 261-263.
    • (1979) AIEE Transactions , vol.11 , Issue.3 , pp. 261-263
    • Yoshida, T.1    Hitomi, K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.