1
-
-
0032162519
-
Total flowtime in no-wait flowshops with separated setup times
-
ALDOWAISAN, T. AND A. ALLAHVERDI (1998), "Total Flowtime in No-wait Flowshops with Separated Setup Times," Computers and Operations Research, 25, 9, 757-765.
-
(1998)
Computers and Operations Research
, vol.25
, Issue.9
, pp. 757-765
-
-
Aldowaisan, T.1
Allahverdi, A.2
-
2
-
-
0034141527
-
Minimizing mean flowtime in a two machine flowshop with sequence independent setup times separated
-
ALLAHVERDI, A. (2000), "Minimizing Mean Flowtime in a Two Machine Flowshop with Sequence Independent Setup Times Separated," Computers and Operations Research, 27, 2, 111-127.
-
(2000)
Computers and Operations Research
, vol.27
, Issue.2
, pp. 111-127
-
-
Allahverdi, A.1
-
3
-
-
0032163754
-
Job lateness in flowshops with setup and removal times separated
-
_ AND T. ALDOWAISAN (1998), "Job Lateness in Flowshops with Setup and Removal Times Separated," Journal of the Operational Research Society, 49, 9, 1001-1006.
-
(1998)
Journal of the Operational Research Society
, vol.49
, Issue.9
, pp. 1001-1006
-
-
Aldowaisan, T.1
-
4
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
_, J. N. D. GUPTA, AND _ (1999), "A Review of Scheduling Research Involving Setup Considerations," OMEGA, International Journal of Management Sciences, 27, 2, 219-239.
-
(1999)
OMEGA, International Journal of Management Sciences
, vol.27
, Issue.2
, pp. 219-239
-
-
Gupta, J.N.D.1
-
5
-
-
0002134507
-
Two-machine flowshop with separated sequence-independent setup times: Mean completion time criterion
-
BAGGA, P. C. AND K. KHURANA (1986), "Two-Machine Flowshop with Separated Sequence-Independent Setup Times: Mean Completion Time Criterion," Indian Journal of Management and Systems, 2, 1, 47-57.
-
(1986)
Indian Journal of Management and Systems
, vol.2
, Issue.1
, pp. 47-57
-
-
Bagga, P.C.1
Khurana, K.2
-
6
-
-
0025256245
-
Scheduling groups of jobs in the two-machine flowshop
-
BAKER, K. R. (1990), "Scheduling Groups of Jobs in the Two-machine Flowshop," Mathematical and Computer Modeling, 13, 3, 29-36.
-
(1990)
Mathematical and Computer Modeling
, vol.13
, Issue.3
, pp. 29-36
-
-
Baker, K.R.1
-
7
-
-
21844508729
-
Lot streaming in the two-machine flow shop with setup times
-
_ (1995), "Lot Streaming in the Two-Machine Flow Shop with Setup Times," Annals of Operations Research, 57, 1-11.
-
(1995)
Annals of Operations Research
, vol.57
, pp. 1-11
-
-
-
8
-
-
0003520588
-
-
Pergamon Press, New York
-
BELLMAN, R., A. O. ESOGBUE, AND I. NABESHIMA (1982), Mathematical Aspects of Scheduling and Applications, Pergamon Press, New York.
-
(1982)
Mathematical Aspects of Scheduling and Applications
-
-
Bellman, R.1
Esogbue, A.O.2
Nabeshima, I.3
-
9
-
-
0010757151
-
Flowshop no-wait scheduling with sequence-dependent setup times and release dates
-
BIANCO, L., P. DELL'OLMO, AND S. GIORDANI (1999), "Flowshop No-Wait Scheduling with Sequence-Dependent Setup Times and Release Dates," INFOR, 37, 1, 3-19.
-
(1999)
INFOR
, vol.37
, Issue.1
, pp. 3-19
-
-
Bianco, L.1
Dell'Olmo, P.2
Giordani, S.3
-
10
-
-
84989725928
-
Scheduling tasks with sequence-dependent processing times
-
_, S. RICCIADELLI, G. RINALDI, AND A. SASSANO (1988), "Scheduling Tasks with Sequence-Dependent Processing Times," Naval Research Logistics, 35, 2, 177-184.
-
(1988)
Naval Research Logistics
, vol.35
, Issue.2
, pp. 177-184
-
-
Ricciadelli, S.1
Rinaldi, G.2
Sassano, A.3
-
11
-
-
0002286606
-
Sequencing production on parallel machines with two magnitudes of sequence-dependent setup cost
-
BITRAN, G. R. AND S. M. GILBERT (1990), "Sequencing Production on Parallel Machines with Two Magnitudes of Sequence-Dependent Setup Cost," Journal of Manufacturing and Operations Management, 3, 1, 24-52.
-
(1990)
Journal of Manufacturing and Operations Management
, vol.3
, Issue.1
, pp. 24-52
-
-
Bitran, G.R.1
Gilbert, S.M.2
-
12
-
-
0040193991
-
-
Working Paper, Department of Industrial Engineering, Tel Aviv University, Tel Aviv, Israel
-
BUKCHIN, J., M. TZUR, AND M. JAFFE (1999), Batching to Minimize Average Flow Time in a Two-Machine Flowshop, Working Paper, Department of Industrial Engineering, Tel Aviv University, Tel Aviv, Israel.
-
(1999)
Batching to Minimize Average Flow Time in a Two-Machine Flowshop
-
-
Bukchin, J.1
Tzur, M.2
Jaffe, M.3
-
13
-
-
0014807274
-
A heuristic algorithm for the n-job and m-machine sequencing problem
-
CAMPBELL, H. G., R. A. DUDEK, AND M. L. SMITH (1970), "A Heuristic Algorithm for the n-Job and m-Machine Sequencing Problem," Management Science, 16, 10, 630-637.
-
(1970)
Management Science
, vol.16
, Issue.10
, pp. 630-637
-
-
Campbell, H.G.1
Dudek, R.A.2
Smith, M.L.3
-
14
-
-
0026908992
-
Flow shop scheduling in serial multi-product processes with tansfer and set-up times
-
CAO, J. AND D. C. BEDWORTH (1992), "Flow Shop Scheduling in Serial Multi-Product Processes with Tansfer and Set-up Times," International Journal of Production Research, 30, 8, 1819-1830.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.8
, pp. 1819-1830
-
-
Cao, J.1
Bedworth, D.C.2
-
15
-
-
0028698198
-
Lot streaming in a 2-stage flowshop with setup, processing, and removal times separated
-
CETINKAYA, F. C. (1994), "Lot Streaming in a 2-Stage Flowshop with Setup, Processing, and Removal Times Separated," Journal of Operational Research Society, 45, 12, 1445-1455.
-
(1994)
Journal of Operational Research Society
, vol.45
, Issue.12
, pp. 1445-1455
-
-
Cetinkaya, F.C.1
-
16
-
-
0000399972
-
Unit-sized transfer batch scheduling with setup times
-
_ AND M. S. KAYALIGIL (1992), "Unit-Sized Transfer Batch Scheduling with Setup Times," Computers and Industrial engineering, 22, 2, 177-183.
-
(1992)
Computers and Industrial Engineering
, vol.22
, Issue.2
, pp. 177-183
-
-
Kayaligil, M.S.1
-
17
-
-
0012694908
-
Approximation algorithms for two-machine flow shop scheduling with batch setup times
-
CHEN, B., C. N. POTTS, AND V. A. STRUSEVICH (1998), "Approximation Algorithms for Two-Machine Flow Shop Scheduling with Batch Setup Times," Mathematical Programming, 82, 1-2, 255-271.
-
(1998)
Mathematical Programming
, vol.82
, Issue.1-2
, pp. 255-271
-
-
Chen, B.1
Potts, C.N.2
Strusevich, V.A.3
-
18
-
-
0031076263
-
Lot streaming with detached setups in 3-machine flowshops
-
CHEN, J. AND G. STEINER (1997), "Lot Streaming with Detached Setups in 3-machine Flowshops," European Journal of Operational Research, 96, 3, 591-611.
-
(1997)
European Journal of Operational Research
, vol.96
, Issue.3
, pp. 591-611
-
-
Chen, J.1
Steiner, G.2
-
19
-
-
0032262156
-
Lot streaming with attached setups in three-machine flowshops
-
_ AND _ (1998), "Lot Streaming with Attached Setups in Three-Machine Flowshops," IIE Transactions, 30, 11, 1075-1084.
-
(1998)
IIE Transactions
, vol.30
, Issue.11
, pp. 1075-1084
-
-
-
20
-
-
0032496483
-
An exact algorithm for batching and scheduling two part types in a mixed shop: A technical note
-
CHENG, T. C. E. AND M. Y. KOVALYOV (1998), "An Exact Algorithm for Batching and Scheduling Two Part Types in a Mixed Shop: A Technical Note," International Journal of Production Economics, 1988, 55, 1, 53-56.
-
(1988)
International Journal of Production Economics
, vol.55
, Issue.1
, pp. 53-56
-
-
Cheng, T.C.E.1
Kovalyov, M.Y.2
-
21
-
-
0034159731
-
Makespan minimization in the two-machine flowshop batch scheduling problem
-
_, B. M. T. LIN, AND A. TOKER (2000), "Makespan Minimization in the Two-Machine Flowshop Batch Scheduling Problem," Naval Research Logistics, 47, 2, 128-144.
-
(2000)
Naval Research Logistics
, vol.47
, Issue.2
, pp. 128-144
-
-
Lin, B.M.T.1
Toker, A.2
-
22
-
-
0032069909
-
Batching and scheduling to minimize the makespan in the two-machine flowshop
-
_ AND G. WANG (1998), "Batching and Scheduling to Minimize the Makespan in the Two-Machine Flowshop", IIE Transactions, 30, 5, 447-453.
-
(1998)
IIE Transactions
, vol.30
, Issue.5
, pp. 447-453
-
-
Wang, G.1
-
23
-
-
0033078058
-
A note on two-machine flexible manufacturing cell scheduling
-
_ AND _ (1999a), "A Note on Two-Machine Flexible Manufacturing Cell Scheduling," IEEE Transactions on Robotics and Automation, 15, 1, 187-190.
-
(1999)
IEEE Transactions on Robotics and Automation
, vol.15
, Issue.1
, pp. 187-190
-
-
-
24
-
-
0032628881
-
Scheduling the fabrication and assembly of components in a two-machine flowshop
-
_ AND _ (1999b), "Scheduling the Fabrication and Assembly of Components in a Two-Machine Flowshop," IIE Transactions, 31, 2, 135-143.
-
(1999)
IIE Transactions
, vol.31
, Issue.2
, pp. 135-143
-
-
-
25
-
-
0032789050
-
One-operator-two-machine flowshop scheduling with setup and dismounting times
-
_, _, AND C. SRISKANDARAJAH (1999), "One-Operator-Two-Machine Flowshop Scheduling with Setup and Dismounting Times," Computers and Operations Research, 26, 7, 715-730.
-
(1999)
Computers and Operations Research
, vol.26
, Issue.7
, pp. 715-730
-
-
Sriskandarajah, C.1
-
26
-
-
0030868028
-
Batching to minimize total production time for two part types
-
CHING, C. Y., C. J. LIAO, AND C. J. WU (1997), "Batching to Minimize Total Production Time for Two Part Types," International Journal of Production Economics, 48, 1, 63-72.
-
(1997)
International Journal of Production Economics
, vol.48
, Issue.1
, pp. 63-72
-
-
Ching, C.Y.1
Liao, C.J.2
Wu, C.J.3
-
27
-
-
0016099706
-
Two-machine flowshop scheduling problems with sequence dependent setup times: A dynamic programming approach
-
CORWIN, B. D. AND A. O. ESOGBUE (1974), "Two-Machine Flowshop Scheduling Problems with Sequence Dependent Setup Times: A Dynamic Programming Approach," Naval Research Logistics Quarterly, 21, 3, 515-524.
-
(1974)
Naval Research Logistics Quarterly
, vol.21
, Issue.3
, pp. 515-524
-
-
Corwin, B.D.1
Esogbue, A.O.2
-
28
-
-
0031139162
-
Combinatorial optimization models for production scheduling in automated manufacturing systems
-
CRAMA, Y. (1997), "Combinatorial Optimization Models for Production Scheduling in Automated Manufacturing Systems," European Journal of Operational Research, 99, 1, 136-153.
-
(1997)
European Journal of Operational Research
, vol.99
, Issue.1
, pp. 136-153
-
-
Crama, Y.1
-
29
-
-
0033136545
-
A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size
-
DANNEBERG, D., T. TAUTENHAHN, AND F. WERNER (1999), "A Comparison of Heuristic Algorithms for Flow Shop Scheduling Problems with Setup Times and Limited Batch Size," Mathematical and Computer Modelling, 29, 9, 101-126.
-
(1999)
Mathematical and Computer Modelling
, vol.29
, Issue.9
, pp. 101-126
-
-
Danneberg, D.1
Tautenhahn, T.2
Werner, F.3
-
30
-
-
0017516618
-
An evaluation of flow shop sequencing heuristics
-
DANNENBRING, D. G. (1967), "An Evaluation of Flow Shop Sequencing Heuristics," Management Science, 23, 11, 1174-1882.
-
(1967)
Management Science
, vol.23
, Issue.11
, pp. 1174-1882
-
-
Dannenbring, D.G.1
-
31
-
-
0029407502
-
A saving index heuristic algorithm for flowshop scheduling with sequence dependent set-up times
-
DAS, S. R., J. N. D. GUPTA, AND B. M. KHUMAWALA (1995), "A Saving Index Heuristic Algorithm for Flowshop Scheduling with Sequence Dependent Set-up Times," Journal of the Operational Research Society, 46, 11, 1365-1373.
-
(1995)
Journal of the Operational Research Society
, vol.46
, Issue.11
, pp. 1365-1373
-
-
Das, S.R.1
Gupta, J.N.D.2
Khumawala, B.M.3
-
32
-
-
0025824858
-
Job lateness in a two-machine flowshop with setup times separated
-
DILEEPAN, P. AND T. SEN (1991), "Job Lateness in a Two-Machine Flowshop with Setup Times Separated," Computers and Operations Research, 18, 6, 549-556.
-
(1991)
Computers and Operations Research
, vol.18
, Issue.6
, pp. 549-556
-
-
Dileepan, P.1
Sen, T.2
-
33
-
-
0002499542
-
The lessons of flowshop schedulig research
-
DUDEK, R. A., S. S. PANWALKAR, AND M. L. SMITH (1991), "The Lessons of Flowshop Schedulig Research," Operations Research, 40, 1, 7-13.
-
(1991)
Operations Research
, vol.40
, Issue.1
, pp. 7-13
-
-
Dudek, R.A.1
Panwalkar, S.S.2
Smith, M.L.3
-
35
-
-
0001068310
-
Sequencing a one-state variable machine; a solvable case of the traveling salesman problem
-
1964
-
GILMORE, P. C. AND R. E. GOMORY (1964), "Sequencing a One-State Variable Machine; A Solvable Case of the Traveling Salesman Problem," Operations Research, 1964, 12, 5, 655-679.
-
(1964)
Operations Research
, vol.12
, Issue.5
, pp. 655-679
-
-
Gilmore, P.C.1
Gomory, R.E.2
-
36
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: A survey
-
GRAHAM, R. L., E. L. LAWLER, J. K. LENSTRA, AND A. H. G. RINNOOY KAN (1979), "Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey," Annals of Dicrete Mathemataics, 5, 287-326.
-
(1979)
Annals of Dicrete Mathemataics
, vol.5
, pp. 287-326
-
-
Graham, R.L.1
Lawler, E.L.2
Lenstra, J.K.3
Rinnooy Kan, A.H.G.4
-
37
-
-
0040193981
-
-
PhD Dissertation, Texas Tech University, Lubbock, Texas
-
GUPTA, J. N. D. (1969), "Economic Aspects of Scheduling Theory, PhD Dissertation, Texas Tech University, Lubbock, Texas.
-
(1969)
Economic Aspects of Scheduling Theory
-
-
Gupta, J.N.D.1
-
38
-
-
0015203679
-
M-stage scheduling problem - A critical appraisal
-
_ (1971), "M-Stage Scheduling Problem - A Critical Appraisal," International Journal of Production Research, 9, 2, 39-47.
-
(1971)
International Journal of Production Research
, vol.9
, Issue.2
, pp. 39-47
-
-
-
39
-
-
0015316023
-
Heuristic algorithms for multistage flowshop scheduling problem
-
_ (1972a), "Heuristic Algorithms for Multistage Flowshop Scheduling Problem," AIEE Transactions, 4, 1, 11-18.
-
(1972)
AIEE Transactions
, vol.4
, Issue.1
, pp. 11-18
-
-
-
40
-
-
0015403480
-
Optimal scheduling in multistage flowshop
-
_ (1972b), "Optimal Scheduling in Multistage Flowshop," AIEE Transactions, 4, 3, 238-243.
-
(1972)
AIEE Transactions
, vol.4
, Issue.3
, pp. 238-243
-
-
-
41
-
-
0009383985
-
A search algorithm for the generalized scheduling problem
-
_ (1975), "A Search Algorithm for the Generalized Scheduling Problem," Computers and Operations Research, 2, 2, 83-90.
-
(1975)
Computers and Operations Research
, vol.2
, Issue.2
, pp. 83-90
-
-
-
42
-
-
0040788390
-
-
A Review of Flowshop Scheduling Research L. P. Ritzman et al. (eds.), Martinus Nijhoff, The Hague, Netherlands
-
_ (1979), "A Review of Flowshop Scheduling Research" in Disaggregation: Problems in Manufacturing and Service Organizations, L. P. Ritzman et al. (eds.), Martinus Nijhoff, The Hague, Netherlands, 359-364.
-
(1979)
Disaggregation: Problems in Manufacturing and Service Organizations
, pp. 359-364
-
-
-
43
-
-
0000044050
-
Flowshop schedules with sequence dependent setup times
-
_ (1986), "Flowshop Schedules with Sequence Dependent Setup Times," Journal of Operations Research Society Japan, 29, 3, 206-219.
-
(1986)
Journal of Operations Research Society Japan
, vol.29
, Issue.3
, pp. 206-219
-
-
-
44
-
-
0009370108
-
Flowshop scheduling with sequence dependent setup times
-
Washington, D.C.
-
_ (1988), "Flowshop Scheduling with Sequence Dependent Setup Times," Proceedings of the ORSA/TIMS National Meeting, Washington, D.C.
-
(1988)
Proceedings of the ORSA/TIMS National Meeting
-
-
-
45
-
-
0002311638
-
Approximate schedules for the two-machine flow-shop with sequence dependent setup times
-
_ AND W. P. DARROW (1985), "Approximate Schedules for the Two-Machine Flow-Shop with Sequence Dependent Setup Times," Indian Journal of Management and Systems, 1, 1, 6-11.
-
(1985)
Indian Journal of Management and Systems
, vol.1
, Issue.1
, pp. 6-11
-
-
Darrow, W.P.1
-
46
-
-
0022677934
-
The two-machine sequence dependent flowshop scheduling problem
-
_ AND _ (1986), ""The Two-Machine Sequence Dependent Flowshop Scheduling Problem,"" European Journal of Operational Research, 24, 3, 439-446.
-
(1986)
European Journal of Operational Research
, vol.24
, Issue.3
, pp. 439-446
-
-
-
47
-
-
0009360934
-
-
Working Paper, Department of Management, Ball State University, Muncie, IN
-
_, S. R. DAS, AND S. GHOSH (1995), Flowshop Scheduling with Sequence Dependent Setup Times, Working Paper, Department of Management, Ball State University, Muncie, IN.
-
(1995)
Flowshop Scheduling with Sequence Dependent Setup Times
-
-
Das, S.R.1
Ghosh, S.2
-
48
-
-
0031281269
-
Two-stage no-wait scheduling models with setup and removal times
-
_, V. A. SRUSEVICH, AND C. ZWANEVELD (1997), "Two-Stage No-Wait Scheduling Models with Setup and Removal Times," Computers and Operations Research, 24, 11, 1025-1031.
-
(1997)
Computers and Operations Research
, vol.24
, Issue.11
, pp. 1025-1031
-
-
Srusevich, V.A.1
Zwaneveld, C.2
-
49
-
-
0001326653
-
Scheduling a two-stage hybrid flowshop with separable setup and removal times
-
_ AND E. A. TUNC (1994), "Scheduling a Two-Stage Hybrid Flowshop with Separable Setup and Removal Times," European Journal of Operational Research, 77, 3, 415-428.
-
(1994)
European Journal of Operational Research
, vol.77
, Issue.3
, pp. 415-428
-
-
Tunc, E.A.1
-
50
-
-
0030134958
-
A survey of machine scheduling problems with blocking and no-wait in process
-
HALL, N. G. AND C. SRISKANDARAJAH (1996), "A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process," Operations Research, 44, 3, 510-525.
-
(1996)
Operations Research
, vol.44
, Issue.3
, pp. 510-525
-
-
Hall, N.G.1
Sriskandarajah, C.2
-
51
-
-
0004244112
-
-
Kluwer-Nijhoff Publishing, Boston, MA
-
HAM, I., K. HITOMI, AND T. YOSHIDA (1985), Group Technology, Kluwer-Nijhoff Publishing, Boston, MA.
-
(1985)
Group Technology
-
-
Ham, I.1
Hitomi, K.2
Yoshida, T.3
-
52
-
-
21844507005
-
An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal times
-
HAN, W. AND P. DEJAX (1994), "An Efficient Heuristic Based on Machine Workload for the Flowshop Scheduling Problem with Setup and Removal Times," Annals of Operations Research, 50, 263-279.
-
(1994)
Annals of Operations Research
, vol.50
, pp. 263-279
-
-
Han, W.1
Dejax, P.2
-
53
-
-
0000613599
-
Operations scheduling for group technology applications
-
HITOMI, K. AND I. HAM (1976), "Operations Scheduling for Group Technology Applications," CIRP Annals, 25, 419-422.
-
(1976)
CIRP Annals
, vol.25
, pp. 419-422
-
-
Hitomi, K.1
Ham, I.2
-
54
-
-
0002645196
-
An experimental investigation of group production scheduling
-
Tokyo, Japan
-
_, N. NAKAMURA, T. YOSHIDA, AND K. OKUDA (1977), "An Experimental Investigation of Group Production Scheduling," Proceedings of the 4th International Conference on Production Research, Tokyo, Japan, 609-617.
-
(1977)
Proceedings of the 4th International Conference on Production Research
, pp. 609-617
-
-
Nakamura, N.1
Yoshida, T.2
Okuda, K.3
-
55
-
-
0031383019
-
Production sequencing with reentrant work flows and sequence dependent setup times
-
HWANG, H. AND J. U. SUN (1997), "Production Sequencing with Reentrant Work Flows and Sequence Dependent Setup Times," Computers and Industrial Engineering, 33, 3-4, 773-776.
-
(1997)
Computers and Industrial Engineering
, vol.33
, Issue.3-4
, pp. 773-776
-
-
Hwang, H.1
Sun, J.U.2
-
56
-
-
0000177367
-
Application of the branch and bound technique to some flow shop scheduling problem
-
IGNALL, E. ANDN L. E. SCHRAGE (1965), "Application of the Branch and Bound Technique to Some Flow Shop Scheduling Problem," Operations Research, 13, 3, 400-412.
-
(1965)
Operations Research
, vol.13
, Issue.3
, pp. 400-412
-
-
Ignall, E.1
Schrage, L.E.2
-
57
-
-
0003075019
-
Optimal two-and three-stage production schedules with setup times included
-
JOHNSON, S. M. (1954), "Optimal Two-and Three-Stage Production Schedules with Setup Times Included," Naval Research Logistics Quarterly, 1, 1, 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, Issue.1
, pp. 61-68
-
-
Johnson, S.M.1
-
59
-
-
0021505170
-
Minimizing the makespan in a two-machine flowshop with time lags and setup conditions
-
KHURANA, K. AND P. C. BAGGA (1984), "Minimizing the Makespan in a Two-Machine Flowshop with Time Lags and Setup Conditions," Zeitschrift Operations Research, 28, 2, 163-174.
-
(1984)
Zeitschrift Operations Research
, vol.28
, Issue.2
, pp. 163-174
-
-
Khurana, K.1
Bagga, P.C.2
-
60
-
-
0001196230
-
Scheduling of job-block with deadline in n × 2 flowshop problem with separated setup times
-
_ AND _ (1985), "Scheduling of Job-Block with Deadline in n × 2 Flowshop Problem with Separated Setup Times," Indian Journal of Pure Applied Mathematics, 16, 3, 213-224.
-
(1985)
Indian Journal of Pure Applied Mathematics
, vol.16
, Issue.3
, pp. 213-224
-
-
-
61
-
-
0031258498
-
Transfer batch scheduling for a two-stage flowshop with identical parallel machines at each stage
-
KIM, J-S., S-H. KANG, AND S. M. LEE (1997), "Transfer Batch Scheduling for a Two-Stage Flowshop with Identical Parallel Machines at Each Stage," OMEGA, International Journal of Management Sciences, 25, 5, 547-555.
-
(1997)
OMEGA, International Journal of Management Sciences
, vol.25
, Issue.5
, pp. 547-555
-
-
Kim, J.-S.1
Kang, S.-H.2
Lee, S.M.3
-
62
-
-
0028462998
-
Impact of sequence-dependent setup times on job shop scheduling performance
-
KIM, S. C. AND P. M. BOBROWSKI (1994), "Impact of Sequence-Dependent Setup Times on Job Shop Scheduling Performance." International Journal of Production Research, 32, 7, 1503-1520.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.7
, pp. 1503-1520
-
-
Kim, S.C.1
Bobrowski, P.M.2
-
63
-
-
38249004716
-
Two-machine shop scheduling problems with batch processing
-
KLEINAN, U. (1993), "Two-Machine Shop Scheduling Problems with Batch Processing," Mathematical and Computer Modelling, 17, 3, 55-66.
-
(1993)
Mathematical and Computer Modelling
, vol.17
, Issue.3
, pp. 55-66
-
-
Kleinan, U.1
-
64
-
-
0345901561
-
Sequencing and scheduling: Algorithms and complexity
-
S. C. Graves, A. H. G. Rinnooy Kan, and P. H. Zipkin (eds.) North Holland, Amsterdam, Netherlands
-
LAWLER, E. L., J. K. LENSTRA, A. H. G. RINNOOY KAN, AND D. B. SHMOYS (1993), "Sequencing and Scheduling: Algorithms and Complexity" in Logistics of Production and Inventory, , S. C. Graves, A. H. G. Rinnooy Kan, and P. H. Zipkin (eds.) North Holland, Amsterdam, Netherlands, 445-522.
-
(1993)
Logistics of Production and Inventory
, pp. 445-522
-
-
Lawler, E.L.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
Shmoys, D.B.4
-
65
-
-
0031492360
-
Current trends in deterministic scheduling
-
LEE, C.-Y., L. LEI, AND M. PINEDO (1997), "Current Trends in Deterministic Scheduling," Annals of Operations Research, 70, 1, 1-41.
-
(1997)
Annals of Operations Research
, vol.70
, Issue.1
, pp. 1-41
-
-
Lee, C.-Y.1
Lei, L.2
Pinedo, M.3
-
66
-
-
0024031525
-
Concurrent routing, sequencing, and setups for a two-machine flexible manufacturing cell
-
LEE, E.-J. AND P. B. MIRCHANDANI (1988), "Concurrent Routing, Sequencing, and Setups for a Two-Machine Flexible Manufacturing Cell," IEEE Journal of Robotics and Automation, 4, 3, 256-264.
-
(1988)
IEEE Journal of Robotics and Automation
, vol.4
, Issue.3
, pp. 256-264
-
-
Lee, E.-J.1
Mirchandani, P.B.2
-
67
-
-
0029491089
-
Flowshop scheduling of robotic cells with job-dependent transportation and setup effects
-
LEVNER, E., K. KOGAN, AND. O. MAIMON (1995), "Flowshop Scheduling of Robotic Cells with Job-Dependent Transportation and Setup Effects," Journal of the Operational Research Society, 95, 46, 12, 1447-1455.
-
(1995)
Journal of the Operational Research Society
, vol.95
, Issue.46
, pp. 12
-
-
Levner, E.1
Kogan, K.2
Maimon, O.3
-
68
-
-
0031248652
-
A hybrid two-stage flowshop with part family, batch production, major and minor set-ups
-
LI, S. (1997), "A Hybrid Two-Stage Flowshop with Part Family, Batch Production, Major and Minor Set-ups," European Journal of Operational Research, 102, 1, 142-156.
-
(1997)
European Journal of Operational Research
, vol.102
, Issue.1
, pp. 142-156
-
-
Li, S.1
-
69
-
-
0027663578
-
Two-machine group scheduling problem with blocking and anticipatory setups
-
LOGENDRAN, R. AND C. SRISKANDARAJAH (1993), "Two-Machine Group Scheduling Problem with Blocking and Anticipatory Setups," European Journal of Operational Research, 69, 3, 467-481.
-
(1993)
European Journal of Operational Research
, vol.69
, Issue.3
, pp. 467-481
-
-
Logendran, R.1
Sriskandarajah, C.2
-
70
-
-
0024736520
-
On the complexity of scheduling with batch setups
-
MONMA, C. L. AND C. N. POTTS (1989), "On the Complexity of Scheduling with Batch Setups," Operations Research, 37, 5, 798-804.
-
(1989)
Operations Research
, vol.37
, Issue.5
, pp. 798-804
-
-
Monma, C.L.1
Potts, C.N.2
-
71
-
-
0009438549
-
Two- and three-machine flowshop make-span scheduling problems with additional times separated from processing times
-
NABESHIMA, I. AND S. MARUYAMA (1984), "Two- and Three-Machine Flowshop Make-span Scheduling Problems with Additional Times Separated from Processing Times," Journal of the Operations Research Society of Japan, 27, 4, 348-366.
-
(1984)
Journal of the Operations Research Society of Japan
, vol.27
, Issue.4
, pp. 348-366
-
-
Nabeshima, I.1
Maruyama, S.2
-
72
-
-
0020699921
-
A heuristic algorithm for the m-machine flow-shop sequencing problem
-
NAWAZ, M., E. E. ENSCORE, AND I. HAM (1983), "A Heuristic Algorithm for the m-Machine Flow-Shop Sequencing Problem" OMEGA The International Journal of Management Science, 11, 1, 91-95.
-
(1983)
OMEGA The International Journal of Management Science
, vol.11
, Issue.1
, pp. 91-95
-
-
Nawaz, M.1
Enscore, E.E.2
Ham, I.3
-
73
-
-
0032683531
-
Scheduling flowshops with finite buffers and sequence-dependent setups times
-
NORMAN, B. A. (1999), "Scheduling Flowshops with Finite Buffers and Sequence-Dependent Setups Times," Computers and Industrial Engineering, 36, 1, 163-177.
-
(1999)
Computers and Industrial Engineering
, vol.36
, Issue.1
, pp. 163-177
-
-
Norman, B.A.1
-
74
-
-
0001443508
-
Shifting bottleneck algorithm for scheduling semiconductor testing operations
-
OVACIK, I. M. AND R. A. UZSOY (1992), "Shifting Bottleneck Algorithm for Scheduling Semiconductor Testing Operations," Journal of Electronics Manufacturing, 2, 119-134.
-
(1992)
Journal of Electronics Manufacturing
, vol.2
, pp. 119-134
-
-
Ovacik, I.M.1
Uzsoy, R.A.2
-
75
-
-
0025894270
-
Analysis of heuristics for job sequencing in manufacturing flow line work-cells
-
PARK T. AND H. J. STEUDEL (1991), "Analysis of Heuristics for Job Sequencing in Manufacturing Flow Line Work-Cells," Computers and Industrial Engineering, 20, 2, 129-140.
-
(1991)
Computers and Industrial Engineering
, vol.20
, Issue.2
, pp. 129-140
-
-
Park, T.1
Steudel, H.J.2
-
76
-
-
0021155393
-
A survey and evaluation of static flow shop problems
-
PARK, Y. B., C. D. PEGDEN, AND E. E. ENSCORE (1984), "A Survey and Evaluation of Static Flow Shop Problems," International Journal of Production Research, 22, 1, 127-141.
-
(1984)
International Journal of Production Research
, vol.22
, Issue.1
, pp. 127-141
-
-
Park, Y.B.1
Pegden, C.D.2
Enscore, E.E.3
-
77
-
-
0031190804
-
A simulated annealing heuristic for scheduling to minimize wieghted tardiness in a flowshop with sequence dependent setup times of jobs - A case study
-
PARTHASARATHY, S. AND C. RAJENDRAN (1997a), "A Simulated Annealing Heuristic for Scheduling to Minimize Wieghted Tardiness in a Flowshop with Sequence Dependent Setup Times of Jobs - A Case Study," Production Planning and Control, 8, 5, 475-483.
-
(1997)
Production Planning and Control
, vol.8
, Issue.5
, pp. 475-483
-
-
Parthasarathy, S.1
Rajendran, C.2
-
78
-
-
0031145735
-
An experimental evaluation of heuristics for scheduling in a real-life flowshop with sequence dependent setup times of jobs
-
_ AND _ (1997b), "An Experimental Evaluation of Heuristics for Scheduling in a Real-Life Flowshop with Sequence Dependent Setup Times of Jobs," International Journal of Production Economics, 49, 3, 255-263.
-
(1997)
International Journal of Production Economics
, vol.49
, Issue.3
, pp. 255-263
-
-
-
80
-
-
84974861854
-
Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
-
POTTS, C. N. AND L. N. WASSENHOVE (1992), "Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity," Journal of Operational Research Society, 43, 5, 395-406.
-
(1992)
Journal of Operational Research Society
, vol.43
, Issue.5
, pp. 395-406
-
-
Potts, C.N.1
Wassenhove, L.N.2
-
81
-
-
0026117836
-
Flowshop scheduling with set-up, processing and removal times separated
-
PROUST, C., J. N. D. GUPTA, AND V. DESCHAMPS (1991), "Flowshop Scheduling with Set-up, Processing and Removal Times Separated," International Journal of Production Research, 29, 3, 479-493.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.3
, pp. 479-493
-
-
Proust, C.1
Gupta, J.N.D.2
Deschamps, V.3
-
82
-
-
0009311113
-
Scheduling in serial mixed-storage multiproduct processes with transfer and set-up times
-
G. V. Reklaitis and H. D. Spriggs (eds.), Elsevier Science Publishers, New York
-
RAJAGOPALAN, D. AND I. A. KARIMI (1987), "Scheduling in Serial Mixed-Storage Multiproduct Processes with Transfer and Set-up Times" in Foundations of Computer Aided Process Operations, G. V. Reklaitis and H. D. Spriggs (eds.), Elsevier Science Publishers, New York, 679-686.
-
(1987)
Foundations of Computer Aided Process Operations
, pp. 679-686
-
-
Rajagopalan, D.1
Karimi, I.A.2
-
83
-
-
0031234631
-
Heuristics for scheduling in a flowshop with setup, processing, and removal times separated
-
RAJENDRAN, C. AND H. ZIEGLER (1997), "Heuristics for Scheduling in a Flowshop with Setup, Processing, and Removal Times Separated," Production Planning and Control, 8, 6, 568-576.
-
(1997)
Production Planning and Control
, vol.8
, Issue.6
, pp. 568-576
-
-
Rajendran, C.1
Ziegler, H.2
-
84
-
-
0009316378
-
The flowshop scheduling polyhedron with setup times
-
Graduate Program in Operations Research, University of Texas at Austin, Austin, TX
-
RIOS-MERCADO, R. Z. AND J. F. BARD (1996), The Flowshop Scheduling Polyhedron with Setup Times, Technical Report ORP96-07, Graduate Program in Operations Research, University of Texas at Austin, Austin, TX.
-
(1996)
Technical Report Orp96-07
-
-
Rios-Mercado, R.Z.1
Bard, J.F.2
-
85
-
-
0032189491
-
Heuristics for the flow line problem with setup costs
-
_ AND _ (1998a), "Heuristics for the Flow Line Problem with Setup Costs," European Journal of Operational Research, 110, 1, 76-98.
-
(1998)
European Journal of Operational Research
, vol.110
, Issue.1
, pp. 76-98
-
-
-
86
-
-
0032068389
-
Computational experience with a branch-and-cut algorithm for flowshop scheduling with setups
-
_ AND _ (1998b), "Computational Experience with a Branch-and-Cut Algorithm for Flowshop Scheduling with Setups," Computers and Operations Research, 25, 5, 351-366.
-
(1998)
Computers and Operations Research
, vol.25
, Issue.5
, pp. 351-366
-
-
-
87
-
-
0344672464
-
An enhanced TSP-based heuristic for makespan minimization in a flowshop with setup times
-
_ AND _ (1999a), "An Enhanced TSP-Based Heuristic for Makespan Minimization in a Flowshop with Setup Times," Journal of Heuristics, 5, 1, 57-64.
-
(1999)
Journal of Heuristics
, vol.5
, Issue.1
, pp. 57-64
-
-
-
88
-
-
0033359123
-
A branch-and-bound algorithm for flowshop scheduling with setup times
-
_ AND _ (1999b), "A Branch-and-Bound Algorithm for Flowshop Scheduling with Setup Times," IEE Transactions, 31, 8, 721-731.
-
(1999)
IEE Transactions
, vol.31
, Issue.8
, pp. 721-731
-
-
-
89
-
-
0016973706
-
P-complete approximation problems
-
SAHNI, S. AND T. GONZALEZ (1976), "P-Complete Approximation problems," Journal of ACM, 23, 3, 555-565.
-
(1976)
Journal of ACM
, vol.23
, Issue.3
, pp. 555-565
-
-
Sahni, S.1
Gonzalez, T.2
-
90
-
-
0031621164
-
Group scheduling with sequence dependent setups
-
san Diego, CA
-
SCHALLER, J. E., J. N. D. GUPTA, AND A. J. VAKHARIA (1997), "Group Scheduling with Sequence Dependent Setups," Proceedings of the Annual Decision Sciences Institute Meeting, san Diego, CA, 1141-1143.
-
(1997)
Proceedings of the Annual Decision Sciences Institute Meeting
, pp. 1141-1143
-
-
Schaller, J.E.1
Gupta, J.N.D.2
Vakharia, A.J.3
-
91
-
-
0033720051
-
Scheduling a flowline manufacturing cell with sequence dependent family setup times
-
_, _, AND _ (1999), "Scheduling a Flowline Manufacturing Cell with Sequence Dependent Family Setup Times," European Journal of Operational Research, 125, 2, 324-339.
-
(1999)
European Journal of Operational Research
, vol.125
, Issue.2
, pp. 324-339
-
-
-
92
-
-
0001117904
-
Optimal schedule in a GT-type flow-shop under series-parallel precedence constraints
-
SEKIGUCHI, Y. (1983), "Optimal Schedule in a GT-Type Flow-Shop under Series-Parallel Precedence Constraints," Journal of Operational Research Society of Japan, 26, 3, 226-251.
-
(1983)
Journal of Operational Research Society of Japan
, vol.26
, Issue.3
, pp. 226-251
-
-
Sekiguchi, Y.1
-
93
-
-
0009311112
-
Heuristics in flow shop scheduling with sequence dependent setup times
-
SIMONS, J. V. (1992), "Heuristics in Flow Shop Scheduling with Sequence Dependent Setup Times," Omega, 20, 2, 215-225.
-
(1992)
Omega
, vol.20
, Issue.2
, pp. 215-225
-
-
Simons, J.V.1
-
94
-
-
0027626538
-
Scheduling a flow-line manufacturing cell: A tabu search approach
-
SKORIN-KAPOV, J. AND A. J. VAKAHARIA (1993), "Scheduling a Flow-Line Manufacturing Cell: A Tabu Search Approach," International Journal of Production Research, 31, 5, 1721-1734.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.5
, pp. 1721-1734
-
-
Skorin-Kapov, J.1
Vakaharia, A.J.2
-
95
-
-
0002131672
-
Heuristics for permutation flowshop scheduling with batch setup times
-
SOTOSKOV, Y. N., T. TAUTENHAHN, AND F. WERNER (1996), "Heuristics for Permutation Flowshop Scheduling with Batch Setup Times," OR Spektrum, 18, 1, 67-80.
-
(1996)
OR Spektrum
, vol.18
, Issue.1
, pp. 67-80
-
-
Sotoskov, Y.N.1
Tautenhahn, T.2
Werner, F.3
-
96
-
-
0001751273
-
A genetic algorithm forfamily and job scheduling a flow-line based manufacturing cell
-
SRIDHAR, J. AND C. RAJENDRAN (1994), "A Genetic Algorithm Forfamily and Job Scheduling a Flow-Line Based Manufacturing Cell," Computers and Industrial Engineering, 27, 1-4, 469-472.
-
(1994)
Computers and Industrial Engineering
, vol.27
, Issue.1-4
, pp. 469-472
-
-
Sridhar, J.1
Rajendran, C.2
-
97
-
-
0022806444
-
A MLP model for the n-job, M-stage flowshop, with sequence dependent setup times
-
SRIKAR, B. N. AND S. GHOSH (1986), "A MLP Model for the n-job, M-Stage Flowshop, with Sequence Dependent Setup Times," International Journal of Production Research, 24, 6, 1459-1472.
-
(1986)
International Journal of Production Research
, vol.24
, Issue.6
, pp. 1459-1472
-
-
Srikar, B.N.1
Ghosh, S.2
-
98
-
-
27844432869
-
On the Srikar-Ghosh MILP model for the N×M SDST flowshop problem
-
STAFFORD, E. F. AND F. T. TSENG (1990), "On the Srikar-Ghosh MILP Model for the N×M SDST Flowshop Problem," International Journal of Production Research, 28, 10, 1817-1830.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.10
, pp. 1817-1830
-
-
Stafford, E.F.1
Tseng, F.T.2
-
99
-
-
0009360486
-
On non-permutation solutions to some two-machine flow shop scheduling models
-
STRUSEVICH, V. A. AND C. ZWANEVELD (1994), "On Non-Permutation Solutions to Some Two-Machine Flow Shop Scheduling Models," Zeischrift fur Operations Research, 39, 3, 305. 319
-
(1994)
Zeischrift fur Operations Research
, vol.39
, Issue.3
, pp. 305
-
-
Strusevich, V.A.1
Zwaneveld, C.2
-
100
-
-
0020177876
-
Sequencing n jobs on two machines with setup, processing and removal times separated
-
1982
-
SULE, D. R. (1982), "Sequencing n Jobs on Two Machines with Setup, Processing and Removal Times Separated," Naval Research Logistics Quarterly, 1982, 29, 3, 517-519.
-
(1982)
Naval Research Logistics Quarterly
, vol.29
, Issue.3
, pp. 517-519
-
-
Sule, D.R.1
-
101
-
-
0020816005
-
Sequencing on two and three machines with setup, processing and removal times separated
-
_ AND K. Y. HUANG (1983), "Sequencing on Two and Three Machines with Setup, Processing and Removal Times Separated," International Journal of Production Research, 21, 5, 723-732.
-
(1983)
International Journal of Production Research
, vol.21
, Issue.5
, pp. 723-732
-
-
Huang, K.Y.1
-
102
-
-
0020736891
-
Flowshop problems with time-lags
-
SZWARC, W. (1983), "Flowshop Problems with Time-Lags," Management Science, 29, 4-477. 481
-
(1983)
Management Science
, vol.29
, Issue.4-477
, pp. 481
-
-
Szwarc, W.1
-
103
-
-
0022895587
-
The flowshop problem with time lags and separated setup times
-
_ (1986), "The Flowshop Problem with Time Lags and Separated Setup Times," Zeitschrift Operations Research, 30, B15-B22.
-
(1986)
Zeitschrift Operations Research
, vol.30
-
-
-
104
-
-
0023440155
-
A flow-shop problem with sequence-dependent additive setup times
-
_ AND J. N. D. GUPTA (1987), "A Flow-Shop Problem with Sequence-Dependent Additive Setup Times," Naval Research Logistics, 34, 5, 619-627.
-
(1987)
Naval Research Logistics
, vol.34
, Issue.5
, pp. 619-627
-
-
Gupta, J.N.D.1
-
105
-
-
0016430777
-
A branch and bound for two-stage production sequencing
-
USKUP, G. AND S. B. SMITH (1975), "A Branch and Bound for Two-Stage Production Sequencing," Operations Research, 23, 1, 118-136.
-
(1975)
Operations Research
, vol.23
, Issue.1
, pp. 118-136
-
-
Uskup, G.1
Smith, S.B.2
-
106
-
-
84989723711
-
A simulated annealing approach to scheduling a manufacturing cell
-
VAKHARIA, A. J. AND Y.-L. CHANG (1990), "A Simulated Annealing Approach to Scheduling a Manufacturing Cell," Naval Research Logistics, 37, 6-559. 577 (19
-
(1990)
Naval Research Logistics
, vol.37
, Issue.6-559
, pp. 577
-
-
Vakharia, A.J.1
Chang, Y.-L.2
-
108
-
-
0029378595
-
Optimal lot streaming for multiple products in a two-machine flowshop
-
VICKSON, R. G. (1995), "Optimal Lot Streaming for Multiple Products in a Two-Machine Flowshop," European Journal of Operational Research, 85, 3, 556-575.
-
(1995)
European Journal of Operational Research
, vol.85
, Issue.3
, pp. 556-575
-
-
Vickson, R.G.1
-
109
-
-
0026896286
-
Two and three-machine flowshop scheduling problems with equal size transfer batches
-
_ AND B. E. ALFREDSSON (1992), "Two and Three-Machine Flowshop Scheduling Problems with Equal Size Transfer Batches," International Journal of Production Research, 30, 7, 1551-1575.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.7
, pp. 1551-1575
-
-
Alfredsson, B.E.1
-
110
-
-
4243294111
-
The two-stage hybrid flowshop scheduling problem with sequence-dependent setup times
-
G. Fandel, T. Gulledge, and A. Jones (eds.), Springer, Berlin, Germany
-
VOß, S. (1993), "The Two-stage Hybrid Flowshop Scheduling Problem with Sequence-Dependent Setup Times" in Operations Research in Production Planning and Control, G. Fandel, T. Gulledge, and A. Jones (eds.), Springer, Berlin, Germany, 336-352.
-
(1993)
Operations Research in Production Planning and Control
, pp. 336-352
-
-
Voß, S.1
-
111
-
-
0018520161
-
Optimal two-stage production scheduling with setup times separated
-
YOSHIDA, T. AND K. HITOMI (1979), "Optimal Two-stage Production Scheduling with Setup Times Separated," AIEE Transactions, 11, 3, 261-263.
-
(1979)
AIEE Transactions
, vol.11
, Issue.3
, pp. 261-263
-
-
Yoshida, T.1
Hitomi, K.2
|