1
-
-
0022693736
-
A comparison of strategies to dampen nervousness in MRP systems
-
BLACKBURN, J. D., D. H. KROPP, AND R. A. MILLEN (1986), "A Comparison of Strategies to Dampen Nervousness in MRP Systems," Management Science, 32, 4, 413-429.
-
(1986)
Management Science
, vol.32
, Issue.4
, pp. 413-429
-
-
Blackburn, J.D.1
Kropp, D.H.2
Millen, R.A.3
-
2
-
-
0023532189
-
Alternative approaches to schedule instability: A comparative analysis
-
_, _, AND _ (1987), "Alternative Approaches to Schedule Instability: A Comparative Analysis," International Journal of Production Research, 25, 12, 1739-1749.
-
(1987)
International Journal of Production Research
, vol.25
, Issue.12
, pp. 1739-1749
-
-
-
3
-
-
84989444315
-
Heuristic lot-sizing performance in a rolling-schedule environment
-
_ AND R. A. MILLEN (1980), "Heuristic Lot-Sizing Performance in a Rolling-Schedule Environment," Decision Sciences, 11, 4, 691-701.
-
(1980)
Decision Sciences
, vol.11
, Issue.4
, pp. 691-701
-
-
Millen, R.A.1
-
4
-
-
84989491970
-
The effectiveness of extending the horizon in rolling production scheduling
-
CARLSON, R. C., S. L. BECKMAN, AND D. H. KROPP (1981), "The Effectiveness of Extending the Horizon in Rolling Production Scheduling," Decision Sciences, 13, 1, 129-146.
-
(1981)
Decision Sciences
, vol.13
, Issue.1
, pp. 129-146
-
-
Carlson, R.C.1
Beckman, S.L.2
Kropp, D.H.3
-
5
-
-
33749286452
-
A heuristic solution procedure for the multi-item single level, limited capacity, lot sizing problem
-
DIXON, P. S. AND R. A. SILVER (1981), "A Heuristic Solution Procedure for the Multi-Item Single Level, Limited Capacity, Lot Sizing Problem," Journal of Operations Management, 2, 1, 23-29.
-
(1981)
Journal of Operations Management
, vol.2
, Issue.1
, pp. 23-29
-
-
Dixon, P.S.1
Silver, R.A.2
-
6
-
-
0019678266
-
The dynamic lot-sizing problem for multiple items under limited capacity
-
DOORAMACI, A., J. C. PANAYIOTOPOULOS, AND N. R. ADAM (1981), "The Dynamic Lot-Sizing Problem for Multiple Items Under Limited Capacity," AIIE Transactions, 13, 4, 294-303.
-
(1981)
AIIE Transactions
, vol.13
, Issue.4
, pp. 294-303
-
-
Dooramaci, A.1
Panayiotopoulos, J.C.2
Adam, N.R.3
-
7
-
-
0018296191
-
A lot sizing rule for time phased component demand
-
GROFF, G. K. (1979), "A Lot Sizing Rule for Time Phased Component Demand," Production and Inventory Management, 20, 47-53.
-
(1979)
Production and Inventory Management
, vol.20
, pp. 47-53
-
-
Groff, G.K.1
-
8
-
-
0022109204
-
Planning lot sizes and capacity requirements in a single stage production system
-
GUNTHER, H. O. (1987), "Planning Lot Sizes and Capacity Requirements in a Single Stage Production System," European Journal of Operational Research, 31, 223-231.
-
(1987)
European Journal of Operational Research
, vol.31
, pp. 223-231
-
-
Gunther, H.O.1
-
9
-
-
0024087527
-
Numerical evaluation of heuristics for the multi-item single-level capacitated lot-size problem
-
_ (1988), "Numerical Evaluation of Heuristics for the Multi-Item Single-Level Capacitated Lot-Size Problem," Engineering Costs and Production Economics, 14, 3, 233-243.
-
(1988)
Engineering Costs and Production Economics
, vol.14
, Issue.3
, pp. 233-243
-
-
-
10
-
-
0029734543
-
An investigation of alternative dampening procedures to cope with MRP system nervousness
-
HO, C. J. AND P. L. CARTER (1996), "An Investigation of Alternative Dampening Procedures to Cope with MRP System Nervousness," International Journal of Production Research, 34, 1, 137-156.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.1
, pp. 137-156
-
-
Ho, C.J.1
Carter, P.L.2
-
11
-
-
0032143246
-
Correlating MRP system nervousness with forecast errors
-
_ AND T. C. IRELAND (1998), "Correlating MRP System Nervousness with Forecast Errors," International Journal of Production Research, 36, 8, 2289-2299.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.8
, pp. 2289-2299
-
-
Ireland, T.C.1
-
12
-
-
0029389855
-
Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty
-
KADIPASAOGLU, S. N. AND V. SRIDHARAN (1995), "Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty," Journal of Operations Management, 13, 193-211.
-
(1995)
Journal of Operations Management
, vol.13
, pp. 193-211
-
-
Kadipasaoglu, S.N.1
Sridharan, V.2
-
13
-
-
0020305108
-
A heuristic algorithm for the multi-item lot-sizing problem with capacity constraints
-
KARNI, R. AND Y. ROLL (1982), "A Heuristic Algorithm for the Multi-Item Lot-Sizing Problem with Capacity Constraints," IIE Transactions, 14, 4, 249-256.
-
(1982)
IIE Transactions
, vol.14
, Issue.4
, pp. 249-256
-
-
Karni, R.1
Roll, Y.2
-
14
-
-
38249033688
-
Alternative master production scheduling techniques in an assemble-to-order environment
-
KING, B. E. AND W. C. BENTON (1987), "Alternative Master Production Scheduling Techniques in an Assemble-to-Order Environment," Journal of Operations Management, 7, 1 & 2, 179-201.
-
(1987)
Journal of Operations Management
, vol.7
, Issue.1-2
, pp. 179-201
-
-
King, B.E.1
Benton, W.C.2
-
15
-
-
0018723096
-
Heuristic procedures for the single operation, multi-item loading problem
-
LAMBRECHT, M. R. AND H. VANDERVERKEN (1979), "Heuristic Procedures for the Single Operation, Multi-Item Loading Problem," AIIE Transactions, 11, 4, 319-325.
-
(1979)
AIIE Transactions
, vol.11
, Issue.4
, pp. 319-325
-
-
Lambrecht, M.R.1
Vanderverken, H.2
-
16
-
-
84985848296
-
A model for master production scheduling in uncertain environments
-
LIN, N. AND L. J. KRAJEWSKI (1992), "A Model for Master Production Scheduling in Uncertain Environments," Decision Sciences, 23, 4, 839-861.
-
(1992)
Decision Sciences
, vol.23
, Issue.4
, pp. 839-861
-
-
Lin, N.1
Krajewski, L.J.2
-
17
-
-
0022737333
-
Multi-item single level capacitated dynamic lot sizing heuristics: A computational comparison
-
("Part I: Static Case"); 124-129 ("Part II: Rolling Horizon")
-
MAES, J. AND L. N. VAN WASSENHOVE (1986), "Multi-Item Single Level Capacitated Dynamic Lot Sizing Heuristics: A Computational Comparison," IIE Transactions, 18, 2, 114-123 ("Part I: Static Case"); 124-129 ("Part II: Rolling Horizon")
-
(1986)
IIE Transactions
, vol.18
, Issue.2
, pp. 114-123
-
-
Maes, J.1
Van Wassenhove, L.N.2
-
18
-
-
84974870384
-
Multi-item single level capacitated dynamic lot sizing heuristics: A general review
-
_ AND _ (1988), "Multi-Item Single Level Capacitated Dynamic Lot Sizing Heuristics: A General Review," Journal of Operational Research Society, 39, 11, 991-1004.
-
(1988)
Journal of Operational Research Society
, vol.39
, Issue.11
, pp. 991-1004
-
-
-
19
-
-
0002657699
-
A heuristic for selecting lot size quantities for the case of deterministic time varying demand rate and discrete opportunities for replenishment
-
SILVER, A. AND H. MEAL (1973), "A Heuristic for Selecting Lot Size Quantities for the Case of Deterministic Time Varying Demand Rate and Discrete Opportunities for Replenishment," Production and Inventory Management, 14, 2, 64-74.
-
(1973)
Production and Inventory Management
, vol.14
, Issue.2
, pp. 64-74
-
-
Silver, A.1
Meal, H.2
-
20
-
-
84985759548
-
Freezing the master production schedule under demand uncertainty
-
SRIDHARAN, S. V. AND W. L. BERRY (1990a), "Freezing the Master Production Schedule Under Demand Uncertainty," Decision Sciences, 21, 1, 97-120.
-
(1990)
Decision Sciences
, vol.21
, Issue.1
, pp. 97-120
-
-
Sridharan, S.V.1
Berry, W.L.2
-
21
-
-
0025399203
-
Master production scheduling, make-to-stock products: A framework for analysis
-
_ AND _ (1990b), "Master Production Scheduling, Make-to-Stock Products: A Framework for Analysis," International Journal of Production Research, 28, 3, 541-558.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.3
, pp. 541-558
-
-
-
22
-
-
0023404035
-
Freezing the master production schedule under rolling planning horizons
-
_, _, AND V. UDAYABHANU (1987), "Freezing the Master Production Schedule Under Rolling Planning Horizons," Management Science, 33, 9, 1137-1149.
-
(1987)
Management Science
, vol.33
, Issue.9
, pp. 1137-1149
-
-
Udayabhanu, V.1
-
23
-
-
84985855322
-
Measuring master production schedule stability under rolling planning horizons
-
_, _, AND _ (1988), "Measuring Master Production Schedule Stability Under Rolling Planning Horizons," Decision Sciences, 19, 1, 147-166.
-
(1988)
Decision Sciences
, vol.19
, Issue.1
, pp. 147-166
-
-
-
24
-
-
0002684530
-
An analysis of alternative policies to achieve schedule instability
-
_ AND R. L. LAFORGE (1990), "An Analysis of Alternative Policies to Achieve Schedule Instability," Journal of Manufacturing and Operations Management, 3, 1, 53-73.
-
(1990)
Journal of Manufacturing and Operations Management
, vol.3
, Issue.1
, pp. 53-73
-
-
LaForge, R.L.1
-
25
-
-
21844485482
-
Freezing the master production schedule: Implications for the fill rate
-
_ AND _ (1994), "Freezing the Master Production Schedule: Implications for the Fill Rate," Decision Sciences, 25, 3, 461-469.
-
(1994)
Decision Sciences
, vol.25
, Issue.3
, pp. 461-469
-
-
-
26
-
-
0003929853
-
-
Irwin, Homewood, IL
-
VOLLMANN, T. E., W. L. BERRY, AND D. L. WHYBARK (1992), Manufacturing Planning and Control Systems, Irwin, Homewood, IL, 322.
-
(1992)
Manufacturing Planning and Control Systems
, pp. 322
-
-
Vollmann, T.E.1
Berry, W.L.2
Whybark, D.L.3
-
27
-
-
0001962762
-
Dynamic version of the economic lot size model
-
WAGNER, H. M. AND T. M. WHITIN (1958), "Dynamic Version of the Economic Lot Size Model," Management Science, 5, 1, 89-96.
-
(1958)
Management Science
, vol.5
, Issue.1
, pp. 89-96
-
-
Wagner, H.M.1
Whitin, T.M.2
-
28
-
-
0032000895
-
Parameters affecting the effectiveness of MRP systems: A review
-
YEUNG, J. H. Y., W. C. K. WONG, AND L. MA (1998), "Parameters Affecting the Effectiveness of MRP Systems: A Review," International Journal of Production Research, 36, 2, 313-331.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.2
, pp. 313-331
-
-
Yeung, J.H.Y.1
Wong, W.C.K.2
Ma, L.3
-
29
-
-
0031553213
-
Lot-sizing rules and freezing the master production schedule in material requirements planning systems
-
ZHAO, X. AND K. LAM (1997), "Lot-Sizing Rules and Freezing the Master Production Schedule in Material Requirements Planning Systems," International Journal of Production Economics, 53, 3, 281-305.
-
(1997)
International Journal of Production Economics
, vol.53
, Issue.3
, pp. 281-305
-
-
Zhao, X.1
Lam, K.2
-
30
-
-
0027612429
-
Freezing the master production schedule in multi-level material requirements planning systems under demand uncertainty
-
_ AND T. S. LEE (1993), "Freezing the Master Production Schedule in Multi-Level Material Requirements Planning Systems Under Demand Uncertainty," Journal of Operations Management, 11, 2, 185-205.
-
(1993)
Journal of Operations Management
, vol.11
, Issue.2
, pp. 185-205
-
-
Lee, T.S.1
-
31
-
-
0030107956
-
Freezing the master production schedule for material requirements planning systems under deterministic demand
-
_ AND _ (1996), "Freezing the Master Production Schedule for Material Requirements Planning Systems Under Deterministic Demand," Production Planning and Control, 7, 2, 144-161.
-
(1996)
Production Planning and Control
, vol.7
, Issue.2
, pp. 144-161
-
-
-
32
-
-
84884343507
-
Lot-sizing rules and freezing the master production schedule in MRP systems under demand uncertainty
-
_, _, AND J. GOODALE (1995), "Lot-Sizing Rules and Freezing the Master Production Schedule in MRP Systems Under Demand Uncertainty," International Journal of Production Research, 33, 8, 2241-2276.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.8
, pp. 2241-2276
-
-
Goodale, J.1
-
33
-
-
0032089532
-
Multi-level lot-sizing heuristics and freezing the master production schedule in material requirements planning systems
-
_ AND J. XIE (1998), "Multi-Level Lot-Sizing Heuristics and Freezing the Master Production Schedule in Material Requirements Planning Systems," Production Planning and Control, 9, 4, 371-384.
-
(1998)
Production Planning and Control
, vol.9
, Issue.4
, pp. 371-384
-
-
Xie, J.1
|