메뉴 건너뛰기




Volumn 6, Issue 1, 1997, Pages 28-33

On the theory of constraints and the goal system

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0011718957     PISSN: 10591478     EISSN: None     Source Type: Journal    
DOI: 10.1111/j.1937-5956.1997.tb00412.x     Document Type: Article
Times cited : (13)

References (13)
  • 1
    • 0002082384 scopus 로고
    • Integrating Kanban Type Pull Systems and MRP Type Push Systems: Insights from a Markovian Model
    • DELEERSNYDER, J. L., T. J. HODGSON, R. E. KING, P. J. O'GRADY, AND A. SAVVA (1992), "Integrating Kanban Type Pull Systems and MRP Type Push Systems: Insights from a Markovian Model," IEE Transactions, 24, 3, 43-56.
    • (1992) IEE Transactions , vol.24 , Issue.3 , pp. 43-56
    • Deleersnyder, J.L.1    Hodgson, T.J.2    King, R.E.3    O'Grady, P.J.4    Savva, A.5
  • 2
    • 0000411214 scopus 로고
    • Tabu Search - Part I
    • GLOVER, F. (1989), "Tabu Search - Part I," ORSA Journal on Computing, 1, 3, 190-206.
    • (1989) ORSA Journal on Computing , vol.1 , Issue.3 , pp. 190-206
    • Glover, F.1
  • 4
    • 0003710588 scopus 로고
    • North River Press, Croton-on-the-Hudson, NY
    • _ and R. E. FOX (1986), The Race, North River Press, Croton-on-the-Hudson, NY.
    • (1986) The Race
    • Fox, R.E.1
  • 6
    • 0021503050 scopus 로고
    • OPT Uncovered: Many Production Planning and Scheduling Concepts Can Be Applied with or Without the Software
    • October
    • JACOBS, F. R. (1984), "OPT Uncovered: Many Production Planning and Scheduling Concepts Can Be Applied With or Without The Software," Industrial Engineering, October, 16, 10, 32-41.
    • (1984) Industrial Engineering , vol.16 , Issue.10 , pp. 32-41
    • Jacobs, F.R.1
  • 7
    • 0023833632 scopus 로고
    • MRP 96: Time to Rethink Manufacturing Logistics
    • KANET, J. J. (1988), "MRP 96: Time to Rethink Manufacturing Logistics," Production and Inventory Management Journal, 29, 2, 57-61.
    • (1988) Production and Inventory Management Journal , vol.29 , Issue.2 , pp. 57-61
    • Kanet, J.J.1
  • 11
    • 0026859945 scopus 로고
    • Push and Pull Production Systems: Issues and Comparisons
    • SPEARMAN, M. L. AND M. A. ZAZANIS (1992), "Push and Pull Production Systems: Issues and Comparisons," Operations Research, 40, 521-532.
    • (1992) Operations Research , vol.40 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2
  • 13
    • 84987039881 scopus 로고
    • Sequencing and Batching for Two Classes of Jobs with Deadlines and Set-up Times
    • WOODRUFF, D. L. AND M. L. SPEARMAN (1992), "Sequencing and Batching for Two Classes of Jobs with Deadlines and Set-up Times," Production and Operations Management, 1, 1, 87-102.
    • (1992) Production and Operations Management , vol.1 , Issue.1 , pp. 87-102
    • Woodruff, D.L.1    Spearman, M.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.