-
1
-
-
0025211593
-
Sequencing with earliness and tardiness penalties: A review
-
BAKER, K. R. AND G. D. SCUDDER (1990), "Sequencing With Earliness and Tardiness Penalties: A Review," Operations Research, 38, 1, 22-36.
-
(1990)
Operations Research
, vol.38
, Issue.1
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
2
-
-
0025416591
-
Simultaneous production planning and scheduling in multiproduct batch plants
-
BIREWAR, B. D. AND I. E. GROSSMAN (1990), "Simultaneous Production Planning and Scheduling in Multiproduct Batch Plants," Industrial and Chemical Engineering Research, 29, 4, 570-580.
-
(1990)
Industrial and Chemical Engineering Research
, vol.29
, Issue.4
, pp. 570-580
-
-
Birewar, B.D.1
Grossman, I.E.2
-
3
-
-
0040957821
-
On a problem of production scheduling
-
BISHOP, G. T. (1957), "On a Problem of Production Scheduling," Operations Research, 5, 1, 97-103.
-
(1957)
Operations Research
, vol.5
, Issue.1
, pp. 97-103
-
-
Bishop, G.T.1
-
4
-
-
0040363674
-
-
930 Tahoe Boulevard, Suite 802-279, Incline Village, NV 89451
-
CPLEX Optimization (1996), 930 Tahoe Boulevard, Suite 802-279, Incline Village, NV 89451.
-
(1996)
-
-
-
5
-
-
0039274175
-
Batch plants adapt to CPI's flexible game plans
-
CHAUDHARY, J. (1988), "Batch Plants Adapt to CPI's Flexible Game Plans," Chemical Engineering, 95, 2, 31-36.
-
(1988)
Chemical Engineering
, vol.95
, Issue.2
, pp. 31-36
-
-
Chaudhary, J.1
-
6
-
-
0030084882
-
Scheduling multi-purpose batch plants with junction constraints
-
DESSOUKY, Y. M., C. A. ROBERTS, M. M. DESSOUKY, AND G. WILSON (1996), "Scheduling Multi-Purpose Batch Plants with Junction Constraints," International Journal of Production Research, 34, 2, 525-541.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.2
, pp. 525-541
-
-
Dessouky, Y.M.1
Roberts, C.A.2
Dessouky, M.M.3
Wilson, G.4
-
7
-
-
0031145544
-
Production scheduling of single-stage multi-product batch chemical processes with fixed batch sizes
-
DESSOUKY, M. M. AND B. A. KIJOWSKI (1997), "Production Scheduling of Single-Stage Multi-Product Batch Chemical Processes with Fixed Batch Sizes," IIE Transactions, 29, 5, 399-408.
-
(1997)
IIE Transactions
, vol.29
, Issue.5
, pp. 399-408
-
-
Dessouky, M.M.1
Kijowski, B.A.2
-
8
-
-
0024748850
-
Optimal design of batch plants with single production routes
-
FAQIR, N. M. AND I. KARIMI (1989), "Optimal Design of Batch Plants with Single Production Routes," Industrial and Chemical Engineering Research, 28, 5, 1191-1202.
-
(1989)
Industrial and Chemical Engineering Research
, vol.28
, Issue.5
, pp. 1191-1202
-
-
Faqir, N.M.1
Karimi, I.2
-
9
-
-
0003986190
-
-
Prentice Hall, Englewood Cliffs, NJ
-
FRANCIS, R. L., L. F. MCGINNIS, AND J. A. WHITE (1992), Facility Layout and Location: An Analytical Approach, Prentice Hall, Englewood Cliffs, NJ.
-
(1992)
Facility Layout and Location: An Analytical Approach
-
-
Francis, R.L.1
McGinnis, L.F.2
White, J.A.3
-
10
-
-
0026873943
-
A comparison of two lot sizing-sequencing heuristics for the process industry
-
HEUTS, R. M. J., H. P. SEIDEL, AND W. J. SELEN (1992), "A Comparison of Two Lot Sizing-Sequencing Heuristics for the Process Industry," European Journal of Operational Research, 59, 3, 413-424.
-
(1992)
European Journal of Operational Research
, vol.59
, Issue.3
, pp. 413-424
-
-
Heuts, R.M.J.1
Seidel, H.P.2
Selen, W.J.3
-
11
-
-
0027545176
-
A general algorithm for short-term scheduling of batch operations-i. MILP formulation
-
KONDILI, E., C. C. PANTELIDES, AND R. W. H. SARGENT (1993), "A General Algorithm for Short-term Scheduling of Batch Operations-I. MILP Formulation," Computers and Chemical Engineering, 17, 2, 211-227.
-
(1993)
Computers and Chemical Engineering
, vol.17
, Issue.2
, pp. 211-227
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
12
-
-
0025414711
-
Scheduling in serial multiproduct batch processes with due-date penalties
-
KU, H. AND I. KARIMI (1990), "Scheduling in Serial Multiproduct Batch Processes with Due-Date Penalties," Industrial and Chemical Engineering Research, 29, 4, 580-590.
-
(1990)
Industrial and Chemical Engineering Research
, vol.29
, Issue.4
, pp. 580-590
-
-
Ku, H.1
Karimi, I.2
-
13
-
-
0023397851
-
Scheduling in batch processes
-
KU, H., D. RAJAGOPALAN, AND I. KARIMI (1987), "Scheduling in Batch Processes," Chemical Engineering Progress, 83, 8, 35-45.
-
(1987)
Chemical Engineering Progress
, vol.83
, Issue.8
, pp. 35-45
-
-
Ku, H.1
Rajagopalan, D.2
Karimi, I.3
-
14
-
-
0028501041
-
Heuristic algorithm for scheduling batch and semi-continuous plants with production deadlines, intermediate storage limitations and equipment changeover costs
-
KUDVA, G., A. ELKAMEL, J. F. PEKNY, AND G. V. REKLAITIS (1994), "Heuristic Algorithm for Scheduling Batch and Semi-Continuous Plants with Production Deadlines, Intermediate Storage Limitations and Equipment Changeover Costs," Computers and Chemical Engineering, 18, 9, 859-875.
-
(1994)
Computers and Chemical Engineering
, vol.18
, Issue.9
, pp. 859-875
-
-
Kudva, G.1
Elkamel, A.2
Pekny, J.F.3
Reklaitis, G.V.4
-
16
-
-
0026186998
-
Scheduling of a multipurpose batch plant using a graphically derive mixed-integer linear program
-
PATSIDOU, E. P. AND J. C. KANTOR (1991), "Scheduling of a Multipurpose Batch Plant Using a Graphically Derive Mixed-Integer Linear Program," Industrial and Chemical Engineering Research, 30, 7, 1548-1561.
-
(1991)
Industrial and Chemical Engineering Research
, vol.30
, Issue.7
, pp. 1548-1561
-
-
Patsidou, E.P.1
Kantor, J.C.2
-
17
-
-
0025492187
-
An exact parallel algorithm for scheduling when production costs depend on consecutive system states
-
PEKNY, J. F., D. L. MILLER, AND G. J. MCRAE (1990), "An Exact Parallel Algorithm for Scheduling when Production Costs Depend on Consecutive System States," Computers and Chemical Engineering, 14, 7, 1009-1023.
-
(1990)
Computers and Chemical Engineering
, vol.14
, Issue.7
, pp. 1009-1023
-
-
Pekny, J.F.1
Miller, D.L.2
McRae, G.J.3
-
18
-
-
84974861854
-
Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
-
POTTS, C. N. AND L. N. VAN WASSENHOVE (1992), "Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity," Journal of Operational Research Society, 43, 5, 395-406.
-
(1992)
Journal of Operational Research Society
, vol.43
, Issue.5
, pp. 395-406
-
-
Potts, C.N.1
Van Wassenhove, L.N.2
-
20
-
-
0039771472
-
The big advantage offered by batch processing is flexibility
-
RIPPIN, D. W. (1991), "The Big Advantage Offered by Batch Processing is Flexibility," Chemical Engineering, 98, 5, 101-107.
-
(1991)
Chemical Engineering
, vol.98
, Issue.5
, pp. 101-107
-
-
Rippin, D.W.1
-
21
-
-
0025701545
-
Operational production planning in a chemical manufacturing environment
-
SELEN, W. J. AND R. M. J. HEUTS (1990), "Operational Production Planning in a Chemical Manufacturing Environment," European Journal of Operational Research, 45, 1, 38-46.
-
(1990)
European Journal of Operational Research
, vol.45
, Issue.1
, pp. 38-46
-
-
Selen, W.J.1
Heuts, R.M.J.2
-
22
-
-
0023995568
-
A model for lot sizing and sequencing in process industries
-
SMITH-DANIELS, V. L. AND L. P. RITZMAN (1988), "A Model for Lot Sizing and Sequencing in Process Industries," International Journal of Production Research, 26, 4, 647-674.
-
(1988)
International Journal of Production Research
, vol.26
, Issue.4
, pp. 647-674
-
-
Smith-Daniels, V.L.1
Ritzman, L.P.2
|