메뉴 건너뛰기




Volumn 8, Issue 4, 1999, Pages 433-444

Simultaneous batching and scheduling for chemical processing with earliness and tardiness penalties

Author keywords

Batching; Chemical processing; Scheduling; Weighted earlines tardiness

Indexed keywords


EID: 0010907503     PISSN: 10591478     EISSN: None     Source Type: Journal    
DOI: 10.1111/j.1937-5956.1999.tb00317.x     Document Type: Article
Times cited : (13)

References (22)
  • 1
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • BAKER, K. R. AND G. D. SCUDDER (1990), "Sequencing With Earliness and Tardiness Penalties: A Review," Operations Research, 38, 1, 22-36.
    • (1990) Operations Research , vol.38 , Issue.1 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 2
    • 0025416591 scopus 로고
    • Simultaneous production planning and scheduling in multiproduct batch plants
    • BIREWAR, B. D. AND I. E. GROSSMAN (1990), "Simultaneous Production Planning and Scheduling in Multiproduct Batch Plants," Industrial and Chemical Engineering Research, 29, 4, 570-580.
    • (1990) Industrial and Chemical Engineering Research , vol.29 , Issue.4 , pp. 570-580
    • Birewar, B.D.1    Grossman, I.E.2
  • 3
    • 0040957821 scopus 로고
    • On a problem of production scheduling
    • BISHOP, G. T. (1957), "On a Problem of Production Scheduling," Operations Research, 5, 1, 97-103.
    • (1957) Operations Research , vol.5 , Issue.1 , pp. 97-103
    • Bishop, G.T.1
  • 4
    • 0040363674 scopus 로고    scopus 로고
    • 930 Tahoe Boulevard, Suite 802-279, Incline Village, NV 89451
    • CPLEX Optimization (1996), 930 Tahoe Boulevard, Suite 802-279, Incline Village, NV 89451.
    • (1996)
  • 5
    • 0039274175 scopus 로고
    • Batch plants adapt to CPI's flexible game plans
    • CHAUDHARY, J. (1988), "Batch Plants Adapt to CPI's Flexible Game Plans," Chemical Engineering, 95, 2, 31-36.
    • (1988) Chemical Engineering , vol.95 , Issue.2 , pp. 31-36
    • Chaudhary, J.1
  • 7
    • 0031145544 scopus 로고    scopus 로고
    • Production scheduling of single-stage multi-product batch chemical processes with fixed batch sizes
    • DESSOUKY, M. M. AND B. A. KIJOWSKI (1997), "Production Scheduling of Single-Stage Multi-Product Batch Chemical Processes with Fixed Batch Sizes," IIE Transactions, 29, 5, 399-408.
    • (1997) IIE Transactions , vol.29 , Issue.5 , pp. 399-408
    • Dessouky, M.M.1    Kijowski, B.A.2
  • 8
    • 0024748850 scopus 로고
    • Optimal design of batch plants with single production routes
    • FAQIR, N. M. AND I. KARIMI (1989), "Optimal Design of Batch Plants with Single Production Routes," Industrial and Chemical Engineering Research, 28, 5, 1191-1202.
    • (1989) Industrial and Chemical Engineering Research , vol.28 , Issue.5 , pp. 1191-1202
    • Faqir, N.M.1    Karimi, I.2
  • 10
    • 0026873943 scopus 로고
    • A comparison of two lot sizing-sequencing heuristics for the process industry
    • HEUTS, R. M. J., H. P. SEIDEL, AND W. J. SELEN (1992), "A Comparison of Two Lot Sizing-Sequencing Heuristics for the Process Industry," European Journal of Operational Research, 59, 3, 413-424.
    • (1992) European Journal of Operational Research , vol.59 , Issue.3 , pp. 413-424
    • Heuts, R.M.J.1    Seidel, H.P.2    Selen, W.J.3
  • 11
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations-i. MILP formulation
    • KONDILI, E., C. C. PANTELIDES, AND R. W. H. SARGENT (1993), "A General Algorithm for Short-term Scheduling of Batch Operations-I. MILP Formulation," Computers and Chemical Engineering, 17, 2, 211-227.
    • (1993) Computers and Chemical Engineering , vol.17 , Issue.2 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 12
    • 0025414711 scopus 로고
    • Scheduling in serial multiproduct batch processes with due-date penalties
    • KU, H. AND I. KARIMI (1990), "Scheduling in Serial Multiproduct Batch Processes with Due-Date Penalties," Industrial and Chemical Engineering Research, 29, 4, 580-590.
    • (1990) Industrial and Chemical Engineering Research , vol.29 , Issue.4 , pp. 580-590
    • Ku, H.1    Karimi, I.2
  • 14
    • 0028501041 scopus 로고
    • Heuristic algorithm for scheduling batch and semi-continuous plants with production deadlines, intermediate storage limitations and equipment changeover costs
    • KUDVA, G., A. ELKAMEL, J. F. PEKNY, AND G. V. REKLAITIS (1994), "Heuristic Algorithm for Scheduling Batch and Semi-Continuous Plants with Production Deadlines, Intermediate Storage Limitations and Equipment Changeover Costs," Computers and Chemical Engineering, 18, 9, 859-875.
    • (1994) Computers and Chemical Engineering , vol.18 , Issue.9 , pp. 859-875
    • Kudva, G.1    Elkamel, A.2    Pekny, J.F.3    Reklaitis, G.V.4
  • 16
    • 0026186998 scopus 로고
    • Scheduling of a multipurpose batch plant using a graphically derive mixed-integer linear program
    • PATSIDOU, E. P. AND J. C. KANTOR (1991), "Scheduling of a Multipurpose Batch Plant Using a Graphically Derive Mixed-Integer Linear Program," Industrial and Chemical Engineering Research, 30, 7, 1548-1561.
    • (1991) Industrial and Chemical Engineering Research , vol.30 , Issue.7 , pp. 1548-1561
    • Patsidou, E.P.1    Kantor, J.C.2
  • 17
    • 0025492187 scopus 로고
    • An exact parallel algorithm for scheduling when production costs depend on consecutive system states
    • PEKNY, J. F., D. L. MILLER, AND G. J. MCRAE (1990), "An Exact Parallel Algorithm for Scheduling when Production Costs Depend on Consecutive System States," Computers and Chemical Engineering, 14, 7, 1009-1023.
    • (1990) Computers and Chemical Engineering , vol.14 , Issue.7 , pp. 1009-1023
    • Pekny, J.F.1    Miller, D.L.2    McRae, G.J.3
  • 18
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: A review of algorithms and complexity
    • POTTS, C. N. AND L. N. VAN WASSENHOVE (1992), "Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity," Journal of Operational Research Society, 43, 5, 395-406.
    • (1992) Journal of Operational Research Society , vol.43 , Issue.5 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 20
    • 0039771472 scopus 로고
    • The big advantage offered by batch processing is flexibility
    • RIPPIN, D. W. (1991), "The Big Advantage Offered by Batch Processing is Flexibility," Chemical Engineering, 98, 5, 101-107.
    • (1991) Chemical Engineering , vol.98 , Issue.5 , pp. 101-107
    • Rippin, D.W.1
  • 21
    • 0025701545 scopus 로고
    • Operational production planning in a chemical manufacturing environment
    • SELEN, W. J. AND R. M. J. HEUTS (1990), "Operational Production Planning in a Chemical Manufacturing Environment," European Journal of Operational Research, 45, 1, 38-46.
    • (1990) European Journal of Operational Research , vol.45 , Issue.1 , pp. 38-46
    • Selen, W.J.1    Heuts, R.M.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.