메뉴 건너뛰기




Volumn 6, Issue 1, 1997, Pages 74-96

O(m2) algorithms for the two and three sublot lot streaming problem

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0013283833     PISSN: 10591478     EISSN: None     Source Type: Journal    
DOI: 10.1111/j.1937-5956.1997.tb00416.x     Document Type: Article
Times cited : (10)

References (15)
  • 2
    • 84985818856 scopus 로고
    • Solution Procedures for the Lot Streaming Problem
    • _ AND D. F. PYKE (1990), "Solution Procedures for the Lot Streaming Problem," Decision Sciences, 21, No. 2, 475-491.
    • (1990) Decision Sciences , vol.21 , Issue.2 , pp. 475-491
    • Pyke, D.F.1
  • 4
    • 0001738801 scopus 로고
    • Note on Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model
    • GOYAL, S. K. (1976), "Note on Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model," Management Science, 23, No. 3, 332-334.
    • (1976) Management Science , vol.23 , Issue.3 , pp. 332-334
    • Goyal, S.K.1
  • 5
    • 38249040429 scopus 로고
    • Overlapping Operations in Material Requirements Planning
    • GRAVES, S. C. AND M. M. KOSTREVA (1986), "Overlapping Operations in Material Requirements Planning," Journal of Operations Management, 6, No. 3, 283-294.
    • (1986) Journal of Operations Management , vol.6 , Issue.3 , pp. 283-294
    • Graves, S.C.1    Kostreva, M.M.2
  • 6
    • 0021503050 scopus 로고
    • OPT Uncovered: Many production scheduling concepts can be applied with or without the Software
    • JAKOBS, F. R. (1984), "OPT Uncovered: Many production scheduling concepts can be applied with or without the Software," Industrial Engineering, 16, No. 10, 32-41.
    • (1984) Industrial Engineering , vol.16 , Issue.10 , pp. 32-41
    • Jakobs, F.R.1
  • 8
    • 0024925432 scopus 로고
    • Flow Shop Scheduling with Lot Streaming
    • POTTS, C. N. AND K. R. BAKER (1989), "Flow Shop Scheduling with Lot Streaming," Operations Research Letters, 8, No. 2, 297-303.
    • (1989) Operations Research Letters , vol.8 , Issue.2 , pp. 297-303
    • Potts, C.N.1    Baker, K.R.2
  • 9
    • 0016572027 scopus 로고
    • Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model
    • SZENDROVITS, A. Z. (1975), "Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model," Management Science, 22, No. 3, 298-308.
    • (1975) Management Science , vol.22 , Issue.3 , pp. 298-308
    • Szendrovits, A.Z.1
  • 10
    • 0001658657 scopus 로고
    • On the Optimality of Sub-batch Sizes for a Multi-stage EPQ Model-a Rejoinder
    • _ (1976), "On the Optimality of Sub-batch Sizes for a Multi-stage EPQ Model-A Rejoinder," Management Science, 23, No. 3, 334-338.
    • (1976) Management Science , vol.23 , Issue.3 , pp. 334-338
  • 11
    • 0020752313 scopus 로고
    • Non-integer Optimal Lot Size Ratios in Two-stage Production/Inventory Systems
    • _ (1983), "Non-integer Optimal Lot Size Ratios in Two-stage Production/Inventory Systems," International Journal of Production Research, 21, No. 3, 323-336.
    • (1983) International Journal of Production Research , vol.21 , Issue.3 , pp. 323-336
  • 14
    • 0346132951 scopus 로고
    • Working Paper No. 262, The Amos Tuck School of Business Administration, Dartmouth College, Hanover, NH
    • _ AND K. R. BAKER (1991), Basic Techniques for Lot Streaming, Working Paper No. 262, The Amos Tuck School of Business Administration, Dartmouth College, Hanover, NH.
    • (1991) Basic Techniques for Lot Streaming
    • Baker, K.R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.