-
1
-
-
0001255490
-
A computational study of local search algorithm for job shop scheduling
-
Aarts, E. H. L., van Laarhoven, P. J. M., Lenstra, J. K., and Ulder, N. L. J., 1994, A computational study of local search algorithm for job shop scheduling. ORSA Journal of Computing, 6, 118- 129.
-
(1994)
ORSA Journal of Computing
, vol.6
-
-
Aarts, E.H.L.1
Van Laarhoven, P.J.M.2
Lenstra, J.K.3
Ulder, N.L.J.4
-
2
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
Adams, j., Balas, E., and Zawack, D., 1988, The shifting bottleneck procedure for job shop scheduling. Management Science, 34, 391-401.
-
(1988)
Management Science
, vol.34
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
3
-
-
0028429339
-
A review of machine learning in scheduling
-
Aytug, H., Bhattacharyya, S., Koehler, G. J., and Snowdon, J. L., 1994, A review of machine learning in scheduling. IEEE Transactions on Engineering Management, 41(2), 165-171.
-
(1994)
IEEE Transactions on Engineering Management
, vol.41
, Issue.2
, pp. 165-171
-
-
Aytug, H.1
Bhattacharyya, S.2
Koehler, G.J.3
Snowdon, J.L.4
-
4
-
-
3743122514
-
Analysis of dispatching policies in semiconductor post-test operations
-
Azrak, M., and Lee, C.-Y., 1993, Analysis of dispatching policies in semiconductor post-test operations. Journal of Electronic Manufacturing, 3, 145- 157.
-
(1993)
Journal of Electronic Manufacturing
, vol.3
-
-
Azrak, M.1
Lee, C.-Y.2
-
5
-
-
0012245221
-
The effects of input control on the performance of a simple scheduling model
-
Baker, K. R., 1984, The effects of input control on the performance of a simple scheduling model. Journal of Operations Management, 4(2), 99-112.
-
(1984)
Journal of Operations Management
, vol.4
, Issue.2
, pp. 99-112
-
-
Baker, K.R.1
-
6
-
-
0345405332
-
-
Technical Report OPR91-06, Graduate Program in Operations Research, University of Texas at Austin
-
Barnes, J. W., and Chambers, J. B., 1991, Solving the job shop scheduling problem using tabu search. Technical Report OPR91-06, Graduate Program in Operations Research, University of Texas at Austin.
-
(1991)
Solving the Job Shop Scheduling Problem Using Tabu Search
-
-
Barnes, J.W.1
Chambers, J.B.2
-
7
-
-
0001096735
-
Genetics and random keys for sequencing and optimization
-
Bean, J. C., 1994, Genetics and random keys for sequencing and optimization. ORSA Journal of Computing, 6, 154-160.
-
(1994)
ORSA Journal of Computing
, vol.6
, pp. 154-160
-
-
Bean, J.C.1
-
8
-
-
0024017013
-
OPAL: A multi-knowledge-based system for industrial job-shop scheduling
-
Bensana, E., Bel, G., and Dubois, D., 1988, OPAL: a multi-knowledge-based system for industrial job-shop scheduling. International Journal of Production Research, 26(5), 795- 819.
-
(1988)
International Journal of Production Research
, vol.26
, Issue.5
-
-
Bensana, E.1
Bel, G.2
Dubois, D.3
-
9
-
-
0021819411
-
Thermodynamical approach to the traveling salesman problem: An efficient simulation algorithm
-
Cerny, V., 1985, Thermodynamical approach to the traveling salesman problem: an efficient simulation algorithm. Journal of Optimization Theory and Applications, 45, 41.
-
(1985)
Journal of Optimization Theory and Applications
, vol.45
, pp. 41
-
-
Cerny, V.1
-
12
-
-
0011746295
-
-
DAI, Politecnico di Torino, Italy
-
Della Croce, F., Tadei, R., and Volta, G., 1992, A genetic algorithm for the job shop problem. DAI, Politecnico di Torino, Italy.
-
(1992)
A Genetic Algorithm for the Job Shop Problem
-
-
Della Croce, F.1
Tadei, R.2
Volta, G.3
-
13
-
-
0003592819
-
-
Reading, MA: Addison-Wesley)
-
Fischler, M. A., and Firschein, O., 1987, Intelligence: The Eye, the Brain and the Computer, (Reading, MA: Addison-Wesley).
-
(1987)
Intelligence: The Eye, the Brain and the Computer
-
-
Fischler, M.A.1
Firschein, O.2
-
14
-
-
1342318735
-
-
Planning and Scheduling Group, McDonnell Douglas Space Systems, Houston, Texas
-
Fox, B. R., and McMahon, M. B., 1990, Genetic operators for sequencing problems. Planning and Scheduling Group, McDonnell Douglas Space Systems, Houston, Texas.
-
(1990)
Genetic Operators for Sequencing Problems.
-
-
Fox, B.R.1
Mc Mahon, M.B.2
-
15
-
-
84982522109
-
ISIS-a knowledge-based system for factory scheduling
-
Fox, M. S., and Smith, S. F., 1984, ISIS-a knowledge-based system for factory scheduling. Expert Systems, 1(1), 25-49.
-
(1984)
Expert Systems
, vol.1
, Issue.1
, pp. 25-49
-
-
Fox, M.S.1
Smith, S.F.2
-
16
-
-
0023964289
-
Closed-loop job release control for vlsi circuit manufacturing
-
Glassey, C. R., and Resende, M. G. C., 1988, Closed-loop job release control for vlsi circuit manufacturing. IEEE Transactions on Semiconductor Manufacturing, 1, 36-46.
-
(1988)
IEEE Transactions on Semiconductor Manufacturing
, vol.1
, pp. 36-46
-
-
Glassey, C.R.1
Resende, M.G.C.2
-
17
-
-
84989487658
-
Heuristics for integer programming using surrogate constraints
-
Glover, F., 1977, Heuristics for integer programming using surrogate constraints. Decision Sciences, 8(1), 156-166.
-
(1977)
Decision Sciences
, vol.8
, Issue.1
, pp. 156-166
-
-
Glover, F.1
-
18
-
-
0003722376
-
-
Reading, MA: Addison-Wesley)
-
Goldberg, D. E., 1989, Genetic Algorithms in Search, Optimization, and Machine Learning (Reading, MA: Addison-Wesley).
-
(1989)
Genetic Algorithms in Search, Optimization, and Machine Learning
-
-
Goldberg, D.E.1
-
19
-
-
0027906589
-
-
Gupta, M. C., Gupta, Y. P., and Kumar, a., 1993, Minimizing flow time variance in a single machine system using genetic algorithm, 70, 289-303.
-
(1993)
Minimizing Flow Time Variance in a Single Machine System Using Genetic Algorithm
, vol.70
, pp. 289-303
-
-
Gupta, M.C.1
Gupta, Y.P.2
Kumar, A.3
-
20
-
-
0000498552
-
Solving a class scheduling problem with a genetic algorithm
-
Herrmann, J. W., and Lee, C.-Y., 1995, Solving a class scheduling problem with a genetic algorithm. ORSA Journal of Computing, 7, 443-452.
-
(1995)
ORSA Journal of Computing
, vol.7
, pp. 443-452
-
-
Herrmann, J.W.1
Lee, C.-Y.2
-
21
-
-
84987038873
-
Global job shop scheduling with a genetic algorithm
-
Herrmann, J. W., Lee, C.-Y., and Hinchman, J., 1995, Global job shop scheduling with a genetic algorithm. Production and Operations Management, 4, 30-44.
-
(1995)
Production and Operations Management
, vol.4
, pp. 30-44
-
-
Herrmann, J.W.1
Lee, C.-Y.2
Hinchman, J.3
-
23
-
-
0016319331
-
A loading and balancing methodology for job shop control
-
Irastorza, J. C., and Deane, R. H., 1974, A loading and balancing methodology for job shop control. AIIE Transactions, 6(4), 302-307.
-
(1974)
AIIE Transactions
, vol.6
, Issue.4
, pp. 302-307
-
-
Irastorza, J.C.1
Deane, R.H.2
-
24
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrick, S., Gelatt, C. D., and Vecchi, M. P., 1983, Optimization by simulated annealing. Science, 220, 671.
-
(1983)
Science
, vol.220
, pp. 671
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Vecchi, M.P.3
-
25
-
-
0001892853
-
Genetic algorithm for schedule optimization
-
May, 23-27
-
Lawton, G., 1992, Genetic algorithm for schedule optimization. AI Expert, May, 23-27.
-
(1992)
AI Expert
-
-
Lawton, G.1
-
26
-
-
45149135939
-
An evaluation of order releasing and due date assignment heuristics in a cellular manufacturing system
-
Mahmoodi, F., Dooley, K. J., and Starr, P. J., 1990, An evaluation of order releasing and due date assignment heuristics in a cellular manufacturing system. Journal of Operations Management, 9, 548-573.
-
(1990)
Journal of Operations Management
, vol.9
, pp. 548-573
-
-
Mahmoodi, F.1
Dooley, K.J.2
Starr, P.J.3
-
27
-
-
0003657544
-
-
Working paper 03-44-88, Graduate School of Business, University of Texas at Austin
-
Matsuo, H., Suh, C. J., and Sullivan, R. S., 1988, Controlled search simulated annealing for general job shop scheduling problem. Working paper 03-44-88, Graduate School of Business, University of Texas at Austin.
-
(1988)
Controlled Search Simulated Annealing for General Job Shop Scheduling Problem
-
-
Matsuo, H.1
Suh, C.J.2
Sullivan, R.S.3
-
28
-
-
0024700372
-
Order review/release: Research issues and perspectives
-
Melnyk, S. A., and Ragatz, G. L., 1989, Order review/release: research issues and perspectives. International Journal of Production Research, 27(7), 1081 - 1096.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.7
-
-
Melnyk, S.A.1
Ragatz, G.L.2
-
29
-
-
0000809619
-
Load smoothing by the planning and order review/release systems: A simulation experiment
-
Melnyk, S. A., Ragatz, G. L., and Fredendall, L., 1991, Load smoothing by the planning and order review/release systems: a simulation experiment. Journal of Operations Management, 10(4), 512-523.
-
(1991)
Journal of Operations Management
, vol.10
, Issue.4
, pp. 512-523
-
-
Melnyk, S.A.1
Ragatz, G.L.2
Fredendall, L.3
-
33
-
-
0026819312
-
Dynamic scheduling system utilizing machine learning as a knowledge acquisition tool
-
Nakasuka, S., and Yoshida, T., 1992, Dynamic scheduling system utilizing machine learning as a knowledge acquisition tool. International Journal of Production Research, 30(2), 411 - 431.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.2
-
-
Nakasuka, S.1
Yoshida, T.2
-
34
-
-
0001443508
-
A shifting bottleneck algorithm for scheduling semiconductor testing operations
-
Ovacik, I. M., and Uzsoy, R., 1992, A shifting bottleneck algorithm for scheduling semiconductor testing operations. Journal of Electronics Manufacturing, 199-134.
-
(1992)
Journal of Electronics Manufacturing
, pp. 134-199
-
-
Ovacik, I.M.1
Uzsoy, R.2
-
35
-
-
0003387679
-
Viewing scheduling as an opportunistic problem-solving process
-
Ow, P. S., and Smith, S. F., 1988, Viewing scheduling as an opportunistic problem-solving process. Annals of Operations Research, 12, 85-108.
-
(1988)
Annals of Operations Research
, vol.12
, pp. 85-108
-
-
Ow, P.S.1
Smith, S.F.2
-
36
-
-
0003054955
-
A survey of scheduling rules
-
Panwalker, S. S., and Iskander, W., 1977, A survey of scheduling rules. Operations Research, 25, 45-61.
-
(1977)
Operations Research
, vol.25
, pp. 45-61
-
-
Panwalker, S.S.1
Iskander, W.2
-
37
-
-
0003438602
-
-
Englewood Cliff's, NJ: Prentice-Hall)
-
Pinedo, M., 1995, Scheduling: Theory, Algorithms, and Systems (Englewood Cliff's, NJ: Prentice-Hall).
-
(1995)
Scheduling: Theory, Algorithms, and Systems
-
-
Pinedo, M.1
-
38
-
-
0028426236
-
Learning-based scheduling in a flexible manufacturing flow line
-
Piramuthu, S., Raman, N., and Shaw, M. J., 1994, Learning-based scheduling in a flexible manufacturing flow line. IEEE Transactions on Engineering M anagement, 41(2), 172-182.
-
(1994)
IEEE Transactions on Engineering M Anagement
, vol.41
, Issue.2
, pp. 172-182
-
-
Piramuthu, S.1
Raman, N.2
Shaw, M.J.3
-
39
-
-
0025405266
-
Decision trees and decision making
-
Quinlan, J. R., 1990, Decision trees and decision making. IEEE Transactions on Systems, Man and Cybernetics, 20, 339-346.
-
(1990)
IEEE Transactions on Systems, Man and Cybernetics
, vol.20
, pp. 339-346
-
-
Quinlan, J.R.1
-
40
-
-
84985757538
-
An evaluation of order release mechanism in a job-shop environment
-
Ragatz, G. L., and Mabert, V. A., 1988, An evaluation of order release mechanism in a job-shop environment. Decision Sciences, 19, 167-189.
-
(1988)
Decision Sciences
, vol.19
, pp. 167-189
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
42
-
-
85023439567
-
MICRO-BOSS: A micro-opportunistic factory scheduler
-
The Robotics Institute, Carnegie Mellon university, Pittsburgh, Pennsylvania
-
Sadeh, N., 1991, MICRO-BOSS: a micro-opportunistic factory scheduler. Center for Integrated Manufacturing Decision Systems, The Robotics Institute, Carnegie Mellon university, Pittsburgh, Pennsylvania.
-
(1991)
Center for Integrated Manufacturing Decision Systems
-
-
Sadeh, N.1
-
43
-
-
84940644968
-
A mathematical theory of communication
-
Shannon, C. E., 1948, A mathematical theory of communication. Bell Systems Technological Journal, 27, 379-423.
-
(1948)
Bell Systems Technological Journal
, vol.27
, pp. 379-423
-
-
Shannon, C.E.1
-
44
-
-
0000936343
-
Intelligent scheduling with machine learning capabilities: The induction of scheduling knowledge
-
Shaw, M. J., Park, S. C., and Raman, N., 1992, Intelligent scheduling with machine learning capabilities: the induction of scheduling knowledge. IIE Transactions, 24(2), 156-168.
-
(1992)
IIE Transactions
, vol.24
, Issue.2
, pp. 156-168
-
-
Shaw, M.J.1
Park, S.C.2
Raman, N.3
-
45
-
-
0021467239
-
Input scheduling and load balance control for a job shop
-
Shimoyashiro, S., Isoda, K., and Awane, H., 1984, Input scheduling and load balance control for a job shop. International Journal of Production Research, 22(4), 597-605.
-
(1984)
International Journal of Production Research
, vol.22
, Issue.4
, pp. 597-605
-
-
Shimoyashiro, S.1
Isoda, K.2
Awane, H.3
-
46
-
-
0009743850
-
Constructing and maintaining detailed production plans: Investigations into the development of knowledge-based factory scheduling systems
-
Smith, S. F., Fox, M. S., and Ow, P. S., 1986, Constructing and maintaining detailed production plans: investigations into the development of knowledge-based factory scheduling systems. AI Magazine, 7(4), 45-61.
-
(1986)
AI Magazine
, vol.7
, Issue.4
, pp. 45-61
-
-
Smith, S.F.1
Fox, M.S.2
Ow, P.S.3
-
47
-
-
0025430443
-
CONWIP: A pull alternative to kanban
-
Spearman, M. L., Woodruff, D. L., and Hopp, W. J., 1990, CONWIP: A pull alternative to kanban. International Journal of Production Research, 28, 879.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 879
-
-
Spearman, M.L.1
Woodruff, D.L.2
Hopp, W.J.3
-
48
-
-
0026930899
-
New search spaces for sequencing problems with application to job shop scheduling
-
Storer, R. H., Wu, S. D., and Vaccari, R., 1992, New search spaces for sequencing problems with application to job shop scheduling. Management Science, 38(10), 1495-1509.
-
(1992)
Management Science
, vol.38
, Issue.10
, pp. 1495-1509
-
-
Storer, R.H.1
Wu, S.D.2
Vaccari, R.3
-
49
-
-
0000892122
-
Parallel taboo search techniques for the job shop scheduling problems
-
Taillard, E., 1994, Parallel taboo search techniques for the job shop scheduling problems. ORSA Journal of Computing, 6, 108-117.
-
(1994)
ORSA Journal of Computing
, vol.6
, pp. 108-117
-
-
Taillard, E.1
-
50
-
-
0026461248
-
Job shop scheduling by simulated annealing
-
van Laarhoven, P. J. M., Aarts, E. H. L., and Lenstra, J. K., 1992, Job shop scheduling by simulated annealing. Operations Research, 40, 113-126.
-
(1992)
Operations Research
, vol.40
, pp. 113-126
-
-
Van Laarhoven, P.J.M.1
Aarts, E.H.L.2
Lenstra, J.K.3
-
52
-
-
0001868119
-
Scheduling problems and the traveling salesman: The genetic edge recombination operators
-
Whitley, D., Starkweather, T., and Fuquay, D., 1989, Scheduling problems and the traveling salesman: the genetic edge recombination operators. Proceedings of the Third International Conference on Genetic Algorithms, 133-140.
-
(1989)
Proceedings of the Third International Conference on Genetic Algorithms
, pp. 133-140
-
-
Whitley, D.1
Starkweather, T.2
Fuquay, D.3
|