메뉴 건너뛰기




Volumn 35, Issue 8, 1997, Pages 2253-2268

Solutions to a modified tool loading problem for a single FMM

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; CONCURRENCY CONTROL; HEURISTIC METHODS; OPTIMIZATION; PROCESS CONTROL; PRODUCTION CONTROL; SCHEDULING;

EID: 0031197384     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075497194831     Document Type: Article
Times cited : (14)

References (14)
  • 1
    • 0024140442 scopus 로고
    • A heuristic for minimizing the number of tool switches on a flexible machine
    • Bard, J. F., 1988, A heuristic for minimizing the number of tool switches on a flexible machine. IIE Transactions, 20, 382-391.
    • (1988) IIE Transactions , vol.20 , pp. 382-391
    • Bard, J.F.1
  • 4
    • 0025511381 scopus 로고
    • Rationalizing tool selection in a flexible manufacturing sytem for sheet-metal products
    • Daskin, M., Jones, P. C. and Lowe, T. J., 1990, Rationalizing tool selection in a flexible manufacturing sytem for sheet-metal products. Operations Research, 38, 1104-1115.
    • (1990) Operations Research , vol.38 , pp. 1104-1115
    • Daskin, M.1    Jones, P.C.2    Lowe, T.J.3
  • 6
    • 0002437073 scopus 로고
    • Automated tooling in a flexible manufacturing system
    • April
    • Kiran, A. S. and Krason, R. j., 1988, Automated tooling in a flexible manufacturing system. Industrial Engineering, April, 52-57.
    • (1988) Industrial Engineering , pp. 52-57
    • Kiran, A.S.1    Krason, R.J.2
  • 8
    • 0027187518 scopus 로고
    • Concurrent part assignment and tool allocation in FMS with material handling considerations
    • Leung, L. C., Maheshwari, S. K. and Miller, W. A., 1993, Concurrent part assignment and tool allocation in FMS with material handling considerations. International Journal of Production Research, 31 (1), 117-138.
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 117-138
    • Leung, L.C.1    Maheshwari, S.K.2    Miller, W.A.3
  • 11
    • 0020718128 scopus 로고
    • Formulation and solution of nonlinear integer planning problems for FMS
    • Stecke, K. E., 1983, Formulation and solution of nonlinear integer planning problems for FMS. Management Science, 29, 273-288.
    • (1983) Management Science , vol.29 , pp. 273-288
    • Stecke, K.E.1
  • 13
    • 0024070715 scopus 로고
    • Models arising from a flexible manufacturing machine, part I: Minimization of the number of tool switches
    • Tang, C. S. and Denardo, E. V., 1988a, Models arising from a flexible manufacturing machine, part I: minimization of the number of tool switches. Operations Research, 36 (5), 767-777.
    • (1988) Operations Research , vol.36 , Issue.5 , pp. 767-777
    • Tang, C.S.1    Denardo, E.V.2
  • 14
    • 0024071392 scopus 로고
    • Models arising from a flexible manufacturing machine, part II: Minimization of the number of switching instants
    • Tang, C. S. and Denardo, E. V., 1988b, Models arising from a flexible manufacturing machine, part II: minimization of the number of switching instants. Operations Research, 36 (5), 778-784.
    • (1988) Operations Research , vol.36 , Issue.5 , pp. 778-784
    • Tang, C.S.1    Denardo, E.V.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.