-
1
-
-
0022794511
-
A branch and bound approach for machine load balancing in flexible manufacturing systems
-
Berrada, M., and Stecke, K. E., 1986, A branch and bound approach for machine load balancing in flexible manufacturing systems. Management Science, 32, 1316-1335.
-
(1986)
Management Science
, vol.32
, pp. 1316-1335
-
-
Berrada, M.1
Stecke, K.E.2
-
2
-
-
0022812077
-
Work scheduling in FMS under tool availability constraints
-
Carrie, A. S., and Perera, D. T. S., 1986, Work scheduling in FMS under tool availability constraints. International Journal of Production Research, 24, 1299-1308.
-
(1986)
International Journal of Production Research
, vol.24
, pp. 1299-1308
-
-
Carrie, A.S.1
Perera, D.T.S.2
-
3
-
-
0026254174
-
Effect of loading and routeing decisions on performance of flexible manufacturing systems
-
Chen, I. J., and Chung, C.-H., 1991, Effect of loading and routeing decisions on performance of flexible manufacturing systems. International Journal of Production Research, 29, 2209-2225.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 2209-2225
-
-
Chen, I.J.1
Chung, C.-H.2
-
4
-
-
0008195477
-
PATHSIM, a modular simulator for an automatic tool handling system evaluation in FMS
-
Crite, G. D., Mills, R. I., and Talavage, J. J., 1985, PATHSIM, a modular simulator for an automatic tool handling system evaluation in FMS. Journal of Manufacturing Systems, 4, 15-28.
-
(1985)
Journal of Manufacturing Systems
, vol.4
, pp. 15-28
-
-
Crite, G.D.1
Mills, R.I.2
Talavage, J.J.3
-
5
-
-
0009444821
-
Loading problems with tool management in flexible manufacturing systems: A few integer programming models
-
de Werra, D., and Widmer, M., 1991, Loading problems with tool management in flexible manufacturing systems: a few integer programming models. International Journal of Flexible Manufacturing Systems, 3, 71-82.
-
(1991)
International Journal of Flexible Manufacturing Systems
, vol.3
, pp. 71-82
-
-
De Werra, D.1
Widmer, M.2
-
6
-
-
0018685640
-
Evaluation of a heuristic for scheduling independent jobs on parallel identical processors
-
Dogramaci, A., and Surkis, J., 1979, Evaluation of a heuristic for scheduling independent jobs on parallel identical processors. Management Science, 25, 1208-1216.
-
(1979)
Management Science
, vol.25
, pp. 1208-1216
-
-
Dogramaci, A.1
Surkis, J.2
-
7
-
-
0027591340
-
A synthesis of decision models for tool management in automated manufacturing
-
Gray, A. E., Seidmann, A., and Stecke, K. E., 1990, A synthesis of decision models for tool management in automated manufacturing. Management Science, 39, 549-567.
-
(1990)
Management Science
, vol.39
, pp. 549-567
-
-
Gray, A.E.1
Seidmann, A.2
Stecke, K.E.3
-
8
-
-
0027904991
-
Flexible manufacturing system: An investigation for research and applications
-
Gunasekaran, A., Martikainen, T., and Yli-Olli, P., 1993, Flexible manufacturing system: an investigation for research and applications. European Journal of Operational Research, 66, 1-26.
-
(1993)
European Journal of Operational Research
, vol.66
, pp. 1-26
-
-
Gunasekaran, A.1
Martikainen, T.2
Yli-Olli, P.3
-
9
-
-
0028273650
-
Performance analysis of a LIM-based high-speed tool delivery system for machining
-
Hahn, H. S., and Sanders, J. L., 1994, Performance analysis of a LIM-based high-speed tool delivery system for machining. International Journal of Production Research, 32, 170-207.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 170-207
-
-
Hahn, H.S.1
Sanders, J.L.2
-
10
-
-
0024716540
-
Real-time tool control and job dispatching in flexible manufacturing systems
-
Han, M. H., Na, Y. K., and Hogg, G. L., 1989, Real-time tool control and job dispatching in flexible manufacturing systems. International Journal of Production Research, 27, 1257-1267.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1257-1267
-
-
Han, M.H.1
Na, Y.K.2
Hogg, G.L.3
-
11
-
-
0021649152
-
The impact of tooling in flexible manufacturing
-
Illinois, National Machine Tool Builders’ Association
-
Hankins, S. L., and Rovito, V. P., 1984, The impact of tooling in flexible manufacturing. Proceedings of the 2nd Biennial International Machine Tool Technical Conference, Illinois, National Machine Tool Builders’ Association, pp. 175-198.
-
(1984)
Proceedings of the 2Nd Biennial International Machine Tool Technical Conference
, pp. 175-198
-
-
Hankins, S.L.1
Rovito, V.P.2
-
12
-
-
0025430088
-
A comparison of dispatching rules for job shops with multiple identical jobs and alternative routeings
-
Kim, Y.-D., 1990, A comparison of dispatching rules for job shops with multiple identical jobs and alternative routeings. International Journal of Production Research, 28, 953-962.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 953-962
-
-
Kim, Y.-D.1
-
13
-
-
0027342202
-
Heuristic approach for loading problems in flexible manufacturing systems
-
Kim, Y-D., and Yano, C. A., 1993, Heuristic approach for loading problems in flexible manufacturing systems. IIE Transactions, 25 (1), 26-39.
-
(1993)
IIE Transactions
, vol.25
, Issue.1
, pp. 26-39
-
-
Kim, Y.-D.1
Yano, C.A.2
-
14
-
-
0028516733
-
A new branch and bound algorithm for loading problems in flexible manufacturing systems
-
Kim, Y.-D., and Yano, C. A., 1994a, A new branch and bound algorithm for loading problems in flexible manufacturing systems. International Journal of Flexible Manufacturing Systems, 6, 361-382.
-
(1994)
International Journal of Flexible Manufacturing Systems
, vol.6
, pp. 361-382
-
-
Kim, Y.-D.1
Yano, C.A.2
-
15
-
-
0028434049
-
A due date-based approach to part type selection in flexible manufacturing systems
-
Kim, Y.-D., and Yano, C. A., 1994b, A due date-based approach to part type selection in flexible manufacturing systems. International Journal of Production Research, 32, 1027-1043.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1027-1043
-
-
Kim, Y.-D.1
Yano, C.A.2
-
16
-
-
3342901509
-
-
Working paper, Florida International University, Miami, Florida
-
Koulamas, C. P., 1993, An effective heuristic for the parallel machine tardiness problem. Working paper, Florida International University, Miami, Florida.
-
(1993)
An Effective Heuristic for the Parallel Machine Tardiness Problem.
-
-
Koulamas, C.P.1
-
17
-
-
0028550668
-
The total tardiness problem: Review and extensions
-
Koulamas, C. P., 1994, The total tardiness problem: review and extensions. Operations Research, 42, 1025-1041.
-
(1994)
Operations Research
, vol.42
, pp. 1025-1041
-
-
Koulamas, C.P.1
-
18
-
-
0040163321
-
Parts and tools handling systems
-
A. Kusiak (ed.) (Amsterdam: Elsevier Science
-
Kusiak, A., 1986, Parts and tools handling systems. In Modeling and Design of Flexible Manufacturing Systems, A. Kusiak (ed.) (Amsterdam: Elsevier Science), pp. 99-109.
-
(1986)
Modeling and Design of Flexible Manufacturing Systems
, pp. 99-109
-
-
Kusiak, A.1
-
19
-
-
0026850995
-
A comparison of tool management strategies and part selection rules for flexible manufacturing systems
-
Kwasi, A.-G., Meredith, J. R., and Raturi, A., 1992, A comparison of tool management strategies and part selection rules for flexible manufacturing systems. International Journal of Production Research, 30, 733-748.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 733-748
-
-
Kwasi, A.-G.1
Meredith, J.R.2
Raturi, A.3
-
20
-
-
0027187518
-
Concurrent part assignment and tool assignment in FMS with material handling considerations
-
Leung, L. C., Maheshwari, S. K., and Miller, W. A., 1993, Concurrent part assignment and tool assignment in FMS with material handling considerations. International Journal of Production Research, 31, 117-138.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 117-138
-
-
Leung, L.C.1
Maheshwari, S.K.2
Miller, W.A.3
-
22
-
-
0023385664
-
Loading a flexible manufacturing system
-
O’ Grady, P. J., and Menon, U., 1987, Loading a flexible manufacturing system. International Journal of Production Research, 25, 1053-1068.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 1053-1068
-
-
O’ Grady, P.J.1
Menon, U.2
-
23
-
-
0027906584
-
A heuristic for the single machine tardiness problem
-
Panwalkar, S. S., Smith, M. L., and Koulamas, C. P., 1993, A heuristic for the single machine tardiness problem. European Journal of Operational Research, 70, 304-310.
-
(1993)
European Journal of Operational Research
, vol.70
, pp. 304-310
-
-
Panwalkar, S.S.1
Smith, M.L.2
Koulamas, C.P.3
-
24
-
-
0008229813
-
A heuristic algorithm for tool loading and scheduling in a flexible manufacturing system with an automatic tool transporter
-
Park, S.-S., and Kim, Y.-D., 1995, A heuristic algorithm for tool loading and scheduling in a flexible manufacturing system with an automatic tool transporter. Journal of the Korean Institute of Industrial Engineers, 21, 119-135.
-
(1995)
Journal of the Korean Institute of Industrial Engineers
, vol.21
, pp. 119-135
-
-
Park, S.-S.1
Kim, Y.-D.2
-
25
-
-
0020205577
-
A decomposition algorithm for the single machine total tardiness problem
-
Potts, C. N., and van Wassenhove, L. N., 1982, A decomposition algorithm for the single machine total tardiness problem. Operations Research Letters, 1, 177-181.
-
(1982)
Operations Research Letters
, vol.1
, pp. 177-181
-
-
Potts, C.N.1
Van Wassenhove, L.N.2
-
26
-
-
0022060472
-
A loading and dispatching problem in random flexible manufacturing systems
-
Shanker, K., and Tzen, Y.-J. J., 1985, A loading and dispatching problem in random flexible manufacturing systems. International Journal of Production Research, 23, 579-595.
-
(1985)
International Journal of Production Research
, vol.23
, pp. 579-595
-
-
Shanker, K.1
Tzen, Y.-J.J.2
-
27
-
-
0006511103
-
Heuristic algorithm for the tool movement policy in flexible manufacturing systems
-
Song, C.-Y., Hwang, H., and Kim, Y.-D., 1995, Heuristic algorithm for the tool movement policy in flexible manufacturing systems. Journal of Manufacturing Systems, 14, 160-168.
-
(1995)
Journal of Manufacturing Systems
, vol.14
, pp. 160-168
-
-
Song, C.-Y.1
Hwang, H.2
Kim, Y.-D.3
-
28
-
-
0022676091
-
A hierarchical approach to solving machine grouping and loading problems for flexible manufacturing systems
-
Stecke, K. E., 1986, A hierarchical approach to solving machine grouping and loading problems for flexible manufacturing systems. European Journal of Operational Research, 24, 369-378.
-
(1986)
European Journal of Operational Research
, vol.24
, pp. 369-378
-
-
Stecke, K.E.1
-
29
-
-
0026923507
-
Planning and scheduling approaches to operate a particular FMS
-
Stecke, K. E., 1992, Planning and scheduling approaches to operate a particular FMS. European Journal of Operational Research, 61, 273-291.
-
(1992)
European Journal of Operational Research
, vol.61
, pp. 273-291
-
-
Stecke, K.E.1
-
30
-
-
84952242943
-
Loading and control policies for a flexible manufacturing system
-
Stecke, K. E., and Solberg, J. J., 1981, Loading and control policies for a flexible manufacturing system. International Journal of Production Research, 19, 481-490.
-
(1981)
International Journal of Production Research
, vol.19
, pp. 481-490
-
-
Stecke, K.E.1
Solberg, J.J.2
-
31
-
-
0022940876
-
Tooling concept for FMS
-
K. Rathmill (ed.) (New York: IFS Publications
-
Tomek, P., 1986, Tooling concept for FMS. Proceedings of the 5th International Conference of FMS, K. Rathmill (ed.) (New York: IFS Publications), pp. 315-326.
-
(1986)
Proceedings of the 5Th International Conference of FMS
, pp. 315-326
-
-
Tomek, P.1
-
32
-
-
34249836688
-
Cutting-tool in computer-integrated manufacturing
-
Veeramani, D., Upon, D. M., and Barash, M. M., 1992, Cutting-tool in computer-integrated manufacturing. International Journal of Flexible Manufacturing Systems, 4, 237-265.
-
(1992)
International Journal of Flexible Manufacturing Systems
, vol.4
, pp. 237-265
-
-
Veeramani, D.1
Upon, D.M.2
Barash, M.M.3
-
33
-
-
0015128399
-
An improved algorithm for scheduling independent tasks
-
Wilkerson, L. J., and Irwin, J. D., 1971, An improved algorithm for scheduling independent tasks. AIIE Transactions, 3, 239-245.
-
(1971)
AIIE Transactions
, vol.3
, pp. 239-245
-
-
Wilkerson, L.J.1
Irwin, J.D.2
|