메뉴 건너뛰기




Volumn 92, Issue 3, 1996, Pages 628-636

A fuzzy-linguistic approach to a multi-criteria sequencing problem

Author keywords

Fuzzy sets; Linguistic variables; Multiple criteria; Scheduling

Indexed keywords

ALGORITHMIC LANGUAGES; FUZZY SETS; MATHEMATICAL MODELS; PROBLEM SOLVING; PRODUCTION CONTROL; SCHEDULING;

EID: 0030576471     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/0377-2217(95)00091-7     Document Type: Article
Times cited : (60)

References (25)
  • 1
    • 0027286812 scopus 로고
    • Single stage minimum absolute lateness problem with a common due date on non-identical machines
    • Alidaee, B., and Panwalkar, S.S., "Single stage minimum absolute lateness problem with a common due date on non-identical machines", Journal of the Operational Research Society 44/1 (1993) 29-36.
    • (1993) Journal of the Operational Research Society , vol.44 , Issue.1 , pp. 29-36
    • Alidaee, B.1    Panwalkar, S.S.2
  • 2
    • 0023440150 scopus 로고
    • Minimizing absolute and squared deviations of completion times with different earliness and tardiness penalties and a common due date
    • Bagghi, U., Chang, Y.L., and Sullivan, R.S., "Minimizing absolute and squared deviations of completion times with different earliness and tardiness penalties and a common due date", Naval Research Logistics 34 (1987) 803-810.
    • (1987) Naval Research Logistics , vol.34 , pp. 803-810
    • Bagghi, U.1    Chang, Y.L.2    Sullivan, R.S.3
  • 3
    • 0024017013 scopus 로고
    • Opal: A multi-knowledge-based system for industrial job-shop scheduling
    • Bensana, E., Bel, G., and Dubois, D., "Opal: A multi-knowledge-based system for industrial job-shop scheduling", International Journal of Production Research 26 (1988) 795-819.
    • (1988) International Journal of Production Research , vol.26 , pp. 795-819
    • Bensana, E.1    Bel, G.2    Dubois, D.3
  • 5
    • 0025230059 scopus 로고
    • A note on a partial search algorithm for the single-machine common due date assignment and sequencing problem
    • Cheng, T.C.E., "A note on a partial search algorithm for the single-machine common due date assignment and sequencing problem", Computers & Operations Research 17 (1990) 321-324.
    • (1990) Computers & Operations Research , vol.17 , pp. 321-324
    • Cheng, T.C.E.1
  • 6
    • 84974859431 scopus 로고
    • A heuristic for common due-date assignment and job scheduling on parallel machines
    • Cheng, T.C.E., "A heuristic for common due-date assignment and job scheduling on parallel machines", Journal of the Operational Research Society 40/12 (1989) 1129-1135.
    • (1989) Journal of the Operational Research Society , vol.40 , Issue.12 , pp. 1129-1135
    • Cheng, T.C.E.1
  • 7
    • 0026154209 scopus 로고
    • On the multiple-machine extension to a common due-date assignment and scheduling problem
    • De, P., Ghosh, J.B., and Wells, C.E., "On the multiple-machine extension to a common due-date assignment and scheduling problem", Journal of the Operational Research Society 42/5 (1991) 419-422.
    • (1991) Journal of the Operational Research Society , vol.42 , Issue.5 , pp. 419-422
    • De, P.1    Ghosh, J.B.2    Wells, C.E.3
  • 8
    • 0023531467 scopus 로고
    • Scheduling to a common due date on parallel uniform processors
    • Emmons, H., "Scheduling to a common due date on parallel uniform processors", Naval Research Logistics 34 (1987) 803-810.
    • (1987) Naval Research Logistics , vol.34 , pp. 803-810
    • Emmons, H.1
  • 9
    • 0000093567 scopus 로고
    • An adaptive approach to defuzzification based on level sets
    • Filev, D.P. and Yager, R.R., "An adaptive approach to defuzzification based on level sets", Fuzzy Sets and Systems 54 (1993) 355-360.
    • (1993) Fuzzy Sets and Systems , vol.54 , pp. 355-360
    • Filev, D.P.1    Yager, R.R.2
  • 11
    • 0000855797 scopus 로고
    • A framework for single-machine multiple objectives sequencing research
    • Fry, T.D., Armstrong, R.D., and Lewis, H., "A framework for single-machine multiple objectives sequencing research", Omega 17 (1989) 595-607.
    • (1989) Omega , vol.17 , pp. 595-607
    • Fry, T.D.1    Armstrong, R.D.2    Lewis, H.3
  • 15
    • 38249001791 scopus 로고
    • A proposal for a defuzzification strategy by the concept of sensitivity analysis
    • Mabuchi, S., "A proposal for a defuzzification strategy by the concept of sensitivity analysis", Fuzzy Sets and Systems 55 (1993) 1-14.
    • (1993) Fuzzy Sets and Systems , vol.55 , pp. 1-14
    • Mabuchi, S.1
  • 17
    • 0020103079 scopus 로고
    • Common due date assignment to minimize total penalty for the one machine scheduling problem
    • Panwalkar, S.S., Smith, M.L., and Seidmann, A., "Common due date assignment to minimize total penalty for the one machine scheduling problem", Operation Research 30 (1982) 391-399.
    • (1982) Operation Research , vol.30 , pp. 391-399
    • Panwalkar, S.S.1    Smith, M.L.2    Seidmann, A.3
  • 18
    • 0001497209 scopus 로고
    • Using fuzzy set theory in a scheduling problem: A case study
    • Prade, H.M., "Using fuzzy set theory in a scheduling problem: A case study", Fuzzy Sets and Systems 2 (1979) 153-165.
    • (1979) Fuzzy Sets and Systems , vol.2 , pp. 153-165
    • Prade, H.M.1
  • 19
    • 0026881321 scopus 로고
    • Application of a measure of proximity to fuzzy control algorithms
    • Pappis, C.P., "Application of a measure of proximity to fuzzy control algorithms", European Journal of Operational Research 59 (1992) 330-332.
    • (1992) European Journal of Operational Research , vol.59 , pp. 330-332
    • Pappis, C.P.1
  • 20
    • 0009981746 scopus 로고
    • A comparative assessment of measures of similarity of fuzzy values
    • Pappis, C.P., and Karacapilidis, N.I., "A comparative assessment of measures of similarity of fuzzy values", Fuzzy Sets and Systems 56 (1993) 171-174.
    • (1993) Fuzzy Sets and Systems , vol.56 , pp. 171-174
    • Pappis, C.P.1    Karacapilidis, N.I.2
  • 22
    • 0001497209 scopus 로고
    • Using fuzzy set theory in a scheduling problem: A case study
    • Prade, H.M., "Using fuzzy set theory in a scheduling problem: A case study", Fuzzy Sets and Systems 2 (1979) 153-165.
    • (1979) Fuzzy Sets and Systems , vol.2 , pp. 153-165
    • Prade, H.M.1
  • 23
    • 0019055358 scopus 로고
    • Two single machine sequencing problems involving controllable job processing times
    • Vickson, R.G., "Two single machine sequencing problems involving controllable job processing times", AIIE Transactions 12 (1980) 258-262.
    • (1980) AIIE Transactions , vol.12 , pp. 258-262
    • Vickson, R.G.1
  • 24
    • 43949169345 scopus 로고
    • On the issue of defuzzification and selection based on a fuzzy set
    • Yager, R.R., and Filev, D.P., "On the issue of defuzzification and selection based on a fuzzy set", Fuzzy Sets and Systems 55 (1993) 255-271.
    • (1993) Fuzzy Sets and Systems , vol.55 , pp. 255-271
    • Yager, R.R.1    Filev, D.P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.