Volumn 35, Issue 1, 1997, Pages 101-122

Formulations and heuristics for scheduling in a buffer-constrained flowshop and flowline-based manufacturing cell with different buffer-space requirements for jobs: Part 2

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRAINT THEORY; HEURISTIC METHODS; MATHEMATICAL MODELS; OPERATIONS RESEARCH; OPTIMIZATION; PERTURBATION TECHNIQUES; SCHEDULING; STRATEGIC PLANNING;

EID: 0030737841     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075497196000     Document Type: Article
Times cited : (7)

References (18)
  • 2
    • 84986958388 scopus 로고
    • A review of kanban production control research literature
    • Berkley, B. J., 1992, A review of kanban production control research literature. Production and Operations Management, 1, 393-411.
    • (1992) Production and Operations Management , vol.1 , pp. 393-411
    • Berkley, B.J.1
  • 3
    • 0014807274 scopus 로고
    • A heuristic algorithm for the n-job, m-machine sequencing problem
    • Campbell, H. G., Dudek, R. A., and Smith, M. L., 1970, A heuristic algorithm for the n-job, m-machine sequencing problem. Management Science, 16, B630-B637.
    • (1970) Management Science , vol.16 , pp. B630-B637
    • Campbell, H.G.1    Dudek, R.A.2    Smith, M.L.3
  • 4
    • 0017516618 scopus 로고
    • An evaluation of flowshop sequencing heuristics
    • Dannenbring, D. G., 1977, An evaluation of flowshop sequencing heuristics. Management Science, 23, 1174-1182.
    • (1977) Management Science , vol.23 , pp. 1174-1182
    • Dannenbring, D.G.1
  • 7
    • 0026156181 scopus 로고
    • A new heuristic for then-job, m-machine flowshop problem
    • Ho, J. C., and Chang, Y. L., 1991, A new heuristic for then-job, m-machine flowshop problem. European Journal of Operational Research, 52, 194-202.
    • (1991) European Journal of Operational Research , vol.52 , pp. 194-202
    • Ho, J.C.1    Chang, Y.L.2
  • 8
    • 0000177367 scopus 로고
    • Application of the branch and bound technique to some flowship scheduling problems
    • Ignall, E., and Schrage, L., 1965, Application of the branch and bound technique to some flowship scheduling problems. Operations Research, 13, 400-412.
    • (1965) Operations Research , vol.13 , pp. 400-412
    • Ignall, E.1    Schrage, L.2
  • 9
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules
    • Johnson, S. M., 1954, Optimal two- and three-stage production schedules. Naval Research Logistics Quarterly, 1, 61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 10
    • 0001057408 scopus 로고
    • Flowshop sequencing problems with limited buffer storage
    • Leisten, R., 1990, Flowshop sequencing problems with limited buffer storage. International Journal of Production Research, 28, 2085-2100.
    • (1990) International Journal of Production Research , vol.28 , pp. 2085-2100
    • Leisten, R.1
  • 13
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job flowshop sequencing problem
    • Nawaz, M., Enscore, E. E., and Ham, I., 1983, A heuristic algorithm for the m-machine, n-job flowshop sequencing problem. Omega, 11, 91-95.
    • (1983) Omega , vol.11 , pp. 91-95
    • Nawaz, M.1    Enscore, E.E.2    Ham, I.3
  • 15
    • 0027542699 scopus 로고
    • Heuristic algorithm for scheduling in a flowshop to minimize total flowtime
    • Rajendran, C., 1993, Heuristic algorithm for scheduling in a flowshop to minimize total flowtime. International Journal of Production Economics, 29, 65-73.
    • (1993) International Journal of Production Economics , vol.29 , pp. 65-73
    • Rajendran, C.1
  • 17
    • 0027814376 scopus 로고
    • Scheduling in a cellular manufacturing system-a simulated annealing approach
    • Sridhar, j., and Rajendran, C., 1993, Scheduling in a cellular manufacturing system-a simulated annealing approach. International Journal of Production Research, 31, 2927-2945.
    • (1993) International Journal of Production Research , vol.31 , pp. 2927-2945
    • Sridhar, J.1    Rajendran, C.2
  • 18
    • 0024700013 scopus 로고
    • A new heuristic method for the flowshop sequencing problem
    • Widmer, M., and Hertz, A., 1989, A new heuristic method for the flowshop sequencing problem. European Journal of Operational Research, 41, 186-193.
    • (1989) European Journal of Operational Research , vol.41 , pp. 186-193
    • Widmer, M.1    Hertz, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.