A review of kanban production control research literature
-
Berkley, B. J., 1992, A review of kanban production control research literature. Production and Operations Management, 1, 393-411.
-
(1992)
Production and Operations Management
, vol.1
, pp. 393-411
-
-
Berkley, B.J.1
-
3
-
-
0014807274
-
A heuristic algorithm for the n-job, m-machine sequencing problem
-
Campbell, H. G., Dudek, R. A., and Smith, M. L., 1970, A heuristic algorithm for the n-job, m-machine sequencing problem. Management Science, 16, B630-B637.
-
(1970)
Management Science
, vol.16
, pp. B630-B637
-
-
Campbell, H.G.1
Dudek, R.A.2
Smith, M.L.3
-
4
-
-
0017516618
-
An evaluation of flowshop sequencing heuristics
-
Dannenbring, D. G., 1977, An evaluation of flowshop sequencing heuristics. Management Science, 23, 1174-1182.
-
(1977)
Management Science
, vol.23
, pp. 1174-1182
-
-
Dannenbring, D.G.1
-
6
-
-
0017961934
-
Four simple heuristics for scheduling a flowshop
-
Gelders, F. L., and Sambandam, N., 1978, Four simple heuristics for scheduling a flowshop. International Journal of Production Research, 16, 221-231.
-
(1978)
International Journal of Production Research
, vol.16
, pp. 221-231
-
-
Gelders, F.L.1
Sambandam, N.2
-
7
-
-
0026156181
-
A new heuristic for then-job, m-machine flowshop problem
-
Ho, J. C., and Chang, Y. L., 1991, A new heuristic for then-job, m-machine flowshop problem. European Journal of Operational Research, 52, 194-202.
-
(1991)
European Journal of Operational Research
, vol.52
, pp. 194-202
-
-
Ho, J.C.1
Chang, Y.L.2
-
8
-
-
0000177367
-
Application of the branch and bound technique to some flowship scheduling problems
-
Ignall, E., and Schrage, L., 1965, Application of the branch and bound technique to some flowship scheduling problems. Operations Research, 13, 400-412.
-
(1965)
Operations Research
, vol.13
, pp. 400-412
-
-
Ignall, E.1
Schrage, L.2
-
9
-
-
0003075019
-
Optimal two- and three-stage production schedules
-
Johnson, S. M., 1954, Optimal two- and three-stage production schedules. Naval Research Logistics Quarterly, 1, 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
10
-
-
0001057408
-
Flowshop sequencing problems with limited buffer storage
-
Leisten, R., 1990, Flowshop sequencing problems with limited buffer storage. International Journal of Production Research, 28, 2085-2100.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 2085-2100
-
-
Leisten, R.1
-
11
-
-
0002605720
-
Analysis for minimizing weighted mean flow-time in flow-shop scheduling
-
Miyazaki, S., and Nishiyama, N., 1980, Analysis for minimizing weighted mean flow-time in flow-shop scheduling. Journal of the Operations Research Society of Japan, 23, 118-132.
-
(1980)
Journal of the Operations Research Society of Japan
, vol.23
, pp. 118-132
-
-
Miyazaki, S.1
Nishiyama, N.2
-
12
-
-
0000652687
-
An adjacent pairwise approach to the mean flow-time scheduling problem
-
Miyazaki, S., Nishiyama, N., and Hashimoto, F., 1978, An adjacent pairwise approach to the mean flow-time scheduling problem. Journal of the Operations Research Society of Japan, 21, 287-299.
-
(1978)
Journal of the Operations Research Society of Japan
, vol.21
, pp. 287-299
-
-
Miyazaki, S.1
Nishiyama, N.2
Hashimoto, F.3
-
13
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flowshop sequencing problem
-
Nawaz, M., Enscore, E. E., and Ham, I., 1983, A heuristic algorithm for the m-machine, n-job flowshop sequencing problem. Omega, 11, 91-95.
-
(1983)
Omega
, vol.11
, pp. 91-95
-
-
Nawaz, M.1
Enscore, E.E.2
Ham, I.3
-
15
-
-
0027542699
-
Heuristic algorithm for scheduling in a flowshop to minimize total flowtime
-
Rajendran, C., 1993, Heuristic algorithm for scheduling in a flowshop to minimize total flowtime. International Journal of Production Economics, 29, 65-73.
-
(1993)
International Journal of Production Economics
, vol.29
, pp. 65-73
-
-
Rajendran, C.1
-
16
-
-
40649092338
-
A flowshop scheduling algorithm to minimize total flowtime
-
Rajendran, C., and Chaudhuri, D., 1991, A flowshop scheduling algorithm to minimize total flowtime. Journal of the Operations Research Society of Japan, 34, 28-46.
-
(1991)
Journal of the Operations Research Society of Japan
, vol.34
, pp. 28-46
-
-
Rajendran, C.1
Chaudhuri, D.2
-
17
-
-
0027814376
-
Scheduling in a cellular manufacturing system-a simulated annealing approach
-
Sridhar, j., and Rajendran, C., 1993, Scheduling in a cellular manufacturing system-a simulated annealing approach. International Journal of Production Research, 31, 2927-2945.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2927-2945
-
-
Sridhar, J.1
Rajendran, C.2
-
18
-
-
0024700013
-
A new heuristic method for the flowshop sequencing problem
-
Widmer, M., and Hertz, A., 1989, A new heuristic method for the flowshop sequencing problem. European Journal of Operational Research, 41, 186-193.
-
(1989)
European Journal of Operational Research
, vol.41
, pp. 186-193
-
-
Widmer, M.1
Hertz, A.2
|