메뉴 건너뛰기




Volumn 35, Issue 9, 1997, Pages 2379-2396

Simultaneous scheduling of workpieces, fixtures and cutting tools within flexible machining cells

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER CONTROL; COMPUTER SIMULATION; MACHINING; NUMERICAL CONTROL SYSTEMS; PRODUCTION CONTROL; SCHEDULING;

EID: 0031233993     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075497194552     Document Type: Article
Times cited : (20)

References (74)
  • 1
    • 3743145757 scopus 로고
    • An object-oriented architecture for knowledge-based production scheduling systems
    • Adiga, S., and Lin, W. T., 1993, An object-oriented architecture for knowledge-based production scheduling systems. Journal of Intelligent Manufacturing, 4 (2), 139-150.
    • (1993) Journal of Intelligent Manufacturing , vol.4 , Issue.2 , pp. 139-150
    • Adiga, S.1    Lin, W.T.2
  • 3
    • 0026850995 scopus 로고
    • A comparison of tool management strategies and part selection rules for a flexible manufacturing system
    • Amoako-Gyampah, K., Meredith, J. R., and Raturi, A., 1992, A comparison of tool management strategies and part selection rules for a flexible manufacturing system. International Journal of Production Research, 30 (4), 733-748.
    • (1992) International Journal of Production Research , vol.30 , Issue.4 , pp. 733-748
    • Amoako-Gyampah, K.1    Meredith, J.R.2    Raturi, A.3
  • 6
    • 0020013653 scopus 로고
    • A state-of-the-art survey of dispatching rules for manufacturing job shop operations
    • Blackstone, J. H., Phillips, T., and Hogg, G. L., 1982, A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research, 20 (1), 27-45.
    • (1982) International Journal of Production Research , vol.20 , Issue.1 , pp. 27-45
    • Blackstone, J.H.1    Phillips, T.2    Hogg, G.L.3
  • 7
    • 0024769152 scopus 로고
    • Implementing a loading heuristic in a discrete release job shop
    • Bobrowski, P. M., 1989, Implementing a loading heuristic in a discrete release job shop. International Journal of Production Research, 27 (11), 1935-1948.
    • (1989) International Journal of Production Research , vol.27 , Issue.11 , pp. 1935-1948
    • Bobrowski, P.M.1
  • 8
    • 38249011351 scopus 로고
    • Neighbourhood search-based optimisation algorithms for production scheduling: A survey
    • Branddimarte, P., 1992, Neighbourhood search-based optimisation algorithms for production scheduling: a survey. Computer Integrated Manufacturing Systems, 5 (2), 167-176.
    • (1992) Computer Integrated Manufacturing Systems , vol.5 , Issue.2 , pp. 167-176
    • Branddimarte, P.1
  • 10
    • 0026908992 scopus 로고
    • Flow shop scheduling in serial multi-product processes with transfer and set-up times
    • Cao, J., and Bedworth, D. D., 1992, Flow shop scheduling in serial multi-product processes with transfer and set-up times. International Journal of Production Research, 30 (8), 1819-1830.
    • (1992) International Journal of Production Research , vol.30 , Issue.8 , pp. 1819-1830
    • Cao, J.1    Bedworth, D.D.2
  • 12
    • 0026254174 scopus 로고
    • Effects of loading and routeing decisions on performance of flexible manufacturing systems
    • Chen, I. J., and Chung, C. H., 1991, Effects of loading and routeing decisions on performance of flexible manufacturing systems. International Journal of Production Research, 29 (11), 2209-2225.
    • (1991) International Journal of Production Research , vol.29 , Issue.11 , pp. 2209-2225
    • Chen, I.J.1    Chung, C.H.2
  • 13
    • 0023983109 scopus 로고
    • Simulation study of job shop scheduling with due dates
    • Cheng, T C. E., 1988, Simulation study of job shop scheduling with due dates. International Journal of System Science, 19 (3), 383-390.
    • (1988) International Journal of System Science , vol.19 , Issue.3 , pp. 383-390
    • Cheng, T.C.E.1
  • 14
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng, T. C. E., and Gupta, M. C., 1989, Survey of scheduling research involving due date determination decisions. European Journal of Operational Research, 156-166.
    • (1989) European Journal of Operational Research , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 15
    • 3743055582 scopus 로고
    • Chippenham, UK: The CIMulation Centre)
    • CIMulation Centre, 1994, pReACTOR User Manuals. (Chippenham, UK: The CIMulation Centre).
    • (1994) Preactor User Manuals
  • 16
    • 3743101273 scopus 로고
    • Artificial intelligence in production scheduling
    • Clark, M., and Farhoodi, F., 1987, Artificial intelligence in production scheduling. ESPERIT 87, pp. 1662-1670.
    • (1987) ESPERIT , vol.87 , pp. 1662-1670
    • Clark, M.1    Farhoodi, F.2
  • 19
    • 84982522109 scopus 로고
    • ISIS-a knowledge-based system for factory scheduling
    • Fox, M. S., and Smith, S. F., 1984, ISIS-a knowledge-based system for factory scheduling. Expert Systems, 1 (1), 25-49.
    • (1984) Expert Systems , vol.1 , Issue.1 , pp. 25-49
    • Fox, M.S.1    Smith, S.F.2
  • 22
    • 0026883892 scopus 로고
    • Tooling constraints and shop floor scheduling: Evaluating the impact of sequence dependency
    • Ghosh, S., Melnyk, S. A., and Ragatz, G. L., 1992, Tooling constraints and shop floor scheduling: evaluating the impact of sequence dependency. International Journal of Production Research, 30 (6), 1237-1253.
    • (1992) International Journal of Production Research , vol.30 , Issue.6 , pp. 1237-1253
    • Ghosh, S.1    Melnyk, S.A.2    Ragatz, G.L.3
  • 23
    • 0027591340 scopus 로고
    • A synthesis of decision models for tool management in automated manufacturing
    • Gray, A. E., Seidmann, A., and Stecke, K. E., 1993, A synthesis of decision models for tool management in automated manufacturing. Management Science, 39 (5), 549-567.
    • (1993) Management Science , vol.39 , Issue.5 , pp. 549-567
    • Gray, A.E.1    Seidmann, A.2    Stecke, K.E.3
  • 27
    • 0027577264 scopus 로고
    • Operations planning and scheduling problems in advanced manufacturing systems
    • Gupta, M. C., Gupta, Y. P., and Evans, G. W., 1993, Operations planning and scheduling problems in advanced manufacturing systems. International Journal of Production Research, 31 (4), 869-900.
    • (1993) International Journal of Production Research , vol.31 , Issue.4 , pp. 869-900
    • Gupta, M.C.1    Gupta, Y.P.2    Evans, G.W.3
  • 29
    • 0004221362 scopus 로고
    • (Lake Geneva, Switzerland: Manufacturing Technologies Press)
    • Hoffman, E. G., 1987, Modular Fixturing (Lake Geneva, Switzerland: Manufacturing Technologies Press).
    • (1987) Modular Fixturing
    • Hoffman, E.G.1
  • 31
    • 3743104569 scopus 로고
    • Optimal two- and three-stage production schedules with setup times included
    • J. F. Muth, and G. L. Thompson (eds) (Englewood Cliffs, NJ: Prentice Hall), Chapter 2
    • Johnson, S. M., 1963, Optimal two- and three-stage production schedules with setup times included. In Industrial Scheduling, J. F. Muth, and G. L. Thompson (eds) (Englewood Cliffs, NJ: Prentice Hall), Chapter 2.
    • (1963) Industrial Scheduling
    • Johnson, S.M.1
  • 33
    • 0027928107 scopus 로고
    • Intermediate tool requirement planning for FMS
    • Khator, S. K., and Leung, C. L., 1994, Intermediate tool requirement planning for FMS. Journal of Manufacturing Systems, 13 (1), 9-19.
    • (1994) Journal of Manufacturing Systems , vol.13 , Issue.1 , pp. 9-19
    • Khator, S.K.1    Leung, C.L.2
  • 34
    • 0027342202 scopus 로고
    • Heuristic approaches for loading problems in flexible manufacturing systems
    • Kim, Y.-D., and Yano, C. A., 1993, Heuristic approaches for loading problems in flexible manufacturing systems. IIE Transactions, 25 (1), 26-39.
    • (1993) IIE Transactions , vol.25 , Issue.1 , pp. 26-39
    • Kim, Y.-D.1    Yano, C.A.2
  • 35
    • 0028434049 scopus 로고
    • A due date-based approach to part type selection in flexible manufacturing systems
    • Kim, Y.-D., and Yano, C. A., 1994, A due date-based approach to part type selection in flexible manufacturing systems. International Journal of Production Research, 32 (5), 1027-1043.
    • (1994) International Journal of Production Research , vol.32 , Issue.5 , pp. 1027-1043
    • Kim, Y.-D.1    Yano, C.A.2
  • 39
    • 0029393210 scopus 로고
    • Estimating flowtimes and setting due-dates in complex production systems
    • Lawrence, S. R., 1995, Estimating flowtimes and setting due-dates in complex production systems. IIE Transaction, 27, 657-668.
    • (1995) IIE Transaction , vol.27 , pp. 657-668
    • Lawrence, S.R.1
  • 40
    • 3743124788 scopus 로고
    • Integration of MRP II, CAPP and integrated tool management system (ITMS)
    • V. C. Venkatesh and J. A. Mcgeough (eds) (Holland: Elsevier)
    • Lee, K. T, and Chua, T. J., 1991, Integration of MRP II, CAPP and integrated tool management system (ITMS). Proceedings of the 8th Computer-Aided Production Engineering Conference, V. C. Venkatesh and J. A. Mcgeough (eds) (Holland: Elsevier), pp. 293-303.
    • (1991) Proceedings of the 8Th Computer-Aided Production Engineering Conference , pp. 293-303
    • Lee, K.T.1    Chua, T.J.2
  • 41
    • 0001057408 scopus 로고
    • Flowshop sequencing problems with limited buffer storage
    • Leisten, R., 1990, Flowshop sequencing problems with limited buffer storage. International Journal of Production Research, 28 (11), 2085-2100.
    • (1990) International Journal of Production Research , vol.28 , Issue.11 , pp. 2085-2100
    • Leisten, R.1
  • 43
    • 0027146758 scopus 로고
    • Addressing the gap in scheduling research: A review of optimisation and heuristic methods in production scheduling
    • MacCarthy, B. L., and Liu, J., 1993, Addressing the gap in scheduling research: a review of optimisation and heuristic methods in production scheduling. International Journal of Production Research, 31 (1), 59-79.
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 59-79
    • Maccarthy, B.L.1    Liu, J.2
  • 44
    • 0026365483 scopus 로고
    • Real-time control of a manufacturing cell using knowledge-based simulation
    • Phoenix, Arizona
    • Manivannan, S., and Banks, J., 1991, Real-time control of a manufacturing cell using knowledge-based simulation. Proceedings of the 1991 Winter Simulation Conference, Phoenix, Arizona, pp. 251-260.
    • (1991) Proceedings of the 1991 Winter Simulation Conference , pp. 251-260
    • Manivannan, S.1    Banks, J.2
  • 45
    • 0029247581 scopus 로고
    • Review of research in tooling technology, process modelling and proess planning, part 1: Tooling and process modelling
    • Maropoulos, P. G., 1995a, Review of research in tooling technology, process modelling and proess planning, part 1: Tooling and process modelling. Journal of Computer Integrated Manufacturing Systems, 8 (1), 5-12.
    • (1995) Journal of Computer Integrated Manufacturing Systems , vol.8 , Issue.1 , pp. 5-12
    • Maropoulos, P.G.1
  • 46
    • 0029244195 scopus 로고
    • Review of research in tooling technology, process modelling and process planning, part 2: Process planning
    • Maropoulos, P. G., 1995b, Review of research in tooling technology, process modelling and process planning, part 2: Process planning. Journal of Computer Integrated Manufacturing Systems, 8 (1), 13-20.
    • (1995) Journal of Computer Integrated Manufacturing Systems , vol.8 , Issue.1 , pp. 13-20
    • Maropoulos, P.G.1
  • 48
    • 0029341931 scopus 로고
    • Model and solution approaches for part movement minimisation and load balancing in FMS with machine, tool and process planning flexibilities
    • Modi, B. K., and Shanker, K., 1995, Model and solution approaches for part movement minimisation and load balancing in FMS with machine, tool and process planning flexibilities. International Journal of Production Research, 33 (7), 1791-1816.
    • (1995) International Journal of Production Research , vol.33 , Issue.7 , pp. 1791-1816
    • Modi, B.K.1    Shanker, K.2
  • 49
    • 0006531923 scopus 로고
    • Dynamic manufacturing scheduling with Petri-net modelling and constraint based editing
    • V. C. Venkatesh and J. A. Mcgeough (eds) (Holland: Elsevier
    • Mori, K., Tsukiyama, M., and Fukuda, T, 1991, Dynamic manufacturing scheduling with Petri-net modelling and constraint based editing. Proceeding of the 8th Computer-Aided Production Engineering Conference, V. C. Venkatesh and J. A. Mcgeough (eds) (Holland: Elsevier), pp. 477-486.
    • (1991) Proceeding of the 8Th Computer-Aided Production Engineering Conference , pp. 477-486
    • Mori, K.1    Tsukiyama, M.2    Fukuda, T.3
  • 54
    • 0029482935 scopus 로고
    • Role of simulation in planning and control of flexible machining cells
    • Arlington, USA
    • Rahimifard, S., and Newman, S. T. 1995, Role of simulation in planning and control of flexible machining cells. Proceedings of the Winter Simulation Conference, Arlington, USA, pp. 793-798.
    • (1995) Proceedings of the Winter Simulation Conference , pp. 793-798
    • Rahimifard, S.1    Newman, S.T.2
  • 56
    • 3743136999 scopus 로고    scopus 로고
    • A framework of strategies for economic manufacture in flexible batch machining applications-part 1: The strategies
    • to be submitted
    • Rahimaifard, S., and Newman, S. T., 1997a, A framework of strategies for economic manufacture in flexible batch machining applications-part 1: The strategies. Journal of Manufacturing Systems, to be submitted.
    • (1997) Journal of Manufacturing Systems
    • Rahimaifard, S.1    Newman, S.T.2
  • 57
    • 3743059009 scopus 로고    scopus 로고
    • A framework of strategies for economic manufacture in flexible batch machining applications-part 2: The experimental studies
    • to be submitted
    • Rahimifard, S., and Newman, S. T., 1997b, A framework of strategies for economic manufacture in flexible batch machining applications-part 2: The experimental studies. Journal of Manufacturing Systems, to be submitted.
    • (1997) Journal of Manufacturing Systems
    • Rahimifard, S.1    Newman, S.T.2
  • 59
    • 0024053466 scopus 로고
    • A generic tool management system architecture for flexible manufacturing systems (FMS)
    • Ranky, P. G., 1988, A generic tool management system architecture for flexible manufacturing systems (FMS). Robotica, 6, 221-234.
    • (1988) Robotica , vol.6 , pp. 221-234
    • Ranky, P.G.1
  • 60
    • 0002436155 scopus 로고
    • On-line simulation for real-time scheduling of manufacturing systems
    • Rogers, P., and Flanagan, M. T., 1991, On-line simulation for real-time scheduling of manufacturing systems. Industrial Engienering, pp. 37-40.
    • (1991) Industrial Engienering , pp. 37-40
    • Rogers, P.1    Flanagan, M.T.2
  • 61
    • 0026866144 scopus 로고
    • Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system
    • Sabuncuoglu, I., and Hommertzheim, D. L., 1992, Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system. International Journal of Production Research, 30 (5), 1059-1079.
    • (1992) International Journal of Production Research , vol.30 , Issue.5 , pp. 1059-1079
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 62
    • 0000936343 scopus 로고
    • Intelligent scheduling with machine learning capabilities: The introduction of scheduling knowledge
    • Shaw, M. J., Park, S., and Raman, N., 1992, Intelligent scheduling with machine learning capabilities: the introduction of scheduling knowledge. IIE Transactions, 24 (2), 156-168.
    • (1992) IIE Transactions , vol.24 , Issue.2 , pp. 156-168
    • Shaw, M.J.1    Park, S.2    Raman, N.3
  • 65
    • 0343699908 scopus 로고
    • Design, planning, scheduling and control problems of flexible manufacturing systems
    • M. Oliff (ed.) (New York: Benjamin/ Cummings Publishing
    • Stecke, K. E., 1988, Design, planning, scheduling and control problems of flexible manufacturing systems. In Intelligent Manufacturing, M. Oliff (ed.) (New York: Benjamin/ Cummings Publishing), 189-198.
    • (1988) Intelligent Manufacturing , pp. 189-198
    • Stecke, K.E.1
  • 67
    • 0010842658 scopus 로고
    • A due date-based dispatching rule for flexible manufacturing systems
    • Stoeva, S. P., 1990, A due date-based dispatching rule for flexible manufacturing systems. International Journal of Production Research, 28 (11), 1991-1999.
    • (1990) International Journal of Production Research , vol.28 , Issue.11 , pp. 1991-1999
    • Stoeva, S.P.1
  • 68
    • 3743112389 scopus 로고
    • Intelligent scheduling of sequence dependent set-up times using neural network
    • Manchester, UK
    • Suh, T. J., and Esat, I. I., 1993, Intelligent scheduling of sequence dependent set-up times using neural network. Proceedings of the 30th International Matador Conference, Manchester, UK, pp. 381-385.
    • (1993) Proceedings of the 30Th International Matador Conference , pp. 381-385
    • Suh, T.J.1    Esat, I.I.2
  • 69
    • 0011782101 scopus 로고
    • Sewickley, US: System Modeling Corporation)
    • Systems Modeling Corporation, 1994, ARENA User Manuals. (Sewickley, US: System Modeling Corporation).
    • (1994) ARENA User Manuals
  • 71
    • 3743114656 scopus 로고
    • Integration of cutting-tool management with shop-floor control in flexible machining systems
    • (ed.) (London: Chapman & Hall), Chapter
    • Veeramani, D., 1994, Integration of cutting-tool management with shop-floor control in flexible machining systems. In Computer Control of Flexible Manufacturing Systems, S. B. Joshi (ed.) (London: Chapman & Hall), Chapter 15, pp. 405-426.
    • (1994) Computer Control of Flexible Manufacturing Systems, S. B. Joshi , vol.15 , pp. 405-426
    • Veeramani, D.1
  • 73
    • 0026854481 scopus 로고
    • Dispatching rules and flexible environments: The influence on the buffer behaviour
    • Zavanella, L., Agliari, A., and Diligent, M., 1992, Dispatching rules and flexible environments: the influence on the buffer behaviour. International Journal of Production Research, 30 (4), 749-772.
    • (1992) International Journal of Production Research , vol.30 , Issue.4 , pp. 749-772
    • Zavanella, L.1    Agliari, A.2    Diligent, M.3
  • 74
    • 0024899145 scopus 로고
    • Scheduling in a manufacturing shop with sequence-dependent setups
    • Zhou, C., and Egbelu, P. J., 1989, Scheduling in a manufacturing shop with sequence-dependent setups. Robotics and Computer-Integrated Manufacturing, 5 (1), 73-81.
    • (1989) Robotics and Computer-Integrated Manufacturing , vol.5 , Issue.1 , pp. 73-81
    • Zhou, C.1    Egbelu, P.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.