메뉴 건너뛰기




Volumn 36, Issue 7, 1998, Pages 1801-1824

Part type selection, machine loading and part type volume determination problems in FMS planning

Author keywords

[No Author keywords available]

Indexed keywords

HEURISTIC PROGRAMMING; MATHEMATICAL PROGRAMMING; PERFORMANCE; PLANNING; PROBLEM SOLVING;

EID: 0032121744     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075498192977     Document Type: Article
Times cited : (33)

References (42)
  • 1
    • 0028466353 scopus 로고
    • A comparison of tool management and part selection approaches for a varying part type mix
    • Amoako-Gyampah, K., 1994, A comparison of tool management and part selection approaches for a varying part type mix. International Journal of Flexible Manufacturing Systems, 6, 179-207.
    • (1994) International Journal of Flexible Manufacturing Systems , vol.6 , pp. 179-207
    • Amoako-Gyampah, K.1
  • 2
    • 0026850995 scopus 로고
    • A comparison of tool management and part selection rules for a flexible manufacturing system
    • Amoako-Gyampah, K., Meredith, J. R., and Raturi, A., 1992, A comparison of tool management and part selection rules for a flexible manufacturing system. International Journal of Production Research, 30 (4), 733-748.
    • (1992) International Journal of Production Research , vol.30 , Issue.4 , pp. 733-748
    • Amoako-Gyampah, K.1    Meredith, J.R.2    Raturi, A.3
  • 3
    • 0023964447 scopus 로고
    • Flexibility in the manufacturing system: Definitions and petrinet modelling
    • Berrad, M., and Sippers, D., 1988, Flexibility in the manufacturing system: definitions and petrinet modelling. International Journal of Production Research, 26 (2), 237-248.
    • (1988) International Journal of Production Research , vol.26 , Issue.2 , pp. 237-248
    • Berrad, M.1    Sippers, D.2
  • 4
    • 0022794511 scopus 로고
    • A branch and bound approach for machine load balancing in flexible manufacturing systems
    • Berrada, M., and Stecke, K. E., 1986, A branch and bound approach for machine load balancing in flexible manufacturing systems. Management Science, 32 (10), 1316-1335.
    • (1986) Management Science , vol.32 , Issue.10 , pp. 1316-1335
    • Berrada, M.1    Stecke, K.E.2
  • 7
    • 0010906377 scopus 로고
    • Cluster analysis to batching in flexible manufacturing systems
    • Co, H. C., 1992, Cluster analysis to batching in flexible manufacturing systems. Computer Integrated Manufacturing, 3 (2), 79-82.
    • (1992) Computer Integrated Manufacturing , vol.3 , Issue.2 , pp. 79-82
    • Co, H.C.1
  • 8
    • 0026896801 scopus 로고
    • Streamlining material flow in flexible manufacturing systems: A lesson in simplicity
    • Co, H. C., 1994, Streamlining material flow in flexible manufacturing systems: a lesson in simplicity. International Journal of Production Research, 30 (7), 1483-1499.
    • (1994) International Journal of Production Research , vol.30 , Issue.7 , pp. 1483-1499
    • Co, H.C.1
  • 9
    • 0025595213 scopus 로고
    • A methodical approach to the flexible-manufacturing system batching, loading and tool configuration problems
    • Co, H. C., Bierman, J. S., and Chen, S. K., 1990, A methodical approach to the flexible-manufacturing system batching, loading and tool configuration problems. International Journal of Production Research, 28 (12), 2171-2186.
    • (1990) International Journal of Production Research , vol.28 , Issue.12 , pp. 2171-2186
    • Co, H.C.1    Bierman, J.S.2    Chen, S.K.3
  • 11
    • 0027591340 scopus 로고
    • A synthesis of decision models for tool management in automated manufacturing
    • Gray, A. E., Seidman, A., and Stecke, K. E., 1993, A synthesis of decision models for tool management in automated manufacturing. Management Science, 39 (5), 549-567.
    • (1993) Management Science , vol.39 , Issue.5 , pp. 549-567
    • Gray, A.E.1    Seidman, A.2    Stecke, K.E.3
  • 12
    • 0027577264 scopus 로고
    • Operations planning and scheduling problems in advanced manufacturing systems
    • Gupta, M. C., Gupta, Y. P., and Evans, G. W., 1993, Operations planning and scheduling problems in advanced manufacturing systems. International Journal of Production Research, 31 (4), 869-900.
    • (1993) International Journal of Production Research , vol.31 , Issue.4 , pp. 869-900
    • Gupta, M.C.1    Gupta, Y.P.2    Evans, G.W.3
  • 13
    • 0004829780 scopus 로고
    • Part selection problems in flexible manufacturing systems planning stage
    • K. E. Stecke and R. Suri (eds) (Amsterdam: Elsevier)
    • Hwang, S., 1986, Part selection problems in flexible manufacturing systems planning stage, Proceedings of the 1st ORSA/TIMS Conference on Flexible Manufacturing Systems, K. E. Stecke and R. Suri (eds) (Amsterdam: Elsevier), pp. 297-309.
    • (1986) Proceedings of the 1St ORSA/TIMS Conference on Flexible Manufacturing Systems , pp. 297-309
    • Hwang, S.1
  • 15
    • 0027342202 scopus 로고    scopus 로고
    • Heuristic approaches to loading problems in flexible manufacturing systems
    • Kim, Y.-D., and Yano, C. A., Heuristic approaches to loading problems in flexible manufacturing systems. IIE Transactions, 25 (1), 26-39.
    • IIE Transactions , vol.25 , Issue.1 , pp. 26-39
    • Kim, Y.-D.1    Yano, C.A.2
  • 16
    • 84952494480 scopus 로고
    • Machine component group formation in group technology: Review and extensions
    • King, J. R., and Nakornchai, V., 1980, Machine component group formation in group technology: review and extensions. International Journal of Production Research, 20 (2), 117-134
    • (1980) International Journal of Production Research , vol.20 , Issue.2 , pp. 117-134
    • King, J.R.1    Nakornchai, V.2
  • 17
    • 0022679940 scopus 로고
    • Grouping of parts and components in flexible manufacturing systems
    • Kumar, K. R., Kusiak, A., and Vannelli, A., 1982, Grouping of parts and components in flexible manufacturing systems. European Journal of Operational Research, 24 (3), 387-397.
    • (1982) European Journal of Operational Research , vol.24 , Issue.3 , pp. 387-397
    • Kumar, K.R.1    Kusiak, A.2    Vannelli, A.3
  • 18
    • 0025460582 scopus 로고
    • Joint consideration of grouping and loading problems in a flexible manufacturing system
    • Kumar, P., Tewari, N. K., and Singh, N., 1990, Joint consideration of grouping and loading problems in a flexible manufacturing system. International Journal of Production Research, 28 (7), 1345-1356.
    • (1990) International Journal of Production Research , vol.28 , Issue.7 , pp. 1345-1356
    • Kumar, P.1    Tewari, N.K.2    Singh, N.3
  • 19
    • 0011790378 scopus 로고
    • The part family problems in flexible manufacturing systems
    • K. E. Stecke and R. Suri (eds) (Amsterdam: Elsevier)
    • Kusiak, A., 1984, The part family problems in flexible manufacturing systems, Proceedings of the 1st ORsA/TIMS Conference on FMS. K. E. Stecke and R. Suri (eds) (Amsterdam: Elsevier), pp. 237-242.
    • (1984) Proceedings of the 1St Orsa/Tims Conference on FMS. , pp. 237-242
    • Kusiak, A.1
  • 21
    • 0027187518 scopus 로고
    • Concurrent part assignment and tool allocation in FMS with material handling considerations
    • Leung, L. C., Maheswari, S. K., and Miller, W. A., 1993, Concurrent part assignment and tool allocation in FMS with material handling considerations. International Journal of Production Research, 31 (1), 117-138.
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 117-138
    • Leung, L.C.1    Maheswari, S.K.2    Miller, W.A.3
  • 22
    • 0006568723 scopus 로고
    • Part selection, machine loading and machine speed selection in flexible manufacturing systems
    • Liang, M., 1993, Part selection, machine loading and machine speed selection in flexible manufacturing systems. Computers and Industrial Engineering, 25 (1-4), 259-262.
    • (1993) Computers and Industrial Engineering , vol.25-1 , Issue.4 , pp. 259-262
    • Liang, M.1
  • 23
    • 0002828302 scopus 로고
    • The scheduling problem in random flexible manufacturing systems
    • K. E. Stecke and R. Suri (eds), Amsterdam: Elsevier
    • Lin, L. S., and Liu, C. Y. J., 1984, The scheduling problem in random flexible manufacturing systems, Proceedings of the 1st ORSA/TIMS Conference on Flexible Manufacturing Systems, K. E. Stecke and R. Suri (eds) (Amsterdam: Elsevier), pp. 278-283.
    • (1984) Proceedings of the 1St ORSA/TIMS Conference on Flexible Manufacturing Systems , pp. 278-283
    • Lin, L.S.1    Liu, C.Y.J.2
  • 27
    • 0002874558 scopus 로고
    • Formulation of heuristic solutions to part grouping and tool loading in flexible manufacturing systems
    • K. E. Stecke and R. Suri (eds) (Amsterdam: Elsevier)
    • Rajagopalan, S., 1986, Formulation of heuristic solutions to part grouping and tool loading in flexible manufacturing systems. Proceedings of the 2nd ORSA/TIMS Conference on Flexible Manufacturing Systems, K. E. Stecke and R. Suri (eds) (Amsterdam: Elsevier), pp. 311-320.
    • (1986) Proceedings of the 2Nd ORSA/TIMS Conference on Flexible Manufacturing Systems , pp. 311-320
    • Rajagopalan, S.1
  • 28
    • 0023384747 scopus 로고
    • The machine loading and tool allocation problem in a flexible manufacturing system
    • Sarin, S. C., and Chen, C. S., 1987, The machine loading and tool allocation problem in a flexible manufacturing system. International Journal of Production Research, 25 (7), 1081-1094.
    • (1987) International Journal of Production Research , vol.25 , Issue.7 , pp. 1081-1094
    • Sarin, S.C.1    Chen, C.S.2
  • 29
    • 0025419819 scopus 로고
    • Modeling and scheduling of a flexible manufacturing system
    • Sawik, T., 1990, Modeling and scheduling of a flexible manufacturing system. European Journal of Operational Research, 45 (2-3), 117-190.
    • (1990) European Journal of Operational Research , vol.45-2 , Issue.3 , pp. 117-190
    • Sawik, T.1
  • 30
    • 0022060472 scopus 로고
    • A loading and dispatching problem in a random flexible manufacturing system
    • Shanker, K., and Tzen, Y. J., 1985, A loading and dispatching problem in a random flexible manufacturing system. International Journal of Production Research, 23 (3), 579-595.
    • (1985) International Journal of Production Research , vol.23 , Issue.3 , pp. 579-595
    • Shanker, K.1    Tzen, Y.J.2
  • 31
    • 0020718128 scopus 로고
    • Formulation and solution of, nonlinear integer production planning problems in flexible manufacturing systems
    • Stecke, K. E., 1983, Formulation and solution of, nonlinear integer production planning problems in flexible manufacturing systems. Management Science, 29 (3), 273-288.
    • (1983) Management Science , vol.29 , Issue.3 , pp. 273-288
    • Stecke, K.E.1
  • 32
    • 0026954929 scopus 로고
    • Procedures to determine part mix ratios for independent demands in flexible manufacturing systems
    • Stecke, K. E., 1992, Procedures to determine part mix ratios for independent demands in flexible manufacturing systems. IEEE Transactions on Engineering Management, 29, 359-369.
    • (1992) IEEE Transactions on Engineering Management , vol.29 , pp. 359-369
    • Stecke, K.E.1
  • 33
    • 0003100937 scopus 로고
    • A flexible approach to implementing short-term FMS planning function
    • K. E. Stecke and R. Suri (eds), Amsterdam: Elsevier
    • Stecke, K. E., and Kim, I., 1986, A flexible approach to implementing short-term FMS planning function. Proceedings of the 2nd ORSA/TIMS Conference on Flexible Manufacturing Systems, K. E. Stecke and R. Suri (eds) (Amsterdam: Elsevier), pp. 283-296.
    • (1986) Proceedings of the 2Nd ORSA/TIMS Conference on Flexible Manufacturing Systems , pp. 283-296
    • Stecke, K.E.1    Kim, I.2
  • 34
  • 35
    • 0024962451 scopus 로고
    • Performance evaluation for systems of pooled machines of unequal size: Unbalancing versus balancing
    • Stecke, K. E., and Kim, I., 1989, Performance evaluation for systems of pooled machines of unequal size: unbalancing versus balancing. European Journal of Operational Research, 42 (1), 22-38.
    • (1989) European Journal of Operational Research , vol.42 , Issue.1 , pp. 22-38
    • Stecke, K.E.1    Kim, I.2
  • 36
    • 0025894458 scopus 로고
    • A flexible approach to part type selection in flexible flow systems using part mix ratios
    • Stecke, K. E., and Kim, I., 1991, A flexible approach to part type selection in flexible flow systems using part mix ratios. International Journal of Production Research, 29 (1), 5375.
    • (1991) International Journal of Production Research , vol.29 , Issue.1 , pp. 5375
    • Stecke, K.E.1    Kim, I.2
  • 37
    • 0028499223 scopus 로고
    • Production planning decisions in flexible manufacturing systems with random material flows
    • Stecke, K. E., and Raman, N., 1994, Production planning decisions in flexible manufacturing systems with random material flows. IIE Transactions, 26 (5), 2-17.
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 2-17
    • Stecke, K.E.1    Raman, N.2
  • 38
    • 0029253721 scopus 로고
    • FMS planning decisions, operating flexibilities, and system performance
    • Stecke, K. E., and Raman, N., 1995, FMS planning decisions, operating flexibilities, and system performance. IIE Transactions on Engineering Management, 42 (1), 82-90.
    • (1995) IIE Transactions on Engineering Management , vol.42 , Issue.1 , pp. 82-90
    • Stecke, K.E.1    Raman, N.2
  • 39
    • 0022097833 scopus 로고
    • The optimality of unbalancing both workloads and machine group sizes in closed queuing networks of multiserver queues
    • Stecke, K. E., and Solberg, J. J., 1985, The optimality of unbalancing both workloads and machine group sizes in closed queuing networks of multiserver queues. Operations Research, 33 (4), 882-910.
    • (1985) Operations Research , vol.33 , Issue.4 , pp. 882-910
    • Stecke, K.E.1    Solberg, J.J.2
  • 40
    • 8544231238 scopus 로고
    • Grouping parts and tools in flexible manufacturing systems production planning
    • Ventura, J. A., Chen, F. F., and Wu, C.-H., 1990, Grouping parts and tools in flexible manufacturing systems production planning. International Journal of Production Research, 28 (6), 1039-1056.
    • (1990) International Journal of Production Research , vol.28 , Issue.6 , pp. 1039-1056
    • Ventura, J.A.1    Chen, F.F.2    Wu, C.-H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.