메뉴 건너뛰기




Volumn 30, Issue 2, 1998, Pages 179-191

A beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; FLEXIBLE MANUFACTURING SYSTEMS; HEURISTIC METHODS; INVENTORY CONTROL; MATERIALS HANDLING EQUIPMENT; PROBLEM SOLVING; PROCESS CONTROL; PRODUCTION CONTROL;

EID: 0032000573     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408179808966449     Document Type: Article
Times cited : (49)

References (36)
  • 1
  • 5
    • 0022097890 scopus 로고
    • Scheduling/rescheduling in the manufacturing operating system environment
    • Yamamoto, M., and Nof, S Y., (1985) Scheduling/rescheduling in the manufacturing operating system environment. International Journal of Production Research, 23, 705–722.
    • (1985) International Journal of Production Research , vol.23 , pp. 705-722
    • Yamamoto, M.1    Nof, S.Y.2
  • 6
    • 0000098624 scopus 로고
    • Experimental investigation of real time scheduling in flexible manufacturing systems
    • Chang, Y.L., Sullivan, R. S., and Bagchi, U., (1985) Experimental investigation of real time scheduling in flexible manufacturing systems. Annals of Operations Research, 3, 355–377.
    • (1985) Annals of Operations Research , vol.3 , pp. 355-377
    • Chang, Y.L.1    Sullivan, R.S.2    Bagchi, U.3
  • 7
    • 0024680284 scopus 로고
    • Control of material handling transporters in automated manufacturing
    • Han, M.H., and McGinnis, L. F., (1989) Control of material handling transporters in automated manufacturing. IIE TRANSACTIONS, 21, 184–190.
    • (1989) IIE TRANSACTIONS , vol.21 , pp. 184-190
    • Han, M.H.1    McGinnis, L.F.2
  • 8
    • 3342981820 scopus 로고
    • Machine utilization achieved using balanced FMS production ratios in a simulated setting
    • Schriber, T.J., and Stecke, K.E., (1988) Machine utilization achieved using balanced FMS production ratios in a simulated setting. Annals of Operations Research, 15, 229–267.
    • (1988) Annals of Operations Research , vol.15 , pp. 229-267
    • Schriber, T.J.1    Stecke, K.E.2
  • 9
    • 0026866144 scopus 로고
    • Dynamic dispatching algorithm for scheduling machines and AGVs in a flexible manufacturing system
    • Sabuncuoglu, I., and Hommertzheim, D.L., (1992) Dynamic dispatching algorithm for scheduling machines and AGVs in a flexible manufacturing system. International Journal of Production Research, 30, 1059–1080.
    • (1992) International Journal of Production Research , vol.30 , pp. 1059-1080
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 10
    • 0042088700 scopus 로고
    • Experimental investigation of FMS due-date scheduling problem evaluation of machine and AGV scheduling rules
    • Sabuncuoglu, I., and Hommertzheim, D.L., (1993) Experimental investigation of FMS due-date scheduling problem evaluation of machine and AGV scheduling rules. International Journal of Flexible Manufacturing Systems, 5, 301–324.
    • (1993) International Journal of Flexible Manufacturing Systems , vol.5 , pp. 301-324
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 11
    • 0021898921 scopus 로고
    • Effectiveness of alternate operations in a flexible manufacturing system
    • Wilhelm, W.E., and Shin, H.M., (1985) Effectiveness of alternate operations in a flexible manufacturing system. International Journal of Production Research, 23, 65–79.
    • (1985) International Journal of Production Research , vol.23 , pp. 65-79
    • Wilhelm, W.E.1    Shin, H.M.2
  • 12
    • 0026254174 scopus 로고
    • Effects of loading and routing decisions on the performance of flexible manufacturing systems
    • Chen, I.J., and Chung, C.H., (1991) Effects of loading and routing decisions on the performance of flexible manufacturing systems. International Journal of Production Research, 29, 2209–2225.
    • (1991) International Journal of Production Research , vol.29 , pp. 2209-2225
    • Chen, I.J.1    Chung, C.H.2
  • 13
  • 16
    • 0027848396 scopus 로고
    • Jobs and tool sequencing in an automated manufacturing environment
    • Chandra, P., Li, S., and Stan, M., (1993) Jobs and tool sequencing in an automated manufacturing environment. International Journal of Production Research, 31, 2911–2925.
    • (1993) International Journal of Production Research , vol.31 , pp. 2911-2925
    • Chandra, P.1    Li, S.2    Stan, M.3
  • 18
    • 0001596526 scopus 로고
    • Current issues concerning FMS scheduling
    • Hutchinson, J., (1991) Current issues concerning FMS scheduling. OMEGA, 19, 529–537.
    • (1991) OMEGA , vol.19 , pp. 529-537
    • Hutchinson, J.1
  • 19
    • 0024765468 scopus 로고
    • A bottleneck-based beam search for job scheduling in a flexible manufacturing system
    • Chang, Y.L., Matsuo, H., and Sullivan, R., (1989) A bottleneck-based beam search for job scheduling in a flexible manufacturing system. International Journal of Production Research, 11, 1949–1963.
    • (1989) International Journal of Production Research , vol.11 , pp. 1949-1963
    • Chang, Y.L.1    Matsuo, H.2    Sullivan, R.3
  • 21
    • 84952242943 scopus 로고
    • Loading and control policies for a flexible manufacturing system
    • Stecke, K.E., and Solberg, J., (1981) Loading and control policies for a flexible manufacturing system. International Journal of Production Research, 19, 481–490.
    • (1981) International Journal of Production Research , vol.19 , pp. 481-490
    • Stecke, K.E.1    Solberg, J.2
  • 22
  • 24
    • 0030085521 scopus 로고    scopus 로고
    • Scheduling of automated guided vehicles in a decision making hierarchy
    • Akturk, MS., and Yilmaz, H., (1996) Scheduling of automated guided vehicles in a decision making hierarchy. International Journal of Production Research, 34, 577–591.
    • (1996) International Journal of Production Research , vol.34 , pp. 577-591
    • Akturk, M.S.1    Yilmaz, H.2
  • 25
    • 0022281750 scopus 로고
    • Routing and scheduling of automated guided vehicles
    • Bulhnger, H.J. and Warnecke, H.J. (eds), Springer-Verlag, Berlin
    • Kusiak, A., and Cyrus, P., (1985) Routing and scheduling of automated guided vehicles, in Towards the Factory of the Future, Bulhnger, H.J. and Warnecke, H.J. (eds), Springer-Verlag, Berlin, pp. 247–251.
    • (1985) Towards the Factory of the Future , pp. 247-251
    • Kusiak, A.1    Cyrus, P.2
  • 26
    • 0029404820 scopus 로고
    • A time window approach to simultaneous scheduling of machines and material handling system in an FMS
    • Bilge, U., and Ulusoy, G., (1995) A time window approach to simultaneous scheduling of machines and material handling system in an FMS. O perations Research, 43, 1058–1070.
    • (1995) Perations Research , vol.43 , pp. 1058-1070
    • Bilge, U.1    Ulusoy, G.2
  • 27
    • 38249023160 scopus 로고
    • Due date based scheduling in a general flexible manufacturing system
    • Raman, N., Talbot, F. B., Rachamadugu. R., (1989) Due date based scheduling in a general flexible manufacturing system. Journal of Operations Management, 8, 115–132.
    • (1989) Journal of Operations Management , vol.8 , pp. 115-132
    • Raman, N.1    Talbot, F.B.2
  • 28
    • 0006463310 scopus 로고
    • Flexible manufacturing system (FMS) scheduling using filtered beam search
    • De, S., and Lee, A., (1990) Flexible manufacturing system (FMS) scheduling using filtered beam search. Journal of Intelligent Manufacturing, 1, 165–183.
    • (1990) Journal of Intelligent Manufacturing , vol.1 , pp. 165-183
    • De, S.1    Lee, A.2
  • 31
    • 0027803767 scopus 로고
    • Resolving deadlocks in flexible manufacturing cells
    • Leung, Y.T., and Sheen, G.J., (1993) Resolving deadlocks in flexible manufacturing cells. Journal of Manufacturing Systems, 12, 291–304.
    • (1993) Journal of Manufacturing Systems , vol.12 , pp. 291-304
    • Leung, Y.T.1    Sheen, G.J.2
  • 34
    • 0026898533 scopus 로고
    • Experimental Investigation of FMS machine and AGV scheduling rules against the mean flow time criterion
    • Sabuncuoglu, I., Hommertzheim D.L., (1992) Experimental Investigation of FMS machine and AGV scheduling rules against the mean flow time criterion. International Journal of Production Research, 30, 1617–1635.
    • (1992) International Journal of Production Research , vol.30 , pp. 1617-1635
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 35
    • 0005823626 scopus 로고
    • Experimental investigation of FMS due-date scheduling problem an evaluation of due date assignment rules
    • Sabuncuoglu, I., and Hommertzheim, D.L., (1995) Experimental investigation of FMS due-date scheduling problem an evaluation of due date assignment rules. International Journal of Computer Integrated Manufacturing, 8, 133–144.
    • (1995) International Journal of Computer Integrated Manufacturing , vol.8 , pp. 133-144
    • Sabuncuoglu, I.1    Hommertzheim, D.L.2
  • 36
    • 0001596897 scopus 로고
    • Empirical analysis of heuristics
    • Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G. and Shmoys, D.B. (eds), Elsevier, Amsterdam
    • Golden, B.L., and Stewart, W.R., (1985) Empirical analysis of heuristics, in The Traveling Salesman Problem, Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G. and Shmoys, D.B. (eds). Elsevier, Amsterdam, pp. 207–249.
    • (1985) The Traveling Salesman Problem , pp. 207-249
    • Golden, B.L.1    Stewart, W.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.