메뉴 건너뛰기




Volumn 56, Issue 24, 2018, Pages 7375-7389

An optimisation support for the design of hybrid production lines including assembly and disassembly tasks

Author keywords

ant colony optimisation; assembly line balancing; disassembly; disassembly line balancing; mixed integer linear programming

Indexed keywords

ANT COLONY OPTIMIZATION; ASSEMBLY MACHINES; HYBRID SYSTEMS; INTEGER PROGRAMMING;

EID: 85041342531     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2018.1428774     Document Type: Article
Times cited : (43)

References (40)
  • 1
    • 84913615702 scopus 로고    scopus 로고
    • Mathematical Models for Parallel Two-Sided Assembly Line Balancing Problems and Extensions
    • Ağpak, K., and S., Zolfaghari. 2015. “Mathematical Models for Parallel Two-Sided Assembly Line Balancing Problems and Extensions.” International Journal of Production Research 53 (4): 1242–1254
    • (2015) International Journal of Production Research , vol.53 , Issue.4 , pp. 1242-1254
    • Ağpak, K.1    Zolfaghari, S.2
  • 2
    • 36448976916 scopus 로고    scopus 로고
    • A Collaborative Ant Colony Algorithm to Stochastic Mixed-Model U-Shaped Disassembly Line Balancing and Sequencing Problem
    • Agrawal, S., and M. K., Tiwari. 2008. “A Collaborative Ant Colony Algorithm to Stochastic Mixed-Model U-Shaped Disassembly Line Balancing and Sequencing Problem.” International Journal of Production Research 46 (6): 1405–1429.10.1080/00207540600943985
    • (2008) International Journal of Production Research , vol.46 , Issue.6 , pp. 1405-1429
    • Agrawal, S.1    Tiwari, M.K.2
  • 3
  • 4
    • 84876972240 scopus 로고    scopus 로고
    • Multi-Objective Optimization of Stochastic Disassembly Line Balancing with Station Paralleling
    • Aydemir-Karadag, A., and O., Turkbey. 2013. “Multi-Objective Optimization of Stochastic Disassembly Line Balancing with Station Paralleling.” Computers & Industrial Engineering 65 (3): 413–425.10.1016/j.cie.2013.03.014
    • (2013) Computers & Industrial Engineering , vol.65 , Issue.3 , pp. 413-425
    • Aydemir-Karadag, A.1    Turkbey, O.2
  • 5
    • 84874540167 scopus 로고    scopus 로고
    • A Taxonomy of Line Balancing Problems and Their Solutionapproaches
    • Battaïa, O., and A., Dolgui. 2013. “A Taxonomy of Line Balancing Problems and Their Solutionapproaches.” International Journal of Production Economics 142: 259–277.10.1016/j.ijpe.2012.10.020
    • (2013) International Journal of Production Economics , vol.142 , pp. 259-277
    • Battaïa, O.1    Dolgui, A.2
  • 6
    • 84954051979 scopus 로고    scopus 로고
    • Reverse Supply Chains: A Source of Opportunities and Challenges
    • Battaïa, O., and S. M., Gupta. 2015. “Reverse Supply Chains: A Source of Opportunities and Challenges.” Journal of Manufacturing Systems 37: 587–588.10.1016/j.jmsy.2015.11.005
    • (2015) Journal of Manufacturing Systems , vol.37 , pp. 587-588
    • Battaïa, O.1    Gupta, S.M.2
  • 7
    • 33751255097 scopus 로고    scopus 로고
    • Ant Algorithms for a Time and Space Constrained Assembly Line Balancing Problem
    • Bautista, J., and J., Pereira. 2007. “Ant Algorithms for a Time and Space Constrained Assembly Line Balancing Problem.” European Journal of Operational Research 177 (3): 2016–2032.10.1016/j.ejor.2005.12.017
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 2016-2032
    • Bautista, J.1    Pereira, J.2
  • 9
    • 84940610243 scopus 로고    scopus 로고
    • Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints
    • Bentaha, M. L., O., Battaïa, A., Dolgui, and S. J., Hu. 2015. “Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints.” European Journal of Operational Research 247 (3): 957–967.10.1016/j.ejor.2015.06.019
    • (2015) European Journal of Operational Research , vol.247 , Issue.3 , pp. 957-967
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3    Hu, S.J.4
  • 11
    • 85040989185 scopus 로고    scopus 로고
    • Profit-oriented Partial Disassembly Line Design: Dealing with Hazardous Parts and Task Processing Times Uncertainty
    • Bentaha, M. L., A., Dolgui, O., Battaïa, R. J., Riggs, and J., Hu. 2018. “Profit-oriented Partial Disassembly Line Design: Dealing with Hazardous Parts and Task Processing Times Uncertainty.” International Journal of Production Research, 1–23. doi:10.1080/00207543.2017.1418987
    • (2018) International Journal of Production Research , pp. 1-23
    • Bentaha, M.L.1    Dolgui, A.2    Battaïa, O.3    Riggs, R.J.4    Hu, J.5
  • 13
    • 85030867779 scopus 로고    scopus 로고
    • A Beam Search Approach for Solving Type II Robotic Parallel Assembly Line Balancing Problem
    • Çil, Z. A., S., Mete, E., Özceylan, and K., Agpak. 2017. “A Beam Search Approach for Solving Type II Robotic Parallel Assembly Line Balancing Problem.” Applied Soft Computing 61: 129–138
    • (2017) Applied Soft Computing , vol.61 , pp. 129-138
    • Çil, Z.A.1    Mete, S.2    Özceylan, E.3    Agpak, K.4
  • 14
    • 84953276289 scopus 로고    scopus 로고
    • A Mixed Integer Linear Programming Model to Optimize Reverse Logistics Activities of End-of-Life Vehicles in Turkey
    • Part 3
    • E.Demirel, N.Demirel, and H.Gökçen. 2016. “A Mixed Integer Linear Programming Model to Optimize Reverse Logistics Activities of End-of-Life Vehicles in Turkey.” Journal of Cleaner Production 112 Part 3: 2101–2113.10.1016/j.jclepro.2014.10.079
    • (2016) Journal of Cleaner Production , vol.112 , pp. 2101-2113
    • Demirel, E.N.1    Demirelgökçen, H.2
  • 15
    • 77953610368 scopus 로고    scopus 로고
    • A New Multi-Objective Ant Colony Algorithm for Solving the Disassembly Line Balancing Problem
    • Ding, L.-P., Y.-X., Feng, J.-R., Tan, and Y.-C., Gao. 2010. “A New Multi-Objective Ant Colony Algorithm for Solving the Disassembly Line Balancing Problem.” The International Journal of Advanced Manufacturing Technology 48 (5–8): 761–771.10.1007/s00170-009-2303-5
    • (2010) The International Journal of Advanced Manufacturing Technology , vol.48 , Issue.5-8 , pp. 761-771
    • Ding, L.-P.1    Feng, Y.-X.2    Tan, J.-R.3    Gao, Y.-C.4
  • 16
    • 27644543634 scopus 로고    scopus 로고
    • Ant Colony Optimization Theory: A Survey
    • Dorigo, M., and C., Blum. 2005. “Ant Colony Optimization Theory: A Survey.” Theoretical Computer Science 344 (2–3): 243–278.10.1016/j.tcs.2005.05.020
    • (2005) Theoretical Computer Science , vol.344 , Issue.2-3 , pp. 243-278
    • Dorigo, M.1    Blum, C.2
  • 18
    • 0035837942 scopus 로고    scopus 로고
    • A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures
    • Gungor, A., and S. M., Gupta. 2001. “A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures.” International Journal of Production Research 39 (7): 1427–1467.10.1080/00207540110052157
    • (2001) International Journal of Production Research , vol.39 , Issue.7 , pp. 1427-1467
    • Gungor, A.1    Gupta, S.M.2
  • 19
    • 84878666440 scopus 로고    scopus 로고
    • Ant Colony Optimization for Sequence-Dependent Disassembly Line Balancing Problem
    • Kalayci, C. B., and S. M., Gupta. 2013. “Ant Colony Optimization for Sequence-Dependent Disassembly Line Balancing Problem.” Journal of Manufacturing Technology Management 24 (3): 413–427.10.1108/17410381311318909
    • (2013) Journal of Manufacturing Technology Management , vol.24 , Issue.3 , pp. 413-427
    • Kalayci, C.B.1    Gupta, S.M.2
  • 20
    • 84902301531 scopus 로고    scopus 로고
    • A Hybrid Genetic Algorithm for Sequence-Dependent Disassembly Line Balancing Problem
    • Kalayci, C. B., O., Polat, and S. M., Gupta. 2016. “A Hybrid Genetic Algorithm for Sequence-Dependent Disassembly Line Balancing Problem.” Annals of Operations Research 242 (2): 321–354.10.1007/s10479-014-1641-3
    • (2016) Annals of Operations Research , vol.242 , Issue.2 , pp. 321-354
    • Kalayci, C.B.1    Polat, O.2    Gupta, S.M.3
  • 21
    • 74549114147 scopus 로고    scopus 로고
    • Balancing Parallel Assembly Lines with Precise and Fuzzy Goals
    • Kara, Y., H., Gökçen, and Y., Atasagun. 2010. “Balancing Parallel Assembly Lines with Precise and Fuzzy Goals.” International Journal of Production Research 48 (6): 1685–1703.10.1080/00207540802534715
    • (2010) International Journal of Production Research , vol.48 , Issue.6 , pp. 1685-1703
    • Kara, Y.1    Gökçen, H.2    Atasagun, Y.3
  • 23
    • 84920998482 scopus 로고    scopus 로고
    • Reverse Logistics System Design for the Waste of Electrical and Electronic Equipment (WEEE) in Turkey
    • Kilic, H. S., U., Cebeci, and M. B., Ayhan. 2015. “Reverse Logistics System Design for the Waste of Electrical and Electronic Equipment (WEEE) in Turkey.” Resources, Conservation and Recycling 95: 120–132.10.1016/j.resconrec.2014.12.010
    • (2015) Resources, Conservation and Recycling , vol.95 , pp. 120-132
    • Kilic, H.S.1    Cebeci, U.2    Ayhan, M.B.3
  • 24
    • 70749116514 scopus 로고    scopus 로고
    • Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an aND/oR Graph
    • Koc, A., I., Sabuncuoglu, and E., Erel. 2009. “Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an aND/oR Graph.” IIE Transactions 41 (10): 866–881.10.1080/07408170802510390
    • (2009) IIE Transactions , vol.41 , Issue.10 , pp. 866-881
    • Koc, A.1    Sabuncuoglu, I.2    Erel, E.3
  • 25
    • 84898021620 scopus 로고    scopus 로고
    • Simultaneous Balancing and Sequencing of Mixed-Model Parallel Two-Sided Assembly Lines
    • Kucukkoc, I., and D. Z., Zhang. 2014a. “Simultaneous Balancing and Sequencing of Mixed-Model Parallel Two-Sided Assembly Lines.” International Journal of Production Research 52 (12): 3665–3687.10.1080/00207543.2013.879618
    • (2014) International Journal of Production Research , vol.52 , Issue.12 , pp. 3665-3687
    • Kucukkoc, I.1    Zhang, D.Z.2
  • 26
    • 84913600698 scopus 로고    scopus 로고
    • Mathematical Model and Agent Based Solution Approach for the Simultaneous Balancing and Sequencing of Mixed-Model Parallel Two-Sided Assembly Lines
    • Kucukkoc, I., and D. Z., Zhang. 2014b. “Mathematical Model and Agent Based Solution Approach for the Simultaneous Balancing and Sequencing of Mixed-Model Parallel Two-Sided Assembly Lines.” International Journal of Production Economics 158: 314–333.10.1016/j.ijpe.2014.08.010
    • (2014) International Journal of Production Economics , vol.158 , pp. 314-333
    • Kucukkoc, I.1    Zhang, D.Z.2
  • 27
    • 84937967570 scopus 로고    scopus 로고
    • A Mathematical Model and Genetic Algorithm-Based Approach for Parallel Two-Sided Assembly Line Balancing Problem
    • Kucukkoc, I., and D. Z., Zhang. 2015a. “A Mathematical Model and Genetic Algorithm-Based Approach for Parallel Two-Sided Assembly Line Balancing Problem.” Production Planning & Control 26 (11): 874–894.10.1080/09537287.2014.994685
    • (2015) Production Planning & Control , vol.26 , Issue.11 , pp. 874-894
    • Kucukkoc, I.1    Zhang, D.Z.2
  • 28
    • 84936743646 scopus 로고    scopus 로고
    • Balancing of Parallel U-Shaped Assembly Lines
    • Kucukkoc, I., and D. Z., Zhang. 2015b. “Balancing of Parallel U-Shaped Assembly Lines.” Computers & Operations Research 64: 233–244.10.1016/j.cor.2015.05.014
    • (2015) Computers & Operations Research , vol.64 , pp. 233-244
    • Kucukkoc, I.1    Zhang, D.Z.2
  • 29
    • 40449083604 scopus 로고    scopus 로고
    • A Survey of the Literature on the Multiple or Parallel Assembly Line Balancing Problem
    • Lusa, A., 2008. “A Survey of the Literature on the Multiple or Parallel Assembly Line Balancing Problem.” European Journal of Industrial Engineering 2 (1): 50–72.10.1504/EJIE.2008.016329
    • (2008) European Journal of Industrial Engineering , vol.2 , Issue.1 , pp. 50-72
    • Lusa, A.1
  • 30
    • 84923695788 scopus 로고    scopus 로고
    • Unified Assembly-and Disassembly-Line Model Formulae
    • McGovern, S. M., and S. M., Gupta. 2015. “Unified Assembly-and Disassembly-Line Model Formulae.” Journal of Manufacturing Technology Management 26 (2): 195–212.10.1108/JMTM-11-2013-0169
    • (2015) Journal of Manufacturing Technology Management , vol.26 , Issue.2 , pp. 195-212
    • McGovern, S.M.1    Gupta, S.M.2
  • 31
    • 84988918149 scopus 로고    scopus 로고
    • A Solution Approach Based on Beam Search Algorithm for Disassembly Line Balancing Problem
    • Mete, S., Z. A., Çil, K., Ağpak, E., Özceylan, and A., Dolgui. 2016. “A Solution Approach Based on Beam Search Algorithm for Disassembly Line Balancing Problem.” Journal of Manufacturing Systems 41: 188–200.10.1016/j.jmsy.2016.09.002
    • (2016) Journal of Manufacturing Systems , vol.41 , pp. 188-200
    • Mete, S.1    Çil, Z.A.2    Ağpak, K.3    Özceylan, E.4    Dolgui, A.5
  • 32
    • 84992410451 scopus 로고    scopus 로고
    • Resource Constrained Disassembly Line Balancing Problem
    • Mete, S., Z. A., Çil, E., Özceylan, and K., Ağpak. 2016. “Resource Constrained Disassembly Line Balancing Problem.” IFAC-PapersOnLine 49 (12): 921–925.10.1016/j.ifacol.2016.07.893
    • (2016) IFAC-PapersOnLine , vol.49 , Issue.12 , pp. 921-925
    • Mete, S.1    Çil, Z.A.2    Özceylan, E.3    Ağpak, K.4
  • 34
    • 84890189031 scopus 로고    scopus 로고
    • Modeling and Optimizing the Integrated Problem of Closed-Loop Supply Chain Network Design and Disassembly Line Balancing
    • Özceylan, E., T., Paksoy, and T., Bektaş. 2014. “Modeling and Optimizing the Integrated Problem of Closed-Loop Supply Chain Network Design and Disassembly Line Balancing.” Transportation Research Part E: Logistics and Transportation Review 61: 142–164.10.1016/j.tre.2013.11.001
    • (2014) Transportation Research Part E: Logistics and Transportation Review , vol.61 , pp. 142-164
    • Özceylan, E.1    Paksoy, T.2    Bektaş, T.3
  • 35
    • 67651163455 scopus 로고    scopus 로고
    • Ant Colony Optimization for the Single Model U-Type Assembly Line Balancing Problem
    • Sabuncuoglu, I., E., Erel, and A., Alp. 2009. “Ant Colony Optimization for the Single Model U-Type Assembly Line Balancing Problem.” International Journal of Production Economics 120 (2): 287–300.10.1016/j.ijpe.2008.11.017
    • (2009) International Journal of Production Economics , vol.120 , Issue.2 , pp. 287-300
    • Sabuncuoglu, I.1    Erel, E.2    Alp, A.3
  • 36
    • 85135755631 scopus 로고
    • The Assembly Line Balancing Problem
    • Salveson, M., 1955. “The Assembly Line Balancing Problem.” Journal of Industrial Engineering 6 (3): 18–25
    • (1955) Journal of Industrial Engineering , vol.6 , Issue.3 , pp. 18-25
    • Salveson, M.1
  • 37
    • 1642269093 scopus 로고    scopus 로고
    • Closed-Loop Supply Chain Models with Product Remanufacturing
    • Savaskan, R. C., S., Bhattacharya, and L. N., Van Wassenhove. 2004. “Closed-Loop Supply Chain Models with Product Remanufacturing.” Management Science 50 (2): 239–252.10.1287/mnsc.1030.0186
    • (2004) Management Science , vol.50 , Issue.2 , pp. 239-252
    • Savaskan, R.C.1    Bhattacharya, S.2    Van Wassenhove, L.N.3
  • 38
    • 67349174679 scopus 로고    scopus 로고
    • Designing Parallel Assembly Lines with Split Workplaces: Model and Optimization Procedure
    • Scholl, A., and N., Boysen. 2009. “Designing Parallel Assembly Lines with Split Workplaces: Model and Optimization Procedure.” International Journal of Production Economics 119 (1): 90–100.10.1016/j.ijpe.2009.01.011
    • (2009) International Journal of Production Economics , vol.119 , Issue.1 , pp. 90-100
    • Scholl, A.1    Boysen, N.2
  • 40
    • 29344441733 scopus 로고    scopus 로고
    • ANTBAL: An Ant Colony Optimization Algorithm for Balancing Mixed-Model Assembly Lines with Parallel Workstations
    • Vilarinho, P. M., and A. S., Simaria. 2006. “ANTBAL: An Ant Colony Optimization Algorithm for Balancing Mixed-Model Assembly Lines with Parallel Workstations.” International Journal of Production Research 44 (2): 291–303.10.1080/00207540500227612
    • (2006) International Journal of Production Research , vol.44 , Issue.2 , pp. 291-303
    • Vilarinho, P.M.1    Simaria, A.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.