메뉴 건너뛰기




Volumn 103, Issue 2, 2006, Pages 600-609

Balancing of parallel assembly lines

Author keywords

Assembly line balancing; Parallel lines

Indexed keywords

COSTS; MATHEMATICAL MODELS; NUMERICAL METHODS; PROBLEM SOLVING;

EID: 33745833670     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2005.12.001     Document Type: Article
Times cited : (126)

References (19)
  • 1
    • 40849130689 scopus 로고
    • COMSOAL: A computer method of sequencing operations for assembly lines
    • Arcus A.L. COMSOAL: A computer method of sequencing operations for assembly lines. International Journal of Production Research 4 (1966) 259-277
    • (1966) International Journal of Production Research , vol.4 , pp. 259-277
    • Arcus, A.L.1
  • 2
    • 0031270224 scopus 로고    scopus 로고
    • Parallel station heuristic for the mixed-model production line balancing problem
    • Askin R.G., and Zhou M. Parallel station heuristic for the mixed-model production line balancing problem. International Journal of Production Research 35 11 (1997) 3095-3105
    • (1997) International Journal of Production Research , vol.35 , Issue.11 , pp. 3095-3105
    • Askin, R.G.1    Zhou, M.2
  • 3
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • Baybars I. A survey of exact algorithms for the simple assembly line balancing problem. Management Science 32 8 (1986) 909-932
    • (1986) Management Science , vol.32 , Issue.8 , pp. 909-932
    • Baybars, I.1
  • 4
    • 0032117097 scopus 로고    scopus 로고
    • A survey of the assembly line balancing procedures
    • Erdal E., and Sarin S.C. A survey of the assembly line balancing procedures. Production Planning and Control 9 5 (1998) 414-434
    • (1998) Production Planning and Control , vol.9 , Issue.5 , pp. 414-434
    • Erdal, E.1    Sarin, S.C.2
  • 5
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • Ghosh S., and Gagnon J. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research 27 4 (1989) 637-670
    • (1989) International Journal of Production Research , vol.27 , Issue.4 , pp. 637-670
    • Ghosh, S.1    Gagnon, J.2
  • 7
    • 0031232825 scopus 로고    scopus 로고
    • Heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations
    • McMullen P.R., and Frazier G.V. Heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations. International Journal of Production Economics 51 3 (1997) 177-190
    • (1997) International Journal of Production Economics , vol.51 , Issue.3 , pp. 177-190
    • McMullen, P.R.1    Frazier, G.V.2
  • 10
    • 0028531312 scopus 로고
    • The U-line balancing problem
    • Miltenburg J., and Wijngaard J. The U-line balancing problem. Management Science 40 10 (1994) 1378-1388
    • (1994) Management Science , vol.40 , Issue.10 , pp. 1378-1388
    • Miltenburg, J.1    Wijngaard, J.2
  • 11
    • 33745839584 scopus 로고    scopus 로고
    • Nahmias, S., 1993. Production and Operations Analysis. second ed. Irwin, Homewood, IL.
  • 16
  • 17
    • 21844471842 scopus 로고
    • A knowledge-based system for selection of resource allocation rules and algorithms
    • Mital A., and Anand S. (Eds), Chapman & Hall, London
    • Süer G.A., and Dagli C. A knowledge-based system for selection of resource allocation rules and algorithms. In: Mital A., and Anand S. (Eds). Handbook of Expert System Applications in Manufacturing; Structures and Rules (1994), Chapman & Hall, London 108-147
    • (1994) Handbook of Expert System Applications in Manufacturing; Structures and Rules , pp. 108-147
    • Süer, G.A.1    Dagli, C.2
  • 18
    • 0032070937 scopus 로고    scopus 로고
    • Note: Optimal balancing of U-shaped assembly lines
    • Urban T.L. Note: Optimal balancing of U-shaped assembly lines. Management Science 44 5 (1998) 738-741
    • (1998) Management Science , vol.44 , Issue.5 , pp. 738-741
    • Urban, T.L.1
  • 19
    • 0037091985 scopus 로고    scopus 로고
    • A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
    • Vilarinho P.M., and Simaria A.S. A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations. International Journal of Production Research 40 6 (2002) 1405-1420
    • (2002) International Journal of Production Research , vol.40 , Issue.6 , pp. 1405-1420
    • Vilarinho, P.M.1    Simaria, A.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.