메뉴 건너뛰기




Volumn 54, Issue 19, 2016, Pages 5761-5782

Variability modelling and balancing of stochastic assembly lines

Author keywords

constraint programming; diffusion approximation; queueing networks; simulation; stochastic assembly line balancing; variability

Indexed keywords

ALUMINUM; ASSEMBLY; ASSEMBLY MACHINES; COMPUTER PROGRAMMING; CONSTRAINT THEORY; PRODUCTION; QUEUEING NETWORKS; QUEUEING THEORY;

EID: 85026336550     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2016.1177236     Document Type: Article
Times cited : (24)

References (52)
  • 1
    • 33847014539 scopus 로고    scopus 로고
    • A Chance-constrained Approach to Stochastic Line Balancing Problem
    • K.Ağpak, and H.Gökçen. 2007. “A Chance-constrained Approach to Stochastic Line Balancing Problem.” European Journal of Operational Research 180 (3):1098–1115.
    • (2007) European Journal of Operational Research , vol.180 , Issue.3 , pp. 1098-1115
    • Ağpak, K.1    Gökçen, H.2
  • 2
    • 0022503543 scopus 로고
    • An Efficient Heuristic Method for the Simple Assembly Line Balancing Problem
    • I.Baybars, 1986. “An Efficient Heuristic Method for the Simple Assembly Line Balancing Problem.” International Journal of Production Research 24 (1):149–166.10.1080/00207548608919719
    • (1986) International Journal of Production Research , vol.24 , Issue.1 , pp. 149-166
    • Baybars, I.1
  • 4
    • 0024702612 scopus 로고
    • Tradeoff Curves, Targeting and Balancing in Manufacturing Queueing Networks
    • G.R.Bitran, and D.Tirupati. 1989. “Tradeoff Curves, Targeting and Balancing in Manufacturing Queueing Networks.” Operations Research 37 (4):547–564.10.1287/opre.37.4.547
    • (1989) Operations Research , vol.37 , Issue.4 , pp. 547-564
    • Bitran, G.R.1    Tirupati, D.2
  • 5
    • 85026341804 scopus 로고    scopus 로고
    • Solving an Assembly Line Balancing Problem by Combining IP and CP
    • A.Bockmayr, and N.Pisaruk. 2001. “Solving an Assembly Line Balancing Problem by Combining IP and CP.” 6th annual workshop of ERCIM working group on constraints, Prague, Czech Republic, June 18–20.
    • (2001) Czech Republic
    • Bockmayr, A.1    Pisaruk, N.2
  • 7
    • 34548399728 scopus 로고    scopus 로고
    • A Versatile Algorithm for Assembly Line Balancing
    • N.Boysen, and M.Fliedner. 2008. “A Versatile Algorithm for Assembly Line Balancing.” European Journal of Operational Research 184 (1):39–56.10.1016/j.ejor.2006.11.006
    • (2008) European Journal of Operational Research , vol.184 , Issue.1 , pp. 39-56
    • Boysen, N.1    Fliedner, M.2
  • 11
    • 79751537157 scopus 로고    scopus 로고
    • Multi-objective Optimization of a Stochastic Assembly Line Balancing: A Hybrid Simulated Annealing Algorithm
    • B.Çakır, F.Altıparmak, and B.Dengiz. 2011. “Multi-objective Optimization of a Stochastic Assembly Line Balancing:A Hybrid Simulated Annealing Algorithm.” Computers & Industrial Engineering 60 (3):376–384.
    • (2011) Computers & Industrial Engineering , vol.60 , Issue.3 , pp. 376-384
    • Çakır, B.1    Altıparmak, F.2    Dengiz, B.3
  • 12
    • 0013054874 scopus 로고
    • A Dynamic Programming Approach to Stochastic Assembly Line Balancing
    • R.L.Carraway, 1989. “A Dynamic Programming Approach to Stochastic Assembly Line Balancing.” Management Science 35 (4):459–471.10.1287/mnsc.35.4.459
    • (1989) Management Science , vol.35 , Issue.4 , pp. 459-471
    • Carraway, R.L.1
  • 13
    • 84930388681 scopus 로고    scopus 로고
    • A New Look at the Bowl Phenomenon
    • P.B.Castellucci, and A.M.Costa. 2015. “A New Look at the Bowl Phenomenon.” Pesquisa Operacional 35 (1):57–72.10.1590/0101-7438.2015.035.01.0057
    • (2015) Pesquisa Operacional , vol.35 , Issue.1 , pp. 57-72
    • Castellucci, P.B.1    Costa, A.M.2
  • 14
    • 33748934553 scopus 로고    scopus 로고
    • The Stochastic U-line Balancing Problem: A Heuristic Procedure
    • W.C.Chiang, and T.L.Urban. 2006. “The Stochastic U-line Balancing Problem:A Heuristic Procedure.” European Journal of Operational Research 175 (3):1767–1781.10.1016/j.ejor.2004.10.031
    • (2006) European Journal of Operational Research , vol.175 , Issue.3 , pp. 1767-1781
    • Chiang, W.C.1    Urban, T.L.2
  • 15
    • 77957272182 scopus 로고    scopus 로고
    • A Diffusion Approximation Model for Wireless Networks Based on IEEE 802.11 Standard
    • T.Czachórski, K.Grochla, T.Nycz, and F.Pekergin. 2010. “A Diffusion Approximation Model for Wireless Networks Based on IEEE 802.11 Standard.” Computer Communications 33:S86–S92.10.1016/j.comcom.2010.07.006
    • (2010) Computer Communications , vol.33 , pp. S86-S92
    • Czachórski, T.1    Grochla, K.2    Nycz, T.3    Pekergin, F.4
  • 16
    • 77956638844 scopus 로고    scopus 로고
    • A Computer Simulation Approach to Evaluating Assembly Line Balancing with Variable Operation Times
    • B.Das, J.M.Sanchez-Rivas, A.Garcia-Diaz, and C.A.MacDonald. 2010. “A Computer Simulation Approach to Evaluating Assembly Line Balancing with Variable Operation Times.” Journal of Manufacturing Technology Management 21 (7):872–887.10.1108/17410381011077964
    • (2010) Journal of Manufacturing Technology Management , vol.21 , Issue.7 , pp. 872-887
    • Das, B.1    Sanchez-Rivas, J.M.2    Garcia-Diaz, A.3    MacDonald, C.A.4
  • 18
    • 84870545654 scopus 로고    scopus 로고
    • Balancing of Simple Assembly Lines under Variations of Task Processing Times
    • E.Gurevsky, O.Battaïa, and A.Dolgui. 2012. “Balancing of Simple Assembly Lines under Variations of Task Processing Times.” Annals of Operations Research 201 (1):265–286.10.1007/s10479-012-1203-5
    • (2012) Annals of Operations Research , vol.201 , Issue.1 , pp. 265-286
    • Gurevsky, E.1    Battaïa, O.2    Dolgui, A.3
  • 19
    • 84870419286 scopus 로고    scopus 로고
    • Stability Measure for a Generalized Assembly Line Balancing Problem
    • E.Gurevsky, O.Battaïa, and A.Dolgui. 2013. “Stability Measure for a Generalized Assembly Line Balancing Problem.” Discrete Applied Mathematics 161 (3):377–394.10.1016/j.dam.2012.08.037
    • (2013) Discrete Applied Mathematics , vol.161 , Issue.3 , pp. 377-394
    • Gurevsky, E.1    Battaïa, O.2    Dolgui, A.3
  • 20
    • 84873667893 scopus 로고    scopus 로고
    • Designing Unpaced Production Lines to Optimize Throughput and Work-in-process Inventory
    • M.Hillier, 2013. “Designing Unpaced Production Lines to Optimize Throughput and Work-in-process Inventory.” IIE Transactions 45 (5):516–527.10.1080/0740817X.2012.706733
    • (2013) IIE Transactions , vol.45 , Issue.5 , pp. 516-527
    • Hillier, M.1
  • 21
    • 84869846652 scopus 로고
    • Recent Developments in Modeling and Performance Analysis Tools for Manufacturing Systems
    • Joshi S., Smith J., (eds), Chapman & Hall, London, Dordrecht: Springer
    • M.Kamath, 1994. “Recent Developments in Modeling and Performance Analysis Tools for Manufacturing Systems.” In Computer Control of Flexible Manufacturing Systems, edited by S.Joshi and J.Smith, Chapman & Hall, London, 231–263. Dordrecht:Springer.
    • (1994) Computer Control of Flexible Manufacturing Systems , pp. 231-263
    • Kamath, M.1
  • 22
    • 0030573486 scopus 로고    scopus 로고
    • Maximizing the Production Rate in Simple Assembly Line Balancing – A Branch and Bound Procedure
    • R.Klein, and A.Scholl. 1996. “Maximizing the Production Rate in Simple Assembly Line Balancing – A Branch and Bound Procedure.” European Journal of Operational Research 91:367–385.10.1016/0377-2217(95)00047-X
    • (1996) European Journal of Operational Research , vol.91 , pp. 367-385
    • Klein, R.1    Scholl, A.2
  • 23
    • 0027151556 scopus 로고
    • A Diffusion Approximation Analysis of an ATM Statistical Multiplexer with Multiple Types of Traffic – I. Equilibrium State Solutions
    • H.Kobayashi, and Q.Ren. 1993. “A Diffusion Approximation Analysis of an ATM Statistical Multiplexer with Multiple Types of Traffic – I. Equilibrium State Solutions.” ICC:IEEE international conference on communications, Geneva, May 23–26.
    • (1993) ICC: IEEE international conference on communications
    • Kobayashi, H.1    Ren, Q.2
  • 24
    • 0036542286 scopus 로고    scopus 로고
    • Improving Throughput for an Electronic Assembly Line using a Constraint Analysis Methodology
    • J.E.Kobza, K.P.Ellis, and F.J.Vittes. 2002. “Improving Throughput for an Electronic Assembly Line using a Constraint Analysis Methodology.” Production Planning & Control 13 (3):262–273.
    • (2002) Production Planning & Control , vol.13 , Issue.3 , pp. 262-273
    • Kobza, J.E.1    Ellis, K.P.2    Vittes, F.J.3
  • 26
    • 84873676187 scopus 로고    scopus 로고
    • Performance Analysis of Closed-loop Assembly Lines with General Processing Times and Finite Buffer Spaces
    • S.Lagershausen, M.Manitz, and H.Tempelmeier. 2013. “Performance Analysis of Closed-loop Assembly Lines with General Processing Times and Finite Buffer Spaces.” IIE Transactions 45 (5):502–515.10.1080/0740817X.2012.705450
    • (2013) IIE Transactions , vol.45 , Issue.5 , pp. 502-515
    • Lagershausen, S.1    Manitz, M.2    Tempelmeier, H.3
  • 27
    • 84860234376 scopus 로고    scopus 로고
    • Optimizing the Supply Chain Configuration for Make-to-order Manufacturing
    • H.Li, and K.Womer. 2012. “Optimizing the Supply Chain Configuration for Make-to-order Manufacturing.” European Journal of Operational Research 221 (1):118–128.10.1016/j.ejor.2012.03.025
    • (2012) European Journal of Operational Research , vol.221 , Issue.1 , pp. 118-128
    • Li, H.1    Womer, K.2
  • 28
    • 70449688145 scopus 로고    scopus 로고
    • Throughput Analysis of Production Systems: Recent Advances and Future Topics
    • J.Li, E.D.Blumenfeld, N.Huang, and M.J.Alden. 2009. “Throughput Analysis of Production Systems:Recent Advances and Future Topics.” International Journal of Production Research 47 (14):3823–3851.10.1080/00207540701829752
    • (2009) International Journal of Production Research , vol.47 , Issue.14 , pp. 3823-3851
    • Li, J.1    Blumenfeld, E.D.2    Huang, N.3    Alden, M.J.4
  • 31
    • 36849069882 scopus 로고    scopus 로고
    • Queueing-model Based Analysis of Assembly Lines with Finite Buffers and General Service Times
    • M.Manitz, 2008. “Queueing-model Based Analysis of Assembly Lines with Finite Buffers and General Service Times.” Computers & Operations Research 35:2520–2536.
    • (2008) Computers & Operations Research , vol.35 , pp. 2520-2536
    • Manitz, M.1
  • 32
    • 84855251301 scopus 로고    scopus 로고
    • The Variance of Inter-departure Times of the Output of an Assembly Line with Finite Buffers, Converging Flow of Material, and General Service Times
    • M.Manitz, and H.Tempelmeier. 2012. “The Variance of Inter-departure Times of the Output of an Assembly Line with Finite Buffers, Converging Flow of Material, and General Service Times.” OR Spectrum 34 (1):273–291.10.1007/s00291-010-0216-1
    • (2012) OR Spectrum , vol.34 , Issue.1 , pp. 273-291
    • Manitz, M.1    Tempelmeier, H.2
  • 33
    • 26444432230 scopus 로고    scopus 로고
    • Combining Heuristic Procedures and Simulation Models for Balancing a PC Camera Assembly Line
    • A.R.Mendes, A.L.Ramos, A.S.Simaria, and P.M.Vilarinho. 2005. “Combining Heuristic Procedures and Simulation Models for Balancing a PC Camera Assembly Line.” Computers & Industrial Engineering 49 (3):413–431.
    • (2005) Computers & Industrial Engineering , vol.49 , Issue.3 , pp. 413-431
    • Mendes, A.R.1    Ramos, A.L.2    Simaria, A.S.3    Vilarinho, P.M.4
  • 34
    • 0002569892 scopus 로고
    • A Heuristic Method of Assembly Line Balancing for Assumptions of Constant or Variable Work Element Times
    • C.L.Moodie, and H.H.Young. 1965. “A Heuristic Method of Assembly Line Balancing for Assumptions of Constant or Variable Work Element Times.” Journal of Industrial Engineering 16:23–29.
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 23-29
    • Moodie, C.L.1    Young, H.H.2
  • 35
    • 0038580042 scopus 로고
    • A Stochastic Approach to Assembly Line Balancing
    • M.M.Nkasu, and K.H.Leung. 1995. “A Stochastic Approach to Assembly Line Balancing.” International Journal of Production Research 33 (4):975–991.10.1080/00207549508930189
    • (1995) International Journal of Production Research , vol.33 , Issue.4 , pp. 975-991
    • Nkasu, M.M.1    Leung, K.H.2
  • 36
    • 75849138540 scopus 로고    scopus 로고
    • Balancing Stochastic Two-Sided Assembly Lines: A Chance-constrained, Piecewise-linear, Mixed Integer Program and a Simulated Annealing Algorithm
    • U.Özcan, 2010. “Balancing Stochastic Two-Sided Assembly Lines:A Chance-constrained, Piecewise-linear, Mixed Integer Program and a Simulated Annealing Algorithm.” European Journal of Operational Research 205 (1):81–97.
    • (2010) European Journal of Operational Research , vol.205 , Issue.1 , pp. 81-97
    • Özcan, U.1
  • 37
    • 78650589919 scopus 로고    scopus 로고
    • A Genetic Algorithm for the Stochastic Mixed-model U-line Balancing and Sequencing Problem
    • U.Özcan, T.Kellegöz, and B.Toklu. 2011. “A Genetic Algorithm for the Stochastic Mixed-model U-line Balancing and Sequencing Problem.” International Journal of Production Research 49 (6):1605–1626.
    • (2011) International Journal of Production Research , vol.49 , Issue.6 , pp. 1605-1626
    • Özcan, U.1    Kellegöz, T.2    Toklu, B.3
  • 39
    • 38049048184 scopus 로고    scopus 로고
    • Evaluating Optimization Models to Solve SALBP
    • R.Pastor, L.Ferrer, and A.García. 2007. “Evaluating Optimization Models to Solve SALBP.” Lecture Notes in Computer Science 4705 (4705):791–803.10.1007/978-3-540-74472-6
    • (2007) Lecture Notes in Computer Science , vol.4705 , Issue.4705 , pp. 791-803
    • Pastor, R.1    Ferrer, L.2    García, A.3
  • 40
    • 0016036689 scopus 로고
    • Accuracy of the Diffusion Approximation for Some Queuing Systems
    • M.Reiser, and H.Kobayashi. 1974. “Accuracy of the Diffusion Approximation for Some Queuing Systems.” IBM Journal of Research and Development 18 (2):110–124.10.1147/rd.182.0110
    • (1974) IBM Journal of Research and Development , vol.18 , Issue.2 , pp. 110-124
    • Reiser, M.1    Kobayashi, H.2
  • 41
    • 25144466050 scopus 로고
    • Data of Assembly Line Balancing Problems
    • A.Scholl,. 1993. “Data of Assembly Line Balancing Problems.” Working Paper, TH Darmstadt. Available:http://www.assembly-line-balancing.de/
    • (1993) Working Paper, TH Darmstadt
    • Scholl, A.1
  • 43
    • 35348899105 scopus 로고    scopus 로고
    • Queueing Theory for Semiconductor Manufacturing Systems: A Survey and Open Problems
    • J.G.Shanthikumar, S.Ding, and M.T.Zhang. 2007. “Queueing Theory for Semiconductor Manufacturing Systems:A Survey and Open Problems.” IEEE Transactions on Automation Science and Engineering 4 (4):513–522.10.1109/TASE.2007.906348
    • (2007) IEEE Transactions on Automation Science and Engineering , vol.4 , Issue.4 , pp. 513-522
    • Shanthikumar, J.G.1    Ding, S.2    Zhang, M.T.3
  • 44
    • 84916620110 scopus 로고    scopus 로고
    • A Study of Constraint Programming Heuristics for the Car-Sequencing Problem
    • M.Siala, E.Hebrard, and M.J.Huguet. 2015. “A Study of Constraint Programming Heuristics for the Car-Sequencing Problem.” Engineering Applications of Artificial Intelligence 38:34–44.10.1016/j.engappai.2014.10.009
    • (2015) Engineering Applications of Artificial Intelligence , vol.38 , pp. 34-44
    • Siala, M.1    Hebrard, E.2    Huguet, M.J.3
  • 45
    • 0023983194 scopus 로고
    • Buffer Space Allocation in Automated Assembly Lines
    • J.M.Smith, and S.Daskalaki. 1988. “Buffer Space Allocation in Automated Assembly Lines.” Operations Research 36 (2):343–358.10.1287/opre.36.2.343
    • (1988) Operations Research , vol.36 , Issue.2 , pp. 343-358
    • Smith, J.M.1    Daskalaki, S.2
  • 46
    • 70349273768 scopus 로고    scopus 로고
    • Topological Network Design of General, Finite, Multi-server Queueing Networks
    • J.M.Smith, F.R.Cruz, and T.Van Woensel. 2010. “Topological Network Design of General, Finite, Multi-server Queueing Networks.” European Journal of Operational Research 201 (2):427–441.10.1016/j.ejor.2009.03.012
    • (2010) European Journal of Operational Research , vol.201 , Issue.2 , pp. 427-441
    • Smith, J.M.1    Cruz, F.R.2    Van Woensel, T.3
  • 47
    • 84857711203 scopus 로고    scopus 로고
    • Solving Two-machine Assembly Scheduling Problems with Inventory Constraints
    • D.Terekhov, M.K.Doğru, U.Özen, and J.C.Beck. 2012. “Solving Two-machine Assembly Scheduling Problems with Inventory Constraints.” Computers & Industrial Engineering 63 (1):120–134.
    • (2012) Computers & Industrial Engineering , vol.63 , Issue.1 , pp. 120-134
    • Terekhov, D.1    Doğru, M.K.2    Özen, U.3    Beck, J.C.4
  • 48
    • 84857488174 scopus 로고    scopus 로고
    • Event and Object Oriented Simulation to Fast Evaluate Operational Objectives of Mixed Model Assembly Lines Problems
    • L.Tiacci, 2012. “Event and Object Oriented Simulation to Fast Evaluate Operational Objectives of Mixed Model Assembly Lines Problems.” Simulation Modelling Practice and Theory 24:35–48.10.1016/j.simpat.2012.01.004
    • (2012) Simulation Modelling Practice and Theory , vol.24 , pp. 35-48
    • Tiacci, L.1
  • 49
    • 84916208602 scopus 로고    scopus 로고
    • Coupling a Genetic Algorithm Approach and a Discrete Event Simulator to Design Mixed-model un-paced Assembly Lines with Parallel Workstations and Stochastic Task Times
    • L.Tiacci, 2015. “Coupling a Genetic Algorithm Approach and a Discrete Event Simulator to Design Mixed-model un-paced Assembly Lines with Parallel Workstations and Stochastic Task Times.” International Journal of Production Economics 159:319–333.10.1016/j.ijpe.2014.05.005
    • (2015) International Journal of Production Economics , vol.159 , pp. 319-333
    • Tiacci, L.1
  • 50
    • 80255132035 scopus 로고    scopus 로고
    • Rule-based Modeling and Constraint Programming Based Solution of the Assembly Line Balancing Problem
    • S.Topaloglu, L.Salum, and A.A.Supciller. 2012. “Rule-based Modeling and Constraint Programming Based Solution of the Assembly Line Balancing Problem.” Expert Systems with Applications 39 (3):3484–3493.10.1016/j.eswa.2011.09.038
    • (2012) Expert Systems with Applications , vol.39 , Issue.3 , pp. 3484-3493
    • Topaloglu, S.1    Salum, L.2    Supciller, A.A.3
  • 51
    • 0022013776 scopus 로고
    • Queueing Models for a Flexible Machining Station Part I: The Diffusion Approximation
    • D.D.W.Yao, and J.A.Buzacott. 1985. “Queueing Models for a Flexible Machining Station Part I:The Diffusion Approximation.” European Journal of Operational Research 19 (2):233–240.10.1016/0377-2217(85)90177-8
    • (1985) European Journal of Operational Research , vol.19 , Issue.2 , pp. 233-240
    • Yao, D.D.W.1    Buzacott, J.A.2
  • 52
    • 78049296921 scopus 로고    scopus 로고
    • A Constraint Programming Approach to Tool Allocation and Production Scheduling in Flexible Manufacturing Systems
    • L.J.Zeballos, 2010. “A Constraint Programming Approach to Tool Allocation and Production Scheduling in Flexible Manufacturing Systems.” Robotics and Computer-Integrated Manufacturing 26 (6):725–743.10.1016/j.rcim.2010.04.005
    • (2010) Robotics and Computer-Integrated Manufacturing , vol.26 , Issue.6 , pp. 725-743
    • Zeballos, L.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.