메뉴 건너뛰기




Volumn 26, Issue 6, 2010, Pages 725-743

A constraint programming approach to tool allocation and production scheduling in flexible manufacturing systems

Author keywords

Constraint programming; Flexible manufacturing systems; Scheduling; Tool management

Indexed keywords

CONSTRAINT PROGRAMMING; FLEXIBLE MANUFACTURING; INDUSTRIAL ENVIRONMENTS; MACHINE ASSIGNMENT; OBJECTIVE FUNCTIONS; PRODUCTION SCHEDULING; SEARCH STRATEGIES; TEST PROBLEM; TIMING DECISIONS; TOOL ALLOCATION; TOOL MAGAZINE; TOOL MANAGEMENT; TOOL PLANNING;

EID: 78049296921     PISSN: 07365845     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.rcim.2010.04.005     Document Type: Conference Paper
Times cited : (52)

References (23)
  • 3
    • 0027591340 scopus 로고
    • Decision models for tool management in automated manufacturing
    • A.E. Gray, A. Seidmann, and K.E. Stecke Decision models for tool management in automated manufacturing Management Science 39 5 1993 549 567
    • (1993) Management Science , vol.39 , Issue.5 , pp. 549-567
    • Gray, A.E.1    Seidmann, A.2    Stecke, K.E.3
  • 4
    • 0030110029 scopus 로고    scopus 로고
    • Auxiliary tool allocation in flexible manufacturing systems
    • T.S. Atan, and R. Pandit Auxiliary tool allocation in flexible manufacturing systems European Journal of Operational Research 89 3 1996 642 659
    • (1996) European Journal of Operational Research , vol.89 , Issue.3 , pp. 642-659
    • Atan, T.S.1    Pandit, R.2
  • 7
    • 0023384747 scopus 로고
    • The machine loading and tool allocation problem in flexible manufacturing systems
    • S.C. Sarin, and C.S. Chen The machine loading and tool allocation problem in flexible manufacturing systems International Journal of Production Research 25 7 1987 1081 1094
    • (1987) International Journal of Production Research , vol.25 , Issue.7 , pp. 1081-1094
    • Sarin, S.C.1    Chen, C.S.2
  • 8
    • 0031275801 scopus 로고    scopus 로고
    • Due date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
    • H.K. Roh, and Y.D. Kim Due date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter International Journal of Production Research 35 1997 2989 3003
    • (1997) International Journal of Production Research , vol.35 , pp. 2989-3003
    • Roh, H.K.1    Kim, Y.D.2
  • 10
    • 33644751275 scopus 로고    scopus 로고
    • Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS
    • F.T.S. Chan, and R. Swarnkar Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS Robotics and Computer-Integrated Manufacturing 22 2006 353 362
    • (2006) Robotics and Computer-Integrated Manufacturing , vol.22 , pp. 353-362
    • Chan, F.T.S.1    Swarnkar, R.2
  • 14
    • 0034661344 scopus 로고    scopus 로고
    • Hybrid mixed-integer/constraint logic programming strategies for solving scheduling and combinatorial optimization problems
    • I. Harjunkoski, V. Jain, and I.E. Grossman Hybrid mixed-integer/ constraint logic programming strategies for solving scheduling and combinatorial optimization problems Computers and Chemical Engineering 24 2000 337 343
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 337-343
    • Harjunkoski, I.1    Jain, V.2    Grossman, I.E.3
  • 15
    • 0010986664 scopus 로고    scopus 로고
    • Algorithms for hybrid MILP/CP models for a class of optimization problems
    • V. Jain, and I.E. Grossmann Algorithms for hybrid MILP/CP models for a class of optimization problems INFORMS Journal of Computing 13 2001 258 276
    • (2001) INFORMS Journal of Computing , vol.13 , pp. 258-276
    • Jain, V.1    Grossmann, I.E.2
  • 16
    • 0037111002 scopus 로고    scopus 로고
    • Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods
    • I. Harjunkoski, and I.E. Grossmann Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods Computers and Chemical Engineering 26 2002 1533 1552
    • (2002) Computers and Chemical Engineering , vol.26 , pp. 1533-1552
    • Harjunkoski, I.1    Grossmann, I.E.2
  • 17
    • 4143136582 scopus 로고    scopus 로고
    • Hybrid MILP/CP decomposition approach for the continuous time scheduling of multipurpose batch plants
    • C.T. Maravelias, and I.E.A. Grossmann Hybrid MILP/CP decomposition approach for the continuous time scheduling of multipurpose batch plants Computers and Chemical Engineering 28 2004 1921 1949
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 1921-1949
    • Maravelias, C.T.1    Grossmann, I.E.A.2
  • 18
    • 33748920331 scopus 로고    scopus 로고
    • Integrated production and material handling scheduling using mathematical programming and constraint programming
    • G. El Khayat, A. Langevin, and D. Riopel Integrated production and material handling scheduling using mathematical programming and constraint programming European Journal of Operational Research 175 2006 1818 1832
    • (2006) European Journal of Operational Research , vol.175 , pp. 1818-1832
    • El Khayat, G.1    Langevin, A.2    Riopel, D.3
  • 19
    • 78049253246 scopus 로고    scopus 로고
    • ILOG Solver 6.0. User's manual. 2003
    • ILOG Solver 6.0. User's manual. 2003.
  • 20
    • 78049291118 scopus 로고    scopus 로고
    • IC-Parc ECLiPSe. User manual. 2003
    • IC-Parc ECLiPSe. User manual. 2003.
  • 21
    • 78049256558 scopus 로고    scopus 로고
    • Mozart Consortium. Tutorials [accessedNovember10,2007]
    • Mozart Consortium. Tutorials: 〈 http://www.mozart-oz.org/home/doc/ 〉; [accessed November 10, 2007].
  • 22
    • 78049285536 scopus 로고    scopus 로고
    • ILOG OPLStudio 3.7. User's manual. 2003.
    • ILOG OPLStudio 3.7. User's manual. 2003.
  • 23
    • 78049305388 scopus 로고    scopus 로고
    • ILOG Scheduler 6.0. User's manual. 2003
    • ILOG Scheduler 6.0. User's manual. 2003.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.