-
1
-
-
0037230929
-
A weighted approach for assembly line design with station paralleling and equipment selection
-
Bukchin, J. and Rubinovitz, J. (2003), "A weighted approach for assembly line design with station paralleling and equipment selection", IIE Transactions, Vol. 35, pp. 73-85.
-
(2003)
IIE Transactions
, vol.35
, pp. 73-85
-
-
Bukchin, J.1
Rubinovitz, J.2
-
2
-
-
33746794110
-
Integrating inspection-policy design in assembly-line balancing
-
Carcano, O.E. and Portioli-Staudacher, A. (2006), "Integrating inspection-policy design in assembly-line balancing", International Journal of Production Research, Vol. 44 Nos 18/19, pp. 4081-103.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.18-19
, pp. 4081-4103
-
-
Carcano, O.E.1
Portioli-Staudacher, A.2
-
3
-
-
62149115017
-
The design of imbalanced series queue flow lines
-
De La Wyche, P. and Wild, R. (1977), "The design of imbalanced series queue flow lines", Operations Research Quarterly, Vol. 28 No. 3, pp. 695-702.
-
(1977)
Operations Research Quarterly
, vol.28
, Issue.3
, pp. 695-702
-
-
De La Wyche, P.1
Wild, R.2
-
4
-
-
0001754984
-
The effect of some design factors on the efficiency of production lines with variable operation times
-
Hillier, F.S. and Boling, R.W. (1966), "The effect of some design factors on the efficiency of production lines with variable operation times", Journal of Industrial Engineering, Vol. 17 No. 12, pp. 651-8.
-
(1966)
Journal of Industrial Engineering
, vol.17
, Issue.12
, pp. 651-658
-
-
Hillier, F.S.1
Boling, R.W.2
-
5
-
-
0346443142
-
Toward characterizing the optimal allocation of work in production line systems with variable operation times
-
Rowbens, M. (Ed.) North-Holland, Amsterdam
-
Hillier, F.S. and Boling, R.W. (1977), "Toward characterizing the optimal allocation of work in production line systems with variable operation times", in Rowbens, M. (Ed.), Advances in Operations Research, North-Holland, Amsterdam, pp. 649-58.
-
(1977)
Advances in Operations Research
, pp. 649-658
-
-
Hillier, F.S.1
Boling, R.W.2
-
6
-
-
0018509376
-
On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times
-
Hillier, F.S. and Boling, R.W. (1979), "On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times", Management Science, Vol. 25 No. 8, pp. 721-8.
-
(1979)
Management Science
, vol.25
, Issue.8
, pp. 721-728
-
-
Hillier, F.S.1
Boling, R.W.2
-
7
-
-
0001012830
-
The effect of the coefficient of variation of operation times on the allocation of storage space in production line systems
-
Hillier, F.S. and So, K.C. (1991), "The effect of the coefficient of variation of operation times on the allocation of storage space in production line systems", IIE Transaction, Vol. 23 No. 2, pp. 198-206.
-
(1991)
IIE Transaction
, vol.23
, Issue.2
, pp. 198-206
-
-
Hillier, F.S.1
So, K.C.2
-
8
-
-
0027574248
-
Some date for applying the bowl phenomenon to large production line systems
-
Hillier, F.S. and So, K.C. (1993), "Some date for applying the bowl phenomenon to large production line systems", International Journal of Production Research, Vol. 31 No. 4, pp. 818-22.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.4
, pp. 818-22
-
-
Hillier, F.S.1
So, K.C.2
-
9
-
-
17444416318
-
On the optimal design of tandem queueing systems with finite buffer
-
Hillier, F.S. and So, K.C. (1995), "On the optimal design of tandem queueing systems with finite buffer", Queuing Systems, Vol. 21, pp. 245-66.
-
(1995)
Queuing Systems
, vol.21
, pp. 245-266
-
-
Hillier, F.S.1
So, K.C.2
-
10
-
-
0027251210
-
Toward characterizing the optimal allocation of storage space in production line systems with variable processing items
-
Hillier, F.S., So, K.C. and Boling, R.W. (1993), "Toward characterizing the optimal allocation of storage space in production line systems with variable processing items", Management Science, Vol. 39 No. 1, pp. 126-33.
-
(1993)
Management Science
, vol.39
, Issue.1
, pp. 126-133
-
-
Hillier, F.S.1
So, K.C.2
Boling, R.W.3
-
11
-
-
0004312527
-
-
6th ed., Holcomb Hathaway, Scottsdale, AZ
-
Konz, S. and Johnson, S. (2004), Work Design, 6th ed., Holcomb Hathaway, Scottsdale, AZ.
-
(2004)
Work Design
-
-
Konz, S.1
Johnson, S.2
-
12
-
-
0028530952
-
Allocating work to a two-stage production system with interstage buffer
-
Lau, H.S. (1994), "Allocating work to a two-stage production system with interstage buffer", International Journal of Production Research, Vol. 36, pp. 281-9.
-
(1994)
International Journal of Production Research
, vol.36
, pp. 281-9
-
-
Lau, H.S.1
-
13
-
-
0022710720
-
A decision support system for the design of unpaced production lines
-
Lau, H.S. and Martin, G.E. (1986), "A decision support system for the design of unpaced production lines", International Journal of Production Research, Vol. 24 No. 3, pp. 599-610.
-
(1986)
International Journal of Production Research
, vol.24
, Issue.3
, pp. 599-610
-
-
Lau, H.S.1
Martin, G.E.2
-
14
-
-
11144304066
-
A bidirectional heuristic for stochastic assembly line balancing type II problem
-
Liu, S.B., Ong, H.L. and Huang, H.C. (2005), "A bidirectional heuristic for stochastic assembly line balancing type II problem", International Journal of Advanced Manufacturing Technology, Vol. 25, pp. 71-7.
-
(2005)
International Journal of Advanced Manufacturing Technology
, vol.25
, pp. 71-7
-
-
Liu, S.B.1
Ong, H.L.2
Huang, H.C.3
-
15
-
-
33644643502
-
Line balancing and simulation of an automated production transfer line
-
Masood, S. (2006), "Line balancing and simulation of an automated production transfer line", Assembly Automation, Vol. 26 No. 1, pp. 69-74.
-
(2006)
Assembly Automation
, vol.26
, Issue.1
, pp. 69-74
-
-
Masood, S.1
-
16
-
-
0038580042
-
A stochastic approach to assembly line balancing
-
Nkasu, M.M. and Leung, K.H. (1995), "A stochastic approach to assembly line balancing", International Journal of Production Research, Vol. 33 No. 4, pp. 975-91.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.4
, pp. 975-91
-
-
Nkasu, M.M.1
Leung, K.H.2
-
17
-
-
77956626275
-
-
Springer, New York, NY
-
Papadopoulos, C.T., O'Kelly, M.E.J., Vidalis, M.J. and Spinellis, D. (2009), Analysis and Design of Discrete Part Production Lines, Springer, New York, NY.
-
(2009)
Analysis and Design of Discrete Part Production Lines
-
-
Papadopoulos, C.T.1
O'kelly, M.E.J.2
Vidalis, M.J.3
Spinellis, D.4
-
18
-
-
84952238341
-
A note on the operating characteristics of "balanced" and "unbalanced" production flow lines
-
Payne, S., Slack, N. and Wild, R. (1972), "A note on the operating characteristics of "balanced" and "unbalanced" production flow lines", International Journal of Production Research, Vol. 10 No. 1, pp. 93-8.
-
(1972)
International Journal of Production Research
, vol.10
, Issue.1
, pp. 93-8
-
-
Payne, S.1
Slack, N.2
Wild, R.3
-
19
-
-
0028392676
-
The bowl phenomenon in unpaced liens
-
Pike, R. and Martin, G.E. (1994), "The bowl phenomenon in unpaced liens", International Journal of Production Research, Vol. 32 No. 3, pp. 483-99.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.3
, pp. 483-499
-
-
Pike, R.1
Martin, G.E.2
-
20
-
-
0016486948
-
On the mean production rate of a two-stage production system of the tandem type
-
Rao, N.P. (1975a), "On the mean production rate of a two-stage production system of the tandem type", International Journal of Production Research, Vol. 13 No. 2, pp. 207-17.
-
(1975)
International Journal of Production Research
, vol.13
, Issue.2
, pp. 207-217
-
-
Rao, N.P.1
-
21
-
-
0016655176
-
Two-stage production systems with independent storage
-
Rao, N.P. (1975b), "Two-stage production systems with independent storage", AIIE Transactions, Vol. 7 No. 4, pp. 414-21.
-
(1975)
AIIE Transactions
, vol.7
, Issue.4
, pp. 414-421
-
-
Rao, N.P.1
-
22
-
-
0016974623
-
A generalization of "bowl phenomenon" in service production systems
-
Rao, N.P. (1976), "A generalization of "bowl phenomenon" in service production systems", International Journal of Production Research, Vol. 14 No. 4, pp. 437-43.
-
(1976)
International Journal of Production Research
, vol.14
, Issue.4
, pp. 437-43
-
-
Rao, N.P.1
-
23
-
-
0003753468
-
-
Richard Irwin, Homewood, IL
-
Schmidt, J.W. and Taylor, R.E. (1970), Simulation Analysis of Industrial Systems, Richard Irwin, Homewood, IL.
-
(1970)
Simulation Analysis of Industrial Systems
-
-
Schmidt, J.W.1
Taylor, R.E.2
-
24
-
-
61349104863
-
Improving the efficiency of unpaced production lines by unbalancing service time means
-
Shaaban, S. and McNamara, T. (2009), "Improving the efficiency of unpaced production lines by unbalancing service time means", International Journal of Operation Research, Vol. 4 No. 3, pp. 346-61.
-
(2009)
International Journal of Operation Research
, vol.4
, Issue.3
, pp. 346-61
-
-
Shaaban, S.1
McNamara, T.2
-
25
-
-
24644478375
-
The non steady state performance of unpaced manual assembly lines
-
Slack, N.D. and Wild, R. (1980), "The non steady state performance of unpaced manual assembly lines", International Journal of Production Research, Vol. 18 No. 5, pp. 581-95.
-
(1980)
International Journal of Production Research
, vol.18
, Issue.5
, pp. 581-95
-
-
Slack, N.D.1
Wild, R.2
-
26
-
-
0001562309
-
Stochastic unpaced line design: Review and further experimental results
-
Smunt, T.L. and Perkins, W.C. (1985), "Stochastic unpaced line design: review and further experimental results", Journal of Operations Management, Vol. 5 No. 3, pp. 351-73.
-
(1985)
Journal of Operations Management
, vol.5
, Issue.3
, pp. 351-73
-
-
Smunt, T.L.1
Perkins, W.C.2
-
27
-
-
0024641336
-
On the efficiency of unbalancing production lines
-
So, K.C. (1989), "On the efficiency of unbalancing production lines", International Journal of Production Research, Vol. 27 No. 4, pp. 717-29.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.4
, pp. 717-29
-
-
So, K.C.1
-
28
-
-
0034651056
-
Large production line optimization using simulated annealing
-
Spinellis, D., Papadopoulos, C. and MacGregory Smith, J. (2000), "Large production line optimization using simulated annealing", International Journal of Production Research, Vol. 38 No. 3, pp. 509-41.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.3
, pp. 509-41
-
-
Spinellis, D.1
Papadopoulos, C.2
MacGregory Smith, J.3
-
29
-
-
0242270555
-
Practical considerations in the optimization of flow production systems
-
Templemeir, H. (2003), "Practical considerations in the optimization of flow production systems", International Journal of Production Research, Vol. 41 No. 1, pp. 149-70.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.1
, pp. 149-70
-
-
Templemeir, H.1
-
30
-
-
25144472327
-
An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
-
Urban, T.L. and Chiang, W.C. (2006), "An optimal piecewise-linear program for the U-line balancing problem with stochastic task times", European Journal of Operations Research, Vol. 168, pp. 771-82.
-
(2006)
European Journal of Operations Research
, vol.168
, pp. 771-82
-
-
Urban, T.L.1
Chiang, W.C.2
-
31
-
-
15344340307
-
On the workload and "phaseload" allocation problems of short reliable production lines with finite buffers
-
Vidalis, M.J., Papadopoulos, C.T. and Heavey, C. (2005), "On the workload and "phaseload" allocation problems of short reliable production lines with finite buffers", Computers & Industrial Engineering, Vol. 48, pp. 825-37.
-
(2005)
Computers & Industrial Engineering
, vol.48
, pp. 825-37
-
-
Vidalis, M.J.1
Papadopoulos, C.T.2
Heavey, C.3
-
32
-
-
77956632425
-
Simulation as a means of solving the buffer capacity problem for flow line production
-
Wood, A., Pooley, T. and Thomas, L. (1997), "Simulation as a means of solving the buffer capacity problem for flow line production", Stochastic Modelling in Innovative Manufacturing, Vol. 44 No. 5, pp. 292-308.
-
(1997)
Stochastic Modelling in Innovative Manufacturing
, vol.44
, Issue.5
, pp. 292-308
-
-
Wood, A.1
Pooley, T.2
Thomas, L.3
-
33
-
-
42549133175
-
An assembly line design and construction for a small manufacturing company
-
Yaman, R. (2008), "An assembly line design and construction for a small manufacturing company", Assembly Automation, Vol. 28 No. 2, pp. 163-72.
-
(2008)
Assembly Automation
, vol.28
, Issue.2
, pp. 163-72
-
-
Yaman, R.1
|