메뉴 건너뛰기




Volumn 221, Issue 1, 2012, Pages 118-128

Optimizing the supply chain configuration for make-to-order manufacturing

Author keywords

Make to order (MTO) manufacturing; Math programming; Project management; Resource constraints; Sourcing; Supply chain design

Indexed keywords

COMPUTER PROGRAMMING; CONSTRAINT THEORY; ITERATIVE METHODS; MANUFACTURE; NONLINEAR PROGRAMMING; PROJECT MANAGEMENT; SCHEDULING; SUPPLY CHAIN MANAGEMENT; SUPPLY CHAINS;

EID: 84860234376     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2012.03.025     Document Type: Article
Times cited : (59)

References (59)
  • 1
    • 77957163410 scopus 로고    scopus 로고
    • Supply chain configuration for diffusion of new products: An integrated optimization approach
    • M. Amini, and H. Li Supply chain configuration for diffusion of new products: an integrated optimization approach Omega 39 3 2011 313 322
    • (2011) Omega , vol.39 , Issue.3 , pp. 313-322
    • Amini, M.1    Li, H.2
  • 5
    • 0347568237 scopus 로고    scopus 로고
    • How many suppliers are best? A decision-analysis approach
    • P.D. Berger, A. Gerstenfeld, and A.Z. Zeng How many suppliers are best? A decision-analysis approach Omega 32 1 2004 9 15
    • (2004) Omega , vol.32 , Issue.1 , pp. 9-15
    • Berger, P.D.1    Gerstenfeld, A.2    Zeng, A.Z.3
  • 6
    • 0035254165 scopus 로고    scopus 로고
    • A study of simple rules for subcontracting in make-to-order manufacturing
    • J.W.M. Bertrand, and V. Sridharan A study of simple rules for subcontracting in make-to-order manufacturing European Journal of Operational Research 128 3 2001 509 531
    • (2001) European Journal of Operational Research , vol.128 , Issue.3 , pp. 509-531
    • Bertrand, J.W.M.1    Sridharan, V.2
  • 7
    • 38149027740 scopus 로고    scopus 로고
    • A state-of-the-art review on scheduling with learning effect
    • D. Biskup A state-of-the-art review on scheduling with learning effect European Journal of Operational Research 188 2 2008 315 329
    • (2008) European Journal of Operational Research , vol.188 , Issue.2 , pp. 315-329
    • Biskup, D.1
  • 12
    • 0030574803 scopus 로고    scopus 로고
    • Modeling setup times, process batches and transfer batches using activity network logic
    • E.L. Demeulemeester, and W.S. Herroelen Modeling setup times, process batches and transfer batches using activity network logic European Journal of Operational Research 89 2 1996 355 365
    • (1996) European Journal of Operational Research , vol.89 , Issue.2 , pp. 355-365
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 14
    • 34848824987 scopus 로고    scopus 로고
    • An integrated multiobjective decision making process for supplier selection and order allocation
    • E.A. Demirtas, and O. Ustun An integrated multiobjective decision making process for supplier selection and order allocation Omega 36 1 2008 509 521
    • (2008) Omega , vol.36 , Issue.1 , pp. 509-521
    • Demirtas, E.A.1    Ustun, O.2
  • 16
    • 44249086028 scopus 로고    scopus 로고
    • GAMS Development Corporation Washington, DC
    • GAMS GAMS User's Guide 2008 GAMS Development Corporation Washington, DC
    • (2008) GAMS User's Guide
  • 17
    • 25144480454 scopus 로고    scopus 로고
    • Optimizing the supply chain configuration for new products
    • S.C. Graves, and S.P. Willems Optimizing the supply chain configuration for new products Management Science 51 8 2005 1165 1180
    • (2005) Management Science , vol.51 , Issue.8 , pp. 1165-1180
    • Graves, S.C.1    Willems, S.P.2
  • 18
    • 19844377525 scopus 로고    scopus 로고
    • Build-to-order supply chain management: A literature review and framework for development
    • A. Gunasekaran, and E.W.T. Ngai Build-to-order supply chain management: a literature review and framework for development Journal of Operations Management 23 5 2005 423 451
    • (2005) Journal of Operations Management , vol.23 , Issue.5 , pp. 423-451
    • Gunasekaran, A.1    Ngai, E.W.T.2
  • 19
    • 2342539189 scopus 로고    scopus 로고
    • Supply chain scheduling: Batching and delivery
    • N.G. Hall, and C.N. Potts Supply chain scheduling: batching and delivery Operations Research 51 4 2003 566 584
    • (2003) Operations Research , vol.51 , Issue.4 , pp. 566-584
    • Hall, N.G.1    Potts, C.N.2
  • 22
    • 2542528067 scopus 로고    scopus 로고
    • Logic, optimization and constraint programming
    • J. Hooker Logic, optimization and constraint programming INFORMS Journal on Computing 14 4 2002 285 321
    • (2002) INFORMS Journal on Computing , vol.14 , Issue.4 , pp. 285-321
    • Hooker, J.1
  • 23
    • 14844338607 scopus 로고    scopus 로고
    • Towards integrated optimal configuration of platform products, manufacturing processes, and supply chains
    • G.Q. Huang, X.Y. Zhang, and L. Liang Towards integrated optimal configuration of platform products, manufacturing processes, and supply chains Journal of Operations Management 23 2005 267 290
    • (2005) Journal of Operations Management , vol.23 , pp. 267-290
    • Huang, G.Q.1    Zhang, X.Y.2    Liang, L.3
  • 27
    • 0010986664 scopus 로고    scopus 로고
    • Algorithms for hybrid MILP/CP models for a class of optimization problems
    • V. Jain, and I. Grossmann Algorithms for hybrid MILP/CP models for a class of optimization problems INFORMS Journal on Computing 13 4 2001 258 276
    • (2001) INFORMS Journal on Computing , vol.13 , Issue.4 , pp. 258-276
    • Jain, V.1    Grossmann, I.2
  • 30
    • 0034516883 scopus 로고    scopus 로고
    • Integration of assembly and fabrication for make-to-order production
    • R. Kolisch Integration of assembly and fabrication for make-to-order production International Journal of Production Economics 68 3 2000 287 306
    • (2000) International Journal of Production Economics , vol.68 , Issue.3 , pp. 287-306
    • Kolisch, R.1
  • 32
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • R. Kolisch, A. Sprecher, and A. Drexel Characterization and generation of a general class of resource-constrained project scheduling problems Management Science 41 10 1995 1693 1703
    • (1995) Management Science , vol.41 , Issue.10 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexel, A.3
  • 33
    • 84862672037 scopus 로고    scopus 로고
    • A hybrid optimization approach to configure supply chains for new products diffusion: A case study of multiple-sourcing strategy
    • forthcoming
    • Li, H.; Amini, M.; forthcoming. A hybrid optimization approach to configure supply chains for new products diffusion: a case study of multiple-sourcing strategy. International Journal of Production Research: http://dx.doi.org/10.1080/00207543.2011.597789.
    • International Journal of Production Research
    • Li, H.1    Amini, M.2
  • 34
    • 81555208211 scopus 로고    scopus 로고
    • New model and heuristics for safety stock placement in general acyclic supply chain networks
    • H. Li, and D. Jiang New model and heuristics for safety stock placement in general acyclic supply chain networks Computers and Operations Research 39 7 2012 1333 1344
    • (2012) Computers and Operations Research , vol.39 , Issue.7 , pp. 1333-1344
    • Li, H.1    Jiang, D.2
  • 35
    • 34848914805 scopus 로고    scopus 로고
    • A model and procedure for competitive bidding under resource constraints
    • H. Li, and K. Womer A model and procedure for competitive bidding under resource constraints International Journal of Operational Research 2 4 2007 452 480
    • (2007) International Journal of Operational Research , vol.2 , Issue.4 , pp. 452-480
    • Li, H.1    Womer, K.2
  • 36
    • 49349085445 scopus 로고    scopus 로고
    • Modeling the supply chain configuration problem under resource constraints
    • H. Li, and K. Womer Modeling the supply chain configuration problem under resource constraints International Journal of Project Management 26 6 2008 646 654
    • (2008) International Journal of Project Management , vol.26 , Issue.6 , pp. 646-654
    • Li, H.1    Womer, K.2
  • 37
    • 80052423312 scopus 로고    scopus 로고
    • Incorporating uncertainty into a supplier selection problem
    • 10.1016/j.ijpe.2009.11.007
    • L. Li, and Z.B. Zabinsky Incorporating uncertainty into a supplier selection problem International Journal of Production Economics 2009 10.1016/j.ijpe.2009.11.007
    • (2009) International Journal of Production Economics
    • Li, L.1    Zabinsky, Z.B.2
  • 40
    • 20444453324 scopus 로고    scopus 로고
    • A framework for facilitating sourcing and allocation decisions for make-to-order items
    • N.N. Murthy, S. Soni, and S. Ghosh A framework for facilitating sourcing and allocation decisions for make-to-order items Decision Sciences 35 4 2004 609 637
    • (2004) Decision Sciences , vol.35 , Issue.4 , pp. 609-637
    • Murthy, N.N.1    Soni, S.2    Ghosh, S.3
  • 41
    • 0000497721 scopus 로고    scopus 로고
    • Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
    • K. Neumann, and C. Schwindt Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production OR Spectrum 19 3 1997 205 217
    • (1997) OR Spectrum , vol.19 , Issue.3 , pp. 205-217
    • Neumann, K.1    Schwindt, C.2
  • 42
    • 75849145567 scopus 로고    scopus 로고
    • A fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environment
    • D. Peidro, J. Mula, M. Jimenez, and M. Betella A fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environment European Journal of Operational Research 205 1 2010 65 80
    • (2010) European Journal of Operational Research , vol.205 , Issue.1 , pp. 65-80
    • Peidro, D.1    Mula, J.2    Jimenez, M.3    Betella, M.4
  • 43
    • 0024105857 scopus 로고
    • A decision support system for purchasing management of large projects
    • B. Ronen, and D. Trietsch A decision support system for purchasing management of large projects Operations Research 36 6 1988 882 890
    • (1988) Operations Research , vol.36 , Issue.6 , pp. 882-890
    • Ronen, B.1    Trietsch, D.2
  • 44
    • 70649097283 scopus 로고    scopus 로고
    • Single vs. multiple objective supplier selection in a make-to-order environment
    • T. Sawik Single vs. multiple objective supplier selection in a make-to-order environment Omega 38 3-4 2010 203 212
    • (2010) Omega , vol.38 , Issue.34 , pp. 203-212
    • Sawik, T.1
  • 45
    • 78049432046 scopus 로고    scopus 로고
    • Selection of a dynamic supply portfolio in make-to-order environment with risks
    • T. Sawik Selection of a dynamic supply portfolio in make-to-order environment with risks Computers & Operations Research 38 4 2011 782 796
    • (2011) Computers & Operations Research , vol.38 , Issue.4 , pp. 782-796
    • Sawik, T.1
  • 48
    • 0017537769 scopus 로고
    • Measures of the restrictiveness of project networks
    • A. Thesen Measures of the restrictiveness of project networks Networks 7 1977 193 208
    • (1977) Networks , vol.7 , pp. 193-208
    • Thesen, A.1
  • 49
    • 79251609198 scopus 로고    scopus 로고
    • A branch and bound algorithm for minimizing makespan on a single machine with unequal release times under learning effect and deteriorating jobs
    • M.D. Toksari A branch and bound algorithm for minimizing makespan on a single machine with unequal release times under learning effect and deteriorating jobs Computers & Operations Research 38 9 2011 1361 1365
    • (2011) Computers & Operations Research , vol.38 , Issue.9 , pp. 1361-1365
    • Toksari, M.D.1
  • 53
    • 0002573726 scopus 로고
    • Production and cost function: An econometric survey
    • A.A. Walters Production and cost function: an econometric survey Econometrica 31 1-2 1963 1 66
    • (1963) Econometrica , vol.31 , Issue.12 , pp. 1-66
    • Walters, A.A.1
  • 54
    • 0029260612 scopus 로고
    • A survey of US manufacturing practices in make-to-order machine shops
    • J.D. Wisner, and S.P. Siferd A survey of US manufacturing practices in make-to-order machine shops Production and Inventory Management Journal 36 1 1995 1 6
    • (1995) Production and Inventory Management Journal , vol.36 , Issue.1 , pp. 1-6
    • Wisner, J.D.1    Siferd, S.P.2
  • 55
    • 0018456284 scopus 로고
    • Learning curves, production rate, and program costs
    • K. Womer Learning curves, production rate, and program costs Management Science 25 1979 312 319
    • (1979) Management Science , vol.25 , pp. 312-319
    • Womer, K.1
  • 57
    • 69749092309 scopus 로고    scopus 로고
    • Fuzzy multi-objective programming for supplier selection and risk modeling: A possibility approach
    • D.D. Wu, Y. Zhang, D. Wu, and D.L. Olson Fuzzy multi-objective programming for supplier selection and risk modeling: a possibility approach European Journal of Operational Research 200 3 2010 774 787
    • (2010) European Journal of Operational Research , vol.200 , Issue.3 , pp. 774-787
    • Wu, D.D.1    Zhang, Y.2    Wu, D.3    Olson, D.L.4
  • 58
    • 79955118074 scopus 로고    scopus 로고
    • Some single-machine scheduling with both learning and deterioration effects
    • Y.-B. Wu, M.-Z. Wang, and J.-B. Wang Some single-machine scheduling with both learning and deterioration effects Applied Mathematical Modelling 35 8 2011 3731 3736
    • (2011) Applied Mathematical Modelling , vol.35 , Issue.8 , pp. 3731-3736
    • Wu, Y.-B.1    Wang, M.-Z.2    Wang, J.-B.3
  • 59
    • 67549134462 scopus 로고    scopus 로고
    • Using frontier portfolios to improve make-to-order operations
    • J. Yue, Y. Xia, T. Tran, and B. Chen Using frontier portfolios to improve make-to-order operations Production and Operations Management 18 2 2009 226 239
    • (2009) Production and Operations Management , vol.18 , Issue.2 , pp. 226-239
    • Yue, J.1    Xia, Y.2    Tran, T.3    Chen, B.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.