메뉴 건너뛰기




Volumn 26, Issue 1, 2018, Pages 30-67

Optimization model for a production, inventory, distribution and routing problem in small furniture companies

Author keywords

Furniture industry; Integrated production distribution planning; Production routing problem; Production, inventory, distribution routing problem

Indexed keywords


EID: 85019563025     PISSN: 11345764     EISSN: 18638279     Source Type: Journal    
DOI: 10.1007/s11750-017-0448-1     Document Type: Article
Times cited : (35)

References (55)
  • 1
    • 84946012494 scopus 로고    scopus 로고
    • A two-phase iterative heuristic approach for the production routing problem
    • Absi N, Archetti C, Dauzère-Pérès S, Feillet D (2014) A two-phase iterative heuristic approach for the production routing problem. Transp Sci 49(4):784–795. doi:10.1287/trsc.2014.0523
    • (2014) Transp Sci , vol.49 , Issue.4 , pp. 784-795
    • Absi, N.1    Archetti, C.2    Dauzère-Pérès, S.3    Feillet, D.4
  • 2
    • 84893873667 scopus 로고    scopus 로고
    • Formulations and branch-and-cut algorithms for multivehicle production and inventory routing problems
    • Adulyasak Y, Cordeau JF, Jans R (2014a) Formulations and branch-and-cut algorithms for multivehicle production and inventory routing problems. INFORMS J Comput 26:103–120
    • (2014) INFORMS J Comput , vol.26 , pp. 103-120
    • Adulyasak, Y.1    Cordeau, J.F.2    Jans, R.3
  • 3
    • 84894570180 scopus 로고    scopus 로고
    • Optimization-based adaptive large neighborhood search for the production routing problem
    • Adulyasak Y, Cordeau JF, Jans R (2014b) Optimization-based adaptive large neighborhood search for the production routing problem. Transp Sci 48(1):20–45
    • (2014) Transp Sci , vol.48 , Issue.1 , pp. 20-45
    • Adulyasak, Y.1    Cordeau, J.F.2    Jans, R.3
  • 4
    • 84937863906 scopus 로고    scopus 로고
    • Benders decomposition for production routing under demand uncertainty
    • Adulyasak Y, Cordeau JF, Jans R (2015) Benders decomposition for production routing under demand uncertainty. Oper Res 63(4):851–867. doi:10.1287/opre.2015.1401
    • (2015) Oper Res , vol.63 , Issue.4 , pp. 851-867
    • Adulyasak, Y.1    Cordeau, J.F.2    Jans, R.3
  • 5
    • 84919340915 scopus 로고    scopus 로고
    • The production routing problem: a review of formulations and solution algorithms
    • Adulyasak Y, Cordeau JF, Jans R (2015b) The production routing problem: a review of formulations and solution algorithms. Comput Oper Res 55:141–152. doi:10.1016/j.cor.2014.01.011
    • (2015) Comput Oper Res , vol.55 , pp. 141-152
    • Adulyasak, Y.1    Cordeau, J.F.2    Jans, R.3
  • 6
    • 84885174047 scopus 로고    scopus 로고
    • Lot sizing versus batching in the production and distribution planning of perishable goods
    • Amorim P, Belo-Filho M, Toledo F, Almeder C, Almada-Lobo B (2013) Lot sizing versus batching in the production and distribution planning of perishable goods. Int J Prod Econ 146(1):208–218. doi:10.1016/j.ijpe.2013.07.001
    • (2013) Int J Prod Econ , vol.146 , Issue.1 , pp. 208-218
    • Amorim, P.1    Belo-Filho, M.2    Toledo, F.3    Almeder, C.4    Almada-Lobo, B.5
  • 7
    • 84904152234 scopus 로고    scopus 로고
    • A rich vehicle routing problem dealing with perishable food: a case study
    • Amorim P, Parragh SN, Sperandio F, Almada-Lobo B (2014) A rich vehicle routing problem dealing with perishable food: a case study. TOP 22(2):489–508. doi:10.1007/s11750-012-0266-4
    • (2014) TOP , vol.22 , Issue.2 , pp. 489-508
    • Amorim, P.1    Parragh, S.N.2    Sperandio, F.3    Almada-Lobo, B.4
  • 8
    • 34547145422 scopus 로고    scopus 로고
    • Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
    • Araujo S, Arenales M, Clark A (2007) Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups. J Heuristics 13(4):337–358. doi:10.1007/s10732-007-9011-9
    • (2007) J Heuristics , vol.13 , Issue.4 , pp. 337-358
    • Araujo, S.1    Arenales, M.2    Clark, A.3
  • 9
    • 79955067887 scopus 로고    scopus 로고
    • Analysis of the maximum level policy in a production–distribution system
    • Archetti C, Bertazzi L, Paletta G, Speranza MG (2011) Analysis of the maximum level policy in a production–distribution system. Comput Oper Res 38(12):1731–1746. doi:10.1016/j.cor.2011.03.002
    • (2011) Comput Oper Res , vol.38 , Issue.12 , pp. 1731-1746
    • Archetti, C.1    Bertazzi, L.2    Paletta, G.3    Speranza, M.G.4
  • 10
    • 78650513384 scopus 로고    scopus 로고
    • Tabu search with path relinking for an integrated production–distribution problem
    • Armentano V, Shiguemoto A, Løkketangen A (2011) Tabu search with path relinking for an integrated production–distribution problem. Comput Oper Res 38(8):1199–1209. doi:10.1016/j.cor.2010.10.026
    • (2011) Comput Oper Res , vol.38 , Issue.8 , pp. 1199-1209
    • Armentano, V.1    Shiguemoto, A.2    Løkketangen, A.3
  • 11
    • 38749150380 scopus 로고    scopus 로고
    • A zero-inventory production and distribution problem with a fixed customer sequence
    • Armstrong R, Gao S, Lei L (2007) A zero-inventory production and distribution problem with a fixed customer sequence. Ann Oper Res 159(1):395–414. doi:10.1007/s10479-007-0272-3
    • (2007) Ann Oper Res , vol.159 , Issue.1 , pp. 395-414
    • Armstrong, R.1    Gao, S.2    Lei, L.3
  • 12
    • 33751113046 scopus 로고    scopus 로고
    • An exact algorithm for a single-vehicle routing problem with time windows and multiple routes
    • Azi N, Gendreau M, Potvin JY (2007) An exact algorithm for a single-vehicle routing problem with time windows and multiple routes. Eur J Oper Res 178(3):755–766. doi:10.1016/j.ejor.2006.02.019
    • (2007) Eur J Oper Res , vol.178 , Issue.3 , pp. 755-766
    • Azi, N.1    Gendreau, M.2    Potvin, J.Y.3
  • 13
    • 69849087762 scopus 로고    scopus 로고
    • Heuristics for a multiperiod inventory routing problem with production decisions
    • Bard JF, Nananukul N (2009) Heuristics for a multiperiod inventory routing problem with production decisions. Comput Ind Eng 57(3):713–723. doi:10.1016/j.cie.2009.01.020
    • (2009) Comput Ind Eng , vol.57 , Issue.3 , pp. 713-723
    • Bard, J.F.1    Nananukul, N.2
  • 14
    • 67349211770 scopus 로고    scopus 로고
    • The integrated production–inventory–distribution–routing problem
    • Bard JF, Nananukul N (2009b) The integrated production–inventory–distribution–routing problem. J Sched 12(3):257–280. doi:10.1007/s10951-008-0081-9
    • (2009) J Sched , vol.12 , Issue.3 , pp. 257-280
    • Bard, J.F.1    Nananukul, N.2
  • 15
    • 77955271201 scopus 로고    scopus 로고
    • A branch-and-price algorithm for an integrated production and inventory routing problem
    • Bard JF, Nananukul N (2010) A branch-and-price algorithm for an integrated production and inventory routing problem. Comput Oper Res 37(12):2202–2217. doi:10.1016/j.cor.2010.03.010
    • (2010) Comput Oper Res , vol.37 , Issue.12 , pp. 2202-2217
    • Bard, J.F.1    Nananukul, N.2
  • 16
    • 0032136666 scopus 로고    scopus 로고
    • Supply chain design and analysis: models and methods
    • Beamon BM (1998) Supply chain design and analysis: models and methods. Int J Prod Econ 55:281–294
    • (1998) Int J Prod Econ , vol.55 , pp. 281-294
    • Beamon, B.M.1
  • 17
    • 84938787400 scopus 로고    scopus 로고
    • A hybrid variable neighborhood tabu search heuristic for the vehicle routing problem with multiple time windows
    • Belhaiza S, Hansen P, Laporte G (2014) A hybrid variable neighborhood tabu search heuristic for the vehicle routing problem with multiple time windows. Comput Oper Eng 52(Part B):269–281. doi:10.1016/j.cor.2013.08.010
    • (2014) Comput Oper Eng , vol.52 , pp. 269-281
    • Belhaiza, S.1    Hansen, P.2    Laporte, G.3
  • 18
    • 41149118126 scopus 로고    scopus 로고
    • Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs
    • Beraldi P, Ghiani G, Grieco A, Guerriero E (2008) Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs. Comput Oper Res 35(11):3644–3656. doi:10.1016/j.cor.2007.04.003
    • (2008) Comput Oper Res , vol.35 , Issue.11 , pp. 3644-3656
    • Beraldi, P.1    Ghiani, G.2    Grieco, A.3    Guerriero, E.4
  • 19
    • 26844451403 scopus 로고    scopus 로고
    • Minimizing the total cost in an integrated vendor-managed inventory system
    • Bertazzi L, Paletta G, Speranza MG (2005) Minimizing the total cost in an integrated vendor-managed inventory system. J Heuristics 11:393–419
    • (2005) J Heuristics , vol.11 , pp. 393-419
    • Bertazzi, L.1    Paletta, G.2    Speranza, M.G.3
  • 20
    • 56349117292 scopus 로고    scopus 로고
    • A memetic algorithm with dynamic population management for an integrated production–distribution problem
    • Boudia M, Prins C (2009) A memetic algorithm with dynamic population management for an integrated production–distribution problem. Eur J Oper Res 195(3):703–715. doi:10.1016/j.ejor.2007.07.034
    • (2009) Eur J Oper Res , vol.195 , Issue.3 , pp. 703-715
    • Boudia, M.1    Prins, C.2
  • 21
    • 34047126268 scopus 로고    scopus 로고
    • A reactive GRASP and path relinking for a combined production–distribution problem
    • Boudia M, Louly M, Prins C (2007) A reactive GRASP and path relinking for a combined production–distribution problem. Comput Oper Res 34(11):3402–3419. doi:10.1016/j.cor.2006.02.005
    • (2007) Comput Oper Res , vol.34 , Issue.11 , pp. 3402-3419
    • Boudia, M.1    Louly, M.2    Prins, C.3
  • 22
    • 84959377307 scopus 로고    scopus 로고
    • Multi-item production routing problem with backordering: a MILP approach
    • Brahimi N, Aouam T (2016) Multi-item production routing problem with backordering: a MILP approach. Int J Prod Res 54(4):1076–1093. doi:10.1080/00207543.2015.1047971
    • (2016) Int J Prod Res , vol.54 , Issue.4 , pp. 1076-1093
    • Brahimi, N.1    Aouam, T.2
  • 23
    • 0028371172 scopus 로고
    • Coordination of production and distribution planning
    • Chandra P, Fisher ML (1994) Coordination of production and distribution planning. Eur J Oper Res 72:503–517
    • (1994) Eur J Oper Res , vol.72 , pp. 503-517
    • Chandra, P.1    Fisher, M.L.2
  • 24
    • 57649159122 scopus 로고    scopus 로고
    • Production scheduling and vehicle routing with time windows for perishable food products
    • Chen HK, Hsueh CF, Chang MS (2009) Production scheduling and vehicle routing with time windows for perishable food products. Comput Oper Res 36(7):2311–2319. doi:10.1016/j.cor.2008.09.010
    • (2009) Comput Oper Res , vol.36 , Issue.7 , pp. 2311-2319
    • Chen, H.K.1    Hsueh, C.F.2    Chang, M.S.3
  • 25
    • 22544468772 scopus 로고    scopus 로고
    • Integrated production and distribution operations: Taxonomy, models, and review
    • Simchi-Levi D, Wu S, Shen ZJ (eds), chap 17, Kluwer Academic Publishers, Boston
    • Chen ZL (2004) Integrated production and distribution operations: taxonomy, models, and review. In: Simchi-Levi D, Wu S, Shen ZJ (eds) Handbook of quantitative supply chain analysis: modeling in the e-business era, chap 17. Kluwer Academic Publishers, Boston, pp 711–745
    • (2004) Handbook of Quantitative Supply Chain Analysis: Modeling in the E-Business Era , pp. 711-745
    • Chen, Z.L.1
  • 26
    • 77249147436 scopus 로고    scopus 로고
    • Integrated production and outbound distribution scheduling: review and extensions
    • Chen ZL (2010) Integrated production and outbound distribution scheduling: review and extensions. Oper Res 58(1):130–148. doi:10.1287/opre.1080.0688
    • (2010) Oper Res , vol.58 , Issue.1 , pp. 130-148
    • Chen, Z.L.1
  • 27
    • 33744826037 scopus 로고    scopus 로고
    • Order assignment and scheduling in a supply chain
    • Chen ZL, Pundoor G (2006) Order assignment and scheduling in a supply chain. Oper Res 54(3):555–572. doi:10.1287/opre.1060.0280
    • (2006) Oper Res , vol.54 , Issue.3 , pp. 555-572
    • Chen, Z.L.1    Pundoor, G.2
  • 28
    • 22544461035 scopus 로고    scopus 로고
    • Integrated scheduling of production and distribution operations
    • Chen ZL, Vairaktarakis GL (2005) Integrated scheduling of production and distribution operations. Manag Sci 51(4):614–628. doi:10.1287/mnsc.1040.0325
    • (2005) Manag Sci , vol.51 , Issue.4 , pp. 614-628
    • Chen, Z.L.1    Vairaktarakis, G.L.2
  • 29
    • 70349206132 scopus 로고    scopus 로고
    • A simulation/metaheuristic approach to newspaper production and distribution supply chain problems
    • Chiang WC, Russell R, Xu X, Zepeda D (2009) A simulation/metaheuristic approach to newspaper production and distribution supply chain problems. Int J Prod Econ 121(2):752–767. doi:10.1016/j.ijpe.2009.03.001
    • (2009) Int J Prod Econ , vol.121 , Issue.2 , pp. 752-767
    • Chiang, W.C.1    Russell, R.2    Xu, X.3    Zepeda, D.4
  • 30
    • 84941598954 scopus 로고    scopus 로고
    • A review of tactical optimization models for integrated production and transport routing planning decisions
    • Díaz-Madroñero M, Peidro D, Mula J (2015) A review of tactical optimization models for integrated production and transport routing planning decisions. Comput Ind Eng 88:518–535. doi:10.1016/j.cie.2015.06.010
    • (2015) Comput Ind Eng , vol.88 , pp. 518-535
    • Díaz-Madroñero, M.1    Peidro, D.2    Mula, J.3
  • 31
    • 0028769399 scopus 로고
    • On practical resource allocation for production planning and scheduling with period overlapping setups
    • Dillenberger C, Escudero LF, Wollensak A, Zhang W (1994) On practical resource allocation for production planning and scheduling with period overlapping setups. Eur J Oper Res 75(2):275–286. doi:10.1016/0377-2217(94)90074-4
    • (1994) Eur J Oper Res , vol.75 , Issue.2 , pp. 275-286
    • Dillenberger, C.1    Escudero, L.F.2    Wollensak, A.3    Zhang, W.4
  • 32
    • 28244496090 scopus 로고    scopus 로고
    • Benchmarking optimization software with performance profiles
    • Dolan ED, Moré JJ (2002) Benchmarking optimization software with performance profiles. Math Progr 91(2):201–213. doi:10.1007/s101070100263
    • (2002) Math Progr , vol.91 , Issue.2 , pp. 201-213
    • Dolan, E.D.1    Moré, J.J.2
  • 33
    • 84859794755 scopus 로고    scopus 로고
    • Integrated production and distribution planning for perishable food products
    • Farahani P, Grunow M, Günther HO (2012) Integrated production and distribution planning for perishable food products. Flex Serv Manuf J 24(1):28–51. doi:10.1007/s10696-011-9125-0
    • (2012) Flex Serv Manuf J , vol.24 , Issue.1 , pp. 28-51
    • Farahani, P.1    Grunow, M.2    Günther, H.O.3
  • 34
    • 58149250389 scopus 로고    scopus 로고
    • Solution approaches for the soft drink integrated production lot sizing and scheduling problem
    • Ferreira D, Morabito R, Rangel S (2009) Solution approaches for the soft drink integrated production lot sizing and scheduling problem. Eur J Oper Res 196(2):697–706. doi:10.1016/j.ejor.2008.03.035
    • (2009) Eur J Oper Res , vol.196 , Issue.2 , pp. 697-706
    • Ferreira, D.1    Morabito, R.2    Rangel, S.3
  • 35
    • 70350569826 scopus 로고    scopus 로고
    • Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants
    • Ferreira D, Morabito R, Rangel S (2010) Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants. Comput Oper Res 37(4):684–691. doi:10.1016/j.cor.2009.06.007
    • (2010) Comput Oper Res , vol.37 , Issue.4 , pp. 684-691
    • Ferreira, D.1    Morabito, R.2    Rangel, S.3
  • 36
    • 0033339421 scopus 로고    scopus 로고
    • Synchronized development of production, inventory, and distribution schedules
    • Fumero F, Vercellis C (1999) Synchronized development of production, inventory, and distribution schedules. Transp Sci 33(3):330–340. doi:10.1287/trsc.33.3.330
    • (1999) Transp Sci , vol.33 , Issue.3 , pp. 330-340
    • Fumero, F.1    Vercellis, C.2
  • 37
    • 61349164254 scopus 로고    scopus 로고
    • The integrated production and transportation scheduling problem for a product with a short lifespan
    • Geismar HN, Laporte G, Lei L, Sriskandarajah C (2008) The integrated production and transportation scheduling problem for a product with a short lifespan. INFORMS J Comput 20(1):21–33. doi:10.1287/ijoc.1060.0208
    • (2008) INFORMS J Comput , vol.20 , Issue.1 , pp. 21-33
    • Geismar, H.N.1    Laporte, G.2    Lei, L.3    Sriskandarajah, C.4
  • 38
    • 84870504709 scopus 로고    scopus 로고
    • The minimum duration truck driver scheduling problem
    • Goel A (2012) The minimum duration truck driver scheduling problem. EURO J Transp Logist 1(4):285–306. doi:10.1007/s13676-012-0014-9
    • (2012) EURO J Transp Logist , vol.1 , Issue.4 , pp. 285-306
    • Goel, A.1
  • 39
    • 67349105329 scopus 로고    scopus 로고
    • A lagrangian relaxation approach to a coupled lot-sizing and cutting stock problem
    • Gramani M, França P, Arenales M (2009) A lagrangian relaxation approach to a coupled lot-sizing and cutting stock problem. Int J Prod Econ 119(2):219–227. doi:10.1016/j.ijpe.2009.02.011
    • (2009) Int J Prod Econ , vol.119 , Issue.2 , pp. 219-227
    • Gramani, M.1    França, P.2    Arenales, M.3
  • 41
    • 79955056703 scopus 로고    scopus 로고
    • Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighborhood search heuristics
    • James R, Almada-Lobo B (2011) Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighborhood search heuristics. Comput Oper Res 38(12):1816–1825. doi:10.1016/j.cor.2011.02.005
    • (2011) Comput Oper Res , vol.38 , Issue.12 , pp. 1816-1825
    • James, R.1    Almada-Lobo, B.2
  • 42
    • 36448995797 scopus 로고    scopus 로고
    • Modeling industrial lot sizing problems: a review
    • Jans R, Degraeve Z (2008) Modeling industrial lot sizing problems: a review. Int J Prod Res 46(6):1619–1643. doi:10.1080/00207540600902262
    • (2008) Int J Prod Res , vol.46 , Issue.6 , pp. 1619-1643
    • Jans, R.1    Degraeve, Z.2
  • 43
    • 33748518397 scopus 로고    scopus 로고
    • On the integrated production, inventory, and distribution routing problem
    • Lei L, Liu S, Ruszczynski A, Park S (2006) On the integrated production, inventory, and distribution routing problem. IIE Trans 38(11):955–970. doi:10.1080/07408170600862688
    • (2006) IIE Trans , vol.38 , Issue.11 , pp. 955-970
    • Lei, L.1    Liu, S.2    Ruszczynski, A.3    Park, S.4
  • 44
    • 84975276625 scopus 로고    scopus 로고
    • MIP models for production lot sizing problems with distribution costs and cargo arrangement
    • Molina F, Morabito R, Araujo S (2016) MIP models for production lot sizing problems with distribution costs and cargo arrangement. J Oper Res Soc 67(11):1395–1407. doi:10.1057/jors.2016.12
    • (2016) J Oper Res Soc , vol.67 , Issue.11 , pp. 1395-1407
    • Molina, F.1    Morabito, R.2    Araujo, S.3
  • 45
    • 85009247926 scopus 로고    scopus 로고
    • Integrating production scheduling and vehicle routing decisions at the operational decision level: a review and discussion
    • Moons S, Ramaekers K, Caris A, Arda Y (2017) Integrating production scheduling and vehicle routing decisions at the operational decision level: a review and discussion. Comput Ind Eng 104:224–245
    • (2017) Comput Ind Eng , vol.104 , pp. 224-245
    • Moons, S.1    Ramaekers, K.2    Caris, A.3    Arda, Y.4
  • 46
    • 75149119642 scopus 로고    scopus 로고
    • Mathematical programming models for supply chain production and transport planning
    • Mula J, Peidro D, Díaz-Madroñero M, Vicens E (2010) Mathematical programming models for supply chain production and transport planning. Eur J Oper Res 204(3):377–390. doi:10.1016/j.ejor.2009.09.008
    • (2010) Eur J Oper Res , vol.204 , Issue.3 , pp. 377-390
    • Mula, J.1    Peidro, D.2    Díaz-Madroñero, M.3    Vicens, E.4
  • 47
    • 39449098494 scopus 로고    scopus 로고
    • Capacitated lot-sizing with extensions: a review
    • Quadt D, Kuhn H (2007) Capacitated lot-sizing with extensions: a review. 4OR 6(1):61–83. doi:10.1007/s10288-007-0057-1
    • (2007) 4OR , vol.6 , Issue.1 , pp. 61-83
    • Quadt, D.1    Kuhn, H.2
  • 48
    • 84873598629 scopus 로고    scopus 로고
    • Long-haul vehicle routing and scheduling with working hour rules
    • Rancourt ME, Cordeau JF, Laporte G (2013) Long-haul vehicle routing and scheduling with working hour rules. Transp Sci 47(1):81–107
    • (2013) Transp Sci , vol.47 , Issue.1 , pp. 81-107
    • Rancourt, M.E.1    Cordeau, J.F.2    Laporte, G.3
  • 49
    • 34748916432 scopus 로고    scopus 로고
    • Integrating multi-product production and distribution in newspaper logistics
    • Russell R, Chiang WC, Zepeda D (2008) Integrating multi-product production and distribution in newspaper logistics. Comput Oper Res 35(5):1576–1588. doi:10.1016/j.cor.2006.09.002
    • (2008) Comput Oper Res , vol.35 , Issue.5 , pp. 1576-1588
    • Russell, R.1    Chiang, W.C.2    Zepeda, D.3
  • 50
    • 0033344267 scopus 로고    scopus 로고
    • A review of integrated analysis of production–distribution systems
    • Sarmiento AM, Nagi R (1999) A review of integrated analysis of production–distribution systems. IIE Trans 31(11):1061–1074
    • (1999) IIE Trans , vol.31 , Issue.11 , pp. 1061-1074
    • Sarmiento, A.M.1    Nagi, R.2
  • 51
    • 36348944512 scopus 로고    scopus 로고
    • An optimization algorithm for the inventory routing problem with continuous moves
    • Savelsbergh M, Song JH (2008) An optimization algorithm for the inventory routing problem with continuous moves. Comput Oper Res 35(7):2266–2282. doi:10.1016/j.cor.2006.10.020
    • (2008) Comput Oper Res , vol.35 , Issue.7 , pp. 2266-2282
    • Savelsbergh, M.1    Song, J.H.2
  • 52
    • 84867540204 scopus 로고    scopus 로고
    • A tabu search procedure for coordinating production, inventory and distribution routing problems
    • Shiguemoto AL, Armentano V (2010) A tabu search procedure for coordinating production, inventory and distribution routing problems. Int Trans Oper Res 17(2):179–195. doi:10.1111/j.1475-3995.2009.00741.x
    • (2010) Int Trans Oper Res , vol.17 , Issue.2 , pp. 179-195
    • Shiguemoto, A.L.1    Armentano, V.2
  • 53
    • 33748422386 scopus 로고    scopus 로고
    • A lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines
    • Toledo FMB, Armentano V (2006) A lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines. Eur J Oper Res 175(2):1070–1083. doi:10.1016/j.ejor.2005.06.029
    • (2006) Eur J Oper Res , vol.175 , Issue.2 , pp. 1070-1083
    • Toledo, F.M.B.1    Armentano, V.2
  • 54
    • 0000555407 scopus 로고
    • Capacitated lot sizing with setup times
    • Trigeiro WW, Thomas LJ, McClain JO (1989) Capacitated lot sizing with setup times. Manag Sci 35(3):353–366. doi:10.1287/mnsc.35.3.353
    • (1989) Manag Sci , vol.35 , Issue.3 , pp. 353-366
    • Trigeiro, W.W.1    Thomas, L.J.2    McClain, J.O.3
  • 55
    • 0031119856 scopus 로고    scopus 로고
    • Strategic production–distribution models: a critical review with emphasis on global supply chain models
    • Vidal CJ, Goetschalckx M (1997) Strategic production–distribution models: a critical review with emphasis on global supply chain models. Eur J Oper Res 98(1):1–18
    • (1997) Eur J Oper Res , vol.98 , Issue.1 , pp. 1-18
    • Vidal, C.J.1    Goetschalckx, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.