-
1
-
-
84946012494
-
A two-phase iterative heuristic approach for the production routing problem
-
Absi N, Archetti C, Dauzère-Pérès S, Feillet D (2014) A two-phase iterative heuristic approach for the production routing problem. Transp Sci 49(4):784–795. doi:10.1287/trsc.2014.0523
-
(2014)
Transp Sci
, vol.49
, Issue.4
, pp. 784-795
-
-
Absi, N.1
Archetti, C.2
Dauzère-Pérès, S.3
Feillet, D.4
-
2
-
-
84893873667
-
Formulations and branch-and-cut algorithms for multivehicle production and inventory routing problems
-
Adulyasak Y, Cordeau JF, Jans R (2014a) Formulations and branch-and-cut algorithms for multivehicle production and inventory routing problems. INFORMS J Comput 26:103–120
-
(2014)
INFORMS J Comput
, vol.26
, pp. 103-120
-
-
Adulyasak, Y.1
Cordeau, J.F.2
Jans, R.3
-
3
-
-
84894570180
-
Optimization-based adaptive large neighborhood search for the production routing problem
-
Adulyasak Y, Cordeau JF, Jans R (2014b) Optimization-based adaptive large neighborhood search for the production routing problem. Transp Sci 48(1):20–45
-
(2014)
Transp Sci
, vol.48
, Issue.1
, pp. 20-45
-
-
Adulyasak, Y.1
Cordeau, J.F.2
Jans, R.3
-
4
-
-
84937863906
-
Benders decomposition for production routing under demand uncertainty
-
Adulyasak Y, Cordeau JF, Jans R (2015) Benders decomposition for production routing under demand uncertainty. Oper Res 63(4):851–867. doi:10.1287/opre.2015.1401
-
(2015)
Oper Res
, vol.63
, Issue.4
, pp. 851-867
-
-
Adulyasak, Y.1
Cordeau, J.F.2
Jans, R.3
-
5
-
-
84919340915
-
The production routing problem: a review of formulations and solution algorithms
-
Adulyasak Y, Cordeau JF, Jans R (2015b) The production routing problem: a review of formulations and solution algorithms. Comput Oper Res 55:141–152. doi:10.1016/j.cor.2014.01.011
-
(2015)
Comput Oper Res
, vol.55
, pp. 141-152
-
-
Adulyasak, Y.1
Cordeau, J.F.2
Jans, R.3
-
6
-
-
84885174047
-
Lot sizing versus batching in the production and distribution planning of perishable goods
-
Amorim P, Belo-Filho M, Toledo F, Almeder C, Almada-Lobo B (2013) Lot sizing versus batching in the production and distribution planning of perishable goods. Int J Prod Econ 146(1):208–218. doi:10.1016/j.ijpe.2013.07.001
-
(2013)
Int J Prod Econ
, vol.146
, Issue.1
, pp. 208-218
-
-
Amorim, P.1
Belo-Filho, M.2
Toledo, F.3
Almeder, C.4
Almada-Lobo, B.5
-
7
-
-
84904152234
-
A rich vehicle routing problem dealing with perishable food: a case study
-
Amorim P, Parragh SN, Sperandio F, Almada-Lobo B (2014) A rich vehicle routing problem dealing with perishable food: a case study. TOP 22(2):489–508. doi:10.1007/s11750-012-0266-4
-
(2014)
TOP
, vol.22
, Issue.2
, pp. 489-508
-
-
Amorim, P.1
Parragh, S.N.2
Sperandio, F.3
Almada-Lobo, B.4
-
8
-
-
34547145422
-
Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
-
Araujo S, Arenales M, Clark A (2007) Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups. J Heuristics 13(4):337–358. doi:10.1007/s10732-007-9011-9
-
(2007)
J Heuristics
, vol.13
, Issue.4
, pp. 337-358
-
-
Araujo, S.1
Arenales, M.2
Clark, A.3
-
9
-
-
79955067887
-
Analysis of the maximum level policy in a production–distribution system
-
Archetti C, Bertazzi L, Paletta G, Speranza MG (2011) Analysis of the maximum level policy in a production–distribution system. Comput Oper Res 38(12):1731–1746. doi:10.1016/j.cor.2011.03.002
-
(2011)
Comput Oper Res
, vol.38
, Issue.12
, pp. 1731-1746
-
-
Archetti, C.1
Bertazzi, L.2
Paletta, G.3
Speranza, M.G.4
-
10
-
-
78650513384
-
Tabu search with path relinking for an integrated production–distribution problem
-
Armentano V, Shiguemoto A, Løkketangen A (2011) Tabu search with path relinking for an integrated production–distribution problem. Comput Oper Res 38(8):1199–1209. doi:10.1016/j.cor.2010.10.026
-
(2011)
Comput Oper Res
, vol.38
, Issue.8
, pp. 1199-1209
-
-
Armentano, V.1
Shiguemoto, A.2
Løkketangen, A.3
-
11
-
-
38749150380
-
A zero-inventory production and distribution problem with a fixed customer sequence
-
Armstrong R, Gao S, Lei L (2007) A zero-inventory production and distribution problem with a fixed customer sequence. Ann Oper Res 159(1):395–414. doi:10.1007/s10479-007-0272-3
-
(2007)
Ann Oper Res
, vol.159
, Issue.1
, pp. 395-414
-
-
Armstrong, R.1
Gao, S.2
Lei, L.3
-
12
-
-
33751113046
-
An exact algorithm for a single-vehicle routing problem with time windows and multiple routes
-
Azi N, Gendreau M, Potvin JY (2007) An exact algorithm for a single-vehicle routing problem with time windows and multiple routes. Eur J Oper Res 178(3):755–766. doi:10.1016/j.ejor.2006.02.019
-
(2007)
Eur J Oper Res
, vol.178
, Issue.3
, pp. 755-766
-
-
Azi, N.1
Gendreau, M.2
Potvin, J.Y.3
-
13
-
-
69849087762
-
Heuristics for a multiperiod inventory routing problem with production decisions
-
Bard JF, Nananukul N (2009) Heuristics for a multiperiod inventory routing problem with production decisions. Comput Ind Eng 57(3):713–723. doi:10.1016/j.cie.2009.01.020
-
(2009)
Comput Ind Eng
, vol.57
, Issue.3
, pp. 713-723
-
-
Bard, J.F.1
Nananukul, N.2
-
14
-
-
67349211770
-
The integrated production–inventory–distribution–routing problem
-
Bard JF, Nananukul N (2009b) The integrated production–inventory–distribution–routing problem. J Sched 12(3):257–280. doi:10.1007/s10951-008-0081-9
-
(2009)
J Sched
, vol.12
, Issue.3
, pp. 257-280
-
-
Bard, J.F.1
Nananukul, N.2
-
15
-
-
77955271201
-
A branch-and-price algorithm for an integrated production and inventory routing problem
-
Bard JF, Nananukul N (2010) A branch-and-price algorithm for an integrated production and inventory routing problem. Comput Oper Res 37(12):2202–2217. doi:10.1016/j.cor.2010.03.010
-
(2010)
Comput Oper Res
, vol.37
, Issue.12
, pp. 2202-2217
-
-
Bard, J.F.1
Nananukul, N.2
-
16
-
-
0032136666
-
Supply chain design and analysis: models and methods
-
Beamon BM (1998) Supply chain design and analysis: models and methods. Int J Prod Econ 55:281–294
-
(1998)
Int J Prod Econ
, vol.55
, pp. 281-294
-
-
Beamon, B.M.1
-
17
-
-
84938787400
-
A hybrid variable neighborhood tabu search heuristic for the vehicle routing problem with multiple time windows
-
Belhaiza S, Hansen P, Laporte G (2014) A hybrid variable neighborhood tabu search heuristic for the vehicle routing problem with multiple time windows. Comput Oper Eng 52(Part B):269–281. doi:10.1016/j.cor.2013.08.010
-
(2014)
Comput Oper Eng
, vol.52
, pp. 269-281
-
-
Belhaiza, S.1
Hansen, P.2
Laporte, G.3
-
18
-
-
41149118126
-
Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs
-
Beraldi P, Ghiani G, Grieco A, Guerriero E (2008) Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs. Comput Oper Res 35(11):3644–3656. doi:10.1016/j.cor.2007.04.003
-
(2008)
Comput Oper Res
, vol.35
, Issue.11
, pp. 3644-3656
-
-
Beraldi, P.1
Ghiani, G.2
Grieco, A.3
Guerriero, E.4
-
19
-
-
26844451403
-
Minimizing the total cost in an integrated vendor-managed inventory system
-
Bertazzi L, Paletta G, Speranza MG (2005) Minimizing the total cost in an integrated vendor-managed inventory system. J Heuristics 11:393–419
-
(2005)
J Heuristics
, vol.11
, pp. 393-419
-
-
Bertazzi, L.1
Paletta, G.2
Speranza, M.G.3
-
20
-
-
56349117292
-
A memetic algorithm with dynamic population management for an integrated production–distribution problem
-
Boudia M, Prins C (2009) A memetic algorithm with dynamic population management for an integrated production–distribution problem. Eur J Oper Res 195(3):703–715. doi:10.1016/j.ejor.2007.07.034
-
(2009)
Eur J Oper Res
, vol.195
, Issue.3
, pp. 703-715
-
-
Boudia, M.1
Prins, C.2
-
21
-
-
34047126268
-
A reactive GRASP and path relinking for a combined production–distribution problem
-
Boudia M, Louly M, Prins C (2007) A reactive GRASP and path relinking for a combined production–distribution problem. Comput Oper Res 34(11):3402–3419. doi:10.1016/j.cor.2006.02.005
-
(2007)
Comput Oper Res
, vol.34
, Issue.11
, pp. 3402-3419
-
-
Boudia, M.1
Louly, M.2
Prins, C.3
-
22
-
-
84959377307
-
Multi-item production routing problem with backordering: a MILP approach
-
Brahimi N, Aouam T (2016) Multi-item production routing problem with backordering: a MILP approach. Int J Prod Res 54(4):1076–1093. doi:10.1080/00207543.2015.1047971
-
(2016)
Int J Prod Res
, vol.54
, Issue.4
, pp. 1076-1093
-
-
Brahimi, N.1
Aouam, T.2
-
23
-
-
0028371172
-
Coordination of production and distribution planning
-
Chandra P, Fisher ML (1994) Coordination of production and distribution planning. Eur J Oper Res 72:503–517
-
(1994)
Eur J Oper Res
, vol.72
, pp. 503-517
-
-
Chandra, P.1
Fisher, M.L.2
-
24
-
-
57649159122
-
Production scheduling and vehicle routing with time windows for perishable food products
-
Chen HK, Hsueh CF, Chang MS (2009) Production scheduling and vehicle routing with time windows for perishable food products. Comput Oper Res 36(7):2311–2319. doi:10.1016/j.cor.2008.09.010
-
(2009)
Comput Oper Res
, vol.36
, Issue.7
, pp. 2311-2319
-
-
Chen, H.K.1
Hsueh, C.F.2
Chang, M.S.3
-
25
-
-
22544468772
-
Integrated production and distribution operations: Taxonomy, models, and review
-
Simchi-Levi D, Wu S, Shen ZJ (eds), chap 17, Kluwer Academic Publishers, Boston
-
Chen ZL (2004) Integrated production and distribution operations: taxonomy, models, and review. In: Simchi-Levi D, Wu S, Shen ZJ (eds) Handbook of quantitative supply chain analysis: modeling in the e-business era, chap 17. Kluwer Academic Publishers, Boston, pp 711–745
-
(2004)
Handbook of Quantitative Supply Chain Analysis: Modeling in the E-Business Era
, pp. 711-745
-
-
Chen, Z.L.1
-
26
-
-
77249147436
-
Integrated production and outbound distribution scheduling: review and extensions
-
Chen ZL (2010) Integrated production and outbound distribution scheduling: review and extensions. Oper Res 58(1):130–148. doi:10.1287/opre.1080.0688
-
(2010)
Oper Res
, vol.58
, Issue.1
, pp. 130-148
-
-
Chen, Z.L.1
-
27
-
-
33744826037
-
Order assignment and scheduling in a supply chain
-
Chen ZL, Pundoor G (2006) Order assignment and scheduling in a supply chain. Oper Res 54(3):555–572. doi:10.1287/opre.1060.0280
-
(2006)
Oper Res
, vol.54
, Issue.3
, pp. 555-572
-
-
Chen, Z.L.1
Pundoor, G.2
-
28
-
-
22544461035
-
Integrated scheduling of production and distribution operations
-
Chen ZL, Vairaktarakis GL (2005) Integrated scheduling of production and distribution operations. Manag Sci 51(4):614–628. doi:10.1287/mnsc.1040.0325
-
(2005)
Manag Sci
, vol.51
, Issue.4
, pp. 614-628
-
-
Chen, Z.L.1
Vairaktarakis, G.L.2
-
29
-
-
70349206132
-
A simulation/metaheuristic approach to newspaper production and distribution supply chain problems
-
Chiang WC, Russell R, Xu X, Zepeda D (2009) A simulation/metaheuristic approach to newspaper production and distribution supply chain problems. Int J Prod Econ 121(2):752–767. doi:10.1016/j.ijpe.2009.03.001
-
(2009)
Int J Prod Econ
, vol.121
, Issue.2
, pp. 752-767
-
-
Chiang, W.C.1
Russell, R.2
Xu, X.3
Zepeda, D.4
-
30
-
-
84941598954
-
A review of tactical optimization models for integrated production and transport routing planning decisions
-
Díaz-Madroñero M, Peidro D, Mula J (2015) A review of tactical optimization models for integrated production and transport routing planning decisions. Comput Ind Eng 88:518–535. doi:10.1016/j.cie.2015.06.010
-
(2015)
Comput Ind Eng
, vol.88
, pp. 518-535
-
-
Díaz-Madroñero, M.1
Peidro, D.2
Mula, J.3
-
31
-
-
0028769399
-
On practical resource allocation for production planning and scheduling with period overlapping setups
-
Dillenberger C, Escudero LF, Wollensak A, Zhang W (1994) On practical resource allocation for production planning and scheduling with period overlapping setups. Eur J Oper Res 75(2):275–286. doi:10.1016/0377-2217(94)90074-4
-
(1994)
Eur J Oper Res
, vol.75
, Issue.2
, pp. 275-286
-
-
Dillenberger, C.1
Escudero, L.F.2
Wollensak, A.3
Zhang, W.4
-
32
-
-
28244496090
-
Benchmarking optimization software with performance profiles
-
Dolan ED, Moré JJ (2002) Benchmarking optimization software with performance profiles. Math Progr 91(2):201–213. doi:10.1007/s101070100263
-
(2002)
Math Progr
, vol.91
, Issue.2
, pp. 201-213
-
-
Dolan, E.D.1
Moré, J.J.2
-
33
-
-
84859794755
-
Integrated production and distribution planning for perishable food products
-
Farahani P, Grunow M, Günther HO (2012) Integrated production and distribution planning for perishable food products. Flex Serv Manuf J 24(1):28–51. doi:10.1007/s10696-011-9125-0
-
(2012)
Flex Serv Manuf J
, vol.24
, Issue.1
, pp. 28-51
-
-
Farahani, P.1
Grunow, M.2
Günther, H.O.3
-
34
-
-
58149250389
-
Solution approaches for the soft drink integrated production lot sizing and scheduling problem
-
Ferreira D, Morabito R, Rangel S (2009) Solution approaches for the soft drink integrated production lot sizing and scheduling problem. Eur J Oper Res 196(2):697–706. doi:10.1016/j.ejor.2008.03.035
-
(2009)
Eur J Oper Res
, vol.196
, Issue.2
, pp. 697-706
-
-
Ferreira, D.1
Morabito, R.2
Rangel, S.3
-
35
-
-
70350569826
-
Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants
-
Ferreira D, Morabito R, Rangel S (2010) Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants. Comput Oper Res 37(4):684–691. doi:10.1016/j.cor.2009.06.007
-
(2010)
Comput Oper Res
, vol.37
, Issue.4
, pp. 684-691
-
-
Ferreira, D.1
Morabito, R.2
Rangel, S.3
-
36
-
-
0033339421
-
Synchronized development of production, inventory, and distribution schedules
-
Fumero F, Vercellis C (1999) Synchronized development of production, inventory, and distribution schedules. Transp Sci 33(3):330–340. doi:10.1287/trsc.33.3.330
-
(1999)
Transp Sci
, vol.33
, Issue.3
, pp. 330-340
-
-
Fumero, F.1
Vercellis, C.2
-
37
-
-
61349164254
-
The integrated production and transportation scheduling problem for a product with a short lifespan
-
Geismar HN, Laporte G, Lei L, Sriskandarajah C (2008) The integrated production and transportation scheduling problem for a product with a short lifespan. INFORMS J Comput 20(1):21–33. doi:10.1287/ijoc.1060.0208
-
(2008)
INFORMS J Comput
, vol.20
, Issue.1
, pp. 21-33
-
-
Geismar, H.N.1
Laporte, G.2
Lei, L.3
Sriskandarajah, C.4
-
38
-
-
84870504709
-
The minimum duration truck driver scheduling problem
-
Goel A (2012) The minimum duration truck driver scheduling problem. EURO J Transp Logist 1(4):285–306. doi:10.1007/s13676-012-0014-9
-
(2012)
EURO J Transp Logist
, vol.1
, Issue.4
, pp. 285-306
-
-
Goel, A.1
-
39
-
-
67349105329
-
A lagrangian relaxation approach to a coupled lot-sizing and cutting stock problem
-
Gramani M, França P, Arenales M (2009) A lagrangian relaxation approach to a coupled lot-sizing and cutting stock problem. Int J Prod Econ 119(2):219–227. doi:10.1016/j.ijpe.2009.02.011
-
(2009)
Int J Prod Econ
, vol.119
, Issue.2
, pp. 219-227
-
-
Gramani, M.1
França, P.2
Arenales, M.3
-
41
-
-
79955056703
-
Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighborhood search heuristics
-
James R, Almada-Lobo B (2011) Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighborhood search heuristics. Comput Oper Res 38(12):1816–1825. doi:10.1016/j.cor.2011.02.005
-
(2011)
Comput Oper Res
, vol.38
, Issue.12
, pp. 1816-1825
-
-
James, R.1
Almada-Lobo, B.2
-
42
-
-
36448995797
-
Modeling industrial lot sizing problems: a review
-
Jans R, Degraeve Z (2008) Modeling industrial lot sizing problems: a review. Int J Prod Res 46(6):1619–1643. doi:10.1080/00207540600902262
-
(2008)
Int J Prod Res
, vol.46
, Issue.6
, pp. 1619-1643
-
-
Jans, R.1
Degraeve, Z.2
-
43
-
-
33748518397
-
On the integrated production, inventory, and distribution routing problem
-
Lei L, Liu S, Ruszczynski A, Park S (2006) On the integrated production, inventory, and distribution routing problem. IIE Trans 38(11):955–970. doi:10.1080/07408170600862688
-
(2006)
IIE Trans
, vol.38
, Issue.11
, pp. 955-970
-
-
Lei, L.1
Liu, S.2
Ruszczynski, A.3
Park, S.4
-
44
-
-
84975276625
-
MIP models for production lot sizing problems with distribution costs and cargo arrangement
-
Molina F, Morabito R, Araujo S (2016) MIP models for production lot sizing problems with distribution costs and cargo arrangement. J Oper Res Soc 67(11):1395–1407. doi:10.1057/jors.2016.12
-
(2016)
J Oper Res Soc
, vol.67
, Issue.11
, pp. 1395-1407
-
-
Molina, F.1
Morabito, R.2
Araujo, S.3
-
45
-
-
85009247926
-
Integrating production scheduling and vehicle routing decisions at the operational decision level: a review and discussion
-
Moons S, Ramaekers K, Caris A, Arda Y (2017) Integrating production scheduling and vehicle routing decisions at the operational decision level: a review and discussion. Comput Ind Eng 104:224–245
-
(2017)
Comput Ind Eng
, vol.104
, pp. 224-245
-
-
Moons, S.1
Ramaekers, K.2
Caris, A.3
Arda, Y.4
-
46
-
-
75149119642
-
Mathematical programming models for supply chain production and transport planning
-
Mula J, Peidro D, Díaz-Madroñero M, Vicens E (2010) Mathematical programming models for supply chain production and transport planning. Eur J Oper Res 204(3):377–390. doi:10.1016/j.ejor.2009.09.008
-
(2010)
Eur J Oper Res
, vol.204
, Issue.3
, pp. 377-390
-
-
Mula, J.1
Peidro, D.2
Díaz-Madroñero, M.3
Vicens, E.4
-
47
-
-
39449098494
-
Capacitated lot-sizing with extensions: a review
-
Quadt D, Kuhn H (2007) Capacitated lot-sizing with extensions: a review. 4OR 6(1):61–83. doi:10.1007/s10288-007-0057-1
-
(2007)
4OR
, vol.6
, Issue.1
, pp. 61-83
-
-
Quadt, D.1
Kuhn, H.2
-
48
-
-
84873598629
-
Long-haul vehicle routing and scheduling with working hour rules
-
Rancourt ME, Cordeau JF, Laporte G (2013) Long-haul vehicle routing and scheduling with working hour rules. Transp Sci 47(1):81–107
-
(2013)
Transp Sci
, vol.47
, Issue.1
, pp. 81-107
-
-
Rancourt, M.E.1
Cordeau, J.F.2
Laporte, G.3
-
49
-
-
34748916432
-
Integrating multi-product production and distribution in newspaper logistics
-
Russell R, Chiang WC, Zepeda D (2008) Integrating multi-product production and distribution in newspaper logistics. Comput Oper Res 35(5):1576–1588. doi:10.1016/j.cor.2006.09.002
-
(2008)
Comput Oper Res
, vol.35
, Issue.5
, pp. 1576-1588
-
-
Russell, R.1
Chiang, W.C.2
Zepeda, D.3
-
50
-
-
0033344267
-
A review of integrated analysis of production–distribution systems
-
Sarmiento AM, Nagi R (1999) A review of integrated analysis of production–distribution systems. IIE Trans 31(11):1061–1074
-
(1999)
IIE Trans
, vol.31
, Issue.11
, pp. 1061-1074
-
-
Sarmiento, A.M.1
Nagi, R.2
-
51
-
-
36348944512
-
An optimization algorithm for the inventory routing problem with continuous moves
-
Savelsbergh M, Song JH (2008) An optimization algorithm for the inventory routing problem with continuous moves. Comput Oper Res 35(7):2266–2282. doi:10.1016/j.cor.2006.10.020
-
(2008)
Comput Oper Res
, vol.35
, Issue.7
, pp. 2266-2282
-
-
Savelsbergh, M.1
Song, J.H.2
-
52
-
-
84867540204
-
A tabu search procedure for coordinating production, inventory and distribution routing problems
-
Shiguemoto AL, Armentano V (2010) A tabu search procedure for coordinating production, inventory and distribution routing problems. Int Trans Oper Res 17(2):179–195. doi:10.1111/j.1475-3995.2009.00741.x
-
(2010)
Int Trans Oper Res
, vol.17
, Issue.2
, pp. 179-195
-
-
Shiguemoto, A.L.1
Armentano, V.2
-
53
-
-
33748422386
-
A lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines
-
Toledo FMB, Armentano V (2006) A lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines. Eur J Oper Res 175(2):1070–1083. doi:10.1016/j.ejor.2005.06.029
-
(2006)
Eur J Oper Res
, vol.175
, Issue.2
, pp. 1070-1083
-
-
Toledo, F.M.B.1
Armentano, V.2
-
54
-
-
0000555407
-
Capacitated lot sizing with setup times
-
Trigeiro WW, Thomas LJ, McClain JO (1989) Capacitated lot sizing with setup times. Manag Sci 35(3):353–366. doi:10.1287/mnsc.35.3.353
-
(1989)
Manag Sci
, vol.35
, Issue.3
, pp. 353-366
-
-
Trigeiro, W.W.1
Thomas, L.J.2
McClain, J.O.3
-
55
-
-
0031119856
-
Strategic production–distribution models: a critical review with emphasis on global supply chain models
-
Vidal CJ, Goetschalckx M (1997) Strategic production–distribution models: a critical review with emphasis on global supply chain models. Eur J Oper Res 98(1):1–18
-
(1997)
Eur J Oper Res
, vol.98
, Issue.1
, pp. 1-18
-
-
Vidal, C.J.1
Goetschalckx, M.2
|