-
1
-
-
0002211552
-
One warehouse multiple retailer systems with vehicle routing costs
-
S. ANILY AND A. FEDERGRUEN, "One Warehouse Multiple Retailer Systems with Vehicle Routing Costs," Management Sci. 36, 92-114 (1990).
-
(1990)
Management Sci.
, vol.36
, pp. 92-114
-
-
Anily, S.1
Federgruen, A.2
-
2
-
-
0003181676
-
Two-echelon distribution systems with vehicle routing costs and central inventories
-
S. ANILY AND A. FEDERGRUEN, "Two-Echelon Distribution Systems with Vehicle Routing Costs and Central Inventories," Opns. Res. 41, 37-47 (1993).
-
(1993)
Opns. Res.
, vol.41
, pp. 37-47
-
-
Anily, S.1
Federgruen, A.2
-
3
-
-
0021513251
-
Strong formulations for multi-item capacitated lot sizing
-
I. BARANY, T. J. VAN ROY, AND L. A. WOLSEY, "Strong Formulations for Multi-Item Capacitated Lot Sizing," Management Sci. 30, 1255-1261 (1984).
-
(1984)
Management Sci.
, vol.30
, pp. 1255-1261
-
-
Barany, I.1
Van Roy, T.J.2
Wolsey, L.A.3
-
4
-
-
0020911813
-
Improving the distribution of industrial gases with an on-line computerized routing and scheduling optimizer
-
W. J. BELL, L. M. DALBERTO, M. L. FISHER, ET AL., "Improving the Distribution of Industrial Gases with an On-Line Computerized Routing and Scheduling Optimizer," Interfaces 13, 4-23 (1983).
-
(1983)
Interfaces
, vol.13
, pp. 4-23
-
-
Bell, W.J.1
Dalberto, L.M.2
Fisher, M.L.3
-
5
-
-
0024716762
-
An analysis of inventory and transportation costs in a constrained network
-
J. BENJAMIN, "An Analysis of Inventory and Transportation Costs in a Constrained Network," Transp. Sci. 23, 177-183 (1989).
-
(1989)
Transp. Sci.
, vol.23
, pp. 177-183
-
-
Benjamin, J.1
-
6
-
-
0022267380
-
Analyzing trade-offs between transportation, inventory and production costs on freight networks
-
D. E. BLUMENFELD, L. D. BURNS, J. D. DILTZ, AND C. F. DAGANZO, "Analyzing Trade-offs between Transportation, Inventory and Production Costs on Freight Networks," Transp. Res. 19B, 361-380 (1985).
-
(1985)
Transp. Res.
, vol.19 B
, pp. 361-380
-
-
Blumenfeld, D.E.1
Burns, L.D.2
Diltz, J.D.3
Daganzo, C.F.4
-
7
-
-
0023163926
-
Reducing logistics costs at general motors
-
D. E. BLUMENFELD, L. D. BURNS, C. F. DAGANZO, ET AL., "Reducing Logistics Costs at General Motors," Interfaces 17, 26-37 (1987).
-
(1987)
Interfaces
, vol.17
, pp. 26-37
-
-
Blumenfeld, D.E.1
Burns, L.D.2
Daganzo, C.F.3
-
8
-
-
0025944047
-
Synchronizing production and transportation schedules
-
D. E. BLUMENFELD, L. D. BURNS, AND C. F. DAGANZO, "Synchronizing Production and Transportation Schedules," Transp. Res. 25B, 23-37 (1991).
-
(1991)
Transp. Res.
, vol.25 B
, pp. 23-37
-
-
Blumenfeld, D.E.1
Burns, L.D.2
Daganzo, C.F.3
-
9
-
-
0028371172
-
Coordination of production and distribution planning
-
P. CHANDRA AND M. L. FISHER, "Coordination of Production and Distribution Planning," Eur. J. Oper. Res. 72, 503-517 (1994).
-
(1994)
Eur. J. Oper. Res.
, vol.72
, pp. 503-517
-
-
Chandra, P.1
Fisher, M.L.2
-
10
-
-
0027911608
-
Determining profit-maximizing production/shipping policies in a one-to-one direct shipping, stochastic demand environment
-
T. W. CHIEN, "Determining Profit-Maximizing Production/ Shipping Policies in a One-to-One Direct Shipping, Stochastic Demand Environment," Eur. J. Oper. Res. 64, 83-102 (1993).
-
(1993)
Eur. J. Oper. Res.
, vol.64
, pp. 83-102
-
-
Chien, T.W.1
-
11
-
-
0001837441
-
An integrated inventory allocation and vehicle routing problem
-
T. W. CHIEN, A. BALAKRISHNAN, AND R. T. WONG, "An Integrated Inventory Allocation and Vehicle Routing Problem," Transp. Sci. 23, 67-76 (1989).
-
(1989)
Transp. Sci.
, vol.23
, pp. 67-76
-
-
Chien, T.W.1
Balakrishnan, A.2
Wong, R.T.3
-
12
-
-
0023984228
-
Strategic analysis of integrated production-distribution systems: Models and methods
-
M. A. COHEN AND H. L. LEE, "Strategic Analysis of Integrated Production-Distribution Systems: Models and Methods," Opns. Res. 36, 216-228 (1988).
-
(1988)
Opns. Res.
, vol.36
, pp. 216-228
-
-
Cohen, M.A.1
Lee, H.L.2
-
13
-
-
0023563839
-
Inventory/routing: Reduction from an annual to a short-period problem
-
M. DROR AND M. BALL, "Inventory/Routing: Reduction from an Annual to a Short-Period Problem," Naval Res. Logist. 34, 891-905 (1987).
-
(1987)
Naval Res. Logist.
, vol.34
, pp. 891-905
-
-
Dror, M.1
Ball, M.2
-
14
-
-
0021489143
-
A combined vehicle routing and inventory allocation problem
-
A. FEDERGRUEN AND P. ZIPKIN, "A Combined Vehicle Routing and Inventory Allocation Problem," Opns. Res. 32, 1019-1037 (1984).
-
(1984)
Opns. Res.
, vol.32
, pp. 1019-1037
-
-
Federgruen, A.1
Zipkin, P.2
-
16
-
-
85037959268
-
A modified subgradient algorithm for lagrangean relaxation
-
in press
-
F. FUMERO, "A Modified Subgradient Algorithm for Lagrangean Relaxation," Comput. Opns. Res. (in press).
-
Comput. Opns. Res.
-
-
Fumero, F.1
-
17
-
-
0028516896
-
Capacity analysis in repetitive assemble-to-order manufacturing systems
-
F. FUMERO AND C. VERCELLIS, "Capacity Analysis in Repetitive Assemble-to-Order Manufacturing Systems," Eur. J. Oper. Res. 78, 204-215 (1994).
-
(1994)
Eur. J. Oper. Res.
, vol.78
, pp. 204-215
-
-
Fumero, F.1
Vercellis, C.2
-
18
-
-
0030284990
-
Capacity management through lagrangean relaxation: An application to tires production
-
F. FUMERO AND C. VERCELLIS, "Capacity Management through Lagrangean Relaxation: An Application to Tires Production" Prod. Plan. Control. 7, 604-614 (1996).
-
(1996)
Prod. Plan. Control.
, vol.7
, pp. 604-614
-
-
Fumero, F.1
Vercellis, C.2
-
19
-
-
0031095818
-
Integrating distribution, machine assignment and lot-sizing via lagrangean relaxation
-
F. FUMERO AND C. VERCELLIS, "Integrating Distribution, Machine Assignment and Lot-Sizing via Lagrangean Relaxation," Int. J. Prod. Econ. 49, 45-54 (1997).
-
(1997)
Int. J. Prod. Econ.
, vol.49
, pp. 45-54
-
-
Fumero, F.1
Vercellis, C.2
-
20
-
-
0002554041
-
Lagrangean relaxation for integer programming
-
A. M. GEOFFRION, "Lagrangean Relaxation for Integer Programming," Math. Program. Study 2, 82-114 (1974).
-
(1974)
Math. Program. Study
, vol.2
, pp. 82-114
-
-
Geoffrion, A.M.1
-
21
-
-
0006040250
-
An integrated production, distribution, and inventory planning system
-
F. GLOVER, G. JONES, D. KARNEY, ET AL., "An Integrated Production, Distribution, and Inventory Planning System," Interfaces 9, 21-35 (1979).
-
(1979)
Interfaces
, vol.9
, pp. 21-35
-
-
Glover, F.1
Jones, G.2
Karney, D.3
-
22
-
-
0021632689
-
Analysis of a large scale vehicle routing problem with an inventory component
-
B. GOLDEN, A. ASSAD, AND R. DAHL, "Analysis of a Large Scale Vehicle Routing Problem with an Inventory Component," Large Scale Systems 7, 181-190 (1984).
-
(1984)
Large Scale Systems
, vol.7
, pp. 181-190
-
-
Golden, B.1
Assad, A.2
Dahl, R.3
-
23
-
-
0012553838
-
Facets and algorithms for capacitated lot sizing
-
J. M. Y. LEUNG, T. L. MAGNANTI, AND R. VACHANI, "Facets and Algorithms for Capacitated Lot Sizing," Math. Program. 45, 331-359 (1989).
-
(1989)
Math. Program.
, vol.45
, pp. 331-359
-
-
Leung, J.M.Y.1
Magnanti, T.L.2
Vachani, R.3
-
24
-
-
0019576149
-
Combinatorial optimization and vehicle fleet planning: Perspectives and prospects
-
T. L. MAGNANTI, "Combinatorial Optimization and Vehicle Fleet Planning: Perspectives and Prospects," Networks 11, 179-213 (1981).
-
(1981)
Networks
, vol.11
, pp. 179-213
-
-
Magnanti, T.L.1
-
25
-
-
21144476120
-
Integrated production, distribution, and inventory planning at Libbey-Owens-Ford
-
C. H. MARTIN, D. C. DENT, AND J. C. ECKHART, "Integrated Production, Distribution, and Inventory Planning at Libbey-Owens-Ford," Interfaces 23, 68-78 (1993).
-
(1993)
Interfaces
, vol.23
, pp. 68-78
-
-
Martin, C.H.1
Dent, D.C.2
Eckhart, J.C.3
-
26
-
-
0027912829
-
Performance characteristics of stochastic integrated production-distribution systems
-
D. F. PYKE AND M. A. COHEN, "Performance Characteristics of Stochastic Integrated Production-Distribution Systems," Eur. J. Oper. Res. 68, 23-48 (1993).
-
(1993)
Eur. J. Oper. Res.
, vol.68
, pp. 23-48
-
-
Pyke, D.F.1
Cohen, M.A.2
-
27
-
-
0028408276
-
Multiproduct integrated production-distribution systems
-
D. F. PYKE AND M. A. COHEN, "Multiproduct Integrated Production-Distribution Systems," Eur. J. Oper. Res. 74, 18-49 (1994).
-
(1994)
Eur. J. Oper. Res.
, vol.74
, pp. 18-49
-
-
Pyke, D.F.1
Cohen, M.A.2
-
28
-
-
0342456020
-
A decomposition algorithm for solving the multifacility production-transportation problem with nonlinear production costs
-
J. F. SHARP, J. C. SNYDER, AND J. H. GREENE, "A Decomposition Algorithm for Solving the Multifacility Production-Transportation Problem with Nonlinear Production Costs," Econometrica 38, 490-506 (1970).
-
(1970)
Econometrica
, vol.38
, pp. 490-506
-
-
Sharp, J.F.1
Snyder, J.C.2
Greene, J.H.3
-
29
-
-
0041760308
-
Coordinated supply chain management
-
D. J. THOMAS AND P. M. GRIFFIN, "Coordinated Supply Chain Management," Eur. J. Oper. Res. 94, 1-15 (1996).
-
(1996)
Eur. J. Oper. Res.
, vol.94
, pp. 1-15
-
-
Thomas, D.J.1
Griffin, P.M.2
|