메뉴 건너뛰기




Volumn 38, Issue 12, 2011, Pages 1816-1825

Single and parallel machine capacitated lotsizing and scheduling: New iterative MIP-based neighborhood search heuristics

Author keywords

CLSD PM; Local search; Metaheuristic; Mixed integer programming; Parallel machine; Relax and fix; Sequence dependent setup

Indexed keywords

CLSD-PM; LOCAL SEARCH; METAHEURISTIC; MIXED INTEGER PROGRAMMING; PARALLEL MACHINE; RELAX-AND-FIX; SEQUENCE-DEPENDENT SETUP;

EID: 79955056703     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2011.02.005     Document Type: Article
Times cited : (91)

References (22)
  • 1
    • 34547356612 scopus 로고    scopus 로고
    • MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs
    • DOI 10.1051/ro:2007014
    • N. Absi, and S. Kedad-Sidhoum MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs Rairo-Operations Research 41 2 2007 171 192 (Pubitemid 47154329)
    • (2007) RAIRO - Operations Research , vol.41 , Issue.2 , pp. 171-192
    • Absi, N.1    Kedad-Sidhoum, S.2
  • 2
    • 74549143166 scopus 로고    scopus 로고
    • Neighbourhood search metaheuristics for capacitated lotsizing with sequence-dependent setups
    • B. Almada-Lobo, and R. James Neighbourhood search metaheuristics for capacitated lotsizing with sequence-dependent setups International Journal of Production Research 48 3 2010 861 878
    • (2010) International Journal of Production Research , vol.48 , Issue.3 , pp. 861-878
    • Almada-Lobo, B.1    James, R.2
  • 3
    • 34548460398 scopus 로고    scopus 로고
    • Single machine multi-product capacitated lot sizing with sequence-dependent setups
    • DOI 10.1080/00207540601094465, PII 772294284
    • B. Almada-Lobo, D. Klabjan, M.A. Carravilla, and J.F. Oliveira Single machine multi-product capacitated lotsizing with sequence-dependent setups International Journal of Production Research 45 20 2007 4873 4894 (Pubitemid 47352796)
    • (2007) International Journal of Production Research , vol.45 , Issue.20 , pp. 4873-4894
    • Almada-Lobo, B.1    Klabjan, D.2    Carravilla, M.A.3    Oliveira, J.F.4
  • 4
    • 34548453509 scopus 로고    scopus 로고
    • Lot sizing and furnace scheduling in small foundries
    • DOI 10.1016/j.cor.2006.05.010, PII S0305054806001390
    • S. Araujo, N. Arenales, and A.R. Clark Lot sizing and furnace scheduling in small foundries Computers and Operations Research 35 3 2008 916 932 (Pubitemid 47368854)
    • (2008) Computers and Operations Research , vol.35 , Issue.3 , pp. 916-932
    • De Araujo, S.A.1    Arenales, M.N.2    Clark, A.R.3
  • 5
    • 0021513251 scopus 로고
    • Strong formulations for multi-item capacitated lot sizing
    • I. Barany, T.J. Vanroy, and L.A. Wolsey Strong formulations for multi-item capacitated lot sizing Management Science 30 10 1984 1255 1261 (Pubitemid 14641369)
    • (1984) Management Science , vol.30 , Issue.10 , pp. 1255-1261
    • Imre, B.1    Van Roy Tony, J.2    Wolsey Laurence, A.3
  • 6
    • 41149118126 scopus 로고    scopus 로고
    • Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs
    • DOI 10.1016/j.cor.2007.04.003, PII S0305054807000858
    • P. Beraldi, G. Ghiani, A. Grieco, and E. Guerriero Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs Computers and Operations Research 35 11 2008 3644 3656 (Pubitemid 351443068)
    • (2008) Computers and Operations Research , vol.35 , Issue.11 , pp. 3644-3656
    • Beraldi, P.1    Ghiani, G.2    Grieco, A.3    Guerriero, E.4
  • 7
    • 0020194024 scopus 로고
    • Computational complexity of the capacitated lot size problem
    • G. Bitran, and H. Yanasse Computational complexity of the capacitated lot size problem Management Science 28 10 1982 1174 1186
    • (1982) Management Science , vol.28 , Issue.10 , pp. 1174-1186
    • Bitran, G.1    Yanasse, H.2
  • 8
    • 77349118693 scopus 로고    scopus 로고
    • Dynamic capacitated lotsizing - A classification and review of the literature on big bucket problems
    • L. Buschkhl, F. Sahling, S. Helber, and H. Tempelmeier Dynamic capacitated lotsizing - a classification and review of the literature on big bucket problems OR Spectrum 32 2010 231 261
    • (2010) OR Spectrum , vol.32 , pp. 231-261
    • Buschkhl, L.1    Sahling, F.2    Helber, S.3    Tempelmeier, H.4
  • 9
    • 79951846026 scopus 로고    scopus 로고
    • Editorial on lotsizing and scheduling: Industrial extensions and research opportunities
    • A.R. Clark, B. Almada-Lobo, and C. Almeder Editorial on lotsizing and scheduling: industrial extensions and research opportunities International Journal of Production Research 49 9 2011 2457 2461
    • (2011) International Journal of Production Research , vol.49 , Issue.9 , pp. 2457-2461
    • Clark, A.R.1    Almada-Lobo, B.2    Almeder, C.3
  • 10
    • 38549131391 scopus 로고    scopus 로고
    • Progressive interval heuristics for multi-item capacitated lot-sizing problems
    • DOI 10.1287/opre.1070.0392
    • A. Federgruen, J. Meissner, and M. Tzur Progressive interval heuristics for multi-item capacitated lot-sizing problems Operations Research 55 3 2007 490 502 (Pubitemid 351159505)
    • (2007) Operations Research , vol.55 , Issue.3 , pp. 490-502
    • Federgruen, A.1    Meissner, J.2    Tzur, M.3
  • 11
    • 58149250389 scopus 로고    scopus 로고
    • Solution approaches for the soft drink integrated production lot sizing and scheduling problem
    • D. Ferreira, R. Morabito, and S. Rangel Solution approaches for the soft drink integrated production lot sizing and scheduling problem European Journal of Operational Research 196 2009 697 706
    • (2009) European Journal of Operational Research , vol.196 , pp. 697-706
    • Ferreira, D.1    Morabito, R.2    Rangel, S.3
  • 12
    • 49449084826 scopus 로고    scopus 로고
    • A proposal for a hybrid meta-strategy for combinatorial optimization problems
    • J.M. Framinan, and R. Pastor A proposal for a hybrid meta-strategy for combinatorial optimization problems Journal of Heuristics 14 4 2008 375 390
    • (2008) Journal of Heuristics , vol.14 , Issue.4 , pp. 375-390
    • Framinan, J.M.1    Pastor, R.2
  • 13
    • 0010775487 scopus 로고    scopus 로고
    • Capacitated lot-sizing with sequence dependent setup costs
    • K. Haase Capacitated lot-sizing with sequence dependent setup costs Operations Research Spektrum 18 1996 51 59
    • (1996) Operations Research Spektrum , vol.18 , pp. 51-59
    • Haase, K.1
  • 14
    • 74149086575 scopus 로고    scopus 로고
    • A fix-and-optimize approach for the multi-level capacitated lot sizing problem
    • S. Helber, and F. Sahling A fix-and-optimize approach for the multi-level capacitated lot sizing problem International Journal of Production Economics 123 2010 247 256
    • (2010) International Journal of Production Economics , vol.123 , pp. 247-256
    • Helber, S.1    Sahling, F.2
  • 15
    • 67649921386 scopus 로고    scopus 로고
    • Solving lot-sizing problems on parallel identical machines using symmetry-breaking constraints
    • R. Jans Solving lot-sizing problems on parallel identical machines using symmetry-breaking constraints Informs Journal on Computing 21 1 2009 123 136
    • (2009) Informs Journal on Computing , vol.21 , Issue.1 , pp. 123-136
    • Jans, R.1
  • 19
    • 39449098494 scopus 로고    scopus 로고
    • Capacitated lot-sizing with extensions: A review
    • D. Quadt, and H. Kuhn Capacitated lot-sizing with extensions: a review 4OR 6 2008 61 83
    • (2008) 4OR , vol.6 , pp. 61-83
    • Quadt, D.1    Kuhn, H.2
  • 20
    • 60349090312 scopus 로고    scopus 로고
    • Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic
    • F. Sahling, L. Buschkhl, H. Tempelmeier, and S. Helber Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic Computers and Operations Research 36 9 2009 2546 2553
    • (2009) Computers and Operations Research , vol.36 , Issue.9 , pp. 2546-2553
    • Sahling, F.1    Buschkhl, L.2    Tempelmeier, H.3    Helber, S.4
  • 21
    • 0141733592 scopus 로고    scopus 로고
    • Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows
    • H. Stadtler Multilevel lot sizing with setup times and multiple constrained resources: internally rolling schedules with lot-sizing windows Operations Research 51 3 2003 487 502
    • (2003) Operations Research , vol.51 , Issue.3 , pp. 487-502
    • Stadtler, H.1
  • 22
    • 33748492325 scopus 로고    scopus 로고
    • Scheduling and lot sizing with sequence-dependent setup: A literature review
    • DOI 10.1080/07408170600559706, PII J784373L461611VQ
    • X.Y. Zhu, and W.E. Wilhelm Scheduling and lot sizing with sequence-dependent setup: a literature review IIE Transactions 38 11 2006 987 1007 (Pubitemid 44355862)
    • (2006) IIE Transactions (Institute of Industrial Engineers) , vol.38 , Issue.11 , pp. 987-1007
    • Zhu, X.1    Wilhelm, W.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.