메뉴 건너뛰기




Volumn 146, Issue 1, 2013, Pages 208-218

Lot sizing versus batching in the production and distribution planning of perishable goods

Author keywords

Batching; Integrated planning; Lot sizing and scheduling; Perishability; Vehicle routing problem with time windows

Indexed keywords

BATCHING; INTEGRATED PLANNING; LOT-SIZING AND SCHEDULING; PERISHABILITY; VEHICLE ROUTING PROBLEM WITH TIME WINDOWS;

EID: 84885174047     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2013.07.001     Document Type: Article
Times cited : (65)

References (22)
  • 3
    • 0031147439 scopus 로고    scopus 로고
    • Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups
    • M.F. Anwar, and R. Nagi Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups International Journal of Production Research 35 1997 1447 1470
    • (1997) International Journal of Production Research , vol.35 , pp. 1447-1470
    • Anwar, M.F.1    Nagi, R.2
  • 4
    • 38749150380 scopus 로고    scopus 로고
    • A zero-inventory production and distribution problem with a fixed customer sequence
    • R. Armstrong, S. Gao, and L. Lei A zero-inventory production and distribution problem with a fixed customer sequence Annals of Operations Research 159 2007 395 414
    • (2007) Annals of Operations Research , vol.159 , pp. 395-414
    • Armstrong, R.1    Gao, S.2    Lei, L.3
  • 5
    • 34047126268 scopus 로고    scopus 로고
    • A reactive GRASP and path relinking for a combined production- distribution problem
    • M. Boudia, M. Louly, and C. Prins A reactive GRASP and path relinking for a combined production-distribution problem Computers & Operations Research 34 2007 3402 3419
    • (2007) Computers & Operations Research , vol.34 , pp. 3402-3419
    • Boudia, M.1    Louly, M.2    Prins, C.3
  • 6
    • 57649159122 scopus 로고    scopus 로고
    • Production scheduling and vehicle routing with time windows for perishable food products
    • H.-K. Chen, C.-F. Hsueh, and M.-S. Chang Production scheduling and vehicle routing with time windows for perishable food products Computers & Operations Research 36 2009 2311 2319
    • (2009) Computers & Operations Research , vol.36 , pp. 2311-2319
    • Chen, H.-K.1    Hsueh, C.-F.2    Chang, M.-S.3
  • 7
    • 77249147436 scopus 로고    scopus 로고
    • Integrated production and outbound distribution scheduling review and extensions
    • Z.-L. Chen Integrated production and outbound distribution scheduling review and extensions Operations Research 58 2009 130 148
    • (2009) Operations Research , vol.58 , pp. 130-148
    • Chen, Z.-L.1
  • 8
    • 22544461035 scopus 로고    scopus 로고
    • Integrated scheduling of production and distribution operations
    • Z.-L. Chen, and G.L. Vairaktarakis Integrated scheduling of production and distribution operations Management Science 51 2005 614 628
    • (2005) Management Science , vol.51 , pp. 614-628
    • Chen, Z.-L.1    Vairaktarakis, G.L.2
  • 9
    • 70349206132 scopus 로고    scopus 로고
    • A simulation/metaheuristic approach to newspaper production and distribution supply chain problems
    • W.-C. Chiang, R. Russell, X. Xu, and D. Zepeda A simulation/metaheuristic approach to newspaper production and distribution supply chain problems International Journal of Production Economics 121 2009 752 767
    • (2009) International Journal of Production Economics , vol.121 , pp. 752-767
    • Chiang, W.-C.1    Russell, R.2    Xu, X.3    Zepeda, D.4
  • 11
    • 61349164254 scopus 로고    scopus 로고
    • The integrated production and transportation scheduling problem for a product with a short lifespan
    • H.N. Geismar, G. Laporte, L. Lei, and C. Sriskandarajah The integrated production and transportation scheduling problem for a product with a short lifespan INFORMS Journal on Computing 20 2008 21 33
    • (2008) INFORMS Journal on Computing , vol.20 , pp. 21-33
    • Geismar, H.N.1    Laporte, G.2    Lei, L.3    Sriskandarajah, C.4
  • 12
    • 0033690423 scopus 로고    scopus 로고
    • Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities
    • K. Haase, and A. Kimms Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities International Journal of Production Economics 66 2000 159 169
    • (2000) International Journal of Production Economics , vol.66 , pp. 159-169
    • Haase, K.1    Kimms, A.2
  • 13
    • 84885179562 scopus 로고    scopus 로고
    • The impact of lot splitting in a single machine scheduling problem with earliness - Tardiness penalties
    • M. Mitsuishi, K. Ueda, F. Kimura, Springer London
    • C. Low, and Y. Yeh The impact of lot splitting in a single machine scheduling problem with earliness - tardiness penalties M. Mitsuishi, K. Ueda, F. Kimura, Manufacturing Systems and Technologies for the New Frontier 2008 Springer London 293 296
    • (2008) Manufacturing Systems and Technologies for the New Frontier , pp. 293-296
    • Low, C.1    Yeh, Y.2
  • 14
    • 0034307307 scopus 로고    scopus 로고
    • Optimal scheduling of batch plants satisfying multiple product orders with different due-dates
    • C. Mendez, G. Henning, and J. Cerda Optimal scheduling of batch plants satisfying multiple product orders with different due-dates Computers & Chemical Engineering 24 2000 2223 2245
    • (2000) Computers & Chemical Engineering , vol.24 , pp. 2223-2245
    • Mendez, C.1    Henning, G.2    Cerda, J.3
  • 15
    • 33745679872 scopus 로고    scopus 로고
    • The impact of delivery lot splitting on delivery reliability in a two-stage supply chain
    • I.V. Nieuwenhuyse, and N. Vandaele The impact of delivery lot splitting on delivery reliability in a two-stage supply chain International Journal of Production Economics 104 2006 694 708
    • (2006) International Journal of Production Economics , vol.104 , pp. 694-708
    • Nieuwenhuyse, I.V.1    Vandaele, N.2
  • 16
    • 27744470759 scopus 로고    scopus 로고
    • An integrated approach for production and distribution planning in supply chain management
    • Y.B. Park An integrated approach for production and distribution planning in supply chain management International Journal of Production Research 43 2005 1205 1224
    • (2005) International Journal of Production Research , vol.43 , pp. 1205-1224
    • Park, Y.B.1
  • 17
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing a review of algorithms and complexity
    • C.N. Potts, and L.N. Van Wassenhove Integrating scheduling with batching and lot-sizing a review of algorithms and complexity The Journal of the Operational Research Society 43 1992 395 406
    • (1992) The Journal of the Operational Research Society , vol.43 , pp. 395-406
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 18
    • 0022132659 scopus 로고
    • Batching in single operation manufacturing systems
    • C. Santos, and M. Magazine Batching in single operation manufacturing systems Operations Research Letters 4 1985 99 103
    • (1985) Operations Research Letters , vol.4 , pp. 99-103
    • Santos, C.1    Magazine, M.2
  • 19
    • 0000110116 scopus 로고
    • Local search in routing problems with time windows
    • M. Savelsbergh Local search in routing problems with time windows Annals of Operations Research 4 1985 285 305
    • (1985) Annals of Operations Research , vol.4 , pp. 285-305
    • Savelsbergh, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.