메뉴 건너뛰기




Volumn 104, Issue , 2017, Pages 224-245

Integrating production scheduling and vehicle routing decisions at the operational decision level: A review and discussion

Author keywords

Classification; Integration; Production distribution problem; Production scheduling; Review; Vehicle routing

Indexed keywords

CLASSIFICATION (OF INFORMATION); INTEGRATION; PRODUCTION CONTROL; REVIEWS; SCHEDULING; SUPPLY CHAINS; VEHICLES;

EID: 85009247926     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2016.12.010     Document Type: Review
Times cited : (160)

References (75)
  • 1
    • 84930872712 scopus 로고    scopus 로고
    • The third comprehensive survey on scheduling problems with setup times/costs
    • Allahverdi, A., The third comprehensive survey on scheduling problems with setup times/costs. European Journal of Operational Research 246 (2015), 345–378, 10.1016/j.ejor.2015.04.004.
    • (2015) European Journal of Operational Research , vol.246 , pp. 345-378
    • Allahverdi, A.1
  • 2
    • 36849051282 scopus 로고    scopus 로고
    • The significance of reducing setup times/setup costs
    • Allahverdi, A., Soroush, H.M., The significance of reducing setup times/setup costs. European Journal of Operational Research 187 (2008), 978–984, 10.1016/j.ejor.2006.09.010.
    • (2008) European Journal of Operational Research , vol.187 , pp. 978-984
    • Allahverdi, A.1    Soroush, H.M.2
  • 7
    • 38749150380 scopus 로고    scopus 로고
    • A zero-inventory production and distribution problem with a fixed customer sequence
    • Armstrong, R., Gao, S., Lei, L., A zero-inventory production and distribution problem with a fixed customer sequence. Annals of Operations Research 159 (2008), 395–414, 10.1007/s10479-007-0272-3.
    • (2008) Annals of Operations Research , vol.159 , pp. 395-414
    • Armstrong, R.1    Gao, S.2    Lei, L.3
  • 8
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug, H., Lawley, M.A., McKay, K., Mohan, S., Uzsoy, R., Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operational Research 161 (2005), 86–110, 10.1016/j.ejor.2003.08.027.
    • (2005) European Journal of Operational Research , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 9
    • 84938969040 scopus 로고    scopus 로고
    • An adaptive large neighbourhood search for the operational integrated production and distribution problem of perishable products
    • Belo-Filho, M.A.F., Amorim, P., Almada-Lobo, B., An adaptive large neighbourhood search for the operational integrated production and distribution problem of perishable products. International Journal of Production Research 53 (2015), 6040–6058, 10.1080/00207543.2015.1010744.
    • (2015) International Journal of Production Research , vol.53 , pp. 6040-6058
    • Belo-Filho, M.A.F.1    Amorim, P.2    Almada-Lobo, B.3
  • 10
    • 84953425772 scopus 로고    scopus 로고
    • The vehicle routing problem: State of the art classification and review
    • Braekers, K., Ramaekers, K., Van Nieuwenhuyse, I., The vehicle routing problem: State of the art classification and review. Computers & Industrial Engineering 99 (2016), 300–313, 10.1016/j.cie.2015.12.007.
    • (2016) Computers & Industrial Engineering , vol.99 , pp. 300-313
    • Braekers, K.1    Ramaekers, K.2    Van Nieuwenhuyse, I.3
  • 13
    • 84968820819 scopus 로고    scopus 로고
    • The multi-trip vehicle routing problem with time windows and release dates
    • Cattaruzza, D., Absi, N., Feillet, D., The multi-trip vehicle routing problem with time windows and release dates. Transportation Science 50 (2016), 676–693, 10.1287/trsc.2015.0608.
    • (2016) Transportation Science , vol.50 , pp. 676-693
    • Cattaruzza, D.1    Absi, N.2    Feillet, D.3
  • 14
    • 2642510666 scopus 로고    scopus 로고
    • Machine scheduling with job delivery coordination
    • Chang, Y.-C., Lee, C.-Y., Machine scheduling with job delivery coordination. European Journal of Operational Research 158 (2004), 470–487, 10.1016/S0377-2217(03)00364-3.
    • (2004) European Journal of Operational Research , vol.158 , pp. 470-487
    • Chang, Y.-C.1    Lee, C.-Y.2
  • 15
    • 84894328276 scopus 로고    scopus 로고
    • An ant colony optimization heuristic for an integrated production and distribution scheduling problem
    • Chang, Y.-C., Li, V.C., Chiang, C.-J., An ant colony optimization heuristic for an integrated production and distribution scheduling problem. Engineering Optimization 46 (2014), 503–520, 10.1080/0305215X.2013.786062.
    • (2014) Engineering Optimization , vol.46 , pp. 503-520
    • Chang, Y.-C.1    Li, V.C.2    Chiang, C.-J.3
  • 16
    • 22544468772 scopus 로고    scopus 로고
    • Integrated production and distribution operations: Taxonomy, models, and review
    • D. Simchi-Levi S.D. Wu Z.-J. Shen Kluwer Academic Publishers. Boston
    • Chen, Z.-L., Integrated production and distribution operations: Taxonomy, models, and review. Simchi-Levi, D., Wu, S.D., Shen, Z.-J., (eds.) Handbook of quantitative supply chain analysis: Modeling in the E-business Era, 2004, Kluwer Academic Publishers., Boston, 711–746.
    • (2004) Handbook of quantitative supply chain analysis: Modeling in the E-business Era , pp. 711-746
    • Chen, Z.-L.1
  • 17
    • 77249147436 scopus 로고    scopus 로고
    • Integrated production and outbound distribution scheduling: Review and extensions
    • Chen, Z.-L., Integrated production and outbound distribution scheduling: Review and extensions. Operations Research 58 (2010), 130–148, 10.1287/opre.1080.0688.
    • (2010) Operations Research , vol.58 , pp. 130-148
    • Chen, Z.-L.1
  • 18
    • 57649159122 scopus 로고    scopus 로고
    • Production scheduling and vehicle routing with time windows for perishable food products
    • Chen, H.-K., Hsueh, C.-F., Chang, M.-S., Production scheduling and vehicle routing with time windows for perishable food products. Computers & Operations Research 36 (2009), 2311–2319, 10.1016/j.cor.2008.09.010.
    • (2009) Computers & Operations Research , vol.36 , pp. 2311-2319
    • Chen, H.-K.1    Hsueh, C.-F.2    Chang, M.-S.3
  • 19
    • 22544461035 scopus 로고    scopus 로고
    • Integrated scheduling of production and distribution operations
    • Chen, Z.-L., Vairaktarakis, G.L., Integrated scheduling of production and distribution operations. Management Science 51 (2005), 614–628, 10.1287/mnsc.1040.0325.
    • (2005) Management Science , vol.51 , pp. 614-628
    • Chen, Z.-L.1    Vairaktarakis, G.L.2
  • 21
    • 70349206132 scopus 로고    scopus 로고
    • A simulation/metaheuristic approach to newspaper production and distribution supply chain problems
    • Chiang, W.-C., Russell, R., Xu, X., Zepeda, D., A simulation/metaheuristic approach to newspaper production and distribution supply chain problems. International Journal of Production Economics 121 (2009), 752–767, 10.1016/j.ijpe.2009.03.001.
    • (2009) International Journal of Production Economics , vol.121 , pp. 752-767
    • Chiang, W.-C.1    Russell, R.2    Xu, X.3    Zepeda, D.4
  • 22
    • 0000419596 scopus 로고
    • Scheduling of vehicles from a central depot to a number of delivery points
    • Clarke, G., Wright, J., Scheduling of vehicles from a central depot to a number of delivery points. Operations Research 12 (1964), 568–581.
    • (1964) Operations Research , vol.12 , pp. 568-581
    • Clarke, G.1    Wright, J.2
  • 24
    • 84941598954 scopus 로고    scopus 로고
    • A review of tactical optimization models for integrated production and transport routing planning decisions
    • Díaz-Madroñero, M., Peidro, D., Mula, J., A review of tactical optimization models for integrated production and transport routing planning decisions. Computers & Industrial Engineering 88 (2015), 518–535, 10.1016/j.cie.2015.06.010.
    • (2015) Computers & Industrial Engineering , vol.88 , pp. 518-535
    • Díaz-Madroñero, M.1    Peidro, D.2    Mula, J.3
  • 25
    • 78349263818 scopus 로고    scopus 로고
    • Survey: Matheuristics for rich vehicle routing problems
    • M.J. Blesa C. Blum G. Raidl A. Roli M. Sampels Springer Berlin Heidelberg
    • Doerner, K.F., Schmid, V., Survey: Matheuristics for rich vehicle routing problems. Hybrid metaheuristics Blesa, M.J., Blum, C., Raidl, G., Roli, A., Sampels, M., (eds.) Lecture notes in computer science, Vol. 6373, 2010, Springer, Berlin Heidelberg, 206–221, 10.1007/978-3-642-16054-7_15.
    • (2010) Hybrid metaheuristics, Lecture notes in computer science , vol.6373 , pp. 206-221
    • Doerner, K.F.1    Schmid, V.2
  • 27
    • 84926376645 scopus 로고    scopus 로고
    • Integrated scheduling of production and delivery on a single machine with availability constraint
    • Fan, J., Lu, X., Liu, P., Integrated scheduling of production and delivery on a single machine with availability constraint. Theoretical Computer Science 562 (2015), 581–589, 10.1016/j.tcs.2014.10.047.
    • (2015) Theoretical Computer Science , vol.562 , pp. 581-589
    • Fan, J.1    Lu, X.2    Liu, P.3
  • 28
    • 84859794755 scopus 로고    scopus 로고
    • Integrated production and distribution planning for perishable food products
    • Farahani, P., Grunow, M., Günther, H.-O., Integrated production and distribution planning for perishable food products. Flexible Services and Manufacturing Journal 24 (2012), 28–51, 10.1007/s10696-011-9125-0.
    • (2012) Flexible Services and Manufacturing Journal , vol.24 , pp. 28-51
    • Farahani, P.1    Grunow, M.2    Günther, H.-O.3
  • 29
    • 84920528756 scopus 로고    scopus 로고
    • Integrated batch production and distribution scheduling with limited vehicle capacity
    • Gao, S., Qi, L., Lei, L., Integrated batch production and distribution scheduling with limited vehicle capacity. International Journal of Production Economics 160 (2015), 13–25, 10.1016/j.ijpe.2014.08.017.
    • (2015) International Journal of Production Economics , vol.160 , pp. 13-25
    • Gao, S.1    Qi, L.2    Lei, L.3
  • 30
    • 1842843006 scopus 로고    scopus 로고
    • Coordinated scheduling of production and delivery from multiple plants
    • Garcia, J.M., Lozano, S., Canca, D., Coordinated scheduling of production and delivery from multiple plants. Robotics and Computer-Integrated Manufacturing 20 (2004), 191–198, 10.1016/j.rcim.2003.10.004.
    • (2004) Robotics and Computer-Integrated Manufacturing , vol.20 , pp. 191-198
    • Garcia, J.M.1    Lozano, S.2    Canca, D.3
  • 31
    • 61349164254 scopus 로고    scopus 로고
    • The integrated production and transportation scheduling problem for a product with a short lifespan
    • Geismar, H.N., Laporte, G., Lei, L., Sriskandarajah, C., The integrated production and transportation scheduling problem for a product with a short lifespan. INFORMS Journal on Computing 20 (2008), 21–33, 10.1287/ijoc.1060.0208.
    • (2008) INFORMS Journal on Computing , vol.20 , pp. 21-33
    • Geismar, H.N.1    Laporte, G.2    Lei, L.3    Sriskandarajah, C.4
  • 32
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling: A survey
    • Graham, R.L., Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G., Optimization and approximation in deterministic sequencing and scheduling: A survey. Annals of Discrete Mathematics 5 (1979), 287–326, 10.1016/S0167-5060(08)70356-X.
    • (1979) Annals of Discrete Mathematics , vol.5 , pp. 287-326
    • Graham, R.L.1    Lawler, E.L.2    Lenstra, J.K.3    Rinnooy Kan, A.H.G.4
  • 35
    • 84978998591 scopus 로고    scopus 로고
    • A bi-objective model for integrated scheduling of production and distribution in a supply chain with order release date restrictions
    • Jamili, N., Ranjbar, M., Salari, M., A bi-objective model for integrated scheduling of production and distribution in a supply chain with order release date restrictions. Journal of Manufacturing Systems 40 (2016), 105–118, 10.1016/j.jmsy.2016.06.005.
    • (2016) Journal of Manufacturing Systems , vol.40 , pp. 105-118
    • Jamili, N.1    Ranjbar, M.2    Salari, M.3
  • 36
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with setup times included
    • Johnson, S.M., Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly 1 (1954), 61–68, 10.1002/nav.3800010110.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 37
    • 84979561827 scopus 로고    scopus 로고
    • The coordinated production and transportation scheduling problem with a time-sensitive product: A branch-and-cut algorithm
    • Karaoğlan, I., Kesen, S.E., The coordinated production and transportation scheduling problem with a time-sensitive product: A branch-and-cut algorithm. International Journal of Production Research 55 (2017), 536–557, 10.1080/00207543.2016.1213916.
    • (2017) International Journal of Production Research , vol.55 , pp. 536-557
    • Karaoğlan, I.1    Kesen, S.E.2
  • 38
    • 84870715267 scopus 로고    scopus 로고
    • A class of joint production and transportation planning problems under different delivery policies
    • Koc, U., Toptal, A., Sabuncuoglu, I., A class of joint production and transportation planning problems under different delivery policies. Operations Research Letters 41 (2013), 54–60, 10.1016/j.orl.2012.11.002.
    • (2013) Operations Research Letters , vol.41 , pp. 54-60
    • Koc, U.1    Toptal, A.2    Sabuncuoglu, I.3
  • 42
    • 55349141375 scopus 로고    scopus 로고
    • Analysis and algorithms for coordinated scheduling of parallel machine manufacturing and 3PL transportation
    • Li, K., Sivakumar, A.I., Ganesan, V.K., Analysis and algorithms for coordinated scheduling of parallel machine manufacturing and 3PL transportation. International Journal of Production Economics 115 (2008), 482–491, 10.1016/j.ijpe.2008.07.007.
    • (2008) International Journal of Production Economics , vol.115 , pp. 482-491
    • Li, K.1    Sivakumar, A.I.2    Ganesan, V.K.3
  • 43
    • 33845300872 scopus 로고    scopus 로고
    • Coordinating production and distribution of jobs with bundling operations
    • Li, C.-L., Vairaktarakis, G., Coordinating production and distribution of jobs with bundling operations. IIE Transactions 39 (2007), 203–215, 10.1080/07408170600735561.
    • (2007) IIE Transactions , vol.39 , pp. 203-215
    • Li, C.-L.1    Vairaktarakis, G.2
  • 44
    • 10444261222 scopus 로고    scopus 로고
    • Machine scheduling with deliveries to multiple customer locations
    • Li, C.-L., Vairaktarakis, G., Lee, C.-Y., Machine scheduling with deliveries to multiple customer locations. European Journal of Operational Research 164 (2005), 39–51, 10.1016/j.ejor.2003.11.022.
    • (2005) European Journal of Operational Research , vol.164 , pp. 39-51
    • Li, C.-L.1    Vairaktarakis, G.2    Lee, C.-Y.3
  • 45
    • 84962377284 scopus 로고    scopus 로고
    • Integrated production and delivery with single machine and multiple vehicles
    • Li, K., Zhou, C., Leung, J.Y.-T., Ma, Y., Integrated production and delivery with single machine and multiple vehicles. Expert Systems with Applications 57 (2016), 12–20, 10.1016/j.eswa.2016.02.033.
    • (2016) Expert Systems with Applications , vol.57 , pp. 12-20
    • Li, K.1    Zhou, C.2    Leung, J.Y.-T.3    Ma, Y.4
  • 46
    • 84970990688 scopus 로고    scopus 로고
    • A Heuristic method for the integrated production distribution problem
    • Institute of Industrial and Systems Engineers (IISE) Nashville, USA
    • Li, W., Zu, L., A Heuristic method for the integrated production distribution problem. Proceedings of the 2015 industrial and systems engineering research conference, 2015, Institute of Industrial and Systems Engineers (IISE), Nashville, USA, 3027–3034.
    • (2015) Proceedings of the 2015 industrial and systems engineering research conference , pp. 3027-3034
    • Li, W.1    Zu, L.2
  • 48
    • 84900422546 scopus 로고    scopus 로고
    • Coordination of production scheduling and delivery problems with heterogeneous fleet
    • Low, C., Chang, C.-M., Li, R.-K., Huang, C.-L., Coordination of production scheduling and delivery problems with heterogeneous fleet. International Journal of Production Economics 153 (2014), 139–148, 10.1016/j.ijpe.2014.02.014.
    • (2014) International Journal of Production Economics , vol.153 , pp. 139-148
    • Low, C.1    Chang, C.-M.2    Li, R.-K.3    Huang, C.-L.4
  • 49
    • 84871187974 scopus 로고    scopus 로고
    • Integrated scheduling of production and delivery with time windows
    • Low, C., Li, R.-K., Chang, C.-M., Integrated scheduling of production and delivery with time windows. International Journal of Production Research 51 (2013), 897–909, 10.1080/00207543.2012.677071.
    • (2013) International Journal of Production Research , vol.51 , pp. 897-909
    • Low, C.1    Li, R.-K.2    Chang, C.-M.3
  • 51
    • 84903467187 scopus 로고    scopus 로고
    • A representation scheme for integrated production and outbound distribution models
    • Meinecke, C., Scholz-Reiter, B., A representation scheme for integrated production and outbound distribution models. International Journal of Logistics Systems and Management 18 (2014), 283–301, 10.1504/IJLSM.2014.062817.
    • (2014) International Journal of Logistics Systems and Management , vol.18 , pp. 283-301
    • Meinecke, C.1    Scholz-Reiter, B.2
  • 52
    • 33750706574 scopus 로고    scopus 로고
    • Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete
    • Naso, D., Surico, M., Turchiano, B., Kaymak, U., Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete. European Journal of Operational Research 177 (2007), 2069–2099, 10.1016/j.ejor.2005.12.019.
    • (2007) European Journal of Operational Research , vol.177 , pp. 2069-2099
    • Naso, D.1    Surico, M.2    Turchiano, B.3    Kaymak, U.4
  • 53
    • 0000238336 scopus 로고
    • A simplex for function minimization
    • Nelder, J.A., Mead, R., A simplex for function minimization. Computer Journal 7 (1965), 308–313, 10.1093/comjnl/7.4.308.
    • (1965) Computer Journal , vol.7 , pp. 308-313
    • Nelder, J.A.1    Mead, R.2
  • 54
    • 70449569031 scopus 로고    scopus 로고
    • Integrated production and distribution planning for single-period inventory products
    • Park, Y.-B., Hong, S.-C., Integrated production and distribution planning for single-period inventory products. International Journal of Computer Integrated Manufacturing 22 (2009), 443–457, 10.1080/09511920802527590.
    • (2009) International Journal of Computer Integrated Manufacturing , vol.22 , pp. 443-457
    • Park, Y.-B.1    Hong, S.-C.2
  • 55
    • 41349095406 scopus 로고    scopus 로고
    • A survey on pickup and delivery problems: Part I: Transportation between customers and depot
    • Parragh, S.N., Doerner, K.F., Hartl, R.F., A survey on pickup and delivery problems: Part I: Transportation between customers and depot. Journal für Betriebswirtschaft 58 (2008), 21–51, 10.1007/s11301-008-0033-7.
    • (2008) Journal für Betriebswirtschaft , vol.58 , pp. 21-51
    • Parragh, S.N.1    Doerner, K.F.2    Hartl, R.F.3
  • 56
    • 84892234592 scopus 로고    scopus 로고
    • Scheduling: Theory, algorithms and systems
    • 3rd ed. Springer Science & Business Media New York
    • Pinedo, M.L., Scheduling: Theory, algorithms and systems. 3rd ed., 2008, Springer Science & Business Media, New York.
    • (2008)
    • Pinedo, M.L.1
  • 57
    • 84925467455 scopus 로고    scopus 로고
    • Vehicle routing problems with loading constraints: State-of-the-art and future directions
    • Pollaris, H., Braekers, K., Caris, A., Janssens, G.K., Limbourg, S., Vehicle routing problems with loading constraints: State-of-the-art and future directions. OR Spectrum 37 (2015), 297–330, 10.1007/s00291-014-0386-3.
    • (2015) OR Spectrum , vol.37 , pp. 297-330
    • Pollaris, H.1    Braekers, K.2    Caris, A.3    Janssens, G.K.4    Limbourg, S.5
  • 59
    • 26444509814 scopus 로고    scopus 로고
    • Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost
    • Pundoor, G., Chen, Z.-L., Scheduling a production-distribution system to optimize the tradeoff between delivery tardiness and distribution cost. Naval Research Logistics (NRL) 52 (2005), 571–589, 10.1002/nav.20100.
    • (2005) Naval Research Logistics (NRL) , vol.52 , pp. 571-589
    • Pundoor, G.1    Chen, Z.-L.2
  • 60
    • 84907301036 scopus 로고    scopus 로고
    • Joint optimization of production planning and vehicle routing problems: A review of existing strategies
    • Reimann, M., Tavares Neto, R., Bogendorfer, E., Joint optimization of production planning and vehicle routing problems: A review of existing strategies. Pesquisa Operacional 34 (2014), 189–214, 10.1590/0101-7438.2014.034.02.0189.
    • (2014) Pesquisa Operacional , vol.34 , pp. 189-214
    • Reimann, M.1    Tavares Neto, R.2    Bogendorfer, E.3
  • 62
    • 0033344267 scopus 로고    scopus 로고
    • A review of integrated analysis of production–Distribution systems
    • Sarmiento, A.M., Nagi, R., A review of integrated analysis of production–Distribution systems. IIE Transactions 31 (1999), 1061–1074, 10.1023/A:1007623508610.
    • (1999) IIE Transactions , vol.31 , pp. 1061-1074
    • Sarmiento, A.M.1    Nagi, R.2
  • 64
    • 0023313252 scopus 로고
    • Algorithms for the vehicle routing and scheduling problems with time window constraints
    • Solomon, M.M., Algorithms for the vehicle routing and scheduling problems with time window constraints. Operations Research 35 (1987), 254–265, 10.1287/opre.35.2.254.
    • (1987) Operations Research , vol.35 , pp. 254-265
    • Solomon, M.M.1
  • 66
    • 84892144608 scopus 로고    scopus 로고
    • A joint production and transportation planning problem with heterogeneous vehicles
    • Toptal, A., Koc, U., Sabuncuoglu, I., A joint production and transportation planning problem with heterogeneous vehicles. Journal of the Operational Research Society 65 (2014), 180–196, 10.1057/jors.2012.184.
    • (2014) Journal of the Operational Research Society , vol.65 , pp. 180-196
    • Toptal, A.1    Koc, U.2    Sabuncuoglu, I.3
  • 68
    • 84872961323 scopus 로고    scopus 로고
    • Integrated machine scheduling and vehicle routing with time windows
    • Ullrich, C.A., Integrated machine scheduling and vehicle routing with time windows. European Journal of Operational Research 227 (2013), 152–165, 10.1016/j.ejor.2012.11.049.
    • (2013) European Journal of Operational Research , vol.227 , pp. 152-165
    • Ullrich, C.A.1
  • 70
    • 0031119856 scopus 로고    scopus 로고
    • Strategic production-distribution models: A critical review with emphasis on global supply chain models
    • Vidal, C.J., Goetschalckx, M., Strategic production-distribution models: A critical review with emphasis on global supply chain models. European Journal of Operational Research 98 (1997), 1–18, 10.1016/S0377-2217(97)80080-X.
    • (1997) European Journal of Operational Research , vol.98 , pp. 1-18
    • Vidal, C.J.1    Goetschalckx, M.2
  • 71
    • 84892864800 scopus 로고    scopus 로고
    • Integrated production and distribution scheduling with lifespan constraints
    • Viergutz, C., Knust, S., Integrated production and distribution scheduling with lifespan constraints. Annals of Operations Research 213 (2014), 293–318, 10.1007/s10479-012-1197-z.
    • (2014) Annals of Operations Research , vol.213 , pp. 293-318
    • Viergutz, C.1    Knust, S.2
  • 73
    • 84959334880 scopus 로고    scopus 로고
    • Integrated on-line scheduling of order batching and delivery under B2C e-commerce
    • Zhang, J., Wang, X., Huang, K., Integrated on-line scheduling of order batching and delivery under B2C e-commerce. Computers & Industrial Engineering 94 (2016), 280–289, 10.1016/j.cie.2016.02.001.
    • (2016) Computers & Industrial Engineering , vol.94 , pp. 280-289
    • Zhang, J.1    Wang, X.2    Huang, K.3
  • 74
    • 0033318858 scopus 로고    scopus 로고
    • Multiobjective evolutionary algorithms: A comparative case study and the strength Pareto approach
    • Zitzler, E., Thiele, L., Multiobjective evolutionary algorithms: A comparative case study and the strength Pareto approach. IEEE Transactions on Evolutionary Computation 3 (1999), 257–271, 10.1109/4235.797969.
    • (1999) IEEE Transactions on Evolutionary Computation , vol.3 , pp. 257-271
    • Zitzler, E.1    Thiele, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.